HomeMy WebLinkAboutRES NO 108-18RESOLUTION NO. 1108— 18
RESOLUTION OF THE BAKERSFIELD CITY COUNCIL APPROVING AN
AMENDMENT TO THE LAND USE MAP DESIGNATION OF THE
METROPOLITAN BAKERSFIELD GENERAL PLAN LOCATED ON THE
NORTHEAST CORNER OF THE BUENA VISTA ROAD/HARRIS ROAD
INTERSECTION. (GPA/ZC 18-0050).
WHEREAS, RGF Properties LLC, representing Steven Antongiovanni, filed an
application with the City of Bakersfield Development Services Department requesting an
amendment to the land use map designation of the Metropolitan Bakersfield General Plan
from GC (General Commercial) to HMR (High Medium Density Residential) on 11.92 gross
acres (9.5 net acres) located on the northeast corner of the Buena vista Road/Harris Road
intersection (the "Project"): and
WHEREAS, the City Council adopted a Mitigated Negative Declaration with
mitigation measures for the Project; and
WHEREAS, the Planning Commission held a public hearing on June 7, 2018, and
approved Resolution No. 42-18, which recommended that the City Council approve the
Project; and
WHEREAS, the Clerk of the City Council set Wednesday, July 18, 2018 at 5:15 p.m. in
the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time
and place for a public hearing before the City Council to consider the approval of the
amendment as required by Government Code Section 65355, and notice of the public
hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and
WHEREAS, during the hearing, the City Council considered all facts, testimony, and
evidence concerning the staff report, Mitigated Negative Declaration and the Planning
Commission's deliberation, and action.
NOW, THEREFORE, BE IT RESOLVED by the Bakersfield City Council as follows:
1. The above recitals, incorporated herein, are true and correct.
2. The Planning Commission's findings as contained in its Resolution No. 42-18 are
hereby adopted.
3. The Project is subject to mitigation measures found within the adopted Mitigated
Negative Declaration for the Project.
4. The Project is hereby approved subject to the conditions of approval in Exhibit A
and located on the map as shown in Exhibit B, both of which are incorporated
herein.
5. The Project approved herein is hereby made part of the 2nd amendment to the
Land Use Element of the Metropolitan Bakersfield General Plan for calendar year
2018 in accordance with Government Code Section 65358 (b).
�®PkF9
Page I of 2 ° mn
Z5 C:
ORIGINAL
---------000---- —
HEREBY CERTIFY that the foregoing Resolution was passed arldL adeop�fjd by the
Council of the City of Bakersfield at a regular meeting held on JJUU LL 11tltl
by the following vote:✓" ✓ . I/✓ I/✓ r
AYES: COUNCILMEMBER: RIV RA, GONZALES, WEIR, SMITH, FREEMAN, SU LIVAN, PARLIER
NOES: COUNCILMEMBER: ]yJu�'�
ABSTAIN: COUNCILMEMBER: U'J-N
ABSENT: COUNCILMEMBER: �f-i117`l,
IAAIAI, IhVI��/J ✓TO`I
C�I RISTOPHER GERRY
ACTING CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED JUL 18 2018
KAREN GOH
MAYOR of the City of Bakersfield
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
By:
RICHARD IGER
Deputy City Attorney
Exhibits: A Conditions of Approval
B General Plan Amendment Map
Page 2 of 2
of eAKF9N
T
m
U C
/]RlAlni n�
EXHIBIT A
CONDITIONS OF APPROVAL
GENERAL PLAN AMENDMENT/ZONE CHANGE NO. 18-0050
PUBLIC WORKS
Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the General Plan Amendment/Zone
Change (GPA/ZC) area, the developer must submit the following for review and approval
by the City Engineer:
a. Fully executed dedication for Buena Vista Road and Harris Road to arterial/collector or
local standards for the full frontage of the GPA/ZC area, unless otherwise approved by
the City Engineer. Dedications must include sufficient widths for expanded intersections
and additional areas for landscaping as directed by the City Engineer.
b. Comprehensive drainage study of the entire drainage area.
c. Sewer study, which will assure that appropriate sewer service will be provided to the
entirety of the GPA/ZC area. The Buena Vista sewer trunk main is at capacity and
therefore, the sewer study must provide verification to the City Engineer of the existing
sewer system's capability to accept the additional flows to be generated through
development under the new land use and zoning. Sewer capacity mitigation
measures, such as a $350 per equivalent dwelling unit (EDU) may be required.
For orderly development
2. Prior to the recording of any final map or issuance of any certificates of occupancy for
development within the GPA/ZC area, whichever is earlier, the developer must: (a)
construct all infrastructure, both public and private, within the boundary of the GPA/ZC
area, including, but not limited to, any and all boundary streets to the centerline of the
street as required by the City Engineer and (b) construct, and acquire any necessary right-
of-way to construct, any off-site infrastructure required to support development of the
GPA/ZC as determined by the City Engineer. Phasing of the construction of the required
infrastructure may be allowed by the City Engineer. Per City Council Resolution 035-13,
any development within the GPA/ZC area must comply with the City's "complete streets"
policy.
For orderly development
3. Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the GPA/ZC area, the developer must
take all actions necessary to add the GPA/ZC area to the Consolidated Maintenance
District (CMD) and pay all fees for inclusion in the CMD or, if the development is already
within the CMD, update the maintenance district documents as provided in Bakersfield
Municipal Code section 13.04.021 or as otherwise required by the City Engineer.
For orderly development
o``0AKF9�
T
m
O C
(JOICJIMA6
GPA /ZC No. 18-0050
Conditions of Approval
Page 2
4. Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the GPA/ZC area, the developer must
construct, or pay its proportionate share of the estimated cost to construct, the median
(currently $100 per linear foot), as determined by the City Engineer, for the Buena vista
Road frontage of the property within the GPA/ZC area.
For orderly development
5. Prior to the City's issuance of any building permits for construction within the GPA/ZC area,
or an earlier time established through conditions of a subsequent City -approved
subsequent development project, subdivision, or minor land division within the GPA/ZC
area, the developer must pay all development fees for the GPA/ZC area including, but
not limited to, the adopted regional traffic impact fee, local mitigation fees, any major
bridge and thoroughfare district fees, and any planned sewer and drainage area fees.
For orderly development
CITY ATTORNEY
8. In consideration by the City of Bakersfield for land use entitlements, including but not
limited to related environmental approvals related to or arising from this project, the
applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to
indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents,
employees, departments, commissioners and boards ("City" herein) against any and all
liability, claims, actions, causes of action or demands whatsoever against them, or any of
them, before administrative or judicial tribunals of any kind whatsoever, in any way arising
from, the terms and provisions of this application, including without limitation any CEQA
approval or any related development approvals or conditions whether imposed by the
City, or not, except for CITY's sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action or proceeding, falling
under this condition within thirty (30) days of actually receiving such claim. The City, in its
sole discretion, shall be allowed to choose the attorney or outside law firm to defend the
City at the sole cost and expense of the Applicant and the City is not obligated to use any
law firm or attorney chosen by another entity or party.
S'\Advance Planning\0]_GPAs\01 Active\2018\a3\ I B-0050\Res Ord\EXHIBIT A_ C.ndifions.docx
o�eAKF�iI+
in
v C
ORIa1NA�
2 mA mev o
E � �
GSH e. FF a8 s e B SR 8 @e
2JJa� spa g�3€ $gE.E =y a eM �3 8e
w W Z p P➢ tl$ nz u EE S 3: 3�tl5F.@ E�tl�Ea�,=g LL E
Jzg
e tl e ash
w "sri� „�?�€� i :uioi s�saaaa"oo& p „max j3e;
XIMI e a i_ —p AY A Otl3903x 09311Ntl ^J — s J
A ¢
saelnr
is VillIt901
� � y
J
tl0 J
O W
¢
¢
is
y'
GDIM
4
a.
d. a, tlISYNf z p
IM
J
tl0 J
O W
¢
¢
y'
GDIM
4
a.
d. a, tlISYNf z p
IM
Jxt31 _
t..7
Q Q
�
JISIY A
U
�
m_=
m
ISM -1130N1 =��—
G
V -
ORIGINAL_