Loading...
HomeMy WebLinkAbout431 34th Street Drainage Calculations                                  15‐050 Rite Aid – Bakersfield  431 34th Street  Bakersfield, CA  Updated: 7/16/2018     Drainage  Calculations Prepared By:  Civil Design Studio, Inc.  Robert Winslow, PE  P.O. Box 199  Cambria, Ca 93428  805.706.0401  15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 1     Attn: Alerik Hoeh  City of Bakersfield  Department of Public Works  1501 Truxton Avenue  Bakersfield, Ca 93301  Subject:  Rite Aid – Bakersfield   Re:    Drainage Calculations    Alerik:  Please find enclosed the Drainage Calculations for the above referenced project.  The study calculations were prepared using the Rational Method and Mannings Equation.  Please contact me for any clarifications or supporting information you need with reference to  this report.    Regards,      Robert Winslow, PE     15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 2     Contents  Introduction .................................................................................................................................................. 3  Project Location ........................................................................................................................................ 3  Existing Conditions .................................................................................................................................... 3  Proposed Project ....................................................................................................................................... 4  Drainage Calculations ................................................................................................................................... 5  Rational Method Inputs ............................................................................................................................ 5  Site Hydrology ........................................................................................................................................... 5  Proposed Site Runoff ................................................................................................................................ 5  Report Conclusion ..................................................................................................................................... 6  Supporting Documents ................................................................................................................................. 7  NOAA Atlas 14 Point Precipitation Frequency Rainfall Intensity .............................................................. 7       15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 3     Introduction  Project Location  The proposed project is located at 431 34th Street in the City of Bakersfield, County of Kern, State of  California. The site is bordered by 34th Street to the north, commercial development to the west,  commercial development to the south, and commercial parking lot to the east.     Figure 1: Project Location  Existing Conditions  The site previously housed a commercial building that was demolished between 2006 and 2008 and has  been vacant from then until now. The existing conditions of the property is 100% impervious because  the entire site is either paved or building. Stormwater that falls onto the site, sheet flows north and  enter the City of Bakersfield storm drain system via the 34th Street curb and gutter.    15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 4     Proposed Project  The proposed project consists of renovating the existing parking lot, adding a new Rite Aid building, and  constructing a new driveway.     Figure 2: Proposed Project    15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 5     Drainage Calculations  Rational Method Inputs  The Rational Method will be utilized to calculate the anticipated runoff for the proposed development.  Inputs for the rational method equation include the following:  A weighted “C” calculation will be utilized to determine the “C” value for pervious and impervious areas,  for post development.  The site area tributary to the existing storm drain system has been measured at 1.23 acres.   The rainfall intensity is determined from a figure (included) provided by the NOAA Hydrometeorological  Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates: CA. The value used for this  calculation is for a 2 year 10 minute storm. This value is 0.834 inches per hour.  Site Hydrology  The following table shows how the weighted “C” value was calculated.   Table 1: Existing Conditions Weighted "C" Value  Weighted “C” Value – Existing Conditions  Area Description  Area, ac  "C”  Value  Product of “C”  and Area  Impervious  1.23  0.9 1.11  Pervious  0.00  0.3 0.0  Totals  1.23  n/a 1.11  Weighted "C" 0.90    Table 2: Proposed Project Weighted "C" Value  Weighted “C” Value – Proposed Project  Area Description  Area, ac  "C”  Value  Product of “C”  and Area  Impervious  1.09  0.9 0.98  Pervious  0.14  0.3 0.04  Totals  1.6  n/a 1.02  Weighted "C" 0.83  Proposed Site Runoff  The proposed site runoff is collected via concrete curb and gutter improvements on the north and west  side of the proposed building. Stormwater will flow into depressed planters via curb cuts at the low  point in each gutter. Water in the depressed planter will flow to the low point at the northwest corner  of the property and discharge into the private driveway through another curb cut. From here,  15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 6     stormwater will enter the City of Bakersfield’s storm drain system in the curb and gutter along 34th  Street.   Q (Site Peak Flow Rate) = C (Runoff Coefficient) * I (Rainfall intensity) * A (Site Area)  QArea Exist = 0.90 * (0.834 in) * 1.23 acres = 0.92 cfs  QArea Proposed = 0.83 * (0.834 in) * 1.23 acres = 0.85 cfs  Table 3: Stormwater Runoff Comparison  Stormwater Runoff Comparison  Description  Stormwater Runoff (cfs)  Existing Conditions  0.92 cfs  Proposed Project  0.85 cfs  Difference  ‐ 0.07 cfs (decrease)  Report Conclusion  The proposed project provides for a decrease in stormwater runoff by 0.07 cfs. This is due to an increase  in onsite landscaping (pervious area). Therefore, the existing storm drain infrastructure (34th Street curb  and gutter) can handle the runoff from the proposed development.      15‐050 Rite Aid – Bakersfield  Drainage Calculations    Page | 7     Supporting Documents  NOAA Atlas 14 Point Precipitation Frequency Rainfall Intensity