Loading...
HomeMy WebLinkAboutCRYSTAL GEYSER NOI 9-12-2018 BAKERSFIELD FIRE DEPARTMEN T ● 2101 H STREET ● BAKERSFIELD, CA. 93301 ● 661-326-3911 ~CLASS 2 FIRE DEPARTMENT~ Anthony Galagaza ■ Fire Chief ■ Deputy Chief Tyler Hartley Operations/Training/Arson 661-326-3655 Fire Department Headquarters 2101 H Street, Floor 1 Bakersfield, CA 93301 (661) 326-3911 (main) (661) 852-2170 (fax) Fire Department Community Services / Public Information 2101 H Street, Floor 1 Bakersfield, CA 93301 (661) 326-3688 (office) (661) 852-2170 (fax) Fire Prevention Division 2101 H Street, Floor 2 Bakersfield, CA 93301 (661) 326-3979 (main) (661) 852-2171 (fax) Fire Training Division 5642 Victor Street (ODFTF) Bakersfield, CA 93308 (661) 399-4697 (main) (661) 399-5763 (fax) Live Fire Training 106 E. White Lane (FS 5) Bakersfield, CA 93307 (661) 397-6305 (main) (661) 852-2170 (fax) Arson Division 2101 H Street, Floor 2 Bakersfield, CA 93301 (661) 326-3911 (main) (661) 852-2172 (fax) September 12, 2018 Mr. Doug Ueda 1233 E. California Ave Bakersfield, CA 93307 Re: California Accidental Release Program 2 inspection conducted on September 12, 2018. Mr. Ueda Attached are the results of the California Accidental Release Program inspection that was performed on September 12, 2018. I have attached the items that need to be addressed on or before October 19, 2018. Should you have any questions please feel free to call me at our office (661) 326-3650. Sincerely Shane Gardner, REPA Hazardous Materials Specialist BAKERSFIELD FIRE DEPARTMEN T ● 2101 H STREE T ● BAKERSFIELD, CA. 93301 ● 661 -326 -3911 ~CLASS 2 FIRE DEPARTMENT~ 1. Mechanical Integrity-19 CCR 2762.5 1. Application. Sections (b) through (f) of this section apply to the following process equipment: a. Pressure vessels and storage tanks; b. Piping systems (including ancillary components such as valves); c. Relief and vent systems and devices; d. Emergency shutdown systems; e. Controls (including monitoring devices and sensors, alarms, and interlocks); and, f. Pumps, compressors and their drivers. 2. Written procedures. The owner or operator shall establish and implement written procedures to maintain the on-going integrity of process equipment. 3. Training for process maintenance activities. The owner or operator shall train each employee involved in maintaining the on-going integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee’s job tasks to assure that the employee can perform the job tasks in a safe manner. 4. Inspection and testing. a. Inspections and tests shall be performed on process equipment. b. Inspection and testing procedures shall follow recognized and generally accepted good engineering practices. c. The frequency of inspections and tests of process equipment shall be consistent with applicable manufacturers’ recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. d. The owner or operator shall document each inspection and test that has been performed on process equipment. The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed, and the results of the inspection or test. e. Equipment deficiencies. The owner or operator shall correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in Section 2760.1) before further use or in a safe and timely manner when necessary means are taken to assure safe operation. 5. Quality assurance. a. Appropriate checks and inspections shall be performed to assure that equipment is installed properly and consistent with design specifications and the manufacturer’s instructions. b. The owner or operator shall assure that maintenance materials, spare parts and equipment are suitable for the process application for which they will be used. 2. Seismic Assessment-CAA§ 112(r)(1) GDC Obligations 1. During the inspection it was found that the facility has not completed a seismic assessment. Example RAGAGEP or industry standards of care is 19 CCR 2755.2 Hazard Review, (D), “The hazard review shall include the considerations of BAKERSFIELD FIRE DEPARTMEN T ● 2101 H STREE T ● BAKERSFIELD, CA. 93301 ● 661 -326 -3911 ~CLASS 2 FIRE DEPARTMENT~ applicable external events, including seismic events:; and guidance for California Accidental Release Prevention program prepared for the Administering Agency. 3. Engine Room Doors-CAA §112(r)(1) GDC Obligations 1. All engine room doors were not adequately labeled to warn of the hazards of entering a room with ammonia-containing machinery and restrict unauthorized people from entry. 4. Piping and Valve labeling- CAA §112(r)(1) GDC Obligations 1. The piping was not labeled in bottling room to indicate contents, direction of flow, physical state, and pressure level. IAAR Bulletin No. 109 Section 4.7.6, “All ammonia piping should have appropriate pipe markers attached to indicate the use of the pipe and arrows to indicate the direction of flow.” 5. Fire Sprinkler Service- CFC 901.6 1. Fire extinguishing systems shall be maintained and serviced according to the code. Please conduct 5 year sprinkler certification on system.