SE W W ER AND ST M D I
OR RAN PLANS
FOR
•
PRIOR
wOi O START
R CONSTRUCTION, THE CITY CONSTRUCTION
INSPECTION DEPARTMENT SHALL 24 HOURS NOTICE. TELEPHONE 326-3049
2. ALL MATERIALS SUPPLIED FOR THIS PROJECT
WILL REQUIRE A CERTIFICATE OF COMPLIANCE
STATING THAT THE REQUIREMENTS & STANDARDS,
SET FORTH BY THE CITY OF BAKERSFIELD HAVE
BEEN MET.
3. NO CITY INSPEC11ONS WILL BE GIVEN FOR THE
WORK IN THIS AREA UNTIL A STREET PERMIT
WITH O ANY PHASE
BE
APPROPRIATE SECURITY AND INSURANCE
DIRECTORREVIEWED BY:
ENGINEERS STATEMENTTHESE PLANS AND UNDER MY OF MY KNOWLEDGE ANDSUMMAR"Y OF IMPROVEMENTS INDEX OF SHEETSBELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS,AND SEWER RE VISIONS APPROVED.6" SEWER LINE 736 LF 1. COVER SHEET I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON8" SEWER LINE 3396 LF 2. NOTES THESE PLANS AND ANY ERRORS, OMISSIONS, OR V ' 10�ATIONS OF4" LATERALS 3752 LF 3. MURFREESBORO DRIVE THO -ORDINANCES, STANDARDS A ESIGN CRITERIA SHALL BESTANDARD MANHOLE 16 EA 4. FORT HENRY WAYSEWER -CLEAN OUT 2 EA 5. DAVIS DRIDGE AVENUESTDRM, DRAIN IMEEOVEMENTS TOTA-,' 7. BLOUNTSVILLE DRIVE:S;TO�RAVENUE4'� "r-%'POANAMA ANE�C� 2 S 0 PANAMA ANE APPROVED BY: '§b&R MCINTOSH R.C.E. 33322 DATE4 S RM DRAIN LINE 1393 LF L EXP. 06-30-1830" STORM DRAIN LINE 64 LFSTORM CATCH THEOUTLET STRUCTURE 1 EA
N.T.S.HAb
VICINITY MAP
SPECIFICATIONS
DIRECTION T T T r*y > v
DESIGN CRITERIA INCLUDE IMPROVEMENT REQUIREMENTS
IMPROVEMEUTS TQTAL SHEET TITLE OF THE ADVISORY
• FAIR GARDEN WAY & MOSSY CREEK WAY RoGetZ A. Wit3vo-ba
DRAIN �
BASINS d IN WITH THE CONDITIONS TENTATIVE ,
IMPROVEMENT REVIEWED""RY THE CITY OF BAKERSFIELD
PUBLIC IMPROVEMENTS INDICATED .: ! ..
HEREIN PRIVATE PRIVATELY MAINTAINED.
U9 PANAMA LANE
r 1 1 4 1 1 1
1 1 1
TRENCH Ck SEWER
1
MAIN WATERLINE„” .,.
LAJ
10 1 11 1 12 1 13 1 14 1 15 1 1
l 1 ! 1
STAMP AN °S 1
x x I TYPt 1 -fi -� 1
,,, 1 m GRADE1 1 1 I
1 1LOT 9
DRIDGE
1 1too LOT LINE
DAVIS AVENUE •
15-0527
60 , sO.R.
MAX. TYP.
P.
.� _ 1
r
1
LATERALON DEEP SEWER, SLOPE LATERALS SET PROVIDING PROPER
134 1 339
1 1 2 1 3 4 1 5 1 a1 7 1 19 1 10 1 11 1 12 0
TO LOT LINE SO THAT THE END OF CLEARANCE UNDER WATERLINE AND
LATERA1 1 1 1 1 1 1 1 1
L IS WITHINREQUIRED
_ r
VERIFYNOTE: CONTRACTOR TO
MAIN AND SEWER LATERAL CROSSINGS CALIFORNIAN CONFORMANCE WITH 1 1 1 1 1 1 47 1 r 1 19 1 1 1 17 ' 1 1 14 13
ARE 1
REQUIREMENTS.Al S'E
HEALTH CODE 1
FOR SHALLOW 1
THE SEWER LATERALS MUST CROSS OVER THE WATER OR INSTALLATION 1 + 6 r I
1 1 r 7 1 4 1 1 1 1 i 1 32 1 33 34
UTILITYTHESE 1
INSTALLATIONS MUST RECEIVEIL TREATMENT FOR LATERALS i
CROSSING!« r
A SEWER L 1 _
--mangigm
CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC -
IPE OR EQUIVALENT, CENTERED ON THE PIPEa5010 1 48r 47 1 11
4 41 1 1 1 1WIM35
sw
1 1 r 1 r r 1 r r r r r r f
i 1 ... •t•. ..
VESTINGI
KEY MAP
._
'
R.C.E.APPROVED BY: NICOLAS FID ER, PU LIC S DIRECTOR DATE
'61069 EXP. 12-31-16
NO.
"ASSISTANT PUBLIC WORKS BASIS OF BEARINGS:
THE BEARING OF N. 89#06'48" W. SH OWN FOR THE
NORTH 6t PG. 26 SURVEYOR WAS USED AS THE SHOWN HEREON.
BENCHMARK USED -
INTERSECTION OF OLD RIVER ROAD AND BERKSHIRE ROAD.
(USGS DATUM)
LEGAL DESCRIPTION -1
BEING A ADJUSTMENT 15-0527 PER CERTIFICATE OF
2016 AS DOCUMENT
NO.,000216031870, OFFICIAL RECORDS, IN THE OFFICE
OF THE KERN COUNTY RECORDER; ALSO PORTION OF SECTION TOWNSHIP 30 RANGE
LINE OF THE NORTHEAST QUARTER OF SECTION
IN THE OFFICE
BASIS
IN LAMPHOLE AT THE
ELEVATION '
SUBDIVISION LINE
♦
COMPLIANCE ,
BEING
, SOUTH,
27 EAST, M.D.M•, IN THE CITY O BAKRSFIL.D,
COUNTY STATE OF CALIFORNIA.
Know whtifsbelow..
ABBEEVIATIONS
CL
CENTERLINE
INV
INVERT
SD
STORM DRAIN
MH
MANHOLE
C8
CATCH BASIN
JB
JUNCT10N BOX
SMH
SEWER MANHOLE
sco
SEWER CLEANOUT
SDMH
STORM DRAIN MANHOLE
EXIST
EXISTING
ELEV
ELEVATION
R/W
RIGHT OF WAY
s ♦ ♦
'
a
TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
PHASE BOUNDARY
s
CONSTRUCT SEWER PER I
CONSTRUCT SEWER MANHOLETYPE
h
PER C.O.B. a SW -4.
CONSTRUCT SEWER CLEANOUT
PER C.O.B. t ♦
CONSTRUCT STORM DRAIN PER CITY STANDARDS
DRAIN0 CONSTRUCT STORM
MANHOLE TYPE "A" PER C.O.B. ♦ .: .
BASINCONSTRUCT CATCH
..
i
� � i � ""` A � , �.,., x, ! is #I. •? my limp 1491lop
'..
SE W W ER AND ST M D I
OR RAN PLANS
FOR
•
PRIOR
wOi O START
R CONSTRUCTION, THE CITY CONSTRUCTION
INSPECTION DEPARTMENT SHALL 24 HOURS NOTICE. TELEPHONE 326-3049
2. ALL MATERIALS SUPPLIED FOR THIS PROJECT
WILL REQUIRE A CERTIFICATE OF COMPLIANCE
STATING THAT THE REQUIREMENTS & STANDARDS,
SET FORTH BY THE CITY OF BAKERSFIELD HAVE
BEEN MET.
3. NO CITY INSPEC11ONS WILL BE GIVEN FOR THE
WORK IN THIS AREA UNTIL A STREET PERMIT
WITH O ANY PHASE
BE
APPROPRIATE SECURITY AND INSURANCE
DIRECTORREVIEWED BY:
ENGINEERS STATEMENTTHESE PLANS AND UNDER MY OF MY KNOWLEDGE ANDSUMMAR"Y OF IMPROVEMENTS INDEX OF SHEETSBELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS,AND SEWER RE VISIONS APPROVED.6" SEWER LINE 736 LF 1. COVER SHEET I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON8" SEWER LINE 3396 LF 2. NOTES THESE PLANS AND ANY ERRORS, OMISSIONS, OR V ' 10�ATIONS OF4" LATERALS 3752 LF 3. MURFREESBORO DRIVE THO -ORDINANCES, STANDARDS A ESIGN CRITERIA SHALL BESTANDARD MANHOLE 16 EA 4. FORT HENRY WAYSEWER -CLEAN OUT 2 EA 5. DAVIS DRIDGE AVENUESTDRM, DRAIN IMEEOVEMENTS TOTA-,' 7. BLOUNTSVILLE DRIVE:S;TO�RAVENUE4'� "r-%'POANAMA ANE�C� 2 S 0 PANAMA ANE APPROVED BY: '§b&R MCINTOSH R.C.E. 33322 DATE4 S RM DRAIN LINE 1393 LF L EXP. 06-30-1830" STORM DRAIN LINE 64 LFSTORM CATCH THEOUTLET STRUCTURE 1 EA
N.T.S.HAb
VICINITY MAP
SPECIFICATIONS
DIRECTION T T T r*y > v
DESIGN CRITERIA INCLUDE IMPROVEMENT REQUIREMENTS
IMPROVEMEUTS TQTAL SHEET TITLE OF THE ADVISORY
• FAIR GARDEN WAY & MOSSY CREEK WAY RoGetZ A. Wit3vo-ba
DRAIN �
BASINS d IN WITH THE CONDITIONS TENTATIVE ,
IMPROVEMENT REVIEWED""RY THE CITY OF BAKERSFIELD
PUBLIC IMPROVEMENTS INDICATED .: ! ..
HEREIN PRIVATE PRIVATELY MAINTAINED.
U9 PANAMA LANE
r 1 1 4 1 1 1
1 1 1
TRENCH Ck SEWER
1
MAIN WATERLINE„” .,.
LAJ
10 1 11 1 12 1 13 1 14 1 15 1 1
l 1 ! 1
STAMP AN °S 1
x x I TYPt 1 -fi -� 1
,,, 1 m GRADE1 1 1 I
1 1LOT 9
DRIDGE
1 1too LOT LINE
DAVIS AVENUE •
15-0527
60 , sO.R.
MAX. TYP.
P.
.� _ 1
r
1
LATERALON DEEP SEWER, SLOPE LATERALS SET PROVIDING PROPER
134 1 339
1 1 2 1 3 4 1 5 1 a1 7 1 19 1 10 1 11 1 12 0
TO LOT LINE SO THAT THE END OF CLEARANCE UNDER WATERLINE AND
LATERA1 1 1 1 1 1 1 1 1
L IS WITHINREQUIRED
_ r
VERIFYNOTE: CONTRACTOR TO
MAIN AND SEWER LATERAL CROSSINGS CALIFORNIAN CONFORMANCE WITH 1 1 1 1 1 1 47 1 r 1 19 1 1 1 17 ' 1 1 14 13
ARE 1
REQUIREMENTS.Al S'E
HEALTH CODE 1
FOR SHALLOW 1
THE SEWER LATERALS MUST CROSS OVER THE WATER OR INSTALLATION 1 + 6 r I
1 1 r 7 1 4 1 1 1 1 i 1 32 1 33 34
UTILITYTHESE 1
INSTALLATIONS MUST RECEIVEIL TREATMENT FOR LATERALS i
CROSSING!« r
A SEWER L 1 _
--mangigm
CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC -
IPE OR EQUIVALENT, CENTERED ON THE PIPEa5010 1 48r 47 1 11
4 41 1 1 1 1WIM35
sw
1 1 r 1 r r 1 r r r r r r f
i 1 ... •t•. ..
VESTINGI
KEY MAP
._
'
R.C.E.APPROVED BY: NICOLAS FID ER, PU LIC S DIRECTOR DATE
'61069 EXP. 12-31-16
NO.
"ASSISTANT PUBLIC WORKS BASIS OF BEARINGS:
THE BEARING OF N. 89#06'48" W. SH OWN FOR THE
NORTH 6t PG. 26 SURVEYOR WAS USED AS THE SHOWN HEREON.
BENCHMARK USED -
INTERSECTION OF OLD RIVER ROAD AND BERKSHIRE ROAD.
(USGS DATUM)
LEGAL DESCRIPTION -1
BEING A ADJUSTMENT 15-0527 PER CERTIFICATE OF
2016 AS DOCUMENT
NO.,000216031870, OFFICIAL RECORDS, IN THE OFFICE
OF THE KERN COUNTY RECORDER; ALSO PORTION OF SECTION TOWNSHIP 30 RANGE
LINE OF THE NORTHEAST QUARTER OF SECTION
IN THE OFFICE
BASIS
IN LAMPHOLE AT THE
ELEVATION '
SUBDIVISION LINE
♦
COMPLIANCE ,
BEING
, SOUTH,
27 EAST, M.D.M•, IN THE CITY O BAKRSFIL.D,
COUNTY STATE OF CALIFORNIA.
Know whtifsbelow..
STANDARD NOTES
1. GENERAL
CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR; EQUIPMENT AND
SUPERVISION NECESSARY TO COMPLETE INSTALLATION.
UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS
BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600.
CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS
OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL
AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY
EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY
UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER
TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY
THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF
THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR
SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE
CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR.
CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT
THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE
REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE.
UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR
TO TRENCHING. CROSSING UTILITIES SHALL BE DAYUGHTED AND CHECKED FOR GRADE,
BY CONTRACTOR PRIOR TO TRENCHING.
ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES,
ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHAD_ BE REPAIRED OR REPLACED
AS DIRECTED BY THE CITY ENGINEER.
ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE
REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6,
EXCEPT AS NOTED ON PLANS.
AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC
WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET
RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE
AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED
WITHIN THE RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT.
COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/
CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED
BY THE CITY ENGINEER.
24 HOUR NOTICE: PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY
CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE
THE SECTION MAY BE NOTIFIED AT (661) 326-3049.
2. STANDARD DETAILS
THE FOLLOWING CITY OF BAKERSFIELD STANDARDS
SHALL BE CONSIDERED PART OF THESE PLANS:
S-6, S-7, S-8, S-9, S-10, S-11,
S-12, S-20, S-22.
3. VCP INSTALLATION
MATERIALS : THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY
CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN
CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS
OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION
AND THE CURRENT ASTM SPECIFICATIONS C-12.
JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END
WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION
C-425.
THE PIPE AND FITTINGS FOR 6". 8', 10', AND 12" SANITARY SEWER MAINS MAY
BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM
SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS
MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINLINE"
BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED.
THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING
LATERALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE
CURRENT ASTM SPEGFlCAl1ON C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT
REQUIRED)
4. ABS PIPE INSTALLATION
MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT
ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS
THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER
INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED
IN UNE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED.
JOINTS : USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE
IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE ABS PIPE
CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD.
INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH
THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, 11, AND III EMBEDMENT
MATERIALS WILL BE CONSIDERED SUITABLE.
5, PVC PIPE INSTALLATION
MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT
ASTM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS
THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER
INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED
IN UNE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED.
JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL
BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE
CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD.
INSTALLATION :PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH
THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1, 11, AND III EMBEDMENT
MATERIALS WILL BE CONSIDERED SUITABLE.
6, REINFORCED CONCRETE PIPE WITH PVC LINING.
REINFORCED CONCRETE PIPE WITH PVC LINING SHALL MEET THE FOLLOWING
REQUIREMENTS:
1.A. MATERIALS. REINFORCED CONCRETE PIPE (RCP) SHALL BE EITHER CLASS IV
OR CLASS V WITH WALLS "B" OR "C". RCP SHALL MEET ASTM C 76 FOR STRENGTH,
ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER
GASKETS, AND LINER TESTS IN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE
SHALL BE WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL
AND SPIGOT DESIGN WITH A CONTAINED O-RING GASKET.
PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360'
OF THE PIPE ALL WORK FOR AND IN CONNECTION WITH THE INSTALLATION OF THE
LINING IN CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE
IN STRICT CONFORMITY WITH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND
RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING
REQUIREMENTS.
1.B. PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LINER PLATE SHEETS, WELDING
STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES
WHEN TESTED AT 77F t5 (25'C t3 ).
PROPERTY
TENSILE STRENGTH
INITIAL
2200 PSI MIN.
(PAR,
2100 PG MIN.
(15 MPA MIN.)
(14.5 MPA MIN.)
ELONGATION AT BREAK
200% MIN.
200% MIN.
SHORE DUROMETER, TYPE D
1 -SEC. 50-60
t5
(WITH RESPECT TO INITIAL TEST RESULT)
10 -SEC. 35-50
t5
WEIGHT CHANGE
11.5
TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM
D412 USING DIE B. WEIGHT CHANGE SPECIMENS SHALL BE 1 -INCH (25 -MM) BY
3 -INCH (75 -MM) SAMPLES. SPECIMENS FOR TESTING OF INITIAL PHYSICAL
PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY
TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK.
LINER PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A
TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED
PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE, WITHOUT
RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST
SHALL BE MADE AT A TEMPERATURE OF 70' - 80' F(21' - 27' C) INCLUSIVE
ALL PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT,
CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS
ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL. THE
ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS.
THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL
HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4 -INCH (6 MM) SETTLING
CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE JOINT AFTER INSTALLATIONS,
WITHOUT DAMAGE TO THE LINING.
1.C. CHEMICAL RESISTANCE OF UNER.* AFTER CONDITIONING TO CONSTANT
WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL
BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77* F t5
(25' C t3 ).
AT 28 -DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS
SHAD_ BE REMOVED FROM EACH OF THE CHEMICAL SOLUTIONS AND TESTED IN
ACCORDANCE WITH SECTION 7-2.03(1.B) PARA. 2 ABOVE. IF ANY SPECIMEN FAILS TO
MEET THE 112 -DAY REQUIREMENTS BEFORE COMPLETION OF THE 112 -DAY EXPOSURE,
THE MATERIAL WILL BE SUBJECT TO REJECTION.
CHEMICAL SOLUTION
SULFURIC ACID
SODIUM HYDROXIDE
AMMONIUM HYDROXIDE
NITRIC ACID
FERRIC CHLORIDE 1%
SOAP
DETERGENT
(LINEAR ALKYL BENZYL SULFONATE OR LAS
BACTERIOLOGICAL
CONCENTRATION
20%**
5%
5%**
1 %**
196
0.1%
0.1%
BOD NOT LESS THAN 700 PPM
*THIS IS TO BE USED AS A PRE -QUALIFICATION TEST AND WHEN MATERIAL
FORMULATIONS ARE CHANGED.
**VOLUMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS.
1.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHAD_ BE A
MINIMUM OF 0.065 INCH (1.65 MM) IN THICKNESS. LOCKING EXTENSIONS OF THE
SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED WITH THE
SHEET.
I.E. INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING
OF SHEETS IN COLD WEATHER AND THE WELDING OF ALL JOINTS, SHALL BE DONE IN
ACCORDANCE WITH THE RECOMMENDATIONS OF THE LINER MANUFACTURER.
COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON
THE PLANS.
THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL
WITH THE LONGITUDINAL AXIS OF THE PIPE
THE LINING SHALL BE HELD SNUGLY IN PLACE AGAINST INNER FORMS.
LOCKING EXTENSION SHALL TERMINATE NOT MORE THAN 1-1/2 INCHES (38 MM)
FROM THE END OF THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN
USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 MM) BEYOND THE END OF THE
INSIDE SURFACE
CONCRETE POURED AGAINST LINING SHALL BE VIBRATED, SPADED OR COMPACTED IN
A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE,
HOMOGENOUS CONCRETE. SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE
CONCRETE.
IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE LINING FROM
DAMAGE SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINED
SURFACES. WHEN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING SHALL
BE PULLED, WITHOUT TEARING THE LINING, AND THE RESULTING HOLES CLEARLY MARKED.
ALL NAIL AND TIE HOLES AND ALL CUT, TORN AND SERIOUSLY ABRADED AREAS IN
THE LINING SHALL BE PATCHED. PATCHES MADE ENTIRELY WITH WELDING STRIP SHALL
BE FUSED TO THE LINER OVER THE ENTIRE PATCH AREA. LARGER PATCHES MAY
CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA WITH ADHESIVE
ALL EDGES MUST BE COVERED WITH WELDING STRIP FUSED TO THE PATCH AND THE
SOUND LINING ADJOINING THE DAMAGED AREA.
HOT JOINT COMPOUNDS, SUCH AS COAL TAR, SHALL NOT BE POURED OR APPLIED
TO THE LINING.
THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO
INSTALLED LINING FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE
WORK.
1.F APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING
SHALL BE SET FLUSH WITH THE INNER EDGE OF THE BELL OR SPIGOT END OF A PIPE
SECTION AND SHALL EXTEND TO THE OPPOSITE END OR TO APPROXIMATELY 4 INCHES
(100 MM) BEYOND THE OPPOSITE END DEPENDING UPON THE TYPE OF LINING JOINT
TO BE MADE WITH THE ADJOINING CONCRETE PIPE.
WHEREVER CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES PROTECTED WITH LINING,
JOIN STRUCTURES NOT SO LINED (SUCH AS BRICK STRUCTURES, CONCRETE PIPE OR
CAST -IN-PLACE STRUCTURES WITH CLAY LINING OR CLAY PIPE), THE LINING SHALL BE
EXTENDED OVER AND AROUND THE END OF THE PIPE AND BACK INTO THE STRUCTURE
FOR NOT LESS THAN 4 INCHES (100 MM). THIS PROTECTING CAP MAY BE MOLDED
OR FABRICATED FROM THE LINING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE
WHERE A PIPE LATERAL (NOT OF PLASTIC LINED CONCRETE) IS INSTALLED THROUGH
LINED CONCRETE PIPE, THE SEAL BETWEEN THE UNED PORTION AND THE LATERAL SHALL
BE PER THE MANUFACTURER'S RECOMMENDATIONS.
LINED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS.
CARE SHALL BE EXERCISED IN HANDUNG, TRANSPORTING AND PLACING LINED PIPE
TO PREVENT DAMAGE TO THE LINING. NO INTERIOR HOOKS OR SLINGS SHALL BE USED
IN LIFTING PIPE. ALL HANDUNG OPERATION SHALL BE DONE WITH AN EXTERIOR SUNG OR
WITH A SUITABLE FORK LIFT.
ON PIPE HAVING A 360' LINER COVERAGE, THE LONGITUDINAL EDGES OF THE
SHEET SHALL BE BUTT WELDED. WHEN PIPE TUBES ARE FURNISHED, THESE ARE
SHOP -WELDED JOINTS.
NO PIPE WITH DAMAGED LINING WILL BE ACCEPTED UNTIL THE DAMAGE HAS BEEN
REPAIRED TO THE SATISFACTION OF THE ENGINEER.
1.G. FIELD JOINTS IN LINING FOR CONCRETE PIPE THE JOINT BETWEEN
SECTIONS OF LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER:
IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED WITH
CEMENT MORTAR IN SUCH A MANNER THAT THE MORTAR SHALL NOT, AT ANY POINT.
EXTEND INTO THE PIPE BEYOND THE STRAIGHT UNE CONNECTING THE SURFACES OF THE
ADJACENT PIPE SECTIONS.
PIPE JOINTS MUST BE DRY BEFORE LINING JOINTS ARE MADE.
ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING
SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY.
FIELD JOINTS IN THE LINING AT PIPE JOINTS MAY BE EITHER OF THE FOLLOWING
DESCRIBED TYPES:
TYPE P-1: THE JOINT SHALL BE MADE WITH A SEPARATE 4 -INCH (100 -MM)
JOINT STRIP AND TWO WELDING STRIPS. THE 4 -INCH (100 -MM) JOINT STRIP SHALL BE
CENTERED OVER THE JOINT, HEAT -SEALED TO THE LINING, THEN WELDED ALONG EACH
EDGE TO ADJACENT LINER SHEETS WITH A 1 -INCH (25 -MM) WELD STRIP. THE 4 -INCH
(100 -MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM OF 1/2 INCH (13
MM).
TYPE P-2: THE JOINT SHALL BE MADE WITH A JOINT FLAP WITH LOCKING
EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND
THE PIPE END. THE JOINT FLAP SHALL OVERLAP THE LINING IN THE ADJACENT PIPE
SECTION A MINIMUM OF 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR
TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELDING THE FLAP TO THE
LINING OF THE ADJACENT PIPE USING 1 -INCH (25 -MM) WELD STRIP. .
CARE SHALL BE TAKEN TO PROTECT THE FLAP FROM DAMAGE EXCESSIVE TENSION
AND DISTORTION IN BENDING BACK THE FLAP TO EXPOSE THE PIPE JOINT DURING LAYING
AND JOINT MORTARING SHALL BE AVOIDED. AT TEMPERATURES BELOW 50 F(10 C),
HEATING OF THE UNER MAY BE REQUIRED TO AVOID DAMAGE.
THE JOINT FLAP OR STRIP ON BEVELED PIPE SHALL BE TRIMMED TO A WIDTH
(MEASURED FROM THE END OF THE SPIGOT) OF APPROXIMATELY 4 INCHES (100 MM)
FOR THE ENTIRE CIRCUMFERENTIAL LENGTH OF THE LINING.
ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE WITH THE
SPECIFICATIONS AND INSTRUCTIONS OF THE LINING MANUFACTURER.
WELDING SHALL FUSE BOTH SHEETS AND WELD STRIP TOGETHER TO PROVIDE A
CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER
PLATE.
HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE
JOINED AT A TEMPERATURE BETWEEN 500 AND 600 F (260 AND 316 C).
WELDING TOOLS SHALL BE HELD APPROXIMATELY 1/2 INCH (13 MM) FROM AND MOVED
BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE
WELDING TOOL SHALL BE MOVED SLOWLY ENOUGH AS THE WELD PROGRESSES TO CAUSE
A SMALL BEAD OF MOLTEN MATERIAL TO BE VISIBLE ALONG BOTH EDGES AND IN FRONT
OF THE WELD STRIP.
THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY WHEN THE LINER COVERAGE IS
360 DEGREES:
WHEN GROUNDWATER IS ENCOUNTERED THE LINING JOINT SHALL NOT BE MADE UNTIL
PUMPING OF GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND
NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT.
WHEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FLAP, DO NOT WELD
6 TO 8 INCHES (150 TO 200 MM) AT THE PIPE INVERT TO PROVIDE RELIEF OF
POTENTIAL FUTURE GROUNDWATER BUILD-UP.
1.H. APPLICATION TO CAST -IN-PLACE CONCRETE STRUCTURES - SPECIAL
REQUIREMENTS. LINER SHEETS SHALL BE CLOSELY FITTED AND PROPERLY SECURED TO
THE INNER FORMS. SHEETS SHALL BE CUT TO FIT CURVED AND WARPED SURFACES
USING A MINIMUM NUMBER OF SEPARATE PIECES.
UNLESS OTHERWISE SHOWN ON THE PLANS„ THE LINING SHALL BE RETURNED AT
LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE
STRUCTURE AND ITEMS NOT OF CONCRETE (INCLUDING MANHOLE FRAMES, GATE GUIDES,
CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES). THE SAME
PROCEDURE SHALL BE FOLLOWED AT JOINTS WHERE THE TYPE OF PROTECTIVE LINING IS
CHANGED OR THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT EACH
RETURN, THE RETURNED LINER SHALL BE SEALED TO THE ITEM IN CONTACT WITH THE
PLASTIC -LINED CONCRETE. IF THE LINER CANNOT BE SEALED WITH ADHESIVE BECAUSE
OF THE JOINT AT THE RETURN BEING TOO WIDE OR ROUGH OR BECAUSE OF SAFETY
REGULATIONS, THE JOINT SPACE SHALL BE DENSELY CAULKED WITH LEAD WOOL OR OTHER
APPROVED CAULKING MATERIAL TO A DEPTH OF 2 INCHES (50 MM) AND FINISHED
WITH A MINIMUM OF 1 INCH 925 MM) OF AN APPROVED CORROSION RESISTANT
MATERIAL.
1.1. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS
INSTALLED IN THE TRENCH, ALL SURFACES COVERED WITH LINING, INCLUDING WELDS, SHALL
BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR
(TINKER & RASOR MODEL NO. AP -W WITH POWER PACK OR APPROVED EQUAL) WITH
THE INSTRUMENT SET BETWEEN 18,000 AND 22,000 VOLTS.
ALL WELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD.
ALL PATCHES OVER HOLES, OR REPAIRS TO THE UNER WHEREVER DAMAGE HAS
OCCURRED, SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SECTION 7-2.03(1.E) PARA.
8 ABOVE.
EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER
WILL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2
INCHES (50 MM) BELOW THE LINER TO PROVIDE A TAB. A 10 -POUND (5 KG) PULL
WILL BE APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF
THE STRUCTURE BY MEANS OF A SPRING BALANCE LINER ADJOINING THE WILDING
STRIP WILL BE HELD AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE. THE
10 -POUND (5 KG) PULL WILL BE MAINTAINED IF A WELD FAILURE DEVELOPS, UNTIL NO
FURTHER SEPARATION OCCURS. DEFECTIVE WELDS WILL BE RETESTED AFTER REPAIRS HAVE
BEEN MADE. TABS SHALL BE TRIMMED AWAY NEATLY BY THE INSTALLER OF THE LINER
AFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPECTION SHALL BE MADE
WITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING
THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM
EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK.
SHOP DRAWINGS. CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION
SHOWING DIMENSIONAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW.
PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM
TRENCH DESIGNATION "C". RCP CLASS V SHALL BE INSTALLED PER ASTM TRENCH
DESIGNATION V.
PVC FOR PIPE SIZES 18" AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET
THE FOLLOWING REQUIREMENTS:
1. MATERIAL. PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH
IN ASTM D 3034 WITH SDR OF 35. ELASTOMERIC SEALS AND JOINTS SHALL CONFORM
TO ASTM D 3212 AND ASTM F 477.
2. TESTING. MANUFACTURING TESTING METHODS SHALL CONFORM TO ASTM
F-679 (T -WALL). CERTIFICATES OF COMPLIANCE SHALL BE MADE AVAILABLE TO THE
ENGINEER.
3. INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S
GUIDELINES, THESE SPECIFICATIONS AND ASTM D 2321 "UNDERGROUND INSTALLATION OF
FLEXIBLE THERMOPLASTIC SEWER PIPE".
4. FIELD TESTS. IN -FIELD PRESSURE TESTS SHALL CONFORM TO THESE
SPECIFICATIONS AND THE FOLLOWING:
DEFLECTION MEASUREMENT OF PVC PIPE AFTER 30 DAYS OF INSTALLATION THE
CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A GO -NO-GO 5% MANDREL
THE MANDREL SHALL BE PULLED THROUGH THE PIPE WITH ROPE BY ONE PERSON
WITHOUT MECHANICAL ADVANTAGE THE MANDREL SHALL HAVE VANES AT LEAST AS
LONG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE
WITH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS. THE MANDREL
DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA:
MANDREL DIAMETER = BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.)
WHERE Y = ALLOWABLE DEFLECTION IN % (5%)
BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE
MANUFACTURER)
THE MANDREL SH HAVE AN ODD NUMBER OF VANES WITH SEVEN 7
EL ALL
MINIMUM.
THE MINIMUM LENGTH OF THE CIRCULAR PORTION OF THE MANDREL SHALL BE
EQUAL TO THE NOMINAL DIAMETER OF THE PIPE
ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE
EXCAVATED, RE -BACKFILLED, RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST
CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED.
PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD
S-39, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE
SHALL BE AS SHOWN ON THE PLANS.
7. TRENCH EXCAVATION
THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN
OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED.
THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED
SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION.
THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH
PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF
THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE
CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS
PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE
TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT
INSTALLATIONS SHALL MEET CITY STANDARD S-39.
TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS.
& BRACING AND SHORING
EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND
REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR
DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A
REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING
THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE
RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION
TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE
CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING
BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE
BACKFILL AT ALL TIMES.
SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT
TO THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING,
SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE
OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE
EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF
SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE
CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A
REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE
LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS
PROHIBITED ON THIS PROJECT.
9. TRENCH BACKFILL
TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN
ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR
THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER.
ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD
SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE
PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN
ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS
THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30') FROM FINISHED GRADE
BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED
TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER
AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE.
BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS
AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND
SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER
SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A
COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED.
THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION
ABOVE THE PIPE ZONE WILL BE ALLOWED.
IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS
BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE
DISPOSAL OF THE CONTRACTOR.
THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF
IN-SITU MATERIALS,
iIO
ACHIEVING FIRM BEDDING BELOW PIPE SPRINGUNE, CONTRACTOR SHALL PROVIDE "FIRM
BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGUNE. FIRM BEDDING MEANS THAT
THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE
SPECIFICATIONS.
BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO
THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING
BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS
AND COUPLINGS SHALL BE AVOIDED.
CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS
THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS.
SHOVEL -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT
UP TO THE QUARTER POINT OF THE PIPE.
INITIAL BACKFILL "BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED
IN THE PIPE ZONE FOR INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID
AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE
PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH
SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL
BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND
MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO
COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION
OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE
RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE
PERMITTED.
SUBSEQUENT BACKFILL. ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE
BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE
OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE
MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING,
USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER.
WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL
MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE
DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING
BEFORE SUCCEEDING LAYERS ARE PLACED.
COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF
FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR
ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON
STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED
PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90%) RELATIVE
COMPACTION.
SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM
STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE
MATTER, OR OTHER UNSATISFACTORY MATERIALS.
IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET.
WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS.
BACKFILL TESTING AND COMPACTION. TESTING OF BACKFILL MATERIALS AND COMPACTION
SHALL BE IN ACCORDANCE WITH SECTION 19, "EARTHWORK" AND SECTION 6-3,
"TESTING", OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF
PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL
MEET THE COMPACTION, SAND EQUIVALENT, AND GRADA11ON REQUIREMENTS BEFORE THE
NEXT LAYER IS PLACED.
EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE
COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39
AS MODIFIED ON THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE
ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90%)
RELATIVE COMPACTION FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY
CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE
OF THE FOLLOWING D2922 OR D1556.
IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE
SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED.
COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND
LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER.
SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE
PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING
AND BACKFILL.
HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE
CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND
APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING
AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED
RESIDENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING
WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE
REJECTED.
PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES
THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN
FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER.
PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO UNE AND GRADE, AND IN
SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE
AND TO PREVENT SUDDEN OFFSETS IN THE FLOW UNE AS THE WORK PROGRESSES, THE
INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY
DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE
WEATHER IS UNSUITABLE AT TIMES MEN WORK IS NOT IN PROGRESS, OPEN ENDS OF
PIPE AND FITTINGS SHALL BE CLOSED.
WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO
FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT
PURPOSE IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN
SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING. ON ACCOUNT OF
THE VARIA11ONS IN JOINT CONSTRUCTION OPERATIONS.
CUTTING PIPE THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND
SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE
WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO
ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED
OR INCORRECTLY CUT.
PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED
AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE
UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER
EXFlLTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, 'TESTING PIPELINES"
OF THE 1994 EDITIOONS, 'STANDARD SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION,
AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE
PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24
HOURS PRIOR TO ANY TESTING.
CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO
EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL. WHEN PIPE LAYING IS INTERRUPTED,
AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND
BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO
REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT,
SPRAY HEADS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING
FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER LINE
SEWER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD.
EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO
AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION
COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE
TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON
THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH
THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE
PAID AS SEWER FOR THE APPROPRIATE DIAMETERS.
11. SYSTEM TESTING
A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE
IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE
RECOMMENDATIONS OF THE MANUFACTURER.
PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT
DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING
360. IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO
INSPECTION SHALL BE WITNESSED BY THE CITYS CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL
AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF
ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED
VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES
THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS)
OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER
PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF
THE CITY.
12. WYE FITTINGS SHALL BE INJECTION MOLDED IN -UNE TYPE AND SHALL BE USED FOR ALL
LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE
HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN.
ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING A MINIMUM
OF 4' BEYOND THE PROPERTY UNE OR RIGHT-OF-WAY LINE WITH 30" OF COVER AT FLOW LINE
SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY UNE OR RIGHT-OF-
WAY LINE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1.
LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY UNE OR
RIGHT-OF-WAY UNE AND A MINIMUM OF 2.5' DEEP AT FLOWUNE.
13. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED.
14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD
STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE
STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION,
CURRENT EDITION. ALL CLEANOUIS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY
OF BAKERSFIELD STANDARD DRAWING S-20.
MANHOLES SHALL BE TYPE "A' FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR
PIPES 48' IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE
BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON
KENT -SEAL, IN A GROOVED FOUNDATION.
15. STORM DRAIN PIPE
STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS 111 WITH RUBBER
GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE
CONTRACT PLANS.
16.
REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE
PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE% OF THE STANDARD
SPECIFICATIONS AND THESE SPECIAL PROVISIONS.
EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE
SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE
PLANS OR SPECIFICATIONS FOR STANDARD JOINTS.
HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE
PIPE% OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED.
REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO
SECTION 65-1.066, "RUBBER GASKETED JOINTS", OF THE STANDARD SPECIFICATIONS.
HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE
CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND
APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING
AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED
RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING
WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE
REJECTED.
PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES
THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS
DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE
TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A (LOSE CONCENTRIC JOINT
WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW UNE AS THE
WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND
DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE
TRENCH OR THE WEATHER IS UNSUITABLE AT TIMES WHEN WORK IS NOT IN PROGRESS,
OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED.
WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO
FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT
PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN
SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF
THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM
BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE.
CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND
SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE
WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO
ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED
OR INCORRECTLY CUT.
CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE
INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE
TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH
SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE
CASING ALSO ALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE
BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH
OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL
LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS
SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE.
THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF
BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING.
BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER,
CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE
PERMITTED. THE CASING PIPE SHALL. BE JACKED WITH SUCH PRECISION THAT WILL
ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON
THE PLANS.
UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE
PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION
SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING
SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS
APPROVAL
IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL
TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR
UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF
WORKERS OR THE STABIUTY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR
SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH
SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE
THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A
DETAILED PLAN OF PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL
ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID
PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE
17. MINOR STRUCTURES
MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL
CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF
SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL
PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS
S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD
STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE
PLANS.
THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE
STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL
BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" TO MAKE A
WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET
PLUMB.
18.
SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR
INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN
ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29.
THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A
MINIMUM OF THREE DAYS.
AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF
SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR
PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO
A MINIMUM OF ONE DAY.
THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS.
CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED.
ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS
SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.
AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD
PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN ACCEPTED STREET
RIGHT-OF-WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, A DEPOSIT
BASED ON APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE
RIGHT-OF-WAY AND INSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT.
menti
* 153.77 LF OF 8" SEWER O
0.25% FROM TRACT 6824
* TEMPORARY CLEANOUT PER APPROVED
TRACT 6824 PHASE 3 SEWER do STORM
DRAIN PLANS. REMOVE CLEANOUT AND
CONSTRUCT SEWER MANHOLE.
* SEWER PLANS FOR TRACT 6824 HAVE BEEN
APPROVED. IF SEWER ON 6824 HAS NOT BEEN
CONSTRUCTED PRIOR TO CONSTRUCTION OF TRACT
6536, THEN THE DEVELOPER OF TRACT 6536
SHALL CONSTRUCT SEWER FROM THE CONNECTION
POINT TO EXISTING SEWER ON MOUNTAIN RIDGE
DRIVE IN ACCORDANCE WITH TRACT 6824 SEWER
PLANS AND EASEMENT PROVIDED.
358
354
350
rzh
* 153.77 LF OF 8" SEWER O
0.25% FROM TRACT 6824
342
338
334
330
326
MURFREESBORO DRIVE
(STA. 10+00.00 TO 15+46.44)
SCALE: 1" = 50' HORIZONTAL
FORT HENRY WAY
SEE SHEET 4
I I
1 3
FORT HENRY WAY
SEE SHEET 4
12
2
CENTERLINE
cm 8
-c''
��
NO
o
V-11
p
CV
o
N
ICp
SDMH
Z
9
l
0;10
00 04 12
JUNCTION BOX
W 14
Z
O}+M
I
+
Lou,
%M
+
ci pi
N
+
J
I Lr)a
+
Z
Ui
Q
P
M
P
IP
V12
M
O
N
+
o
I
II
II
I
Z
II'(
�'
j
I
1
c
0
Mz
g
1
I
I
■
�
I
I
I
I
IN
MURFREESBORO DRIVE
(STA. 10+00.00 TO 15+46.44)
SCALE: 1" = 50' HORIZONTAL
FORT HENRY WAY
SEE SHEET 4
I I
1 3
FORT HENRY WAY
SEE SHEET 4
12
2
10+00
11 +00
LEGEND:
CL
CENTERLINE
SMH
INV
INVERT
SCO
SD
STORM DRAIN
SDMH
MH
MANHOLE
EXIST
CB
CATCH BASIN
ELEV
JB
JUNCTION BOX
R/W
J
o
U
0
Mz
g
IIIIIIIIII
+
U
Q
Q
N
r—
PPROXIMATE
FINISHED
RADE
CEN
UNE
g5�
g6
* CONTRACTOR TO
HAVE SURVEYOR
----VERIFY
LOCATION AND
INVERT ELEVATION OF
8" WA
R
SEWER STUB PRIOR
TO BACK FILL
SEWER
STUB
1
RT 8"
SEWS
S =
.25%IN
INVER
8" S
R
INVERT
18"DRAIN
0 3
w
00
00 00
O W
m V)
'J
—I
> >
00
z
M
z
1, T,0
Go
Z
$3
M w
(O
N N
—
~Wj
+M
M
{-
Irv)
+MM
�srM�
>Z
I
V M
»
M
WJ
i�jM
Q-�
J
(AWW4>WCL
INST
LL 35.
LF OF
N W
10+00
11 +00
LEGEND:
CL
CENTERLINE
SMH
INV
INVERT
SCO
SD
STORM DRAIN
SDMH
MH
MANHOLE
EXIST
CB
CATCH BASIN
ELEV
JB
JUNCTION BOX
R/W
SCP STREET CONSTRUCTION PLAN
w w■w s PHASE BOUNDARY
�■■�■■�■■� TRACT BOUNDARY
12+00
SEWER MANHOLE
SEWER CLEANOUT
STORM DRAIN MANHOLE
EXISTING
ELEVATION
RIGHT OF WAY
g48 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
S CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE "A" PER C.O.B. STD. SW -4.
0 CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
13+00
(STA. 10+00.00 TO 15+46.44)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
E
14+00
CONSTRUCT STORM DRAIN PER CITY STANDARDS
CONSTRUCT STORM DRAIN
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
CONSTRUCT CATCH BASIN
TYPE "A" PER C.O.B. STD. D-14.
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
WITH 3.5 OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
2
SHEET WHERE SECTION Is SHOWN
15+00 16+00
CONSTRUCTION NOTES:
O1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
O ENCASE SEWER UNE IN HOT—DIPPED,
BITUMINOUS—COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFlELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
O3 ENCASE SEWER LINE IN HOT—DIPPED,
BITUMINOUS—COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFlELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
360
356
352
344
340
336
332
328
324
SCALE: 1"=50'
25 0 50 100
50 12.5
Know what's below.
0111 before you dig.
r
an
IIIIIIIIII
r
DAVIS DRIGE DRIVE MURFREESBORO DR. PANAMA LANE
SEE SHEET 5
SEE SHEET 3 SEE SHEET 9
T I 5'
I 5, I
I �l 3059' R/W I o 59' o
I T a I 66' +
I
30 30 18 I I I 75'
I - I 15 2
o I w•I R 5' RAW
20' 21Y
R/W oo �- z --T- - - - - - - --L 30 060
30 1-- co
00
wfo)
w+ 17 I 16 I 1_
o a ,� +
-_
-- -- ?� � RAW oD ! R/W o + to a
—W--
N p C,
18" SD
32 b
N M S00'53'43"W 470.02' I-`pV
_
1111+00 12+00 310.00' 13+00-1 - - —� - �— - - -
24" DRAIN cov '�� � � 14+00 in , 236.48' 15+00 INTERSECTION
N M STA. 15+46.48 C.L. FORT HENRY WAY =
STA. 15+47.32 C.L. PANAMA LANE
INTERSECTION R/W 00=INTERSECTION
z
STA 10+00.00 C.L FORT HENRY WAY48STA. 14+90.30 C.L DAVIS DRIDGE AVENUE
STA. 13+10.00 C.L. FORT HENRY WAY = co
L OT "A" STA. 15+46.44 C.L. MURFREESBORO DRIVE
PANAMA LANE
FORT HENRY WAY SEE SHEET 9
(STA. 10+00.00 TO 15+46.48)
SCALE: 1" = 50' HORIZONTAL
362
358
354
350
91 R
342
338
11+00
LEGEND:
CL
ABBREVIATIONS
CENTERLINE
SMH
SEWER MANHOLE
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
CB
CATCH BASIN
ELEV
ELEVATION
JB
JUNCTION BOX
R/W
RIGHT OF WAY
0)
r
O
3
Zo
w N
Z
w N
w
J
._
00 10
J
Q
=
¢
NN
=
ZJ
r
%
SEWER LATERAL LINE TABLE
UNE
BEARING
DISTANCE
L1
N 31'59'31" W
51.41'
L2
S 34'25'40" W
63.94'
0
S 30'19'52" E
35.73'
I
■ II i 1 � II I 3Q I I J
J O
W o Z
'N
L, ■■'■'■}w�- t• t _M II ~^'!� - ~pp- �II �- � �iII I ���II ►-M'(I Cp IIII Na�g0O
i• ►- J
o24 23 IB817
�o�J 22g 21 g 20� o ■•
CVNCD LLI 0 NCCZ NNog O
J _jO
O
O OO N 0;'
W) rnO •M �I CZ UCj I0N CV Q
■Q Zn' c; U W
Z.m W
± m
N�K).C1 NWA,n
tie
nz n $ o g
Wz u'NunN v'
U)Ui
/ R/Wl0�Q�fn0
II
■N89.0617 W
■ i 6 SfWER 100.00 N N89U6'1i"W 8` 190. 1 +00 S89`06'1TE 190-00`14+00 10+0 I- - _ _ •00+00 s
ORT HENRY WAY
SEE SHEET 4
I
1
� 5I20' 20'
'O
O
Z
co
3
D IM
I� I
24 SD 1
N
I
u o
J D
os
�o
JJ
U CU
+ M
d�
n N
0
00) S O $ W Z Z0 O 00 ZO 1� MO
L6 -
■ �pjIMjI(
•�Og JM00JTRACT BOUNDARY I = n
00 W)� rt) In z25 2 27 28 29 3<sNMsW ° 32ujO
I M M I `^-"i .N --M O• I Z �M � M Z I Z . m
I I C) !n !n
■ 1 N$ ( N$I $ 1 Ng I N 5, 10+ Nzz 1 vrQi�z p+ I m + +
5, _ I w
I I I I20' 20' I oa ( OQ W��
■ I I I I N I r I cn cn
I c 1 IT
FAIR GARDEN WAY
SEE SHEET 6
358
354
350
346
342
338
334
330
326
DAVIS DRIDGE AVENUE
(STA. 10+00.00 TO 14+90.30)
SCALE: 1" = 50' HORIZONTAL
u
M
Q
3
JLd
.�-JtWx;;
H
J
C5
0
0
8
4
cn
PHASE LINE
LEGEND:
-
ABBREVIATIONS
CENTERUNE
SMH
:•�_- c�
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
INSTALL
54.71 LF
OF INSTALL
50.00
N
I
u o
J D
os
�o
JJ
U CU
+ M
d�
n N
0
00) S O $ W Z Z0 O 00 ZO 1� MO
L6 -
■ �pjIMjI(
•�Og JM00JTRACT BOUNDARY I = n
00 W)� rt) In z25 2 27 28 29 3<sNMsW ° 32ujO
I M M I `^-"i .N --M O• I Z �M � M Z I Z . m
I I C) !n !n
■ 1 N$ ( N$I $ 1 Ng I N 5, 10+ Nzz 1 vrQi�z p+ I m + +
5, _ I w
I I I I20' 20' I oa ( OQ W��
■ I I I I N I r I cn cn
I c 1 IT
FAIR GARDEN WAY
SEE SHEET 6
358
354
350
346
342
338
334
330
326
DAVIS DRIDGE AVENUE
(STA. 10+00.00 TO 14+90.30)
SCALE: 1" = 50' HORIZONTAL
u
M
Q
3
JLd
.�-JtWx;;
H
J
C5
0
0
8
4
cn
PHASE LINE
10+00 11+00
LEGEND:
CL
ABBREVIATIONS
CENTERUNE
SMH
SEWER MANHOLE
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
INSTALL
54.71 LF
OF INSTALL
50.00
LF
JUNCTION BOX
R/W
RIGHT OF WAY
SCP
STREET CONSTRUCTION PLAN
INSTALL
15!.00
LF OF
24" RCIP
O 0.19
24' R
O 0.1
X I OF
24' RCP
O 0.12X
In
co
IDpOdI
O
ctO
O
J
J
Wtn
Z
•s
Wcn
OW
NN
O
NN
MN
O
. NN
O
J ;
ZZ
.zZM
ZZcSUZ
O —
a
q
a
oo
to
O
pp
2 M
00
M
0
M M
t
0+
M M
+ M
JJ
JJcmn
O�Q
WWWW
JJ
MQ -J
9 Z
1'
04
APPROXIMATE
FINISHED
1
GRAD
O CE
TERUN1
/
wnA
1
1
1
'
,
1
" WA
1
'
•
1
2
* PLUG
'
SEWER
STUB
�N'&RT
N
RT 8"
SEWER
'
NVERT
„ SEWS
8 "
SEWER
*PLUG
2C
1
_
I
SIVERT
INVERT
24"
RAIN
pIN
RT
4' DRA
N
r-
W
. U)
W
Ld
3 z
z
Z
,�
�
O
. m
O
J a0
� 00
O
,
0p OO
W
c
O
O
—
J
>
ZZ
J
_ZZZ
J
ZZ
00
>
z
Z
Q
�
O
Z
W �M T
O
O
C9
raj
i
� d
Ln
co
Z
Q
N N
NCV
J
M M
F
N
M in
�
+ M M
�
M
3
m
>
W
�
W INSALL100.
LF
WW
�QWWW
WW
INSTALL
3.24 LF
OF
W
6
Ac SEUC."
i.00%
-INSTALL
190-00
OF "
vWi
W W
ovC
to
10+00 11+00
PHASE BOUNDARY
� ■ ■ � 0 N � = m � TRACT BOUNDARY
348,.5 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
-s-CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE 'A' PER C.O.B. STD. SW -4.
® CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
12+00
13+00
14+00
(STA. 10+00.00 TO 14+90.30)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1` = 5' VERTICAL
CONSTRUCT STORM DRAIN PER CITY STANDARDS
® CONSTRUCT STORM DRAIN
MANHOLE TYPE 'A' PER C.O.B. STD. SW -4.
atr CONSTRUCT CATCH BASIN
TYPE 'A' PER C.O.B. STD. D-14.
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE 'A"
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
L-- -- A
_2
SHEET WHERE SECTION IS SHOWN
364
360
356
352
348
344
*CONTRACTOR TO HAVE
SURVEYOR VERIFY LOCATION AND
INVERT ELEVATION OF SEWER
STUB PRIOR TO BACK FILL
340
336
332
328
324
15+00 16+00
CONSTRUCTION NOTES:
p1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
p2 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
p3 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
SCALE: 1"=50'
25 0 50 100
50 12.5
Know what's below.
Call before you dig.
am
LEGEND:
CL
ABBREVIATIONS
CENTERUNE
SMH
SEWER MANHOLE
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
CB
CATCH BASIN
ELEV
ELEVATION
JB
JUNCTION BOX
R/W
RIGHT OF WAY
SCP
STREET CONSTRUCTION PLAN
PHASE BOUNDARY
� ■ ■ � 0 N � = m � TRACT BOUNDARY
348,.5 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
-s-CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE 'A' PER C.O.B. STD. SW -4.
® CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
12+00
13+00
14+00
(STA. 10+00.00 TO 14+90.30)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1` = 5' VERTICAL
CONSTRUCT STORM DRAIN PER CITY STANDARDS
® CONSTRUCT STORM DRAIN
MANHOLE TYPE 'A' PER C.O.B. STD. SW -4.
atr CONSTRUCT CATCH BASIN
TYPE 'A' PER C.O.B. STD. D-14.
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE 'A"
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
L-- -- A
_2
SHEET WHERE SECTION IS SHOWN
364
360
356
352
348
344
*CONTRACTOR TO HAVE
SURVEYOR VERIFY LOCATION AND
INVERT ELEVATION OF SEWER
STUB PRIOR TO BACK FILL
340
336
332
328
324
15+00 16+00
CONSTRUCTION NOTES:
p1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
p2 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
p3 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
SCALE: 1"=50'
25 0 50 100
50 12.5
Know what's below.
Call before you dig.
am
IDpOdI
BLOUNTSVILLE DR. DAVIS DRIDGE AVE.
SEE SHEET 7 SEE SHEET 5
t I
C>
�---- -- -- I -- __ --J I 5' I n
-- -- ---, 1-1 I Fz
J--- -
I N I C_V t o
20' I
5 I I I 20' W
I J O
1 20' n 20' I 1 �, 1 30• J in
44 1 �. �. 35 29. Z .+
INTERSECTION fn
20
STA. 10+00.00 C.L.FAIR GARDEN WAY
a
STA. 12+89.15 C.L. BLOUNTSALLE DRIVE I 13 +
__ I W to
W- I
I . N _• 4—_�' __
co
NOO'53 43w E 8w 12+00En
SEWER 320.00'
S "' N M 13+00
45 +-NOO'53'43"E--I - -310.00' --I - - - s
w "' 24" SO SOO.53'43'W 300.00' 7-4,9
+ + n 19
Z
I Z
.o I W IN
I -- -- -- -- -- o Q z 1 wo
Q' o o d T .n v °' a �o--- --
to
I d
z Z 1 ao �5
46 1 ` 5, ,- 1 34 30 J
W+� 5'� =_j __jJ
z z
� 5' 18
I 1 cici
- I 20 20' 9 S M
z _�- Z �, m 'i_ 1 c>o0
�ci I 30-1, I vWi + +
+ jr 0
o+ -- — I — -- �+ �7-
1 i I( g o —<<
47 1 I oaI
31 oa I+
W� 33 U)-
4 1 \11 17
BLOUNTSVILLE DR. DAVIS DRIDGE AVE.
SEE SHEET 7 SEE SHEET 5
358
354
350
346
342
338
334
330
326
FAIR GARDEN WAY
(STA. 10+00.00 TO 13+10.00)
SCALE: 1" = 50' HORIZONTAL
10+00 11+00 12+00
(STA. 10+00.00 TO 13+10.00)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
13+00
LEGEND:
KU
356
358
352
354
348
350
344
346
340
342
336
338
332
334
328
LINE TABLE
UNE III
SIZE
LENGTH
I BEARING
INSTALL
300.00 LF
OF 24"
RCP O 0.18%
ci p
MIS
AIM
It
w
D U
C; -3 c
I
_j In
33
n
Z
PHASE UNE
W
a
a t
J N
N 01
J
>
>
Z
Ibghlll
Z
-
o
110101111111mm,
AIM
MEMEME
MENEM
-
. -
o,-
Ell
o�
011
M
M
Q W LL
v� w
.1
A
PROXIM
TE FINISHED
W g LO.M.
0•�•
111MOME
G
ADE
ENTER
INE —
_ —
1101101!N."
01.11
, 2
AIM
.
Imm
•8"
Mimi
MEN
N
ZRT
J
r
_On
3 W
n
wiz
00 00
p
Lc 1010 I'm ao
z
z
»>
oo
ZZ
z
OCRQ
Z
N N M
m+
�M
EIR
1M M M
AIM
•WW
w
»>Q
Ww
WW
W
cncf
J J _j
WWW
INSTALL
320
00 LF of,
8" PVC
SEWER a
0.3511
10+00 11+00 12+00
(STA. 10+00.00 TO 13+10.00)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
13+00
LEGEND:
KU
356
358
352
354
348
350
344
346
340
342
336
338
332
334
328
LINE TABLE
UNE III
SIZE
LENGTH
I BEARING
L1
18" I
25.0'
S5213 -57-E
MENEEN
34
■■�
I
AIM
ci p
MIS
AIM
w
D U
C; -3 c
I
_j In
33
» z o
PHASE UNE
--m.
Ibghlll
1101010--20mmum110
110101111111mm,
AIM
MEMEME
MENEM
MENNEN
324 A SECTION
6 SCALE: 1" = 50' HORIZ.
1" = 5' VERT.
CL CENTERUNE SMH SEWER MANHOLE
INV INVERT SCO SEWER CLEANOUT
SD STORM DRAIN SDMH STORM DRAIN MANHOLE
MH MANHOLE EXIST EXISTING
CB CATCH BASIN ELEV ELEVATION
JB JUNCTION BOX R/W RIGHT OF WAY
SCP STREET CONSTRUCTION PLAN
® ■ PHASE BOUNDARY
■ ■ ■� ■ ■ ■ ■ TRACT BOUNDARY
348 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
S CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE "A' PER C.O.B. STD. SW -4.
0 CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
48
47
45
0
z
J
-- -- ---z
360
356
352
348
344
340
336
332
CONSTRUCT STORM DRAIN PER CITY STANDARDS
0 CONSTRUCT STORM DRAIN
MANHOLE TYPE 'A" PER C.O.B. STD. SW -4•
CONSTRUCT CATCH BASIN
TYPE "A' PER C.O.B. STD. D-14.
NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A"
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
L-- -- A
2
SHEET WHERE SECTION IS SHOWN
44 0
354
350
346
338
334
330
326
322
FORT SANDERS AVE.
SEE SHEET 8
ll 1,15'ICI�
BLOUNTSVILLE DR.
SEE SHEET 7
II I ( A 111 I
:I �Nrp 25 �� 1,:,:
25
I 22 N I
FORT SANDERS AVE. BLOUNTSVILLE DR.
SEE SHEET 8 SEE SHEET 7
MOSSY CREEK WAY
(STA. 10+00.00 TO 13+10.01)
SCALE: 1" = 50' HORIZONTAL
AIM
34
J N
I
ci p
MIS
AIM
w
D U
C; -3 c
I
_j In
33
» z o
PHASE UNE
:I �Nrp 25 �� 1,:,:
25
I 22 N I
FORT SANDERS AVE. BLOUNTSVILLE DR.
SEE SHEET 8 SEE SHEET 7
MOSSY CREEK WAY
(STA. 10+00.00 TO 13+10.01)
SCALE: 1" = 50' HORIZONTAL
AIM
mmmmmmmmmimm
amnnn
MIS
AIM
--m.
Ibghlll
Ell
011
a,
.1
111MOME
MEN,
1101101!N."
01.11
AIM
Imm
Mimi
MEN
EIR
AIM
m__
AIM
10+00 11+00 12+00
(STA. 10+00.00 TO 13+10.01)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
CONSTRUCTION NOTES:
Ot CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
O2 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
O3 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
13+00
SCALE: 1 "=50'
25 0 50 100
50 12.5
2
356
352
348
344
336
332
328
324
Know what's below.
0111 before you dig.
amnnn
Ibghlll
FAIR GARDEN WAY
1 SEE SHEET 6 I I
■ t I fes- 1 1 R/W"-I Ii i I
■ I 1 J H r 1 I
r --}--- --�-- ---I— --j---- �,, ---) 115'
-- ---I--- --
■ I I I 1 0 3 5' I i
I I I I
!!j 20' 1 1 I
CK 11 301. , H I H ~ N J Z •
' I 1 I I = I I -� 1 9 4 M
�� I� I o t Go
o I $o O� 1 I t o MN� 'oo 0
38 to 37oM MM36 �M35 �: 34M� ^M33z� M 1 Q
I� W 1 N W �n g i °ki v► N in
os + r) (n ( 1 w a
■ I I +� I +"v I cid waOoS ! i ItR yy $M ( '�?io m,°n'�o°, Z
'la-$ ao ( a$ I r< -g I viii rv-�aw IM o+
■ _` Nz t (nz zv~iv~i M a to I (n$z� (n$ o
I I R
- OD - -- - --
N ..
11+00 N 24" D S89'06'170E 185.00'
N
L
> y-
7
�3
I
I
Y
A
W
A
STORM DRAIN
SDMH
1...
MH
MANHOLE
nm
2 Mo
_QF
CATCH BASIN
ELEV
ELEVATION
.J
JUNCTION BOX
R/W
LU C3
W M
STREET CONSTRUCTION PLAN
�i
0 W
W t
I
*o
y0:
� J
$ I
$
c
0
m0
.-
O
cc
10 MgI
la-
12go
W
m
;�
ii>
f 0;1181
I
M
1 1 1 I I
I I I 1 1
J I J ( J ( J I J I
c I I c I I c I
3 0 1 $ I o I $ I o I
g( 4 MM ( 5 M$ ( 6$ I 7 oM
O �
C6 k"110 10
Na I r I 48 I Ia-S C I
I Hz I V)z I (nz I VIZ 1
TRACT BOUNDARY
L
0
7
��
0
7
A
1 1 1 I I
I I I 1 1
J I J ( J ( J I J I
c I I c I I c I
3 0 1 $ I o I $ I o I
g( 4 MM ( 5 M$ ( 6$ I 7 oM
O �
C6 k"110 10
Na I r I 48 I Ia-S C I
I Hz I V)z I (nz I VIZ 1
TRACT BOUNDARY
A
SMH
SEWER MANHOLE
P
A
R
7
1 1 1 I I
I I I 1 1
J I J ( J ( J I J I
c I I c I I c I
3 0 1 $ I o I $ I o I
g( 4 MM ( 5 M$ ( 6$ I 7 oM
O �
C6 k"110 10
Na I r I 48 I Ia-S C I
I Hz I V)z I (nz I VIZ 1
TRACT BOUNDARY
1 sss'0617"E +00
286.15 S +00 i--- - - " +0016+O+00
+ -I S89ros 17"E- '195.00 f } 1-9-+f-0-0 779.20' _20+00 - -1+00
- -
-I F-
t N89'06'17"W 6' SEWER to N 6' 7"W ' N89'O8" SEWER 190.55' 13+00 89•06'17�W 8" SEWER 204.91'14+00 S
■\ i S89t6' 7"E 8'E00' S S
S 9'0617-E 6-270.09'WER 400.
■ 100
R � r r r T
■ Jf I II 1 1 711�
I 1 R/W cr. Of
$"Ix
o bO •� t $ aD ooio a;o ( cz
�-p Qo,o, ooSo o z W o I
$ I g la $ $ $ $ $ o
■ ZI C3 rej ( NO I NO I NO ( NO Ir NO 1 NO I NO Q ! O •� N O N 0" I 0" I ci" pi" I Of" I Oi" ( O O
■ J o ci of • D: I �i,1 $ I N$ I $ I N g I N o 0 0
10 ?i 1: 1 rn I vo 1 c�i°' i �ciV' �� Ng
IO MN I .=N I NO i 0 1 Of0 I NO O i N$ I N I N i Oi" r
V) �j N N N I r= 0 J N M N N N N I I Of I vi
�zoo�-0 (►�iW41 W X42 c�0;,, 43 441 ZJ�45 0;..� 46 �W NW 47 N 0 � Z En 23 d W MW 22 tOW 21 d W 20 rOW1 9 0) l g� � NN 17 16 °°" cc ' NN ,Z��
Q 1 +� ���� �� ^� +� �J +� + (+M �Jcd� (� �, (p 15 14 X13
W M (O rC •- M •- M M _ " W + { d + d ( + ( f �D'r,� Z • (n O W OD ih ih p W
■ _jrnrn I .-rn i= Kj .In ( In I In I=.-� In I !n 1^� Ixoo �M IwM r -M M �M �:r .�� o+�r I o� I +� p '.ci
■ U++ p�p IQO0 la-$ I IQ8 1 a Iz44 Qo I a t �• R/W Zci� In In I !n 1 Ifs I In 1 ""� O NI Ix r
W 0 ( NZ ++ V)Z V)Z $
1- $ ao ro t- , $ IQ ra-$ I a$ t �o (Qo i a I 1< 1j x fA !n rn
V>z m+N rna �z (nz 5 ��+ rnz (~i�z V~iz cn v~iz$ �z Q rnl �$ t 1�-$ t Ia-$ I1a-$ lau�rn
Nam I� 1 I I� 5(��.1 I I +Go (nz cnz (nz �z IW+N
1`'ad �i,� II Icq
■ I I W 1- I 1 13Qa i i 20.20'tWa� �I I ( 1
■ I (1' I 1 I N 'u-) I I 3011 130' 11 10 cn I I r
P j l II( r-1 r cn
- I-----�------�------{--- -- -- -- -- N ------I-------I--------I--- - I -- --
■ I I I P-EMHASE BOUNDARY I t 1 I TI 1 k�/W I --+
■ 1 1 1
MOSSY CREEK WAY
SEE SHEET 6
358
354
350
346
342
338
334
330
326
322
BLOUNTSVILLE DRIVE
(STA. 10+00.00 TO 22+63.35)
SCALE: 1" = 50' HORIZONTAL
22+00
- -+-- - -
a
0
z
U $
MOLD RIVER ROAD
LEGEND:
ABBREVIATIONS
CENTERLINE
SMH
SEWER MANHOLE
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
_QF
CATCH BASIN
ELEV
ELEVATION
JB
JUNCTION BOX
R/W
O
+
�
STREET CONSTRUCTION PLAN
�i
0 W
<
O.
y0:
� J
$ I
$
c
0
m0
co
cc
10 MgI
F—
"L
12go
W
m
;�
ii>
f 0;1181
I
M
�
J
W
+ I
m W
g W I
�
epi W
t+A
C
0(3
� p s
W
NY• 1
'4M t
�
NpM
0WsUi
to to
$
I
++
NZ
NZ
1-8
�N�
I
t
N z
Zdd
--- J-
-- �-
-
0
o1
1 sss'0617"E +00
286.15 S +00 i--- - - " +0016+O+00
+ -I S89ros 17"E- '195.00 f } 1-9-+f-0-0 779.20' _20+00 - -1+00
- -
-I F-
t N89'06'17"W 6' SEWER to N 6' 7"W ' N89'O8" SEWER 190.55' 13+00 89•06'17�W 8" SEWER 204.91'14+00 S
■\ i S89t6' 7"E 8'E00' S S
S 9'0617-E 6-270.09'WER 400.
■ 100
R � r r r T
■ Jf I II 1 1 711�
I 1 R/W cr. Of
$"Ix
o bO •� t $ aD ooio a;o ( cz
�-p Qo,o, ooSo o z W o I
$ I g la $ $ $ $ $ o
■ ZI C3 rej ( NO I NO I NO ( NO Ir NO 1 NO I NO Q ! O •� N O N 0" I 0" I ci" pi" I Of" I Oi" ( O O
■ J o ci of • D: I �i,1 $ I N$ I $ I N g I N o 0 0
10 ?i 1: 1 rn I vo 1 c�i°' i �ciV' �� Ng
IO MN I .=N I NO i 0 1 Of0 I NO O i N$ I N I N i Oi" r
V) �j N N N I r= 0 J N M N N N N I I Of I vi
�zoo�-0 (►�iW41 W X42 c�0;,, 43 441 ZJ�45 0;..� 46 �W NW 47 N 0 � Z En 23 d W MW 22 tOW 21 d W 20 rOW1 9 0) l g� � NN 17 16 °°" cc ' NN ,Z��
Q 1 +� ���� �� ^� +� �J +� + (+M �Jcd� (� �, (p 15 14 X13
W M (O rC •- M •- M M _ " W + { d + d ( + ( f �D'r,� Z • (n O W OD ih ih p W
■ _jrnrn I .-rn i= Kj .In ( In I In I=.-� In I !n 1^� Ixoo �M IwM r -M M �M �:r .�� o+�r I o� I +� p '.ci
■ U++ p�p IQO0 la-$ I IQ8 1 a Iz44 Qo I a t �• R/W Zci� In In I !n 1 Ifs I In 1 ""� O NI Ix r
W 0 ( NZ ++ V)Z V)Z $
1- $ ao ro t- , $ IQ ra-$ I a$ t �o (Qo i a I 1< 1j x fA !n rn
V>z m+N rna �z (nz 5 ��+ rnz (~i�z V~iz cn v~iz$ �z Q rnl �$ t 1�-$ t Ia-$ I1a-$ lau�rn
Nam I� 1 I I� 5(��.1 I I +Go (nz cnz (nz �z IW+N
1`'ad �i,� II Icq
■ I I W 1- I 1 13Qa i i 20.20'tWa� �I I ( 1
■ I (1' I 1 I N 'u-) I I 3011 130' 11 10 cn I I r
P j l II( r-1 r cn
- I-----�------�------{--- -- -- -- -- N ------I-------I--------I--- - I -- --
■ I I I P-EMHASE BOUNDARY I t 1 I TI 1 k�/W I --+
■ 1 1 1
MOSSY CREEK WAY
SEE SHEET 6
358
354
350
346
342
338
334
330
326
322
BLOUNTSVILLE DRIVE
(STA. 10+00.00 TO 22+63.35)
SCALE: 1" = 50' HORIZONTAL
22+00
- -+-- - -
a
0
z
U $
MOLD RIVER ROAD
10+00
11+00 12+00 13+00 14+00 15+00 16+00 17+00
(STA. 10+00.00 TO 22+63.35)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
CL
LEGEND:
ABBREVIATIONS
CENTERLINE
SMH
SEWER MANHOLE
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
_QF
CATCH BASIN
ELEV
ELEVATION
JB
JUNCTION BOX
R/W
RIGHT OF WAY
SCP
STREET CONSTRUCTION PLAN
�i
0 W
<
O.
4D
� J
y{
c
0
m0
co
cc
F—
"L
W
Q
ii>
>
¢0adO
z
�
J
<
m
C
W
W
INSTA
185.00
U 247
CP O
0.16%
IINI�N
ZC
Z W
• J
,
3 N
J
=
•
a s
a
=
zQ
N N
'n
NN
Z Z
.
j
z
Z
Q
d
'u-) 'to
•- •-
M
I� 1�
-
r0
MM
d
rM M
7''Im
_-
D�•
OQ
WW
W >
--
""—
RADEl
TS
UNE
W w
GRADE
® CEN
RUNE
—
—
— —
—
— —
--
NVERT
s"
SEWER
N_
SEWER
'INVERT
8" SE
R
RT 8
;
1 3
--
--
I
VERT
"SEWS
1
8" WATI
7RJ
I
VERT
4 DRA
cc
0
3
00
W
^
W
Z
t0
O 3 W
=
0
W
s a
(:;k-
r0
O
i�
O
=
CD ro
O
a
O
Z
CD aD
J
O
z
J O
j
Z
-1
'>
Z
z
Z-!
j
j
•jj
W
W
r
>
W
_
O
-
_
_
00
Z
C�
x
(� 0
0O
=
Za
Lf)�_
N
M
Q z
'00 Go
Q
OD
Z
Q
OD
M
'' t7
W
zz
00
•M
_
U+M
MM
M
j
. j
a
jj
W
J
V) W
W
N
J INST
W
100.
LF OF
(Wn
W W
LU
F_m
W
W
W
(Wn
W
INSTALL
00
8"
VC
O 0.35
V) W
INST
LL 270.0
LF OF
'PVC SEWER
A 1
00�
PV
SEWER
1.00X
INSTALL
90.55
OF 8"
C SEWS
! 0.35INSTALL
4.91 LF
OF 8' P
SEWER
®0.25%
nn
nn
10+00
11+00 12+00 13+00 14+00 15+00 16+00 17+00
(STA. 10+00.00 TO 22+63.35)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
CL
LEGEND:
ABBREVIATIONS
CENTERLINE
SMH
SEWER MANHOLE
INV
INVERT
SCO
SEWER CLEANOUT
SD
STORM DRAIN
SDMH
STORM DRAIN MANHOLE
MH
MANHOLE
EXIST
EXISTING
CB
CATCH BASIN
ELEV
ELEVATION
JB
JUNCTION BOX
R/W
RIGHT OF WAY
SCP
STREET CONSTRUCTION PLAN
�i
0 W
■■■ PHASE BOUNDARY
■� ■ ■ �■� ■ ■ ■■� ■ ■ � TRACT BOUNDARY
348.5 T•0'M' TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
S CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE 'A' PER C.O.B. STD. SW -4.
® CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
15+00
NEElE CONSTRUCT STORM DRAIN PER CITY STANDARDS
o CONSTRUCT STORM DRAIN
MANHOLE TYPE 'A' PER C.U.B. STD. SW -4 -
CONSTRUCT CATCH BASIN
TYPE "A' PER C.O.B. STD. D-14.
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
_2
SHEET Will SECTION IS SHOWN
I U+UU
LVTVV
CONSTRUCTION NQTES:
a CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
20 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
O3 ENCASE SEWER LINE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
I-ITVV lr-& vv
360
356
352
348
344
340
336
332
328
324
LINE TABLE
UNESIZE
BEARING
LENGTH
BEARING
L1
18'
25.00'
S52'13'S7'E
SEWER LATERAL UNE TABLE
UNE
BEARING
DISTANCE
L2
N 30'54'34' W
59.49'
L3
S 19.04'57' W
51.23'
L4
N 16'13'06" W
30.34'
SCALE: 1"=50'
25 0 50 100
50 12.5
Know what's below.
0111 before you dig.
G53 G
CITY RECORDS NO:
w
0
W ti
co
Z
11111
J
N
0
J
CL
J
-
WZ>
W
p
_
QQ�
CEO
<
z
IL
�i
0 W
<
O.
4D
� J
y{
c
0
m0
co
cc
F—
"L
W
Q
ii>
>
¢0adO
z
�
J
<
m
C
W
W
IINI�N
W ti
co
Z
J
N
0
J
CL
J
-
WZ>
W
p
_
QQ�
CEO
<
z
IL
�i
0 W
<
O.
4D
� J
y{
c
0
m0
co
cc
F—
"L
W
Q
ii>
>
¢0adO
z
�
J
<
m
C
W
W
W ti
356
354
35C
346
342
338
334smim,10MEN
* TEMPORARY CLEANOUT PER APPROVED
TRACT 6824 PHASE 2 SEWER do STORM
DRAIN PLANS. REMOVE CLEANOUT AND
CONSTRUCT SEWER MANHOLE.
—S�
* 319.98 LF OF 8" SEWER O
0.25% FROM TRACT 6824
LINE TABLE
UNE
SIZE
LENGTH
BEARING
L1
30"
39.36'
SOO'53'43"W
L2
30"
25.00'
SOO'53'43"W
L3
24"
15.00'
ISM'53'43"W
SEWER LATERAL LINE TABLE
UNE
BEARING
DISTANCE
L4
S 33V50* W
61.20'
L5
N 3117'54' W
48.97'
* SEWER PLANS FOR TRACT 6824 HAVE BEEN
APPROVED. IF SEINER ON 6824 HAS NOT BEEN
CONSTRUCTED PRIOR TO CONSTRUCTION OF TRACT
6536, THEN THE DEVELOPER OF TRACT 6536
SHALL CONSTRUCT SEWER FROM THE CONNECTION
POINT TO EXISTING SEWER ON MOUNTAIN RIDGE
DRIVE IN ACCORDANCE WITH TRACT 6824 SEWER
PLANS AND EASEMENT PROVIDED.
3%
31
3A
3d
*319.98 LF OF 8" SEWER O
0.25% FROM TRACT 6824
3;
co
■
rn
I I
1
U
1
H
LAU=
��mm��imm
O
o■
Q
O ■
O
J
J I
J
Z
Ln ■
O
'
51 M
�
p
I
R
BE
M
O ■
■
M'
(>
M
O
W U M
50
0-,)
■
■
CA
/
3%
31
3A
3d
*319.98 LF OF 8" SEWER O
0.25% FROM TRACT 6824
3;
A SECTION
$ SCALE: 1" = 50' HORIL
1" = 5' VERT.
3'
3'
3�
32
co
rn
I I
1
Im.
1
H
LAU=
��mm��imm
mum
imum
Q
INSTkLL
J
J I
J
Z
•
O
1
52
O
53
=
p
I
HIM=
I
BE
Z La_
< J
lac
W Q
014=Elmmi�
In
M
W U M
50
0-,)
u'i w
G V
0 <Ix
LL
i m oM
I N
o¢
F.
W
Q
O
+
Q
ds
oz.
p
Qp
a
co
0
11
o V)
cV O
m
Q
=E�@
W_
0
E
N
� M J
v
�Z P
N
in
m
z
0
Ln
W Z
(n
ON,E
>
-mom
O
-j
w
julin
PAN
ME
E
0
x •
E1111111MINEEN
Zo
Z
J N N
fn
E
L1111401
ism
Elm
11MMENENEWERNME
A SECTION
$ SCALE: 1" = 50' HORIL
1" = 5' VERT.
3'
3'
3�
32
TRACT BOUNDARY J
MOSSY CREEK WAY
SEE SHEET 6
H i z
f2LO
- --5' IYi.I `�' I 1 20' 1 z`,� i I �N JJ J F= i" J1 I I I I J 1 J 1_ �� o;- ( g I O i O 1 J i . J Z�� 24 0 25 M 26 ;0 27 1 o i 3 I o I o J of ass �M ;M �M0 28Mo 29Mg 30Mo 31 32s 33 3 IadC I� W CT I pj M I IA CD I - Of M OI
i i/I W, I NWI 1 'n " M r7 `a'o - oI " o n W 10
CD
lm + 1 M Ki NW] I 1 0; : I� —Sn +aF
40
1U%iiOMW II11I /(CanVoW N l(nzl (nz II v`-iI �I II �I I ( I �I 36
Wg, II vWJW"Q 4 I NNNLd pIN Z J.O �44432q1N I O; ( C; 'm
d = - aiOnW��I g I "Z
-•NiV+ 10 _ D
.d:� . D 1:W 338 7.
O " M I NW d IdQ OSI DI +M OD v>
~�IU' 0� d + _�) a0 Q�Z 'M CCii o' g ' t Co Qz Co 0 z + z
NZ°+znz Nz z N�W
I
1 I ILa` _
I
1 I 1 1 i U) cn
1 I I 1 N
..�■.I.�..lNNlNg..I ■.�■.� i i 1 1
1 rioN, T .. Flu .. ■
FORT SANDERS AVENUE
(STA. 10+00.00 TO 21+99.99)
SCALE: 1" = 50' HORIZONTAL
co
rn
I I
1
a•-
1
H
a
J "'
N
Q
INSTkLL
J
J I
J
Z
•
O
1
52
O
53
=
p
C'4 O
'_C3
o'
M o
Z La_
< J
lac
W Q
o
In
M
W U M
50
0-,)
u'i w
G V
0 <Ix
LL
i m oM
I N
o¢
F.
W
Q
O
+
Q
ds
oz.
p
Qp
W
co
U Q
CSN
TRACT BOUNDARY J
MOSSY CREEK WAY
SEE SHEET 6
H i z
f2LO
- --5' IYi.I `�' I 1 20' 1 z`,� i I �N JJ J F= i" J1 I I I I J 1 J 1_ �� o;- ( g I O i O 1 J i . J Z�� 24 0 25 M 26 ;0 27 1 o i 3 I o I o J of ass �M ;M �M0 28Mo 29Mg 30Mo 31 32s 33 3 IadC I� W CT I pj M I IA CD I - Of M OI
i i/I W, I NWI 1 'n " M r7 `a'o - oI " o n W 10
CD
lm + 1 M Ki NW] I 1 0; : I� —Sn +aF
40
1U%iiOMW II11I /(CanVoW N l(nzl (nz II v`-iI �I II �I I ( I �I 36
Wg, II vWJW"Q 4 I NNNLd pIN Z J.O �44432q1N I O; ( C; 'm
d = - aiOnW��I g I "Z
-•NiV+ 10 _ D
.d:� . D 1:W 338 7.
O " M I NW d IdQ OSI DI +M OD v>
~�IU' 0� d + _�) a0 Q�Z 'M CCii o' g ' t Co Qz Co 0 z + z
NZ°+znz Nz z N�W
I
1 I ILa` _
I
1 I 1 1 i U) cn
1 I I 1 N
..�■.I.�..lNNlNg..I ■.�■.� i i 1 1
1 rioN, T .. Flu .. ■
FORT SANDERS AVENUE
(STA. 10+00.00 TO 21+99.99)
SCALE: 1" = 50' HORIZONTAL
360 IV VV
356
352
348
344
340
336
332
1 1 Tvu I/ _rvV13 I4+uu 15+UU 16+00 17+00
(STA. 10+00.00 TO 21+99.99)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
LEGEND:
ABBREVIATIONS
CL CENTERUNE SMH SEWER MANHOLE
INV INVERT SCO SEWER CLEANOUT
SD STORM DRAIN SDMH STORM DRAIN MANHOLE
MH MANHOLE EXIST EXISTING
CB CATCH BASIN ELEV ELEVATION
JB JUNCTION BOX R/W RIGHT OF WAY
SCP STREET CONSTRUCTION PLAN
`NN OMM UNN 11110111111 ® PHASE BOUNDARY
� ■ ■ � ■ ■ � ■ ■ � TRACT BOUNDARY
g45 5 -T o.VA. TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
s CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE "A" PER C.O.B. STD. SVII-4.
® CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
CONSTRUCT STORM DRAIN PER CITY STANDARDS
® CONSTRUCT STORM DRAIN
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
nor CONSTRUCT CATCH BASIN
TYPE "A" PER C.O.B. STD. D-14.
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
2
SHEET TMIERE SECTION IS SHOYMJ
18+00
CONSTRUCTION NOTES:
Ot CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
O2 ENCASE SEWER UNE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
O3 ENCASE SEWER UNE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
19+00
20+00
21+00
SCALE: 1 "=50'
25 0 50 100
50 12.5
22+00
356
352
348
344
340
336
332
328
324
Know what's below.
0111 before you dig.
1t2-G�'3� PHI, a
CITY RECORDS NO:
co
rn
Z
M0
(o
F CD
a
J "'
N
Q
INSTkLL
330.00
LF OF
24" RCP
O 0.45%
U
=tea
z �
'
0c*
O * i
<
mom=
p
m0Z
Z La_
< J
lac
W Q
o
z
W U M
Q 11-
;_c
a
00
G V
0 <Ix
LL
3::
o¢
F.
W
_j
W
co
o V)
cV O
m
Q
m
�
�
i4
N
� M J
v
�Z P
N
in
m
z
0
Ln
W Z
(n
>
O
-j
w
0
x •
:
Zo
Z
J N N
fn
' »>=J
N
to
-1
ZZZ
Z
C3 >.;
og
T�,aM
--
Z
���
��
a
'o
~
a
WWW
"�
PPROXI
ATE FI
(SHED
,6
Q
. >
RADE
CENTERLINE
9
APPSO
FINISH
D
in WWW
(n
W
tai
—
— —
— —
—
— —
— —
—
—
— —
Z
GRA
E CE
TERUN
�`
OM
9
—
— —
— —
—
— —
— —
.2
NVE
T 8" SEWER.
1
1
1
•
,
•
•
,
-
.
1
S=0
_
--
-
`-
-
N
RT 8"
SEWER
25%
INVERT
8"
EWE
4
INVER
F-24 MAIN
-
U W
N 3 W
M
3 W Z
W
0
O
%I-
O cD aJ
a0 a0 c0
O
GD �O
O
>
W
J
J
O
c0
OU
J
ZZ_Z_
ZZ
.,
0- �-
O
�O
_ -
J
O.
--
W
Z
L-
q1tZ
�p +M
.-
pp
O i�
O
MM
M+MMM
MMM
i�
MM
Q0N
6
MM
�+
WJ H J
J
3
Q
W W
_
d'U W
•
J
( WW
cn
WWW
j
WW
"
NMI 11
4nn-00
oF "
WQJ
• PVC
R 0
(n
W
2
360 IV VV
356
352
348
344
340
336
332
1 1 Tvu I/ _rvV13 I4+uu 15+UU 16+00 17+00
(STA. 10+00.00 TO 21+99.99)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
LEGEND:
ABBREVIATIONS
CL CENTERUNE SMH SEWER MANHOLE
INV INVERT SCO SEWER CLEANOUT
SD STORM DRAIN SDMH STORM DRAIN MANHOLE
MH MANHOLE EXIST EXISTING
CB CATCH BASIN ELEV ELEVATION
JB JUNCTION BOX R/W RIGHT OF WAY
SCP STREET CONSTRUCTION PLAN
`NN OMM UNN 11110111111 ® PHASE BOUNDARY
� ■ ■ � ■ ■ � ■ ■ � TRACT BOUNDARY
g45 5 -T o.VA. TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
s CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE "A" PER C.O.B. STD. SVII-4.
® CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
CONSTRUCT STORM DRAIN PER CITY STANDARDS
® CONSTRUCT STORM DRAIN
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
nor CONSTRUCT CATCH BASIN
TYPE "A" PER C.O.B. STD. D-14.
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
UNLESS OTHERWISE NOTED.
SECTION DESIGNATION:
SECTION LETTER
2
SHEET TMIERE SECTION IS SHOYMJ
18+00
CONSTRUCTION NOTES:
Ot CONSTRUCT PIPE SADDLE PER C.O.B. STD.
DET. D-9.
O2 ENCASE SEWER UNE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER UNE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
O3 ENCASE SEWER UNE IN HOT -DIPPED,
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
19+00
20+00
21+00
SCALE: 1 "=50'
25 0 50 100
50 12.5
22+00
356
352
348
344
340
336
332
328
324
Know what's below.
0111 before you dig.
1t2-G�'3� PHI, a
CITY RECORDS NO:
W 00
co
rn
Z
M0
(o
F CD
a
J "'
N
Q
JW
ZZ
M
n
U
=tea
z �
'
0c*
O * i
<
mom=
p
m0Z
Z La_
< J
lac
W Q
o
z
W U M
Q 11-
;_c
a
00
G V
0 <Ix
LL
3::
o¢
F.
W
_j
W
co
o V)
cV O
m
Q
m
�
�
N
� M J
v
�Z P
in
m
z
0
Ln
>
w
0
W 00
co
Z
J
a
J "'
n
W
JW
ZZ
GO
< <
—LU
Q>
=tea
z �
'
0c*
<
mom=
p
m0Z
lac
W Q
F.ac
co �
z
Q 11-
;_c
a
G V
0 <Ix
LL
o¢
F.
W
W
8
=c
W 00
362
358
354
350
346
342
rA-""*-N SECTION
9R SCALE: 1 = 50' HORIZ.
1 = 5' VERT.
Al
(INJS
362
358
354
350
346
�•
1�
1
O1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
CONSTRUCT STORM DRAIN PER CITY STANDARDS
DET. D-9.
0 CONSTRUCT STORM DRAIN
ENCASE SEWER LINE IN HOT -DIPPED,
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
BITUMINOUS -COATED CLASS 150 CAST IRON
m�
PIPE WITH APPROVED MECHANICAL OR
otr CONSTRUCT CATCH BASIN
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
TYPE 'A" PER C.O.B. STD. D-14
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
-DIPPED,
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
O3 ENCASE SEWER LINE IN HOT
INSTAILL
305.80
LF OF 18r
RCP 410.11%
SECTION DESIGNATION:
1
SECTION LETTER
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
A
INSTALL
1565.3
LF
18" R
0 0.11%
Z
•
•
,e .
�
SII
it •1
rA-""*-N SECTION
9R SCALE: 1 = 50' HORIZ.
1 = 5' VERT.
Al
(INJS
362
358
354
350
346
�•
1�
1
O1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
CONSTRUCT STORM DRAIN PER CITY STANDARDS
DET. D-9.
0 CONSTRUCT STORM DRAIN
ENCASE SEWER LINE IN HOT -DIPPED,
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
BITUMINOUS -COATED CLASS 150 CAST IRON
m�
PIPE WITH APPROVED MECHANICAL OR
otr CONSTRUCT CATCH BASIN
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
TYPE 'A" PER C.O.B. STD. D-14
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
-DIPPED,
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
O3 ENCASE SEWER LINE IN HOT
INSTAILL
305.80
LF OF 18r
RCP 410.11%
SECTION DESIGNATION:
1
SECTION LETTER
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
A
INSTALL
1565.3
LF
18" R
0 0.11%
Z
•
•
,e .
�
it •1
T
Fm
�z
.-
,.
o0
0
. P
• a
364
360
356
352
348
344
364
360
rB-***'\ SECTION
9R SCALE: 1 # = 50' HORIZ.
1 = 5' VERT.
12+00
flo
366
362
358
354
350
346
342
CL PANAMA LANE
TRACT BOUNDARY
zkm 10-t'it.JL V.t.. rANAMA Lfflt. =
STA. 15+46.48 C.L. FORT HENRY WAY
IA_Ln 1
/IU MI 1111
FORT HENRY WAY
SEE SHEET 6
PANAMA LANE
(STA. 12+00.00 TO 16+98.65)
SCALE: 1" = 50' HORIZONTAL
ii
17+00 S89.0648"E 18+
00 IN -
0
L OT '.A/'
13+00 14+00 15+00 16+00
(STA. 12+00.00 TO 16+98.65)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
LEGEND:
ABBREVIATIONS
CL CENTERLINE SMH SEWER MANHOLE
r INV INVERT SCO SEWER CLEANOUT
SD STORM DRAIN SDMH STORM DRAIN MANHOLE
MH MANHOLE EXIST EXISTING
CB CATCH BASIN ELEV ELEVATION
JB JUNCTION BOX R/W RIGHT OF WAY
SCP STREET CONSTRUCTION PLAN
PHASE BOUNDARY
■ ■ ® ■ ■ ® ■ TRACT BOUNDARY
TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
S CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE "A" PER C.O.B. STD. SW -4
0 CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
17+00
368
364
360
356
352
348
344
340
CONS MUCIION NOTES:
O1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
CONSTRUCT STORM DRAIN PER CITY STANDARDS
DET. D-9.
0 CONSTRUCT STORM DRAIN
ENCASE SEWER LINE IN HOT -DIPPED,
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
BITUMINOUS -COATED CLASS 150 CAST IRON
m�
PIPE WITH APPROVED MECHANICAL OR
otr CONSTRUCT CATCH BASIN
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
TYPE 'A" PER C.O.B. STD. D-14
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
-DIPPED,
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
O3 ENCASE SEWER LINE IN HOT
INSTAILL
305.80
LF OF 18r
RCP 410.11%
SECTION DESIGNATION:
1
SECTION LETTER
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
A
INSTALL
1565.3
LF
18" R
0 0.11%
Z
�z
.-
,.
o0
0
OJ
Z
d-
w a w
O
d,
m
w
0
z
vi
LLA
�!
j 02 00
�—re—
W
OMA
00
ZJ
Z> >►
Z�
L t
OQ 00
o�
C>
LE
C3
j
�"
Z
Z
•�o�
ZZ
ww
�
w
Z
0
It
N
M
;2
h 1,
C14 fr.
M
w
MM
o¢
w
-APPROXIMATE
NISHED
F—
F—
J J J
�`' w w
i?
w w
V)
U`
w
GRADE
® CEN
RUNE
pts•
W
w w
--
--
—
—
--
—
—
—
—
4•
_0._
_
-
—
--
—
— —
-,a
-_
�
1
INVERT
18" ORI
;"INVERT'
18" CRAIN
13+00 14+00 15+00 16+00
(STA. 12+00.00 TO 16+98.65)
SCALE: 1" = 50' HORIZONTAL
SCALE: 1" = 5' VERTICAL
LEGEND:
ABBREVIATIONS
CL CENTERLINE SMH SEWER MANHOLE
r INV INVERT SCO SEWER CLEANOUT
SD STORM DRAIN SDMH STORM DRAIN MANHOLE
MH MANHOLE EXIST EXISTING
CB CATCH BASIN ELEV ELEVATION
JB JUNCTION BOX R/W RIGHT OF WAY
SCP STREET CONSTRUCTION PLAN
PHASE BOUNDARY
■ ■ ® ■ ■ ® ■ TRACT BOUNDARY
TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION
S CONSTRUCT SEWER PER CITY STANDARDS
® CONSTRUCT SEWER MANHOLE
TYPE "A" PER C.O.B. STD. SW -4
0 CONSTRUCT SEWER CLEANOUT
PER C.O.B. STD. SW -6.
17+00
368
364
360
356
352
348
344
340
LINE TABLE
UNE # SIZE LENGTH BEARING
Al
1 i8" 8.66' N00.53'12"E
L2 18" 21.08' N00'53'12"E
Zi� 0pftft-_
REVISIONS APP VED:
ROGER A MdNTOSH DATE
R.C.E. 33322
.pa -11, Vim' to- is-/S
DANIEL PADILLA DATE
R.C.E. 67008
SCALE: 1 "=50'
25 0 50 100
50 12.5
Know what's below.
0111 before you dig.
CONS MUCIION NOTES:
O1 CONSTRUCT PIPE SADDLE PER C.O.B. STD.
CONSTRUCT STORM DRAIN PER CITY STANDARDS
DET. D-9.
0 CONSTRUCT STORM DRAIN
ENCASE SEWER LINE IN HOT -DIPPED,
MANHOLE TYPE "A" PER C.O.B. STD. SW -4.
BITUMINOUS -COATED CLASS 150 CAST IRON
m�
PIPE WITH APPROVED MECHANICAL OR
otr CONSTRUCT CATCH BASIN
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
TYPE 'A" PER C.O.B. STD. D-14
A MINIMUM 4' HORIZONTAL CLEARANCE FROM
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A"
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3.
WITH 3.5' OPENINGS PER C.O.B. STD. D-14.
-DIPPED,
2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS
O3 ENCASE SEWER LINE IN HOT
UNLESS OTHERWISE NOTED.
BITUMINOUS -COATED CLASS 150 CAST IRON
PIPE WITH APPROVED MECHANICAL OR
SECTION DESIGNATION:
FLANGED JOINTS. ENCASEMENT SHALL PROVIDE
SECTION LETTER
A MINIMUM 10' HORIZONTAL CLEARANCE FROM
A
THE WATER LINE (EACH SIDE) PER CITY OF
BAKERSFIELD STANDARDS AND SPECIFICATIONS
` `
2
FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2.
SHEET WHERE SECTION IS SHOYM
LINE TABLE
UNE # SIZE LENGTH BEARING
Al
1 i8" 8.66' N00.53'12"E
L2 18" 21.08' N00'53'12"E
Zi� 0pftft-_
REVISIONS APP VED:
ROGER A MdNTOSH DATE
R.C.E. 33322
.pa -11, Vim' to- is-/S
DANIEL PADILLA DATE
R.C.E. 67008
SCALE: 1 "=50'
25 0 50 100
50 12.5