HomeMy WebLinkAboutPenske Bakersfield Final ELD 7-10-18 UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:6-10047-16992-9608
Wayne Perry Inc.
Penske #0198-10
8281 Commonwealth Ave.
Buena Park, CA 90621
2929 E. Brundage Ln.
Bakersfield, CA 93307
July 10, 2018
®
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services Date
Diesel Primary Containment System PASS
Post Installation ELD Test Results
7/10/2018
7/16/2018
Date
Test Certification
Post Installation Enhanced Leak Detection (ELD)
July 10, 2018
6-10047-16992-9608
Penske #0198-10
2929 E. Brundage Ln.
Bakersfield, CA 93307
Sergio L. Nunez
This document certifies that the UST systems listed below at the above referenced location have
been tested and passed the iota® VaporTite V005 tightness test. CGRS further certifies that the iota®
VaporTite V005 meets the post installation testing requirements for post installation testing for
newly installed underground storage tank systems as per the California Health and Safety Code,
Chapter 6.7, section 25290.1(j)(1).
Final Test Date:IOTA Technicians:
Site Information Installation Contractor Information
Facility:Customer Name/CA Contractor's License #:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Phone/Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 20,000 Diesel DW Fiberglass CSI Yes PASS
Tank 2 2,500 DEF DW Fiberglass CSI Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 42 40 239.90 DSL TS PASS
S2 42 40 239.90 DSL FS PASS
S3 42 40 239.90 DEF TS PASS
S4 42 40 239.90 DEF FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 42 22 36 144.00 Bravo PASS
UDC2 42 22 36 144.00 Bravo PASS
UDC3 42 22 36 144.00 Bravo PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 36 82.29 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
DSL PL A.O. Smith DW Fiberglass 2 90 PASS
Satilite A.O. Smith DW Fiberglass 2 80 PASS
DEF A.O. Smith DW Fiberglass 2 30 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
DSL Vent A.O. Smith DW Fiberglass 2 30 PASS
DEF Vent A.O. Smith DW Fiberglass 2 30 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
N/A N/A N/A N/A N/A N/A
Reviewed By Date IOTA Tech Signature Date
7/10/2018
CA License No.
7/16/2018 06-1727
2929 E. Brundage Ln.8281 Commonwealth Ave.
Buena Park, CA 90621
COMPONENTS IN CONTAINMENT
Kern Glenn Owens
Howard Wines; Kris Karns 714-381-5802/gowens@wpinc.com
Leak Logs / Repair
Bakersfield, CA 93307
hwines@bakersfieldfire.us; kkarns@bakersfieldfire.us
PIPING
TANKS
Final ELD Test Project Worksheet
7/10/2018
Penske #0198-10 Wayne Perry Inc.
Sergio L. Nunez