HomeMy WebLinkAbout AST 2018BAKERSFIELD FIRE DEPARTMENT
2101 H STREET, BAKERSFIELD, CA 93301
Date: i I- 2li- (&' Inspector: Shane Gardner
Business Name: %-o.3AIf C— �4 iLjC- ®L.,X -T
Business Address: Lj-:;�'c-, � u� IS,,C
Aboveground Petroleum Storage Tank Program -Tier 1 Qualified Facility Inspection Report (v 3.0)
Violation
Number
Program Requirement
Citations
Y or N
Class
Comments
Requirement to Prepare and Implement
4010001
SPCC has been prepared
HSC 6.67
25270.4.5(x); 40 CFR 1
4010057
SPCC plan has been prepared that meets all
HSC 6.67
applicable requirements
25270.4.5(a); 40 CFR 1
4030038
SPCC has been implemented
HSC 6.67
25270.4.5(a); 40 CFR 1
4010008
SPCC onsite If facility staffed 4 hrs /day, or at the
HSC 6.67
nearest field office if not so attended
25270.4.5(a); 40 CFR 1
4010047
Qualified Facility's SPCC plan has been self or PE
HSC 6.67
certified.
25270.4.5(a); 40 CFR 1
112.6(a)(1), 112.6(b)
4010035
Facility prepared appropriate SPCC when no
HSC 6.67
longer meeting Tier 1 /II requirements
25270.4.5(a); 40 CFR 1
SPCC Amendments
4010010
Facility has amended SPCC as necessary
HSC 6.67
25270.4.5(a); 40 CFR 1-
112.5(a), 112.5(b)
4030039
SPCC has been implemented within 6 months
HSC 6.67
of amendment
25270.4.5(a)% 40 CFR 1
112.5(a), 112.5(b)
4010048
Tier I Qualified Facility has certified tech
HSC 6.67
25270.4.5(a); 40 CFR 1
amendments.
Five Year Review
4010009
5 year review performed on SPCC and
HSC 6.67
documented
25270.4.5(a); 40 CFR 1
General SPCC Requirements
4010012
SPCC in writing, follows code seq /cross ref, good
HSC 6.67
eng practice, mgt approval, items not in place
25270.4.5(a); 40 CFR 1
112.7
4010041
SPCC Plan addresses the type of oil and storage
HSC 6.67
capacity for all fixed and portable containers
25270.4.5(a); 40 CFR 1
4010042
SPCC Plan addressed countermeasures for
HSC 6.67
discharge discovery, response and cleanup
25270.4.5(x); 40 CFR 1
(a);
11270.4.
4010017
SPCC contains procedures for reporting a
HSC 6.67
discharge
25270.4.5(a); 40 CFR 1
112.7(a)(3) NO;
4010018
SPCC organized so discharge procedures are
HSC 6.67
readily usable if the facility has no response plan
25270.4.5(a), 40 CFR 1
112.7(a)(5)
4010054
SPCC contains a prediction of direction and total
HSC 6.67
quantity of oil potentially discharged
25270.4.5(x); 40 CFR 1
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
4010020
SPCC addresses the appropriate general
HSC 6.67
containment /diversionary structures /equipment
25270.4 40 CFR 1
).5(a);
4030037
Appropriate (general) containment /diversionary
HSC 6.67
structures /equipment have been provided
25270.4.5(x); 40 CFR 1 112 7(c)
4010023
Employee training and spill prevention briefings
HSC 6.67
discussed in SPCC plan
25270.4.5(a); 40 CFR 1
112.7(f)(1), 112.7(f)(3)
4020001
Training provided for op /maint of equip,
HSC 6.67
discharge procedures, laws /regs, general fac
25270.4.5(a), 40 CFR 1
i
'(
112 7(f)(1)
ops, and SPCC
4010022
Person has been designated as accountable for
HSC 6.67
discharge prevention and reports to
25270.4.5(a); 40 CFR 1
112.7(f)(2)
management
4030040
Spill prevention briefings are conducted
HSC 6.67
annually
25270.4.5(a); 40 CFR 1
4010024
SPCC addresses security measures- lighting,
HSC 6.67
access to handling /storage,
25270.4.5(a); 40 CFR 1
m 1
112.7(8)
valves /pumps /transfer equip
4030001
Handling areas, valves, pumps /starter controls,
HSC 6.67
load /unload connections secured, lighting
25270.4.5(a); 40 CFR 1
1
12.7(8)
adequate
4030034
Oil filled operational equipment containment
HSC 6.67
standards are met
25270.4.5(x); 40 CFR 1
SPCC Requirements for Onshore Facilities
4010027
Facility drainage or drainage controls
HSC 6.67
adequately discussed
25270.4.5(a); 40 CFR 1
112.7(a)(3)(iii);
112.8(b)
4030035
Facility drainage adequately restrained unless
HSC 6.67
40 CFR 1
conditions met
25270.4.5(a);
4030005
Valves used for drainage are manual (not
HSC 6.67
flapper -type) to prevent a discharge
25211270.4.70.4. 5( x); 40 CFR 1
4010029
Adequate discussion of all bulk storage
HSC 6.67
containers located at the facility
25270.4.5(a), 40 CFR 1
112.8(c)
4030012
Material and construction of all containers are
HSC 6.67
compatible with the material stored
25270.4.5(a), 40 CFR 1
4030041
All bulk storage containers have secondary
HSC 6.67
containment to prevent a discharge at Tier I
25270.4.5(a); 40 CFR 1
112.6(a)(3)(ii)
facility
4030006
Rainwater in diked areas is inspected before
HSC 6.67
I; Do
draining
25270.4.5(a); 40 CFR 1
112.8(c)(3)(i -iii)
4010026
Records maintained of drainage from diked
HSC 6.67
25270.4.5(a); 40 CFR 1
areas
112.8(c)(3)(iv)
4030017
Buried section of partially buried or bunkered
HSC 6.67
Qn
metallic tank has corrosion protection
25270.4s(a); 40 CFR 1
!��
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
4010028
SPCC discusses procedures to test /inspect
HSC 6.67
storage containers for integrity per industry
25270.4.5(a); 40 CFR 1
standards
112.8(c)(6)
4030014
Tanks inspected and tested by qualified person
HSC 6.67
in accordance with industry standards
25270.4.5(a); 40 CFR 1
y
4030015
Aboveground containers tested or inspected for
HSC 6.67
integrity based on industry standards
25270.4.5(a); 40 CFR 1
117 Rtr)toq)
4010021
Inspection /integrity testing records signed, kept
HSC 6.67
for 3 years and written inspection procedures
25270.4.5(x); 40 CFR 1
kept
112.7(e), 112.8(c)(6)
4010055
SPCC plan adequately describes overfill
HSC 6.67
prevention methods, including system or
25270.4.5(x); 40 CFR 1
procedures used
112.6(a)(3)(iii)
4030042
Overfill prevention sytems or procedures are
HSC 6.67
used and tested routinely to ensure proper
25270.4.5(a), 40 CFR 1
operation
112.6(a)(3)(iii)
4030021
Visible discharges promptly corrected and any
HSC 6.67
accumulation of oil in diked areas promptly
25270.4.5(a); 40 CFR 1
removed.
112.8(c)(10)
4030026
Aboveground valves, piping, and appurtenances
HSC 6.67
are regularly inspected
25270.4.5(a); 40 CFR 1
117 RIMM)
4030030
Integrity /leak tested buried piping when
HSC 6.67
installed, modified, constructed, relocated, or
25270.4.5(a); 40 CFR 1
vW
replaced
112.8(d)(4)
y
Oil Filled Electrical Equipment
4010037
Oil filled electrical equipment exclusions have
HSC 6.67
been met, and where not met is included in
25270.2(a)(4)
SPCC plan
General Facility Requirements
4010034
Valid permit maintained
HSC 6.1125404.1
4010032
Tank Facility Statement or Business Plan has
HSC 6.67
been submitted
25270.6(a)(1),
'y
25270.6(a)(2)
4040001
Spills /releases of 42 gallons or more of
HSC 6.67 25270.8
petroleum reported upon discovery to Cal OES
& UPAor911
4010033
APSA program fee paid
HSC 6.67 25270.6(b)
4030036
All /any permanently closed tanks are properly
HSC 6.67
closed under the definition in 40 CFR 112.2
25270.4.5(x); 40 CFR 1
112.1(b)(3),112.2
4010044
Substantial Harm Criteria certification
HSC 6.67
maintained at the facility as required
q
25270.4.5(a); 40 CFR 1
4010
Administration /Documentation - General
HSC 6.67; 40 CFR 1
4015
Administration /Documentation - General Local
Ordinance
4020
Training - General
HSC 6.67; 40 CFR 1
4025
Training - General Local Ordinance
4030
Operations Maintenance - General
HSC 6.67; 40 CFR 1
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
4035
Operations /Maintenance - General Local
Ordinance
4040
Release /Leaks /Spills - General
HSC 6.67; 40 CFR 1
4045
Release /Leaks /Spills - General Local Ordinance
4050
Abandonment /Illegal Disposal /Unauthorized
HSC 6.67; 40 CFR 1
Treatment - General
112
4055
Abandonment /Illegal Disposal /Unauthorized
Treatment - General Local Ordinance
Comments:
'6 -There were no violations noted for this inspection
❑ This report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations.
You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided.
Formal enforcement and /or penalty assessment may be initiated for any violations noted, and for those not corrected in a
timely manner. (NOTE: If this is a preliminary report, a final report will follow.)
Operator's Name: � �i C��'�''��_ Operator's Signat e: � ate:
Inspector's Signature: Date: 1,5 r
4