HomeMy WebLinkAboutAST 2018BAKERSFIELD FIRE DEPARTMENT
2101 H STREET BAKERSFIELD, CA 93301
Date: 101-3t (( V- Inspector: Shane Gardner
Business Name: Williams Tank Lines
Business Address: 2148 Bricyn Lane
Aboveground Petroleum Storage Tank Program -Tier I Qualified Facility Inspection Report (v 3.0)
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
Requirement to Prepare and Implement
4010001
SPCC has been prepared
HSC 6.67
25270.4.5(a); 40 CFR 1
4010057
SPCC plan has been prepared that meets all
HSC 6.67
applicable requirements
25270.4.5(a), 40 CFR 1
4030038
SPCC has been implemented
HSC 6.67
25270.4.5(a); 40 CFR 1
4010008
SPCC onsite If facility staffed 4 hrs /day, or at the
HSC 6.67
nearest field office if not so attended
25270.4.5(a); 40 CFR 1
4010047
Qualified Facility's SPCC plan has been self or PE
HSC 6.67
certified.
25270.4.5(x); 40 CFR 1
112.6(x)(1), 112.6(b)
4010035
Facility prepared appropriate SPCC when no
HSC 6.67
longer meeting Tier 1 /II requirements
25270.4.5(a); 40 CFR 1
Nor
SPCC Amendments
4010010
Facility has amended SPCC as necessary
HSC 6.67
25270.4.5(x); 40 CFR 1
112.5(a), 112.5(b)
4030039
SPCC has been implemented within 6 months
HSC 6.67
of amendment
25270.4.5(a); 40 CFR 1
112.5(a), 112.5(b)
4010048
Tier I Qualified Facility has certified tech
HSC 6.67
amendments.
25270.4.5(x); 40 CFR 1
Five Year Review
4010009
5 year review performed on SPCC and
HSC 6.67
25270.4.5(x); 40 CFR 1
S t DUE, F011-
documented
General SPCC Requirements
4010012
SPCC in writing, follows code seq /cross ref, good
HSC 6.67
eng practice, mgt approval, items not in place
25270.4.5(a); 40 CFR 1
112.7
4010041
SPCC Plan addresses the type of oil and storage
HSC 6.67
capacity for all fixed and portable containers
25270.4.5(a); 40 CFR 1
4010042
SPCC Plan addressed countermeasures for
HSC 6.67
discharge discovery, response and cleanup
25270.4.5(a); 40 CFR 1
112.7(a)(3)(iv)
4010017
SPCC contains procedures for reporting a
HSC 6.67
discharge
25270.4.5(a), 40 CFR 1
112.7(a)(3) (vi);
4010018
SPCC organized so discharge procedures are
HSC 6.67
readily usable if the facility has no response plan
25270.4.5(a); 40 CFR 1
112.7(x)(5)
4010054
SPCC contains a prediction of direction and total
HSC 6.67
quantity of oil potentially discharged
25270.4.5(a); 40 CFR 1
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
4010020
SPCC addresses the appropriate general
HSC 6.67
containment /diversionary structures /equipment
25270.4.5(a); 40 CFR 1
112.7(c)
4030037
Appropriate (general) containment /diversionary
HSC 6.67
structures /equipment have been provided
25270.4.5(a); 40 CFR 1
112.7(c)
\/
4010023
Employee training and spill prevention briefings
HSC 6.67
discussed in SPCC plan
25270.4.5(a); 40 CFR 1
112.7(f)(1), 112.7(f)(3)
4020001
Training provided for op /maint of equip,
HSC 6.67
discharge procedures, laws /regs, general fac
25270.4.5(a), 40 CFR 1
112.7(f)(1)
ops, and SPCC
4010022
Person has been designated as accountable for
HSC 6.67
discharge prevention and reports to
25270.4.5(a); 40 CFR 1
112.7(f)(2)
management
4030040
Spill prevention briefings are conducted
HSC 6.67
annually
25270.4.5(a), 40 CFR 1
4010024
SPCC addresses security measures- lighting,
HSC 6.67
access to handling /storage,
25270.4.5(a); 40 CFR 1
112.7(8)
valves /pumps /transfer equip
4030001
Handling areas, valves, pumps /starter controls,
HSC 6.67
load /unload connections secured, lighting
25270.4.5(a); 40 CFR 1
112.7(8)
adequate
4030034
Oil filled operational equipment containment
HSC 6.67
standards are met
25270.4.5(a); 40 CFR 1
SPCC Requirements for Onshore Facilities
4010027
Facility drainage or drainage controls
HSC 6.67
adequately discussed
25270.4.5(a); 40 CFR 1
112.7(a)(3)(iii);
112.8(b)
4030035
Facility drainage adequately restrained unless
HSC 6.67
Conditions met
25270.4.5(a), 40 CFR 1
11,111)
4030005
Valves used for drainage are manual (not
HSC 6.67
flapper -type) to prevent a discharge
25270.4.5(a); 40 CFR 1
�.
112.8(b)(2)
4010029
Adequate discussion of all bulk storage
HSC 6.67
containers located at the facility
25270.4.5(a); 40 CFR 1
112.8(c)
4030012
Material and construction of all containers are
HSC 6.67
compatible with the material stored
25270.4.5(x); 40 CFR 1
Y
4030041
All bulk storage containers have secondary
HSC 6.67
containment to prevent a discharge at Tier I
25270.4.5(( i 40 CFR 1
-
112.6(a)(3)( ii)
facility
4030006
Rainwater in diked areas is inspected before
HSC 6.67
25270.4.5(a); 40 CFR 1
draining
112.8(c)(3)(i -iii)
4010026
Records maintained of drainage from diked
HSC 6.67
25270.4.5(a); 40 CFR 1
areas
112.8(c)(3)(iv)
4030017
Buried section of partially buried or bunkered
HSC 6.67
1
metallic tank has corrosion protection
25270.4.5(x); 40 CFR
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
4010028
SPCC discusses procedures to test /inspect
HSC 6.67
storage containers for integrity per industry
25270.4.5(a), 40 CFR 1
112.8(c)(6)
standards
4030014
Tanks inspected and tested by qualified person
HSC 6.67
in accordance with industry standards
25270.4.5(a); 40 CFR 1
Y
4030015
Aboveground containers tested or inspected for
HSC 6.67
integrity based on industry standards
25270.4.5(x); 40 CFR 1
4010021
Inspection /integrity testing records signed, kept
HSC 6.67
for 3 years and written inspection procedures
25270.4.5(a); CFR 1
112..7(7(e))), , 112.88(( c)(6)
kept
4010055
SPCC plan adequately describes overfill
HSC 6.67
prevention methods, including system or
25270.4.5(x); 40 CFR 1
112.6(a)(3)(iii)
procedures used
4030042
Overfill prevention sytems or procedures are
HSC 6.67
used and tested routinely to ensure proper
25270.4.5(a); 40 CFR 1
112.6(a)(3)(iii)
operation
4030021
Visible discharges promptly corrected and any
HSC 6.67
accumulation of oil in diked areas promptly
25270.4.5(x); 40 CFR 1
112.8(c)(10)
removed.
4030026
Aboveground valves, piping, and appurtenances
HSC 6.67
are regularly inspected
25270.4.5(x); 40 CFR 1
119 q1r4 11A 1
4030030
Integrity /leak tested buried piping when
HSC 6.67
installed, modified, constructed, relocated, or
25270.4.5(a); 40 CFR 1
112.8(d)(4)
replaced
Oil Filled Electrical Equipment
4010037
Oil filled electrical equipment exclusions have
HSC 6.67
been met, and where not met is included in
25270.2(x)(4)
' g-
,SPCC plan
General Facility
Requirements
4010034
Valid permit maintained
HSC 6.11 25404.1
° f'
4010032
Tank Facility Statement or Business Plan has
HSC 6.67
been submitted
25270.6(x)(1),
25270 6(a)(2)
4040001
Spills /releases of 42 gallons or more of
HSC 6.67 25270.8
petroleum reported upon discovery to Cal OES
A-
& UPAor911
4010033
APSA program fee paid
HSC 6. 67 252 70.6(b)
Y
4030036
All /any permanently closed tanks are properly
HSC 6.67
closed under the definition in 40 CFR 112.2
25270.4.5(a); 40 CFR 1
�v
112.1(b)(3),112.2
4010044
Substantial Harm Criteria certification
HSC 6.67
maintained at the facility as required
25270.4.5(a); 40 CFR 1
4010
Administration /Documentation - General
HSC 6.67; 40 CFR 1
4015
Administration /Documentation - General Local
Ordinance
4020
Training - General
HSC 6.67; 40 CFR 1
4025
Training - General Local Ordinance
4030
Operations /Maintenance - General
HSC 6.67, 40 CFR 1
Violation
Viol
Number
Program Requirement
Citations
Y or N
Class
Comments
4035
Operations /Maintenance - General Local
Ordinance
4040
Release /Leaks /Spills - General
HSC 6.67, 40 CFR 1
4045
Release /Leaks /Spills - General Local Ordinance
4050
Abandonment /Illegal Disposal /Unauthorized
HSC 6.67; 40 CFR 1
Treatment - General
112
4055
Abandonment /Illegal Disposal /Unauthorized
Treatment - General Local Ordinance
Comments:
❑ There were no violations noted for this inspection
This report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations.
You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided.
Formal enforcement and /or penalty assessment may be initiated for any violations noted, and for those not corrected in a
timely manner. (NOTE: If this is a preliminary report, a final report will follow.)
Operator's Name: /f-4�ao -/ � Operator's Signature: Date: /a -JJ -/1?
Inspector's Signature: Date:
4