Loading...
HomeMy WebLinkAbout1.2-7300 Ph 3CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PIAN P/L RIGHT OF WAY T.O.M. 363.2 TOP OF MANHOE/TOP OF CLEANOUT ELEVATION CONSTRUCT SEWER PER CITY STANDARDS 0 CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. SW -4 AND SW -5. ® CONSTRUCT SRO CLEANOUT PER C.O.B. STD. SW -6. --- D CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE 'A" PER C.0.9. STD. SW -4 & SW -5. CONSTRUCT CATCH BASIN TYPE 'A" PER C.O.B. SID. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.0.6. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE UNLESS OTHERWISE NOTED. 4) NO SEWER LATERALS SHALL BE WITHIN 5' FROM CLEANOUTS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LEVER �__—_ SHEET WHERE SECTION IS SHOWN 2 q MULTIPLE UTILITY I TRENCH * Y MAX. I I I I I. I6TYP. \ ` ON DEEP SEWER, SLOPE LATERALS TO LOT UNE SO THAT THE END OF LATERAL IS WITHIN REQUIRED TOLERANCE. STAMP AN "S" INTO CURB FACE OVER EACH SEWER LATERAL ¢ SEWER MAIN T& TYP. FINISHED STREET GRADE DETAIL VICINITY MAP NO SCALE F 1f MIN. � SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTIUTY TRENCHES TYPICAL SEWER LATERAL INSTALLATION * FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTIUTY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. NOTE: CONTRACTOR TO VERIFY THAT WATER MAIN. AND SEWER LATERAL CROSSINGS ARE IN CONFORMANCE WITH CALIFORNIA HEALTH CODE REQUIREMENTS. 7' MAX.* EXISTING SUMP IFIL : 4 am 101 O l SEWER AND STORM DRAIN PLANS FOR VESTING TENTATIVE TRACT 7300 13 12 TRACT 7299 (Nor A , 23 TRACT 7302 __.(Nor A PART) f�—LS Wi 17 / UNI TI D (NOT A PART) r 27 29 SmEn um C N1T 24 ,] ,6 1e ,e ,i ,Y 3 IAT ill qaTI TD, f L UNIT 2 loll lNlsf A \ANTI�- 2a \ zD \ \ z 7 \ zz I `�,,y� %U N 1 7 8 z,'®�j-\ INoT A/.PART) U N 1 T 5/ 4 \ 8$ \ \/ \ 1D (NM A PART) 12 "117 21 20\ ry \;a \i v �� v'., a� U N I T d� � `v U N! / �I v V A v/ (Nor A PARI) z (NOT A PART) INOT A PARI') { 14 22 24 12 V � 1 SEWER IMPROVEMENTS STOCKDALE TOTAL T. 30 S, a R. 26 E. y�Gy 0 1,257 LF 1,257 LF 4" LATERALS 1177 LF 1177 LF STANDARD MANHOLE 0 6 EA CLEAN—OUT 2 2 EA <PROJECT 2 EA SIT STORM DRAIN IMPROVEMENTS UNIT 3 TOTAL W 100KLL KM � MING AVENUE 30" DRAIN LINE 90 LF m aw rear g 291 LF 291 LF 42" DRAIN LINE b 116 LF CATCH BASINS d o P STANDARD MANHOLE 1 2 OUTLET STRUCTURE 1 EA z STORM DRAIN IMPROVEMENTS (IN PUBLIC R.O.W.) A0 TOTAL 18" DRAIN LINE r� a 30" DRAIN LINE 475 LF 475 LF >n �a 19 LF 19 LF WHITE LANE S 3 EA a m 14 13 N SOUTHERN PACIFIC RAILROAD STAMP AN "S" INTO CURB FACE OVER EACH SEWER LATERAL ¢ SEWER MAIN T& TYP. FINISHED STREET GRADE DETAIL VICINITY MAP NO SCALE F 1f MIN. � SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTIUTY TRENCHES TYPICAL SEWER LATERAL INSTALLATION * FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTIUTY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. NOTE: CONTRACTOR TO VERIFY THAT WATER MAIN. AND SEWER LATERAL CROSSINGS ARE IN CONFORMANCE WITH CALIFORNIA HEALTH CODE REQUIREMENTS. 7' MAX.* EXISTING SUMP IFIL : 4 am 101 O l SEWER AND STORM DRAIN PLANS FOR VESTING TENTATIVE TRACT 7300 13 12 TRACT 7299 (Nor A , 23 TRACT 7302 __.(Nor A PART) f�—LS Wi 17 / UNI TI D (NOT A PART) r 27 29 SmEn um C N1T 24 ,] ,6 1e ,e ,i ,Y 3 IAT ill qaTI TD, f L UNIT 2 loll lNlsf A \ANTI�- 2a \ zD \ \ z 7 \ zz I `�,,y� %U N 1 7 8 z,'®�j-\ INoT A/.PART) U N 1 T 5/ 4 \ 8$ \ \/ \ 1D (NM A PART) 12 "117 21 20\ ry \;a \i v �� v'., a� U N I T d� � `v U N! / �I v V A v/ (Nor A PARI) z (NOT A PART) INOT A PARI') { 14 22 24 12 V � 1 SEWER IMPROVEMENTS UNIT 3 TOTAL 6" SEWER LINE 225 LF 225 LF B" SEWER LINE 1,257 LF 1,257 LF 4" LATERALS 1177 LF 1177 LF STANDARD MANHOLE 6 EA 6 EA CLEAN—OUT 2 EA 2 EA DROP MANHOLE 2 EA 2 EA STORM DRAIN IMPROVEMENTS UNIT 3 TOTAL 18" DRAIN LINE 200 LF 200 LF 24" DRAIN LINE 985 LF 985 LF 30" DRAIN LINE 90 LF 90 LF 36" DRAIN LINE 291 LF 291 LF 42" DRAIN LINE 116 LF 116 LF CATCH BASINS 3 EA 3 EA STANDARD MANHOLE 6 EA 6 EA OUTLET STRUCTURE 1 EA 1 EA STORM DRAIN IMPROVEMENTS (IN PUBLIC R.O.W.) UNIT TOTAL 18" DRAIN LINE 56 LF 56 LF 30" DRAIN LINE 475 LF 475 LF 36" DRAIN LINE 19 LF 19 LF STANDARD MANHOLE 3 EA 3 EA PROJECT MAP SCALE: 1"=200' ® SHEET NO. INDEX INDEX OF SHEETS SHEET TITLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS 3. DELAMERE STREET 4. HARBOROUGH DRIVE 5. WILDEVE WAY & ADDLINGTON DRIVE 6. HIGHGATE PARK OFFSITE (FUTURE) 7. OFFSITE STORM DRAIN CECT 2FZG4-i'ES OFOce uT.�baC� 09- FSNAI 1J �,I,TgQEG7S-oI"Sg I+�SLL. 001 E ALLDOtZ 1;09- (a,py 15ui�OsrLG PEa'kLT ,w1iTH2,-I "CN6 �ouNOS bC -cN£g T2ACT LIT+-L� TVLE SeA�ea l..'ca< C+sa'Tsoe) p.1a Oesa_AtsoacV� A+ D:TEr-vkea>✓O .Sq C.OaAPLE'T�' EaT.>:Ne£n I �V THE. CZS') UNIT 3 NOTE: 1. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 326-3049. NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. 2. ALL FACILITIES TO BE PRIVATELY MAINTAINED UNLESS OTHERWISE NOTED ON PLAN. 3. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS & STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DESIGN CRITERIA ENCOUNTERED DURING CONSTRUC O SHALL BE CORRECTED AND S ORRECT 5 LL BE REF D ON CORRECTED PLANS AND UBMI ED T l E I I�GINE \i A O E 8 OG A. McINTOSH R.C.E. 33322 DATE IN ACCORDANCE WITH THE CONDITIONS OF THE VTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY TH CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS HEREIN ARE PRIVATE AND ARE TO BE PRIVATELY MAINTAINED. UNLESS OTHERWISE NOTED ON PLAN. APPROVED BY: NICOLAS FIDLER, PUBLIC WORKS DIRECTOR DATE R.C.E. NO. 61069 REVIEWED BY: Q`y v — I2—S"/51W. STUART J. PATTESON, ASSISTANT PUBLIC WORKS DIRECTOR R.C.E. NO. 44898 BASIS OF BEARINGS: THE BEARING OF N 01'02'20" E SHOWN FOR THE EAST LINE SECTION 10, T. 30 S., R. 26 E. AS SHOWN ON RECORD OF SURVEY, BOOK 25, PAGE 49 WAS USED AS THE BASIS OF BEARING SHOWN HEREON. BENCHMARK USED: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE INTERSECTION OF MING AVENUE AND ALLEN RD., ALSO BEING THE NORTHWEST CORNER OF SECTION 12, T.30S., R.26E., ELEV = 367.96' (NAVD 88 DATUM) Know what's below. Call before you dig. STANDARD NOTES: ,w e vi o N 1. GENERAL CONTRACTOR WILL FURNISH ALL MATERIALS, TOOL& LABOR, EQUIPMENT AND z FMIIIIIII- V SUPERMSIN NECESSARY TO COMPLETE INSTALLATION. CHEMICAL SOLUTION CONCENTRATION CONTRACTOR SHALL SHOVEL -SUE OR HAND TAMP BEDDING IN THE HAUNCH REAS, AS 13. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. 20X+ 1.1. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS THS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. N UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS SULFURIC ACID INSTALLED IN THE TRENCH, ALL SURFACES COVERED WITH LINING, INCLUDING WELDS, SHALL SHOVEL -SEQUA TE HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT 14. ALL MANHOLES SHALL CONSTRUCTED IN ACCORDANCE NI70 THE CITY OR BAKER1-1.07 BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. SODIUM HYDROXIDE 5% BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR UP TO THE QUARTER POINT E THE PIPE. - OFTO S-& AND 5-21 AND SECIFOR NS 70-1,02H AND 71-1.07 OF THE STANDARD DRAWINGSICA TO CALL FOR USA LOCATE AND ALL MARKED UTILITIES THAT CROSS AMMONIUM HYDROXIDE 5%+� TINKER & RASOR MODEL NO. AP -W WITH POWER PACK OR APPROVED EQUAL WATT ) THE IONS7. STANDARD SPECIFICATIONS NI THE STALE OF CALIFORNIA, DEPARTMENT TRANSPORTATION, EWER A WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL OR ARE WT OR NITRIC ACID 1%"- INSTRUMENT SET BETWEEN 18,000 AND 22000 VOLTS. INITIAL BACKFILL 'BEDDING MATERIAL' AS SPECIFIED ASTM SHALL BE USED CURRENT ALL N SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY DR AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR READ OF ANY H FERRIC CHLORIDE 1% 1% m IN THE PIPE ZONE FOR INITIAL BACKFILL. AFTER TUE PIPE HAS BEEN PROPERLY AID THE PI BEEN OF BRERS1ElD STANDARD DRAWING S-20. BAKERSFIELD ARD WI EXCAVATIONS TO VERIFY THAT THE PROPOSED DECOR DOES NOT CONFLICT WITH ANY SOAP 0.1% ALL WELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD. AND INSPECTED, INITIAL BACKFILL SHALL PACED N BOTH SIDES AND OVER THE UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER STALLLBBE NOTIFIED IN ODDER DETERGENT 0.1% ALL PATCHES OVER HOLES TO OR REPAIRS THE LINER WHEREVER DAMAGE HAS R PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH MANHOLES SHALL BE TYPE "A' FOR PIPES UNDER 48° IN DIAMETER AND TYPE 'B' FOR TO REDESIGN THE ALIGNMENT. IF RELOCATION E EXISTING UTILITIES IS DEEMED NECESSARY ALKYL BENZYL SULFONATE OR S (LINER A OCCURRED SHALL BE ACCOMPLISHED IN ACCORDANCE VATH SECTION 7-20 1.E 3( ) PARA. SHALL BE AT LEAST TO THE ELEVATION SHOWN N THE PANS. THE MATERIAL SHALL PIPES 48° IN DIAMETER OR LARGER. UNLESS NOTED OTIHERINE. THE BOTTOM MANHOLE THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF BACTERIOLOGICAL BOD NOT LESS THAN 700 PPM 8 ABOVE. BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON THE ALIGNMENT REQUIRES ADDITIONAL PIPET EXCAVATION THE TN Q GH' `c MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO KENT SEAL, IN A GROOVED FOUNDATION. IN GED THE SHALL COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER CEDE OF THE LINER COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION . CONTRACTOR STALL BE WHOLLY RESPONSIBLE FOR 11S REPAIR. C E-WAUFlCATION TEST AND WHEN MATERIAL WILL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2 OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE 15. STORM DRAIN PIPE 0 O FFOORIMUTATINS REECHANGED. INCHES (50 MM) BELOW THE LINER TO PROVIDE A TAB. A 10 -POUND (5 KG) PULL RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WALL NOT BE CONTRACTOR SHALL VERIFY LOCATORS AND ELEVATIONS OF EXISTING SEWER LINES THAT -WLUMEIRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS. HILL BE APPUED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF PERMITTED. STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS III NTH RUBBER THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE THE STRUCTURE BY MEANS OF A SPRING BALANCE. LINER ADJOINING THE WELDING GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. 1.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHALL BEA STRIP WILL BE HELD AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE. THE SUBSEQUENT BACKFILL ABOVE THE LEVEL E INITIAL BACKFILL, THE TRENCH MAY BE CONTRACT PANS. UTIUTIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR MINIMUM OF 0.055 INCH (1.65 MM) IN THICKNESS. LOCKING EXTENSIONS OF THE 10 -POUND (5 KG) PULL WILL BE MAINTAINED IF A WELD FAILURE DEVELOPS UNTIL NO BACKFILLLD WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE TO CROSSING UTILITIES SHALL BE DAYUGHTW AND CHECKED FOR GRADE, SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED VATH THE FURTHER SEPARATION OCCURS DEFECTIVE WELDS WILL BE RETESTED AFTER REPAIRS HAVE OPTION E THE CONTRACTOR, MATERIALS MAYBE USED. NATIVE REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE SHALL CONFORM TO THE CONTRACTOR BY CONTRACTOR PRIM TO TRENCHING. SLEET BEEN MADE TABS SHALL BE TRIMMED AWAY NEATLY TUE INSTALLER OF THE LINER IALSELECT MATERIAL MAY BE COM IMPORTED MATERIAL MAY 8E COMPACTED BY TAMPING AND/OR ROVING, PROVISIONS IN SECTION "REINFORCED CONCRETE PIPE', E THE STANDARD ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, AFTERIN THE WELDING STRIP HAS PASSED INSPECTION. IN SHALL MADE IP USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. SE SPECIFICATIONS AND THEE SPECIAL PROVISIONS. ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED 1.E INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING V 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN OHE TO PREVENT TEARING DIN ORE AS DIRECTED BY THE CITY ENGINEER. E SHEETS IN COLD WEATHER AND THE WELDING OF ALL JOINTS, SHALL BE DONE IN THE PROJECTING DAMAGE TO THE LINER FROM THE WELD STRIP AND WHEN THE COMPACTS BY TAMPING AND/OR ROVING, THE EXCEPT AS OTHERWISE BY CLASSIFICATION ON THE PANS OR THE G ACCORDANCE 'NTH THE RECOMMENDATIONS OF THE LINER MANUFACTURER. EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. AND N OR TAKEN INCHES I MATERIAL SHALL BE PACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE HALL BE FOR CULVERT M SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE ALL AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL E .� 9::i JO as DEPTH EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING / PANS OR SPECIFICATIONS FOR STANDARD JOINTS ACED IN APAVINGCCORDANCE REPLACED IN ACCORDANCE W1Ti THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6 COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON SHOP DRAWINGS CONTRACTOR SHALL SUBMIT MANUFACTURER INFNMAIIN BEFORE SUCCEEDING LAYERS RE PACED. N EXCEPT AS NOTED N PLANS THE PANS. SHOWING DIMENSNAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW. 0 H HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE STAMP AN "S" INTO THE. CURB FACE OVER EACH SEWER LATERAL OOMPACTIN OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF PIPE', OF THE STANDARD SPECIFICATIONS WILL NOT BE REWIRED. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSORS RUNNING PARALLEL PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM TRENCH DESINATIN 'C'. RCP LASS V SHALL BE INSTALLED PER ASTM TRENCH FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING ANO/OR CONCRETE PIPE SHALL HAVE RUBBER GF EIED JOINTS CONFORMING TO WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT- Wi7H THE LONGITUDINAL AXIS OF THE PIPE DESIGNATION "D". ROVING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT N 65 BECKON 65-1.068, 'RUBBER GASKETED JOINTS", OF THE STANDARD SPECIFICATIONS. SECTION T OF -WAY. UNLESS SECURED BY AN I E AGREEMENT, APPROVED INSURANCE AND STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF 6 ENGIN R' SECURITY BASED ON APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED YATHIN THE LINING SHALL BE HELD SNUGLY IN PACE AGAINST INNER FORMS. %FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90� RELATIVE HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE THE RICHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMITCOMPACTION. H LOCKING EXTENSION SHALL TERMINATE NOT MODE THAN 1-1/2 INCHES (38 MM) PVC FOR PIPE SIZES 18' AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET e• CAREFULLY HANDLED AT ALL TIMES ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING. HAULING, UNLOADING. HANDLING ANY ITEMS IN PUBLIC RE DAMAGED N DO NOT MEET CURRENT RIGHT-OF-WAY WAY THATKS FROM THE END E THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN THE FOLLOWING REQUIREMENTS SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM AND PACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED STAND STANDARDS SET BY PUBLIC WIRE REPAIRING AND OR/ UPGRADING AS PER CITY PUBLIC WILL RE ENGINEER. USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 MM) BEYOND THE END OF THE 1. MATERIAL PVC PIPE SHALL MEET N EXCEED ALL REQUIREMENTS SET FORTH SINES N LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE RESILIENT JOINTS ON PIPE AND FITTINGS ELL NOT E DAMAGED. ANY PIPE OR FITTING COMPACTION TESTS SHALL BE THE RESPONSIBUT7 OF THE DEVELOPER/CONTRACTOR. THE INSIDE SURFACE. ASTM D 303412 VASDR OF 35. EASTNERIC SEALS AND JOINTS SHALL CONFORM MATTER, N OTHER UNSATISFACTORY MATERIALS. REJECTED, VATH A NT DAMAGED OR FATTENED PALL CAUSE THAT PIPE OR FITTING TO BE NUMBER AND LOCATION OF REWIRED TESTS SHALL BE DETERMINED BY THE CIN ENGINEER CONCRETE POURED AGAINST LINING SHALL E VIBRATED, SPADED OR COMPACTED IN T TO ASTM D 3212 AND ASTM F 477. IN NO CASE SHALL JETTING GI ALLOWED FOR BACKFILL COMPANION THE STREET. PIPE LAYING. NO PIPE SHALL BE AID UNTIL THE ENGINEER INSPECTS AND APPROVES 2 STANDARD DETAILS A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE, 2. TESTING. MANUFACTURING TESTING METHODSSHALL CONFORM ASTM NWITHINON-STREET WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NN -STREET REAS THE CONDITION OF THE BOTTOM of THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT HOMOGENOUS CONCRETE, SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE CONCRETE. F-679 (T -WALL). CERTIFICATES OF COMPLIANCE STALL BE MADE AVAILABLE TO THE ) SHA AB ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. AHE FDLLOWANG CITY OF STANDARDS SHALL 5, CNC. PRT OF THEE PLANS ENGINEER BACKFILL TESTING AND COMPACIN, TESTING OR BACKFILL MATERIALS AND COMPACTION ;BAKERSFIELD D -1L D-14, D-16, D-18, SW -1, SW -2 SW -3, SW -4, SW -5, SW -6, SW -9, SW -11, ST -6, ST -22 SW- SW- IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE UNING FROM SHALL BE IN ACCORDANCE WITH SECTION 19, 'EARTHWORK" AND SECTION 6-3, PIPE APING SHALL BEGIN FROM THE DOWPING SHALL END OF THE STORM DRAIN AI AS 3. VCP INSTALLATION DAMAGE. SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINED a INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S 'TESTING', E THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF DIRECTED BY THE ENGINEER. PIPE LAYING STALL PROCEED INTI EACH PIECE AID TRUE MATERIALS : THE PIPE AND FITTINGS SHALL EXTRA STRENGTH VITRIFIED CLAY SURFACES WHEN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING STALL GUIDELINES, THESE SPECIFICATIONS AND ASTM D 2321 "UNDERGROUND INSTAIATION OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL R) LINE AND OAND IN SUCH A MANNER TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOININGNING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE CONFORMING TO WARRENT ASTM SPECIFlCATON C-700 AND SHALL BE INSTALLED IN BE PULLED, WITHOUT TEARING THE LINING, AND THE RESULTING HOLES CLEARLY MARKED, FLEXIBLE THERMOPLASTIC SEWER PIPE.*. MEET THE COMPACTION, SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS ALL NAIL AND TIE HOLES AND ALL WI TORN AND SERIOUSLY ABRADED AREAS IN NEXT LAYER IS PLACED. DEBRIS OR EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION E THE OF THE STATE OF CAUFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION THE UNING SHALL BE PATCHED. PATCHES MADE ENTIRELY VATH WELDING STRIP SHALL 4. FIELD TESTS. IN -FIELD PRESSURE TESTS SHALL CONFORM TO THEE EACH LAYER OF BACKFILL SHALL THOROUGHLYNONCI COMPACTED THE RELATIVE TRENCH OR THE WEATHER IS UNSUITABLE AT TIMES WHEN WORK IS NOT IN PROGRESS, AND THE CURRENT ASTM SPECIFICATIONS C-12 BE FUSED TO THE LINER OVER THE ENTIRE PATCH AREA. LARGER PATCHES MAY SPECIFICATIONS AND THE FOLLOWINGOPEN FI COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD 5-39 IS ENDS OF PIPE AND FITTINGS SHALL E CLOSED. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END ANDA SPIGOT ENO CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA WITH ADHESIVE. DEFLECTION MEASUREMENT PVC PIPE AFTER 30 DAYS OF INSTALLATION THE AS MODIFIED N THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE WITI BELLED END PIPE, BELL HOLES SHALL THEN E EXCAVATED AT EACH JOINT TO EWTIH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION ALL CEDES MUST OI ING T ED INTI WELDING STRIP FUSED TO THE PATH AND THE SOUND LINING ADJOINING THE DAMAGED AREA. S IP THE BY PU A GO -NO-GO 5% MANDREL STALL MEASURE EDGE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT 9 FACILITATE THE JOINT OPERATIONS. AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT C-425. THE MANDREL ROUGH ONE PERSON THE MANDREL STALL BE PULLED THROUGH THE PIPE WITH ROPE NTH RELATIVE COMPACTION FOR THE TOP FINISHED AND SHALL BE DETERMINED BY PURPOSE ODDER THAT BELL HOLES MAY E PROPEL LOCATED, NOT MORE THAN THE PIPE AND FITTINGS FOR 6", 8", 10'. AND 12' SANITARY EWER MAINS MAY HOT JOINT COMPOUNDS, SUCH AS COAL TR, SHALL NOT BE POURED OR APPLIED MECHANICAL ADVANTAGE. THE MANDREL SHALL HAVE VANES AT LEAST A TM30' CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE SIX (6) HOLES SHALL EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF E PI BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WATT THE CURRENT ASTM TO THE LINING A LNG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE LONG A OF THE FOLLOWING D2922 N D1556. IN THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS SPECIFICA11N C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO NTH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS THE MANDREL THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR 'MAINLINE' INSTALLED LINING FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE DIAMETER WALL BE CALCULATED USING THE FOLLOWING FORMULA: IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MET THE BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE. BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. WORK. SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING 1.F APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING 0X MANDREL DIAMETER BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND CUTTING PIPE THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE LATERALS MAY BE PLAIN -END NTH COMPRESSION COUPLINGS CONFORMING WITH THE SHALL BE SET FLUSH NTH THE INNER EDGE OF THE BELL OR SPIGOT END OF A PIPE WHERE Y = ALLOWABLE DEFLECTION IN % LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. WORK. ALL PIPE SHALL BE WT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT SECTION AND SHALL EXTEND TO THE OPPOSITE END OR TO APPROXIMATELY 4 INCHES BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO REQUIRED) (100 MM) BEYOND THE OPPOSITE END DEPENDING UPON THE TYPE OF UNING JOINT MANUFACTURER) 10 GE R PIP INSTALLATION ADDITNAL COMPENSATION 'ELL BE ALLOWED FOR ANY MATERIALS WHICH RE DAMAGED TO BE MADE WITH THE ADJOINING CONCRETE PIPE OR INCORRECTLY CUT. 4. ABS PIPE INSTALLATION WHEREVER CONCRETE PIPE OR CAST -IN -PACE STRUCTURES PROTECTED KITH UNING THE MANDREL SHALL HAVE AN ODD NUMBER OF VANES WITH SEVEN (7) - MINIMUM. SEWER PIPE SHALL CONFORM TO THE PANS, AND THESE SPECIAL PROVISIONS. THE i6. BORED/JACKED PIPE MATERIALS : PIPE AND FITTNGS SHALL MEET THE REQUIREMENTS OF THE CURRENT JOIN STRUCTURES NOT SO LINED (SUCH AS BRICK STRUCTURES, CONCRETE PIPE OR PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOTE UNITED 10 EXCAVATION, BEDDING AND BACKFILL. CASING N SMOOTH WALLED PIPE FOR BORED/JACKED PIPE SHALL BE ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS CAST -IN-PLACE STRUCTURES WITH CLAY LINING OR CLAY PIPE), THE UNING SHALL BE THE MINIMUM LENGTH OF THE CIRCULAR PORTION OR THE MANDREL SHALL BE INSTALLED. IT L HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE THROUGH CUT AND FREE FROM CRACKS. HOLES, FOREIGN INCLUSIONS OR OTHER EXTENDED OVER AND ROUND THE END OF THE PIPE AND BACK INTO THE STRUCTURE EQUAL TO THE NOMINAL DIAMETER E THE PIPE. HANDLING OF MATERIALS ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE D. SHAVE PIPE TOWARD END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED ETU INJURIOUS DEFECTS. FITTINGS SHALL E INJECTION MOLDED AND SHALL BE INSTALLED FOR NOT LESS THAN 4 INCHES (100 MN). THIS PROTECTING CAP MAY BE MOLDED CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND T SAND. IF THE PIPE AND CASING RE INSTALLED BY BODING, THE SPACE AROUND THE IN UNE N NEW PIPEUNES; WT -IN FITRNGS ARE NOT PERMITTED. OR FABRICATED FROM THE LINING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE. ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE APPUANCES SHALL BE USED FOR THE SAFE LOADING HAULING, UNLOADING, HANDLING CASING ALSO SHALL BE BACKFILLED WITH GROUT N SAND. THE ENDS OR SPACE WHERE A PIPE LATERAL (NOT OF PLASTIC CONCRETE) INSTALLED THROUGH EXCAVATED, RE -BACKFILLED, EWMPACTED AND RETESTED UNTIL THE MANDREL TEST AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED BETWEEN THE D THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH JOINTS : USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE LINE N LINED CONCRETE PIPE, THE REAL BETWI.EN TIE LINED PORTON AND THE LATERAL SHALL BETWEEN LSIAL CAN BE PASSED. RE -ROUNDING HILL NOT E ALLOWED. RESILIENT JOINTS N PIPE AND FITTINGS PALL NOT BE DAMAGED. ANY PIPE N FITTING NATER IN OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL IN ACCORDANCE NTH THE MANUFACTURER'S RECOMMENDATIONS. MERE ABS PIPE BE PER THE MANUFACTURER'S RECOMMENDATIONS.PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD WITH A JOINT DAMAGED OR FATTENED PALL CAUSE THAT PIPE OR FITTING TO BE REECTED. LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CIN OF BAKERSFIELD. UNED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS. S-39, AS MODIFIED N THE CONTRACT PLANS COMPACTION ABOVE THE PIPE ZONE SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE NTH CARE SHALL BE EXERCISED IN HANDUNG TRANSPORTING AND PLACING LINED PIPE SHALL BE AS SHOWN ON THE PLANS. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, II, AND III EMBEDMENT TO PREVENT DAMAGE TO THE LINING. NO INTERIOR HOOKS OR SUNGS SHALL BE USED 7, TRENCH EXCAVATION THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING MATERIALS WILL BE CONSIDERED SUITABLE. IN LIFTING PIPE. ALL HANDLING OPERATION SHALL BE DONE WTI AN EXTERIOR SUNG OR ACCORDANCE VATH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, WITH A SUITABLE FORK LIFT. THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER. CONSISTENT WITH CURRENT ACCEPTED PROCEDURES WATER BORING SHALL NOT BE 5, PVC PIPE INSTALLATION N PIPE HAVING A 360' LINER COVERAGE, THE LONGITUDINAL EDGES OF THE OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. PIPE LAYING SHALL PROCEED VATH EACH PIECE AID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT VATH THE ADJOINING PIPE PERMITTED. THE CASING PIPE SHALL BE JACKED WHH SUCH PRECISION THAT WILL MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT SHEET SHALL BE BUTT WELDED. WHEN PIPE TUBES ARE FURNISHED, THESE ARE THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTORS N THE PLANS FOR PROPER PIPE INSTALLATION. AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE ASTM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS SHOP -WELDED JOINTS. INTERIOR OF THE PIPE SHALL BE CLEANED OF ALL GIRT AND DEBRIS OF EVERY PANS. THROUGHOUT AND FREE FROM CRACKS HOLES, FOREIGN INCLUSIONS OR OTHER NO PIPE WITH DAMAGED UNING WALL E ACCEPTED UNTIL THE DAMAGE HAS BEEN THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE UPN .COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALATON OF THE INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MORED AND SHALL BE INSTALLED REPAIRED TO THE SATISFACTION OF THE ENGINEER. PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE IT IS THE INTENTION OF WEATHER IS UNSUITABLE AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OR PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION IN UNE ON NEW PIPELINES, CUT -IN FITTINGS RE NOT PERMITTED. I.G. FIELD JOINTS IN LINING FOR CONCRETE PIPE. THE JOINT BETWEEN THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BARING FOR THE PIPE. PIPE AND FITTINGS SHALL BE CLOSED. SHALL BE COMPLETELY FILLED WATT SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY E JOINTS SHALL SECTIONS OF LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER: CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS WITH BELLED END PIPE, BELL HOES SHALL THEN BE EXCAVATED AT EACH JOINT TO APPROVAL BE IN ACCORDANCE PATH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED WITH PROVIDED IN THE PANS. SELECTION OF TRENCH TYPES WALL BE AS REQUIRED BY THE FACIUTATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL CONNECTS TO VCP PIPE, USE CQUPUNGS APPROVED BY THE CITY OF BAKERSFIELD. CEMENT MORTAR IN SUCH A MANNER THAT THE MORTAR SHALL NOT, AT ANY POINT, TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTIUTY CONDUIT PURPOSE. IN ORDER THAT BELL HOLES MAY E PROPERLY LOCATED, NOT MORE THAN TIMES SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH EXTEND INTO THE PIPE BEYOND THE STRAIGHT LINE CONNECTING THE SURFACES E THE INSTALLATIONS SHALL MEET CITY STANDARD S-39. SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING. ON ACCOUNT OF UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF THE CURRENT ASTM SPECIFlCATON D-2321. ONLY CLASS I, 11, AND III EMBEDMENT ADJACENT PIPE SECTIONS THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. WORKERS OR THE STABIUTY OF THE SOIL AND ROADWAY ABOVE. THE CONTRACTOR MATERIALS WILL BE CONSIDERED SUITABLE. PIPE JOINTS MUST BE DRY BEFORE LINING JOINTS ARE MADE TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENT'S CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING & DRACING AND SHORING SPECIAL CASING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE SUFFICIENT JACKS BE INHIBIT THE SLOUGHING AND/ORFU CLOSING THE WORN EAE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE WITH A 6. REINFORCED CONCRETE PIPE WITH PVC LINING. SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY. WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. APPROVAL PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL DETAILED PLAN AND REINFORCED CONCRETE PIPE VATH PVC LINING SHALL MET THE FOLLOWING REQUIREMENT FIELD JOINTS IN THE UNING AT PIPE JOINTS MAY BE ETHER OF THE FOLLOWING EXCAVATION SHALL BE SUPPORTED AS ET FORTH IN THE RULES, ORDERS, AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION VALL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED XP AND ALL EXPENSES THEREFORE WILL BE CONSIDERED ASBEFORE.INCLUDED IN THE BID E 1.A. MATERIALS ENFORCED CONCRETE PIPE (RCP) SHALL E EITHER CAST IV DESCRIBED TYPES: REGULATIONS E THE STATE E SAFE OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A OR INCORRECTLY CUT. PRI PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE. 17. MINOR STRUCTURES OR CLASS V WITH WALLS 'Er02 OR RCP SHALL MEET ASTM C 76 FOR STRENGTH, TWE P-1: THE JOINT SHALL E MAGE VATH A SEPARATE 4 -INCH (100 -MM) ENGINEER TO THE STATE DIVISION E INDUSTRIAL SAFETY, ASTM C 361 AIWA PT TEST PRESSURE SHALL 5 PS FOR RUBBER JOINT STRIP AND TWO WELDING STRIPS TUE 4 -INCH (100 -MM) ,KENT STOMP SQUALL E THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY OTHESJUSTIFYING THE ALTER TE ANY OF THESE PIPELINE TESTING ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL D STS ACCO THE VA NG PARAGRAPHS. PIPE GASKETS, AND LINER TESTS IN ACCORDANCE CENTERED OVER THE JOINT, HEAT -SEALED TO THE LINING, THEN WELDED ALONG EACH OR RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE CONFORM, IN DESK. MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SHALL CURED. WET CAST, VIBRATED AND STEAM N WATER CURED. JOINTS SHALL BE BELL R EDGE TO ADJACENT LINER SHEETS 'NTH A i -INCH (25 -MM) WEIR STRIP. THE 4 -INCH TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATIN FOR LOSSES INCURRED BY THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL IG AND SPIGOT DESIGN 'MTI A CONTAINED 0 -RING GASKET. (100 -MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM OF 1/2 INN (13 CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING IXFlLTRATION TEST OR AIR PRESSURE TEST PER SECTION 3G6-1.4, "TESTING PIPEUNES" PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS MM). BACKFlWNG THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE OF THE 1994 EDITIONS, 'STANDARD SPECIFlS" CATINFOR PUSUC WORKS CONSTRUCTION, S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD TEMPORARY GRATES SHALL CONFORM TO DETAILS THE PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 380' BACKFILL AT ALL TIMES. AND CHAPTER 1.3 OF THE CITY E BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE S-12 INLET N OF THE PIPE. ALL WORK FOR AND IN CONNECTION PATH THE INSTALLATION OR THE TYPE P-2: THE JOINT SHALL BE MADE YOUTH A JOINT FAP WITH LOCKING PIPE SUPPUER'S REQUIREMENTS THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 PLANS' LINING IN CONCRETE PIPE AND FIELD SEALING AND WELDING E JOINTS SHALL BE DONE EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT HOURS PRIOR TO ANY TESTING THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FAT TOP SECTIONS SHALL MEET THE IN STRICT CONFORMITY HATH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND THE PIPE END. THE JOINT FLAP SHALL OVERLAP THE LINING IN THE ADJACENT PIPE TO THE ENGINEER A DETAILED PLAN, DRAW1NG THE DESIGN OF SHORING, BRACING STRENGTH REQUIREMENT E ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOVANG SECTION A MINIMUM OF 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE CLEANING PIPE LINES CRE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO BE SET N A ED OF PORTLAND CEMENT GROUT OR 'KENT SEAL" TO MAKE A REQUIREMENTS TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELDING THE FLAP TO THE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL WHEN PIPE LAYING IS INTERRUPTED, WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET 1.8. PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LINER PATE SLEETS, WELDING - UNING OF THE ADJACENT PIPE USING i -INCH (25 MM) WELD STRIP. EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF AS AT NIGHT, THE PIPE ENDS STALL BE SUITABLY CLOSED. UPON COMPLETION, AND PLUMB. STRIPS AND OTHER ACCESSORY ITEMS SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES CRE SHALL BE TAKEN TO PROTECT THE FAP FROM DAMAGE EXCESSIVE TENSION SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS THE PANS SHALL BE PEERED AND CERTIFIED BY A BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDREI I M TO REMOVE ANY DIRT CN MATERIALS WHICH CLOG PUMPS, EQUIPMENT, 16. ADJUST SY1RVIl• MONUMENT ENCASEMENTS WHEN TESTED AT 77E t5 25C t3 ). ( AND DISTORTION IN BENDING BACK THE FLAP TO EXPOS THE PIPE JOINT DURING LAYING ED CML OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE . HE CONTRACTOR KE PR SPRAY HEADS, ETC. THE SHALL MAKE PROVISIONS FOR PREVENTING SURVEY AND FRAME DCOVER C ENCASEMENTS ,IIN SUED OR PROPERTY INITIAL AND JOINT MORTARING SHALL AVOIDED. AT TEMPERATURES BELOW 50 F(10 C), LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS LESS EI E FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER UNE. T THE LOCATIONSTH INSTALLEDNNEWEDTO FINISH GRADE AT ON THE PLANS, E HEATING tJE THE LINER MAY E REQUIRED TO AVOID DAMAGE. PROHIBITED ON THIS PROJECT. ACCORDANCE WITIi THESE SPECIAL PROVISIONS, AND CIN STANDARD 5-29. 100 IMI TENSILE STRENGTH 2200 PSI MIN. 2100 PS MIN. (15 MPA MIN.) (14.5 MPA MIN.) THE JOINT FAP N STRIP TH BEVELED PIPE SHALL TRIMMED A NADTH 9. TRENCH BACKFILL SEWER LATERALS. SEWER LA70ALS SHALL CONFORM TO THIS IN EVERY REGARD. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A ELONGATION AT BREAK 2008 MIN. 200% MIN. A H (MEASURED FROM THE END OF THE SPIGOT) OF APPROXIMATELY 4 INCHES (100 MN) EXISAND INGEXT SEWER LATERALS STALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO AND EXTENDED RECONSTRUCTED ACCORDING TO THE PLANS COMPRESSOR MINIMUM OF THREE DAYS. - - SHORE DUROMEIER, TWE D 1 SEG 50 60 f5 FOR THE ENTIRE GRCUMFERENIAL LENGTH OF THE UNING. TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN B COUPLINGS MAY E UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE AT THE OPTION E THE CONTRACTOR, MIEN CONCRETE CONTAINING A MINIMUM OF (WITH RESPECT TO INITIAL TEST RESULT) 10 -SEC. 35-50 45 ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE WITH THE ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED N SEVEN SACKS E CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR SPECIFICATIONS AND INSTRUCTIONS OF THE LINING MANUFACTURER. THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. THE PLANS SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH PROTECTION OF THE CONCRETE SURFACE FROM PUBUC TRAFFIC SHALL BE REDUCED TO WEIGHT CHANGE it 5 WELDING SHALL FUSE BOTH SHEETS AND WELD STRIP TOGETHER TO PROVIDE A THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WALL BE A MINIMUM OF ONE DAY. CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER ALL GUNK STALL CONFORM TO THE APPLICABLE SECTIONS THE STANDARD D AS SEWER FOR THE APPROPRIATE DIAMETERS. THE MONUMENT PALL IV SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS TENSILE SPECIMENS ALL BE PREPARED AND TESTED IN ACCORDANCE VATH ASTM ST PLATE. SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL E AS SPECIFIED IN THE CONTRACTOR SHALL GIVE THE OWNER 244 HOURS NOTICE WHEN SURVEYS ARE REWIRED. D412 USING DIE B. WEIGHT CHANE SPECIMENS SHALL BE 1-INGH (25 -MM) BY HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE PIPE OPTIONS STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTOR SHALL BE NO LESS 11. SYSTEM TESTING ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS 3 -INCH (75 -MM) SAMPLES. SPECIMENS FOR TESTING OF INITIAL PHYSICALACCORDANCE PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY JOINED AT TEMPERATURE BETWEEN AND 600 F (260 AND 316 C). .THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30') FROM FINISHED GRADE. A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK. WELDING TOOLS SHALL BE HELD APPROXIMATELY 12 INCH (13 MM / ( ) FROM AND MOVED BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE IN ACCORDANCE NTH THE CITY E BAKERSFIELD SUBDIVISION MANUAL AND THE SEAL TO PVC LINED SEINER LINE/MANHOLE WELDING TOOL SHALL BE MOVED SLOWLY ENOUGH AS THE WELD PROGRESSES TO CAUSE BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER RECOMMENDATIONS OF THE MANUFACTURER. THE CODED HOLE STALL BE APPROXIMATELY 3 INCHES THAN NICE OUTSIDE LINER PATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WTHSTAND A A SMALL BEAD RI MOLTEN MATERIAL TO BE NIBBLE ALONG BOTH EDGES AND IN FRONT E THE WED STRIP. AS NOT TO DAMAGE N DISTURB THE PIPE N ITS ALIGNMENT AND GRADE PRIM TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIED EQUIPMENT SHALL B DIAMETER OF THE CONNECTING LINE. THE CODED HOLE SHALL EBBE DESIGNED TO CUT A HOLE NTH MINIMUM DAMAGE TO THE REINFORCING STELI., PIPE N PLASTIC LINER. HEST PULL E AT LEAST 100 POUNDS PER LINER INCH (1800 KG/M), APPLIED DESIGNED FOR THIS PURPOSE THE TELEVISOR CAMERA BALL HAVE THE CAPABILITY OF ROTATING PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE, WITHOUT THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY WHEN THE LINER COVERAGE IS BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE E DELETERIOUS MATERIALS 360', IN ODDER TO NEW AND RECORD THE TOP AND SIDES E THE PIPE, AS REQUIRED. THE VIDEO PRIOR 70 THE INSTALLATION OF THE PVC BOOT N THE CONNECTION, THE PLASTIC LINER RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST 360 DEGREES: AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND INSPECTN SHALL BE WITNESSED BY THE CITY'S CONSTRUCION INSPECTOR, WHO HALL ALSO INITIAL AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC LINER SHALL BE MADE AT A TEMPERATURE OR 70' - 80' F(21' - 27' C) INCLUSIVE WHEN GROUNDWATER IS ENCOUNTERED THE LINING JOINT SHALL NOT BE MADE UNTIL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES EACH LAYER AND DATE THE "CHAIN OR CUSTODY' FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF MANUFACTURER'S RECOMMENDATION. THE END OF THE CONNECTING LINE SHALL BE SEALED PUMPING OF GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED TO THE PVC BOOT NTH SIKA 449/203 PRIMER AND SIKA FLEX to SEALANT OR AN ALL PASTIL LINER PALE SHEETS, INCLUDING LOCKING EXTENSORS, ALL JOINT, NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT. COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. VIDEO CASSETTE, THE COMPLETED 'CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES APPROVED EQUAL CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS WHEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FAP, 00 NOT WELD THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PANS OF ALL CONNECTED LATERALS) THE PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGGLY TO THE OUTSIDE WALL OF THE ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS E THE MATERIAL THE 6 TO 8 INCHES (150 TO 200 MM) AT THE PIPE INVERT TO PROVIDE RELIEF OF ABOVE THE PIPE ZONE WILL BE ALLOWED. OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER CONNECTION. ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. POTENTIAL FUTURE GROUNDWATER BUILD-UP. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS PRIOR TO ACCEPTANCE AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED FOR HOLIDAYS PER THE UNING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE AND SHALL TRE APPLICATION TO CAST -IN-PLACE EAE CONCRETE STRUCTURES ESPECIAL REQUIREMENTS. LINER SHEETS SHALL CLOSELY FITTED AND PROPERLY SECURED TO BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE THE CITY' THE PLASTIC LINER MANUFACTURER'S RECOMMENDATION. M) SETT HAVE AN ELONGATION SUFFICIENT TO BRIDE UP TO 1/4 -INCH (fi MM) SETTLING THE INNER FORMS. SHEETS SHALL E CUT TO FIT CURVED AND WARPED SURFACES C DISPOSAL OF THE CONTRACTOR. 12, WYE FITTINGS SHALL BE INJECTION MOLDED IN -UNE TYPE AND SHALL BE USED FOR ALL THE CNNECIN UNE SHALL BE CENTERED IN THE CORED HOLE AND PACED 50 IT IS CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE JOINT AFTER INSTALLATIONS, USING A MINIMUM NUMBER OF SEPARATE PIECES. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE FLUSH WITH THE INSIDE WALL OF THE RCP. WITHOUT DAMAGE TO THE LINING UNLESS OTHERWISE SHOWN N THE PANS, THE LINING SHALL BE RETURNED AT IN-SITU MATERIALS. HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. THE PVC BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, INC. OR AN EQUAL I.C. CHEMICAL RESISTANCE OR LINER. ANTER CONDITIONING TO CONSTANT LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE 'FIRM ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED N PANS EXTENDING A MINIMUM APPROVED BY THE CITY ENGINEER. WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL STRUCTURE AND ITEMS NOT OF CONCRETE (INCLUDING MANHOLE FRAMES, GATE GUIDES, ACHIEVING FIRM BEDDING BELOW PIPE SPRINGLINE. CONTRACTOR SHALL PROVIDE OF d BEYOND THE PROPERTY LINE OR RIGHT-OF-WAY UNE W1NI 30' OF COVER AT FLOW UNE BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77' F i5 CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES). THE SAME BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRING INE. FIRM BEDDING MEANS THAT 25' C f3 . ( ) PROCEDURE SHALL BE FOLLOWED AT JOINTS WHERE THE TWE E PROTECTIVE LINING IS THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED A. THE PROPERTY UNE ORRIGHT-OF- GHANED N THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT BEAN SPECIFICATIONS. WAY LINE AS SHOWN IN THE 'SEINER LATERAL MARKER' DETAIL, C.O.B. STD. DET. SW -1. RETURN, THE RETURNED LINER SHALL ER CANNED TO THE HEM IN CONTACT WITH THE A AT 28 -DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE REMOVED FROM EACH E THE CHEMICAL SOLUTIONS AND TESTED IN PASTE -LINED CONCRETE IF THE LINER CANNOT BE SEALED INTI ADHESIVE BECAUSE OF THE JOINT AT THE RETURN BEING T00 NIDE N ROUGH N BECAUSE OF SAFETY BELL N COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING LATERALS SHALL BE A MINIMUM OF 5.0' DEEP AND A MAXIMUM OF Y DEEP AT PROPERTY UNE OR ACCORDANCE VATH SECTION 7-203(1.B) PARA. 2 ABOVE. IF ANY SPECIMEN FAILS TO REGULATIONS, THE JOINT SPACE SHALL BE DENSELY CAULKED WITH LEAD WOOL OR OTHER BEDDING AND BACKFILUK CNSOUDATIN OF MATERIAL AROUND AND UNDER BELLS RIGHT-OF-WAY LINE AND A MINIMUM OF 25' DEW AT FLOWLNE. MEET THE 112 -DAY REQUIREMENTS BEFORE COMPLETION OF THE 112 -DAY EXPOSURE, THE MATERIAL WILL BE SUBJECT TO REJECTION. APPROVED CAULKING MATERIAL TO A DEPTH E 2 INCHES (50 MM) AND FINISHED AND COUPLINGS SHALL BE AVOIDED. .L L.� PI WITH A MINIMUM OF 1 INCH 925 MM) OF AN APPROVED CORROSION RESISTANT Know what's below. I ,Z-7300 13 MATERIAL Call before You dig. CITY RECORDS ■ qq 49 ,w e vi o N z FMIIIIIII- V V ICT140 m O M N _j m \ r m n < � � m N o O O a 6 k Z W I zW U m 3 0 _ W , � 00 - Nm m W m m S a Oc�D `c I 0 O w W k G 0 co Z .� 9::i JO as ;.. zU I jr LL 0U C0 c__i g a N 0 F "44h 0 H 0 C --;)9<a W 3 W W LL t_ 00 cz Z n C-) I c 6 E 1F�( N CO W m e• IL0 UI I �)---------- — HARBIX20UGH DRIVE SEE SHEET 4 1 II n l0 1 OT A PART I 11 II 1 II �� NI I IN 1 NI 21 pK r 1 O Wwi p o �2 J, ZUN h 3Cf Zti L v Um \ xpm mn p � ZOyi Yrl Oy 2� M M m N 6< 'MM \ m.-`- S L.S LOT �+ + \ wiwdF � �Fd 1MMN N 14 M 12TNY W SEWER _ 3.12' 8' N1828'26'W 1 1OL�. g• SEVIER 5044215_E 50110: 177.79 24 GRAIN N229'29°W __- 2a L.S LOT Y o 0 22 ma •\ 23 � _ \ od \ M�Tan 1250 362 360 358 356 354 352 350 348 346 344 342 340 338 INVU 336 334 332 330 328 326 324 UNITS 3 i .42 LF OF 19+00 20+00 TANC-ENT rn C1 pip � SCALE: i" = 40' HORIZONTAL 1 25-27-10- m O � SCALE: 1" = 4' VERTICAL � — -- o CONSTRUCT STORM DRAIN PER CITY STANDARDS 12 I 11 CONSTRUCTION NOTES t; N y m M I UNITS 3 i .42 LF OF 19+00 20+00 TANC-ENT (STA. 14+00.00 C.L. TO 20+50.00 C.L.) C1 OF ® 222.12' SCALE: i" = 40' HORIZONTAL 1 25-27-10- O � SCALE: 1" = 4' VERTICAL � — -- o CONSTRUCT STORM DRAIN PER CITY STANDARDS 12 11 CONSTRUCTION NOTES ® CONSTRUCT STORM DRAIN m RCP 0 08% 177.79 Li I i 0• J nLL0 O + o z w V 7 AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE INSTALL 247.61 LF OF 24" RGJ-REP I 0 0.47% TYPE 'A" PER C.O.B. STD. D-14. N 1 rnJ m F I LF OF 2 " RGJ-R 0 0.11% EX. 24°1 RGJ-RCP W Z L.S LOT � TO PLUGGING AND BACKFILUNG TRENCH. UNLESS OTHERWISE NOTED. =o y P, ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING ro UNLESS OTHERWISE NOTED. 0 24° DRAIN VALDEVE WAY HIGHGATE HEATH AVENUE SEE SHEET 5 NOT A PART II I I � II 1 U11 N T T 1 O I IIz r ya rn----------I, / NOT A PART _J 3 +m JL -ZNOC36 m ylS LOT 0°E _EX. 8' SEWER _ 19� _ -N 1'02'21' E 195.00' 21+ S1T12'21°W J.50' 24' DRAIN IX. 24° DRAIN IX. 24 �ORAIN 1— a I I r i W WATER PER r - r V PA I SEPARATE PLANS I m m N I Cl O N tV 1 L.S LOT I awy m 1 1 a T g I 24 n I 1 3 o I •'c I o i I I 25 I _ + 26 1 ® m I ? I 1 I I a 28 HARBOROUGH DRIVE SEE SHEET DELAMERE STREET (PRIVATE STREET) (STA. 14+43.10 C.L. TO 19+99.52 C.L.) SCALE: 1" = 40' HORIZONTAL f 1 I I iI I I HIGHGATE HEATH AVENUE NOT A PART LF I OF 24° i .42 LF OF 19+00 20+00 TANC-ENT (STA. 14+00.00 C.L. TO 20+50.00 C.L.) C1 OF ® 222.12' SCALE: i" = 40' HORIZONTAL 1 25-27-10- rnI SCALE: 1" = 4' VERTICAL � — -- o CONSTRUCT STORM DRAIN PER CITY STANDARDS a CONSTRUCTION NOTES ® CONSTRUCT STORM DRAIN RGJ -1 RCP 0 08% INST 177.79 Li OF 24' R RCP 010.flR wNv o z w V 7 AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE INSTALL 247.61 LF OF 24" RGJ-REP I 0 0.47% TYPE 'A" PER C.O.B. STD. D-14. N 1 rnJ I STALL 101.E I LF OF 2 " RGJ-R 0 0.11% EX. 24°1 RGJ-RCP W Z WITH 3.5' OPENINGS PER C.O.B. STD. D-14 � TO PLUGGING AND BACKFILUNG TRENCH. UNLESS OTHERWISE NOTED. =o y 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING ro UNLESS OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION p M rn AND INVERT OF EXISTING SEWER AND STORM 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE n$ DRAIN PRIOR TO CONSTRUCTION AND NOTIFY UNLESS OTHERWISE NOTED. ENGINEER OF ANY DISCREPANCIES a NO SEWER LATERALS SHALL BE WITHIN 5' FROM N CLEANOUTS UNLESS OTHERWISE NOTED. w N N 0 SHEET WHERE SECTION IS AIOYM 2 w K O N K I1 i 2m� I IN�T 18' DRAT Q J I i I ? I-8' I SEVER i «1 W /W C� C lig N� i a� • Z Q J � Q W _ 0 cLu Fin N G C� rn0-�6Jm c Z NN ILI -i W I = JNm_N •iii Q I Y > A __..i—. ^ M_M_M ^^^ O ml _ mod _o 3 x 4) and •> rc'Mnn 5 •i I od J1>ya x I 1- �ww i m m N w iCl til w w 1'I. w cjl I AQ — �_ i APPRO%IMATE FINIS ED r� 1= GRADE I AT CEN NE 0 _ t i I i t I I I j it I 1 . • I 1 I I _ -- - -- INVERT 2 GRAIN INVERT 24 DRAIN 3 INVERT EC 24' DR N -- INVT:R FUTURE I VERT 24° RAR! 24 AIN 2 - —}}---- T FUTURE 8' SEWER INVERT 8' — — 1 — I i I- INVERT 8 SEWER IIS - I T B VFR 5 r SSEfE a M 3 M J I � rn m Z I m O mm i o�"nm r �jmm�mm"��m m m W 4"n . > a •>i ai. ii io>iii zJl>ii pZ �Cj Mm 2 i0 � Smm I ImY[VWgO I I ! K M ' �j�q^ fi dMri a nn• I I a¢ nn w3 [i�nn ; w3W mmm M+e`l3 rW] MM W+�1•)M m ,•W1 +M�Y> SErnM WJ �5y J > O ..W W W W S I- >W �1Q-- mmW � J �3y N W W p�/11J j WJWWW J � i o jd w'w m�mi'.i NOf INSTALL 10107 /f OF 8" PVC 0 -0.258 8' UC SEWER -0.47% INSTALL 287.07 LF OF ' PVC O -815 8° PVC SEWER O .25% 0-025% INSTALL II I I I 14+00 OWER 15+00 16+00 0-0.25% LEGEND: 0=11:1x'/LiIIiPd CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN PA RIGHT OF WAY T,O.M 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION — s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A° PER C.O.B. STD. SW -4 AND SW -5. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 364 362 360 358 356 JVL 360 358 356 354 352 350 348 346 344 342 340 338 336 334 17+00 18+00 i .42 LF OF 19+00 20+00 TANC-ENT (STA. 14+00.00 C.L. TO 20+50.00 C.L.) C1 OF ® 222.12' SCALE: i" = 40' HORIZONTAL 1 25-27-10- rnI SCALE: 1" = 4' VERTICAL � — -- o CONSTRUCT STORM DRAIN PER CITY STANDARDS a CONSTRUCTION NOTES ® CONSTRUCT STORM DRAIN 0 MANHOLE TYPE 'A' PER CO.B. STD. SW -4 & SW -5. Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 wNv o z w V 7 AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE Itr CONSTRUCT CATCH BASIN He LESS THAN 12". SJN TYPE 'A" PER C.O.B. STD. D-14. N 1 rnJ � II.W-- �°m CONTRACTOR SHALL SHALL HAVE THE SEWER/STORM DRAIN NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" 2 LINE STUB LOCATION AND INVERT SURVEYED PRIOR W Z WITH 3.5' OPENINGS PER C.O.B. STD. D-14 � TO PLUGGING AND BACKFILUNG TRENCH. UNLESS OTHERWISE NOTED. =o y 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING ro UNLESS OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION p M rn AND INVERT OF EXISTING SEWER AND STORM 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE n$ DRAIN PRIOR TO CONSTRUCTION AND NOTIFY UNLESS OTHERWISE NOTED. ENGINEER OF ANY DISCREPANCIES 4) NO SEWER LATERALS SHALL BE WITHIN 5' FROM CLEANOUTS UNLESS OTHERWISE NOTED. w SECTION DESIGNATION: SECTION IPTiBt: 0 SHEET WHERE SECTION IS AIOYM 2 364 362 360 358 356 JVL 360 358 356 354 352 350 348 346 344 342 340 338 336 334 JVL 360 358 356 354 352 350 348 346 344 342 340 338 336 334 3 SCALE 1'=40' HORIZONTAL 1"=4' VERTICAL CURVE TABLE INSTALL i .42 LF OF 18" TANC-ENT DELTA C1 OF ® 222.12' I 112.92' 1 25-27-10- rnI Z � a V 0 N b � wNv o z w V 7 a O Z w I He d SJN N 1 rnJ � II.W-- �°m X 0 2 2 2 U W Z J � =o y j \ ro p M rn m+Y'NIS, r p n$ limn w 0 w N K I1 i I IN�T 18' DRAT Q J I i I ? I-8' I SEVER i «1 W /W C� C lig I; JVL 360 358 356 354 352 350 348 346 344 342 340 338 336 334 3 SCALE 1'=40' HORIZONTAL 1"=4' VERTICAL CURVE TABLE CURVE RADIUS LENGTH TANC-ENT DELTA C1 500.00' 222.12' I 112.92' 1 25-27-10- 354 352 350 348 346 344 342 340 SEE APPROVE] TRACT 7300 UNITS 1812 SEWER AND STORM DRAIN PIANS 338 336 334 332 330 328 326 324 20+50 ■ Know what's below. Call before you dig. SCALE: 1" = 40' 40' 20' O' 40' 80' 1.2-7300 Ph 3 CITY RECORDS NO: = O h" N O w Z � a V 0 N b � ^ o z w V 7 O Z w I z d w V aM0 J w co � o � � m � � =o \ ro M r p m 0 N K Z Q J ? W R� «1 W /W C� C lig I; i a� 0m W Z Q J � Q W 0 cLu Fin W G C� v c 3 ILI W W M A 0 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 DELAMERE STREET 1 1 SEE SHEET 3 UNIT/�} Tn r I j I 1 �� I 8" WATER PER I 3 I � � I � I I �w SEPARATE PLANS i 24 x o U 3 U 17. J 115 16 I, 12 I 14 R 13 �o I Z�W Mm I 1 Ws o '� I=o o I ry I w 'y � I � g `" I I �• I � �� _ L.S. � � ® � � LOT II I `fin 6 6 I 1vt 35.46' _ 2 1 ` J x,om Wi-n va P/LI J^, 1 \ Mm O¢ N —J_ N L ¢~ N//P,L N O 0 Q K �'' �,�U� II r \ W m y —1..- A NOT A PART 174.47 ' 8' SEWER Sy@e'57'39'E s-12+0074.20 ' B° S8835Y39'E 13+00 112.77 6 SEWER 671'46'W . m 011+00� -S 885739' E 323.41' __ p __ 0 CS Y 14400 369.15' 24 DRAIN N8857'11'W �' PA \ �y\ \ )\ z n 1 rc \ 8° WATER PER --� r-- '� SEPARATE PLANS � I � P� � � ro I � � � 20.87 1 \' \ 8' WATER :9PER + \\ 1 \\ < w a < I �,1 SEPARATE PLANS 1 F a I N I r m \\ 23 I I 1 \\ \\ N o m 1 I I 1� I O v+ P I N \\ \\ z Ju'i 1 z e. 18 19 20 1 ^ 1 I i J = rc (n 1 m I m I 21 (n �' o I r w 22 tp \ \ 22 I + ^ n I J ADDLINGTONSTREET H A R B O R O U G H DRIVE DEIAMERE SHEET1 SEE SHEET SEE SHEET 5 (PRIVATE STREET) (STA. 9+00.00 C.L. TO 15+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL 9+00 10+00 11+00 12+00 13+00 (STA. 9+00.00 C.L. TO 15+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL 14+00 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 - 324 15+00 LEGEND: CURVE RADIUS LENGTH TANGENT DELTA -- D CONSTRUCT STORM DRAIN PER CRY STANDARDS STALL 3691.16 LF OU 4` RGJ—RCP 0 0.11% 300.00' CONSTRUCTION NOTES CL CENTERUNE SAH SEWER MANHOLE E INV INVERT SCO SEWER CLEANOUT MANHOLE TYPE 'A' PER C.O.B. SID. SW -4R SW -5. Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 SD STORM DRAIN SDMH STORM DRAIN MANHOLE a AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE MH MANHOLE EXIST EXISTING T CONSTRUCT CATCH BASIN °A' LESS THAN 12". TYPE PER C.O.B. SID. 0-14. CB CATCH BASIN ELEV ELEVATION 4, 0 Q CONTRACTOR SHALL HAVE THE SEWER/STORM DRAIN JB BOX R/W RIGHT OF WAY NOTES : T ) ALL CATCH BASINS ARE TO BE TYPE "A" LINE STUB LOCATION AND INVERT SURVEYED PRIOR cs WITH 3.5 OPENINGS PER C.O.B. SIO. D-14 TO PLUGGING AND BACKFlWNG TRENCH. UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION UNLESS OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION a•_° H 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE DRAIN PRIOR TO CONSTRUCTION AND NOTIFY 3 OGNSTRUCT SEVER PER CITY STANDARDS UNLESS OTHERWISE NOTED. ENGINEER OF ANY DISCREPANCIES I 4) NO SEWER LATERALS SHALL BE WITHIN 5' FROM � NNt�li ® CONSTRUCT SEWER MANHOLE CLEANOUTS UNLESS OTHERWISE NOTED. �C..-%1 TYPE 'A° PER C.O.B. SID. SW -4 AND SW -5. Z ® CONSTRUCT SEWER CLEANOUT SECTION DESIGNATION: _ I- W PER CO.B. SID. SW -6. SECOON LETTER 2 � SHEET NNE SECTION IS SHOWN I `g NCC O oO CC W U -Zz W 03 GCS 6 cr W o+Aa r W + M — N i l1 APPROXIMATE GRADE RNI APPROXIMATE E 0 ZN ��� _. .VwO 1 i 1 INW B" SEWER I I i I i I - I I r j I I IIV. 11 SEWER 1 I I I I I ' I ci X03 1 � � 'I mw li � 3w m3a oo a -I^O. li ww dww E o7� Tjdww� 174.47 lF OF 8° PVC SEWER O -%25% :. INSTALL 174.20 LF OF B" PVC SEWER 0 -0.25X INSTALL 11.77 LF OF 6° PVC SEWE R 0 1.00% 1 9+00 10+00 11+00 12+00 13+00 (STA. 9+00.00 C.L. TO 15+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL 14+00 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 - 324 15+00 LEGEND: CURVE RADIUS LENGTH TANGENT DELTA -- D CONSTRUCT STORM DRAIN PER CRY STANDARDS 58.12' 37.00' ABBRM TIONS C2 300.00' CONSTRUCTION NOTES CL CENTERUNE SAH SEWER MANHOLE ® CONSTRUCT STORM DRAIN INV INVERT SCO SEWER CLEANOUT MANHOLE TYPE 'A' PER C.O.B. SID. SW -4R SW -5. Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 SD STORM DRAIN SDMH STORM DRAIN MANHOLE a AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE MH MANHOLE EXIST EXISTING T CONSTRUCT CATCH BASIN °A' LESS THAN 12". TYPE PER C.O.B. SID. 0-14. CB CATCH BASIN ELEV ELEVATION 4, 0 Q CONTRACTOR SHALL HAVE THE SEWER/STORM DRAIN JB BOX R/W RIGHT OF WAY NOTES : T ) ALL CATCH BASINS ARE TO BE TYPE "A" LINE STUB LOCATION AND INVERT SURVEYED PRIOR STREET SCP STREET CONSTRUCDON PLAN p/L RIGHT OF WAY WITH 3.5 OPENINGS PER C.O.B. SIO. D-14 TO PLUGGING AND BACKFlWNG TRENCH. UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION UNLESS OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION AND INVERT OF EXISTING SEWER AND STORM 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE DRAIN PRIOR TO CONSTRUCTION AND NOTIFY 3 OGNSTRUCT SEVER PER CITY STANDARDS UNLESS OTHERWISE NOTED. ENGINEER OF ANY DISCREPANCIES 4) NO SEWER LATERALS SHALL BE WITHIN 5' FROM ® CONSTRUCT SEWER MANHOLE CLEANOUTS UNLESS OTHERWISE NOTED. �C..-%1 TYPE 'A° PER C.O.B. SID. SW -4 AND SW -5. Z ® CONSTRUCT SEWER CLEANOUT SECTION DESIGNATION: _ I- W PER CO.B. SID. SW -6. SECOON LETTER 2 � SHEET NNE SECTION IS SHOWN CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA Ci 37.00' 58.12' 37.00' 9000'00' C2 300.00' 126.18' 64.W 240556" LINE TABLE UNE BEARING DISTANCE L1 N 41'3739" W 25.63' L2 N 51'42'49° W 38.20' 150 Know what's below. Cal I before you dig. SCALE: 1" = 40' 40' 20' 0' 40' 8( TD T sp N CJ 4 �Q a T 4, 0 rc �C..-%1 Z a _ I- W Z> � 1 � O NCC O oO CC W y W 03 GCS W r W L J `J 1 J 3\ 1 n 1 1 4N 1 !? i 5 \` w o0 0+ I J m 1 V +m 6 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 DELAMERE STREET SEE SHEET 3 I I I II= ' II A M y G O NII. I I N II Iz IN N O 2 � N S •h N M `700 I W ' �� a la- I p+r ZZUJ NaN N 1A�--. m" TI 66.SEWER E g. ---L-_ r° 162 0'8" SEVER Seti'ST39"E s— — S 88'57$9° E 26250'ioirn WILDEVE WAY (PRIVATE STREET) (STA. 10+00.00 C.L. TO 12+62.50 C.L.) SCALE: 1" = 40' HORIZONTAL i w Ica I 1 w � In. a � N I I 1 I o l l I �� II DELAMERE STREET SEE SHEET 3 9+50 10+00 11+00 12+00 (STA. 9+50.00 C.L. TO 13+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL LEGEND: EN CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAM MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN PA RIGHT OF WAY T.O.M. 363.2 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION —s—CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE °A' PER C.O.B. STD. SW -4 AND SW -5. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 356 354 I 352 350 348 346 I 344 342 340 338 336 334 332 330 328 326 13+00 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 STORM DRAIN PIPE TABLE PIPE i I i LENGTH 01 � I I 76.22' D2 16" I N26.10'20"W I L4 N 1'02'21" E 94.87 omn>_ AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE .11R -111 CONSTRUCT CATCH BASIN LESS THAN 12". FINISHED TYPE "A" PER C.O.B. STD. D-14. \p �W+J t0 I N O SHALL HAVE THE SEWER/STORM DRAIN NOTES : i) ALL CATCH BASINS ARE TO BE TWE LINE STUB L LINE STUB LOCATION AND INVERT SURVEYED PRIOR D- WITH 3.5' OPENINGS PER C.O.B. STD. D-14 GRADEAPPROAMAC GRADE O C 71ERUNE I j V a � 10.02' 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS 1 REMOVE CAP & CONNECT TO EXISTING I 11° 0 1 ! - AND INVERT OF EXISTING SEWER AND STORM N 0 DRAIN PRIOR TO CONSTRUCTION AND NOTIFY UNLESS OTHERWISE NOTED. W ENGINEER OF ANY DISCREPANCIES I NO SEWER LATERALS SHALL BE WITHIN 5- FROM +N0yy1 i o pp I CLEANOUTS UNLESS OTHERWISE NOTED. _ - � ws OM Q2r>�Waaw�}hh µµmµ a w 2 L.S b j M+;J r Z - Y- � I 1 W W T Wei, i (aJ OJYI I i n I N I I �,o-alb I I I M 6 rc Z ,Y O OZ ( I Z mgry Zinn i I I I i o I z I 1 - -z 1 ! �- ! I I 1 I i �- i •J` zn O G In � N Wlal W W 18 W W N 1 i t*O C+ � 1 I I I LL�Inn fnNN O NTERUHE ! .GRADE I S y I ---I--- i�1 I y�I •S '1 i 3 •.W � N ,>j -1 I J ! I i j I 1L INV. li g m`nh IVY Iff DRAIN x'jiI• ' I I I I i : -- - ' INV. 4 DRAIN . i 1 O w W i I INV 8 " SEWER INSTALL 100.0) LF OF VC 1.00$ ° I INSTALL 16'2.50 LF OF °PVC 0 -0.25 i -J INV. 8 SEWER ' i j I 9+50 10+00 11+00 12+00 (STA. 9+50.00 C.L. TO 13+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL LEGEND: EN CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAM MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN PA RIGHT OF WAY T.O.M. 363.2 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION —s—CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE °A' PER C.O.B. STD. SW -4 AND SW -5. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 356 354 I 352 350 348 346 I 344 342 340 338 336 334 332 330 328 326 13+00 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 STORM DRAIN PIPE TABLE PIPE SIZE BEARING LENGTH 01 24" S02.07'25"W 76.22' D2 16" I N26.10'20"W 94.70' SEWER PIPE TABLE PIPE SIZE BEARING LENGTH S1 8" NOO-55-27"E 129.23' S2 8" N25 -0632"W 65.13' LINE TABLE UNE BEARING DISTANCE L1 N 381313' E 68.82' L2 N 7371'43" E 65.20' L3 S 35'40'24" E 55.21' L4 N 1'02'21" E 94.87 rj SCALE 1"=40' HORIZONTAL 1"=4' VERTICAL --- o CONSTRUCT STORM DRAIN PER CLTY STANDARDS ! INS U 1 0 � CONSTRUCTION INSTALL 1002 LF OF 18" N ® CONSTRUCT STORM DRAIN Jul RGJ-RIX' O 0.11% Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 omn>_ AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE .11R -111 CONSTRUCT CATCH BASIN LESS THAN 12". DI TYPE "A" PER C.O.B. STD. D-14. \p �W+J t0 I N O SHALL HAVE THE SEWER/STORM DRAIN NOTES : i) ALL CATCH BASINS ARE TO BE TWE LINE STUB L LINE STUB LOCATION AND INVERT SURVEYED PRIOR D- WITH 3.5' OPENINGS PER C.O.B. STD. D-14 W�to TO PLUGGING AND BACKFILUNG TRENCH. __ j V a � 10.02' 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS Q REMOVE CAP & CONNECT TO EXISTING N23'52'39"W V 11° 0 SEWER. CONTRACTOR TO VERIFY LOCATION - AND INVERT OF EXISTING SEWER AND STORM N j 0 Il �•-^ DRAIN PRIOR TO CONSTRUCTION AND NOTIFY UNLESS OTHERWISE NOTED. W ENGINEER OF ANY DISCREPANCIES 4) NO SEWER LATERALS SHALL BE WITHIN 5- FROM +N0yy1 i o pp I CLEANOUTS UNLESS OTHERWISE NOTED. _ - � ws OM Q2r>�Waaw�}hh µµmµ a w 2 L.S b j M+;J r Z - Y- ,Wj,py aLWR�a�M May 1 W W T Wei, i (aJ OJYI I i n I N I I �,o-alb I I I M 6 rc Z ,Y O OZ ( I Z mgry Zinn I I i o I z 1 - -z - �- — I i i •J` zn O G In � rj SCALE 1"=40' HORIZONTAL 1"=4' VERTICAL --- o CONSTRUCT STORM DRAIN PER CLTY STANDARDS ! INS U 1 0 � CONSTRUCTION NOTES N ® CONSTRUCT STORM DRAIN Jul MANHOLE TYPE °A" PER C.O.B. STD. SW -4 & SW -5. Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 omn>_ AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE .11R -111 CONSTRUCT CATCH BASIN LESS THAN 12". DI TYPE "A" PER C.O.B. STD. D-14. \p �W+J t0 NV O SHALL HAVE THE SEWER/STORM DRAIN NOTES : i) ALL CATCH BASINS ARE TO BE TWE LINE STUB L LINE STUB LOCATION AND INVERT SURVEYED PRIOR D- WITH 3.5' OPENINGS PER C.O.B. STD. D-14 W�to TO PLUGGING AND BACKFILUNG TRENCH. I UNLESS OTHERWISE NOTED. j V a � 10.02' 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS Q REMOVE CAP & CONNECT TO EXISTING N23'52'39"W V UNLESS OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION - AND INVERT OF EXISTING SEWER AND STORM 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE DRAIN PRIOR TO CONSTRUCTION AND NOTIFY UNLESS OTHERWISE NOTED. W ENGINEER OF ANY DISCREPANCIES 4) NO SEWER LATERALS SHALL BE WITHIN 5- FROM pp CLEANOUTS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: Sft"RIXT LETTEIT� ws - 2 L.S LOT 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 JN1-�-7 NOT A ?ART 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 mg's d j Z � W mgr ' vla WSW< �� i Im I- .*o cai < W rn rn i -ii M HARBOROUGH DRIVE SEE SHEET 4 ADDLINGTON STREET (PRIVATE STREET) (STA. 15+94.85 C.L. TO 18+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL L.S LOT rc �16 1 ! INS U 1 0 � IN LL N /¢ Jul '' tC omn>_ RCP O .11R U Q W LL DI \p �W+J t0 NV a �d a w in. 1 W�to I j V a � 10.02' / m 18" DRAIN 2 d N23'52'39"W V JN1-�-7 NOT A ?ART 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 mg's d j Z � W mgr ' vla WSW< �� i Im I- .*o cai < W rn rn i -ii M HARBOROUGH DRIVE SEE SHEET 4 ADDLINGTON STREET (PRIVATE STREET) (STA. 15+94.85 C.L. TO 18+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL L.S LOT rc �16 ! INS U 1 7 � IN LL F /¢ Jul '' tC RCP O .11R DI 17 I ft7±00 S2 - w rn W ,a pp ws - L.S LOT a P/L 1 T i a z��i I n oH'z N i» I �,o-alb I M 6 rc Z ,Y O OZ ( I Z mgry Zinn W0 o z •J` zn O G In � N Wlal W W 18 W W N 1 i t*O C+ � 1 I I I LL�Inn fnNN 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 15+50 16+00 17+00 18+00 18+50 (STA. 15+50.00 C.L. TO 18+50.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL SCALE: 1" = 40' 40' 20' O' 40' BO' O Know what's below. Call before you dig. ! INS ALL 94.70 OF 18 GJ- IN LL 4 RCP O .11R I - w rn ,a pp --<G - T i a z��i oH'z i» I �,o-alb m3� Z ,Y O OZ I Z mgry Zinn •J` O G In �— N Wlal W W W N 1 i � 1 I I I O NTERUHE ! .GRADE I S y I ---I--- i 1 I , I I j 1L INV. li IVY Iff DRAIN ' I I I i : -- - ' INV. 4 DRAIN . i I INV 8 " SEWER I i ° i INV. 8 SEWER j I ' i C I _ b 1 2 0 I i I yW W Wa �l>,i 3 t>Ji N W I I PVC O -0.25 INSTALL 12B+23 lF OF PYC O -D.25$ I � 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 15+50 16+00 17+00 18+00 18+50 (STA. 15+50.00 C.L. TO 18+50.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL SCALE: 1" = 40' 40' 20' O' 40' BO' O Know what's below. Call before you dig. OFFSITE STORM DRAIN SEE SHEET 7 DRAIN (AGE AND DRAINAGE EASEMENT DOC/ 218151637 FUTURE DEVELOPMENT FLOWAGE AND DRAINAGE EASEMENT --_-- --- PER DOC. 900217005998 --------------------------- -213.32 30" DRAIN5501'02'21"W----- HIGHGATE PARK BOULEVARD FLOWAGE AND DRAINAGE EASEMENT 1 PER DOC9218151637 f- - R/W `PA 1 1 M N $o U N T Ia i a4 ti NOT, PART 1 W T a � 1 , 6 1 5 ' i i 2 1 4 I 3 I IS L 1 LO TT HIGHGATE PARK BOULEVARD ADDLINSEE SHEET 5TREET (OFFSITE) (STA. 14+38.18 C.L. TO 19+46.10 C.L.) SCALE: 1" = 40' HORIZONTAL 362 360 358 356 354 352 350 348 346 344 342 340 338 11 i' 336 334 14+00 AND DRAINAGE EASEMENT L.S LOT SEWER U N I T 3 20' WIDE SOUTHERN CAUFORNIA GAS COMPANY PIPELINE EASEMENT PER BK. 5739, Pr 2035 O.R. HARBOROUGH DRIVE SEE SHEET 4 LEGEND' INSTA 1 184.74 OF 30" RCP O I Hyl z , INS TA 213.32 LFI OF 30" R -RCP O 0. 8% CL IN TALL 166.8 LF OF 30 RGJ-RCP 0.08% DRAIN (AGE AND DRAINAGE EASEMENT DOC/ 218151637 FUTURE DEVELOPMENT FLOWAGE AND DRAINAGE EASEMENT --_-- --- PER DOC. 900217005998 --------------------------- -213.32 30" DRAIN5501'02'21"W----- HIGHGATE PARK BOULEVARD FLOWAGE AND DRAINAGE EASEMENT 1 PER DOC9218151637 f- - R/W `PA 1 1 M N $o U N T Ia i a4 ti NOT, PART 1 W T a � 1 , 6 1 5 ' i i 2 1 4 I 3 I IS L 1 LO TT HIGHGATE PARK BOULEVARD ADDLINSEE SHEET 5TREET (OFFSITE) (STA. 14+38.18 C.L. TO 19+46.10 C.L.) SCALE: 1" = 40' HORIZONTAL 362 360 358 356 354 352 350 348 346 344 342 340 338 11 i' 336 334 14+00 AND DRAINAGE EASEMENT L.S LOT SEWER U N I T 3 20' WIDE SOUTHERN CAUFORNIA GAS COMPANY PIPELINE EASEMENT PER BK. 5739, Pr 2035 O.R. HARBOROUGH DRIVE SEE SHEET 4 15+00 16+00 17+00 18+00 (STA. 14+00.00 C.L. TO 20+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL 19+00 LEGEND' INSTA 1 184.74 OF 30" RCP O .08% -- D CONSTRUCT STORM DRAIN PER CITY STANDARDS INS TA 213.32 LFI OF 30" R -RCP O 0. 8% CL IN TALL 166.8 LF OF 30 RGJ-RCP 0.08% INVERT SCO SEWER CLEANOUT 18" RGJ MANHOLE TYPE "A" PER C.O.B. STD. SW -4 & SW -5. Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 SD STORM DRAIN SDMH STORM DRAIN MANHOLE STORMMANHOD (PUBLIC) AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE j rt W � CONSTRUCT CATCH BASIN "A" LESS THAN 127. (PUBLIC) TYPE PER C.O.B. STI. D-14. m CATCH BASIN ELEV ELEVATION ( 92 LF PUB C) e 1 NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" UNE STUB LOCATION AND INVERT SURVEYED PRIOR SCP STREET CONSTRUCTION PLAN PA RIGHT OF WAY WITH 3.5' OPENINGS PER C.O.B. STD. D-14 TO PLUGGING AND BACKFILLING TRENCH. � UNLESS OTHERWISE NOTED. 3 3.2 TOP OF CLEANOUT ELEVATIONUNLESS 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING T .M• MANHOLE/TOP OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION J m N •'Il � W� AND INVERT OF EXISTING SEWER AND STORM o z z�3p � ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE DRAIN PRIOR TO CONSTRUCTION AND NOTIFY $ CONSTRUCT SEWER PER CITY STANDARDS �.•zm UNLESS OTHERWISE NOTED. ENGINEER OF ANY DISCREPANCIES r 4) I ® o � z�Wim ZZI CLEANOUTS UNLESS OTHERWISE NOTED. � o z zin �n EASEMENT LEGEND ® CONSTRUCT SEWER CLEANOUT 1� AS ON, SEC nON DESIGNATION, SECTION LETTER FLOWAGE AND DRAINAGE EASEMENT TO BE Q PER C.O.B. STD. SW -6. DEDICATED WITH FINAL MAP A L_ z ---- - ®SECONDARY ACCESS EASEMENT TO BE DEDICATED WITH FINAL MAP Z M M 0 SHEET WEREE SECTION IS SHOWN W YJ �y dw in s I Z j j � i I 0 i ZLu f r LL I i i I I� 0 I I ISI CJg�Q a,^moo. j I O LLI OoanF C-5 V° I LU i APPROXIMATE RNI IED i I C� i I — I — _ _.� f GRAD O CENTER E 1• co n LL 0 - - i r I 1 d ISI I 114V. j i II - ; _- I Y . WATER � � , , SO. CAL UNEfi , i � �L -- I j -- I , DRAIN IN 30' DRAIN IN . 30" DRAI 15+00 16+00 17+00 18+00 (STA. 14+00.00 C.L. TO 20+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL 19+00 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 20+00 368 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 SOUTHERN CALIFORNIA GAS NOTES LEGEND' m M I i -- D CONSTRUCT STORM DRAIN PER CITY STANDARDS m ABBREVIATIONS O 2 Z U K m a CONSTRUCTION NOTES CL CENTERLINE SMH SEWER MANHOLE ® CONSTRUCT STORM DRAIN INV INVERT SCO SEWER CLEANOUT 18" RGJ MANHOLE TYPE "A" PER C.O.B. STD. SW -4 & SW -5. Oj CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 SD STORM DRAIN SDMH STORM DRAIN MANHOLE STORMMANHOD AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE MH EXIST EXISTING W � CONSTRUCT CATCH BASIN "A" LESS THAN 127. TYPE PER C.O.B. STI. D-14. C8 CATCH BASIN ELEV ELEVATION N O CONTRACTOR SHALL HAVE THE SEWER/STORM DRAIN JB JUNCTION BOX R/W RIGHT OF WAY NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" UNE STUB LOCATION AND INVERT SURVEYED PRIOR SCP STREET CONSTRUCTION PLAN PA RIGHT OF WAY WITH 3.5' OPENINGS PER C.O.B. STD. D-14 TO PLUGGING AND BACKFILLING TRENCH. � UNLESS OTHERWISE NOTED. 3 3.2 TOP OF CLEANOUT ELEVATIONUNLESS 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS O REMOVE CAP & CONNECT TO EXISTING T .M• MANHOLE/TOP OTHERWISE NOTED. SEWER. CONTRACTOR TO VERIFY LOCATION J m N •'Il � W� AND INVERT OF EXISTING SEWER AND STORM 0�i 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE DRAIN PRIOR TO CONSTRUCTION AND NOTIFY $ CONSTRUCT SEWER PER CITY STANDARDS >i UNLESS OTHERWISE NOTED. ENGINEER OF ANY DISCREPANCIES r 4) NO SEWER LATERALS SHALL BE 'WITHIN 5' FROM ® CONSTRUCT SEWER MANHOLE ZZI CLEANOUTS UNLESS OTHERWISE NOTED. TYPE "A' PER C.O.B. STD. SW -4 AND SW -5 EASEMENT LEGEND ® CONSTRUCT SEWER CLEANOUT 1� AS ON, SEC nON DESIGNATION, SECTION LETTER FLOWAGE AND DRAINAGE EASEMENT TO BE Q PER C.O.B. STD. SW -6. DEDICATED WITH FINAL MAP A L_ z ---- - ®SECONDARY ACCESS EASEMENT TO BE DEDICATED WITH FINAL MAP 0 SHEET WEREE SECTION IS SHOWN 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 20+00 368 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 SOUTHERN CALIFORNIA GAS NOTES A SOUTHERN CALIFORNIA GAS COMPANY TRANSMISSION PERSONNEL SHALL BE ON STANDBY WHEN CONSTRUCTION IS TO TAKE PLACE WITHIN 10' OF THE EXISTING TRANSMISSION UNE. CONTACT TAB LAGOW AT 661-763-2825 TWO WEEKS BEFORE THE PROPOSED WORK TO ALLOW AMPLE TIME TO SCHEDULE STANDBY. THE CONTRACTOR MUST ALSO GET A NEW USA TICKET AT LEAST TWO (2) DAYS PRIOR TO ANY CONSTRUCTION. ANY UNDERGROUND STRUCTURE SHALL MAINTAIN A MINIMUM OF 5 FT. (WITH 3 FT. OF UNDISTURBED SOIL) HORIZONTAL SEPARATION AND 18 IN. OF VERTICAL SEPARATION FROM THE EXISTING 24" SOUTHERN CAUFORNIA GAS CO. TRANSMISSION UNE. ADDITIONALLY, NO LESS THAN 3, OR MORE THAN 7', OF COVER IS TO BE OVER THE EXISTING TRANSMISSION LINE AT NO TIME SHALL POWER DRIVEN OR POWER OPERATED EQUIPMENT BE USED DIRECTLY OVER THE TRANSMISSION LINE, OR WITHIN 2' FROM THE EDGE OF THE PIPE EQUIPMENT SHALL NOT REMAIN STATIONARY OVER THE PIPELINE. A_ 6 SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL SCALE: 1" = 40' 40' 20' O' 40' 80' 368 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 454, Know what's below. Call before you dig. o m M I i 0a m O 2 Z U K m a IRCP Z 0 Q J INSTALL 36.79 LF 0 18" RGJ O 0.11 S - i > Q W D N N In N �3 � � N •'pM'�3 it Z W z W N J m N •'Il � W� 0�i M > azo >i i �w O r T� n -Z ZZI z 0 �y dw in s I j j � i I 0 i ZLu f r LL I i i I I� 0 I I ISI CJg�Q a,^moo. j I O LLI OoanF C-5 V° I LU LU ca I I C� I I I — A SOUTHERN CALIFORNIA GAS COMPANY TRANSMISSION PERSONNEL SHALL BE ON STANDBY WHEN CONSTRUCTION IS TO TAKE PLACE WITHIN 10' OF THE EXISTING TRANSMISSION UNE. CONTACT TAB LAGOW AT 661-763-2825 TWO WEEKS BEFORE THE PROPOSED WORK TO ALLOW AMPLE TIME TO SCHEDULE STANDBY. THE CONTRACTOR MUST ALSO GET A NEW USA TICKET AT LEAST TWO (2) DAYS PRIOR TO ANY CONSTRUCTION. ANY UNDERGROUND STRUCTURE SHALL MAINTAIN A MINIMUM OF 5 FT. (WITH 3 FT. OF UNDISTURBED SOIL) HORIZONTAL SEPARATION AND 18 IN. OF VERTICAL SEPARATION FROM THE EXISTING 24" SOUTHERN CAUFORNIA GAS CO. TRANSMISSION UNE. ADDITIONALLY, NO LESS THAN 3, OR MORE THAN 7', OF COVER IS TO BE OVER THE EXISTING TRANSMISSION LINE AT NO TIME SHALL POWER DRIVEN OR POWER OPERATED EQUIPMENT BE USED DIRECTLY OVER THE TRANSMISSION LINE, OR WITHIN 2' FROM THE EDGE OF THE PIPE EQUIPMENT SHALL NOT REMAIN STATIONARY OVER THE PIPELINE. A_ 6 SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL SCALE: 1" = 40' 40' 20' O' 40' 80' 368 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 454, Know what's below. Call before you dig. o m M 0a m O 2 Z U K m a Z 0 Q J W U M S - > Q W D In m � N M > z T� z 0 in s 0 ZLu LL Z LL 0 CJg�Q a,^moo. ® O LLI OoanF C-5 V° LU LU ca 6 C� co n LL 0 �6 �41k �4% EXISTING SUMP (PRIVATE) PROVIDED SUMP CAPACITY : 16.16 AC—FT REQUIRED SUMP CAPACITY : 15.34 AC—FT DESIGN WATER SURFACE = ELEV. 343.0 BOTTOM BASIN = ELEV. 334.0 LEGEND: ABBREVIATIONS CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN P/L RIGHT OF WAY TOM, 363.22 TOP OF MANHCE/TOP OF CLEANOUT ELEVATION —• 5 CONSTRUCT SEVER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A' PER GO.B. STD. SW -4 AND SW -5. ® CONSTRUCT SEWER CLEANOUT PER GO.B. STD. SW -6. a `SEE DETAIL C-7 THIS SHEET l I I I 1 I I I I 1 I I I I I I II I ' I 1 I I1 1 I I I i �"R• `FLOWAGE AND DRAINAGE - 4* EASEMENT PER DOG /0021700.5998 l tea` �.• PROPOS1,' GAS UNE FUM 34' PC&E GAS \\ EASEMENT DRILL ISLAND (NOT A PART) OFFSITE STORM DRAIN I N 1 11 i 1 I II i i I 3 I 1 1 1 GAS 1 1 /8° WATER PER ' i / ' SEPARATE PLANS 4 I 1 1 , PARK CNT . 1 TE CTION GHOA. 0T 1 1 INTER 3818 C.4 HI STA. 13+95.27 _L0P 5 1 Ill 1 FLOWAGE AND OR �N EASEMENT II1 PER DOC. 0218151tAT7 364 LF ERCP 362 79 LF 360 358 360 356 -- 354 PG&E GAS NOTES: CALL 811 (1-800-227-2600) A MINIMUM OF 2 3552 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF OF@ CONTACT) IN ADVANCE FOR THE MARKING OF OF 4Y UNDERGROUND UTILITIES INCLUDING ALL NON-URLJTIES BEFORE YOU DIG, GRADE. OR 350 EXCAVATE. W Z N ANY UNDERGROUND STRUCTURE SHALL MAINTAIN A 352 MINIMUM OF 5 FT. (WITH 3 FT. OF UNDISTURBED 346 SOIL) HORIZONTAL SEPARATION AND 24 IN. OF 350 VERTICAL SEPARATION FROM THE EXISTING 34" �ROG8 PACIFIC GAS & ELECTRIC TRANSMISSION UNE. ®0. ADDITIONALLY, NO LESS THAN 72" OF COVER IS TO 346 BE OVER THE EXISTING TRANSMISSION LINE AT ANY 346 TIME. AT NO TIME SHALL POWER DRIVEN OR POWER 344 OPERATED EQUIPMENT BE USED DIRECTLY OVER THE TRANSMISSION LINE, OR WITHIN 2' FROM THE EDGE 342 OF THE PIPE. EQUIPMENT SHALL NOT REMAIN - - STATIONARY OVER THE PIPELINE. A PG&E 342 TRANSMISSION PERSONNEL SHALL BE ON STANDBY WHEN CONSTRUCTION IS TO TAKE PLACE WITHIN 10' 338 OF THE EXISTING TRANSMISSION LINE ALL 238.7 LF OF 38 340 0088 338 CONSTRUCT PORTION OF 42" OF STORM DRAIN 334 PRIOR TO THE CONSTRUCTION OF THE PROPOSED 34' PG&E GAS UNE. THE CENTER OF THE STORM 332 DRAIN SEGMENT IS TO BE CENTERED UNDER THE 336 PROPOSED GAS LINE. SEE DETAIL SHEET 7 330 UPON COMPLETION OF THE PROPOSED 34" PG&E 334 GAS LINE AND REMOVAL OF EXISTING 34' GAS LINE, (18.53 LF P REMOVE THE PLUG AND CONSTRUCT REMAINDER OF 1 THE STORM DRAIN TO THE EXISTING SUMP. 1 332 330 LEGEND: ABBREVIATIONS CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN P/L RIGHT OF WAY TOM, 363.22 TOP OF MANHCE/TOP OF CLEANOUT ELEVATION —• 5 CONSTRUCT SEVER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A' PER GO.B. STD. SW -4 AND SW -5. ® CONSTRUCT SEWER CLEANOUT PER GO.B. STD. SW -6. a `SEE DETAIL C-7 THIS SHEET l I I I 1 I I I I 1 I I I I I I II I ' I 1 I I1 1 I I I i �"R• `FLOWAGE AND DRAINAGE - 4* EASEMENT PER DOG /0021700.5998 l tea` �.• PROPOS1,' GAS UNE FUM 34' PC&E GAS \\ EASEMENT DRILL ISLAND (NOT A PART) OFFSITE STORM DRAIN I N 1 11 i 1 I II i i I 3 I 1 1 1 GAS 1 1 /8° WATER PER ' i / ' SEPARATE PLANS 4 I 1 1 , PARK CNT . 1 TE CTION GHOA. 0T 1 1 INTER 3818 C.4 HI STA. 13+95.27 _L0P 5 1 Ill 1 FLOWAGE AND OR �N EASEMENT II1 PER DOC. 0218151tAT7 --- o CONSTRUCT STORM DRAIN PER CITY STANDAR 7 SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL ® CONSTRUCT STORM DRAIN MANHOLE TYPE 'A' PER C.O.B. STD. SW -4 & SW -5. `tr CONSTRUCT CATCH BASIN TYPE 'A' PER C.O.B. SID. D-14. NOTES.: 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE UNLESS OTHERWISE NOTED. 4) NO SEWER LATERALS SHALL BE WITHIN 5' FROM CLEANOUTS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER 2 SHUT WHERE SECTION IS SHOWN 2 11 6 1 � FUTURE HIGHGATE PARK BOULEVARD U,rN-r� T V\\ NOT A PART TRACT BIND Y 364 STALL LF ERCP i INSTALL 79 LF 362 360 S -- 360 358 358 356 OF@ OF 4Y GJ -RCP 354 352 W Z N 352 350 350 348 �ROG8 �p ®0. 346 • 346 344 ay>ii 344 342 c>i 342 .. - - 340 338 g 338 IN ALL 238.7 LF OF 38 RGJ-RCP 0088 334 332 332 330 330 1 (18.53 LF P BLIC) 1 �V�MMM 1 I PPRO)OMAI EXISTING GRADE ® 1 DNTERUNE , H I 1. y� r7 N N H Sa N f0 • N ! 1 ai �'F e • Iq—— Z �2 yM,z g 2zz 1 6 �Wf7 Z =m'N � "e7 Z^fpObi7 1 Z 3� PLUG PER t- - DETA L B '1 w I - W 2_ j INV. 36' DRAIN AP ROXIMATE MISTING G�tADE 0 CENLINE ! II j i I 1 I I I I 1 1 PR TO BE R�OVID INV. 3�" PG&E G I N 1 1 1 I i i 1 I INV. 36 DRAIN i I 1 ----_.a - 2 INV. 42 _ i EXISTING SUMP BTM ELEV. 33400' DRAIN --- o CONSTRUCT STORM DRAIN PER CITY STANDAR 7 SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL ® CONSTRUCT STORM DRAIN MANHOLE TYPE 'A' PER C.O.B. STD. SW -4 & SW -5. `tr CONSTRUCT CATCH BASIN TYPE 'A' PER C.O.B. SID. D-14. NOTES.: 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4 INCH IN SIZE UNLESS OTHERWISE NOTED. 4) NO SEWER LATERALS SHALL BE WITHIN 5' FROM CLEANOUTS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER 2 SHUT WHERE SECTION IS SHOWN 2 11 6 1 � FUTURE HIGHGATE PARK BOULEVARD U,rN-r� T V\\ NOT A PART TRACT BIND Y 364 INSTALL! 78.86 LF 364 362 362 360 S 360 358 358 356 356 354 354 352 W Z N 352 350 350 348 �p 348 346 • 346 344 ay>ii 344 342 c>i 342 340 340 338 g 338 336 � 336 334 334 332 332 330 330 CONSTRUCTION NOTES Oi CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE LESS THAN 12'. O CONTRACTOR SHALL HAVE THE SEWER/STORM DRAIN LINE STUB LOCATION AND INVERT SURVEYED PRIOR TO PLUGGING AND BACKFILLING TRENCH. Q3 REMOVE CAP & CONNECT TO EXISTING SEWER. CONTRACTOR TO VERIFY LOCATION AND INVERT OF EXISTING SEWER AND STORM DRAIN PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES &SCALE: ________CALE: 1" = 40' HORIZONTAL 1" = 4' VERTICAL O OMNECT REMAINDER OF 42' STORM DRAIN TO SUMP AFTER 34' PG&E GAS UNE HAS BEEN REMOVED 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 PROPOSED 34' PG&E GAS UNE Ol PLACE 42' STORM DRAIN SEGMENT PRIOR TO CONSTRUCTION OF 34' PCM GAS UNE AND BACKFILL PER =11. STANDARDS I 16' MIN. I O SEQUENCE OF CONSTRUCTION UNDER PROPOSED GAS UNE TRTAR PLUG CGN;. BLOC( OR MORTARED IN PLACE BRICK & MORTAR PLUG DETAIL 7 N. T.S. SCALE: 1" = 40' 40' 20' O' 40' so' 43 Know what's below. Call before you dig. INSTALL! 78.86 LF W 36' RGJ✓-RCP ®01 S Z W Z N m Vl �p • N ,0 ay>ii c>i ' g t2ZZ � L_� n Tn I $I InM �V�MMM I PPRO)OMAI EXISTING GRADE ® 1 DNTERUNE , I 1 ai Iq—— 1 PLUG PER t- - DETA L B '1 I 2_ j INV. 36' DRAIN &SCALE: ________CALE: 1" = 40' HORIZONTAL 1" = 4' VERTICAL O OMNECT REMAINDER OF 42' STORM DRAIN TO SUMP AFTER 34' PG&E GAS UNE HAS BEEN REMOVED 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 PROPOSED 34' PG&E GAS UNE Ol PLACE 42' STORM DRAIN SEGMENT PRIOR TO CONSTRUCTION OF 34' PCM GAS UNE AND BACKFILL PER =11. STANDARDS I 16' MIN. I O SEQUENCE OF CONSTRUCTION UNDER PROPOSED GAS UNE TRTAR PLUG CGN;. BLOC( OR MORTARED IN PLACE BRICK & MORTAR PLUG DETAIL 7 N. T.S. SCALE: 1" = 40' 40' 20' O' 40' so' 43 Know what's below. Call before you dig.