HomeMy WebLinkAbout1.2-7317 Ph A, B & C RevisionsREVIEWED BY: THEODORE D. WRIGHT C 33710 APPROVED BY: 2 s IE 0 BENCHMARK JSED: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT CENTERLINE INTERSECTION OF PADDINGTON STREET AND STOCKDALE RANCH DRIVE. ELEVATION = 350.57 (CITY DATUM) PER TRACT 7240-2 Kt� CHMARK SET: SET NAIL ON TOP OF CURB AT EAST SIDE OF THE SOUTHEAST CURB RETURN AT THE INTERSECTION OF' STOCKDALE HIGHWAY AND STOCKDALE RANCH DRIVE. ELEVATION = 356.49 (CITY DATUM) BASIS OF BEARINGS: THE BEARING OF NORTH 89'27'57" WEST FOR THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 3, T. 30 S., R. 26 E., M.D.B.& M. (ALSO BEING THE CENTERLINE OF STOCKDALE HIGHWAY) PER PARCEL MAP 12062-1 FILED IN BOOK 60 OF PARCEL MAPS AT PAGE 76 IN THE OFFICE OF THE KERN COUNTY RECORDER'S OFFICE WAS USED AS THE BASIS OF BEARINGS SHOWN UPON THIS MAP. PARCELS A AND B OF PARCEL MERGER NO. 16-0182 PER CERTIFICATE OF COMPLIANCE RECORDED ON SEPTEMBER 2, 2016 AS DOCUMENT NO. 000216120378 OF OFFICIAL RECORDS; ALSO BEING A DIVISION OF A PORTION OF SECTION(S) 3 AND 4, IN TOWNSHIP 30 SOUTH, RANGE 26 EAST, MOUNT DIABLO BASE AND MERIDIAN, IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA. VICINITY MAP NO SCALE a No "Al Fe", ITWNFIr� ESTIMATED OUA.NTiTIES FOR PLAN CHECK AND INSPECTION FEE CALCULATIONS. NOT TO BE USED FOR BIDDING PURPOSES. SEWER 21" SEWER MAIN 2,067 LF 8" SEWER MAIN 340 LF PVC LINED SEWER MANHOLES 7 EA ADJUST MANHOLES TO FINISH GRADE 7 EA TIE-IN(S) 1 EA STORM DRAIN ccNSTrcuuxQa r�wA C 18" R.C.P. STORM DRAT -- ` a24LF`/ TYPE "A" CATCH BASINS 2 EA STORM DRAIN MANHOLE 2 EA ADJUST MANHOLE TO FINISH GRADE 2 EA OUTLET STRUCTURE 1 EA TEMPORARY SUMP CHAIN-LINK FENCE 1,215 LF SHEET N�INDEXN�INDEX C7 TITLE SHEET �T GENERAL NOTES �� 4� PLAN AND PROFILE STATION 49+53 TO 59+00 (a) PLAN AND PROFILE STATION 59+00 TO 69+00 PLAN AND PROFILE STATION 69+00 TO 75+42 C SUNAPEE DRIVE MONTPELIER COURT SAN BUENAVENTURA STREET BROOKLINE DRIVE O PROPOSED SUMP DETAIL LUM Q SHEET INDEX NUMBER UNDERGROUNDSERVICEALERT (s ss#12 SEWER MANHOLE W/NUMBER OF SOUTHERNCAFORAA P (D) SO$12 STORM DRAIN MANHOLE W/NUMBER ,a, c8#12 CATCH BASIN W/NUMBER PROPOSED SEWER MAIN u PROPOSED STORM DRAIN s -- -S--- EXISTING SEWER MAIN Aa a SD— EXISTING STORM DRAIN TMH- TOP OF MANHOLE ELEVATION INV.-- PIPE INVERT ELEVATION DIA. TOLL FREE 1-80822726N (E,S,N,W)- (EAST, SOUTH, NORTH, WEST) AT LEAST TWO DAYS HEFORE YOU DIG P.V.C.- POLYVINYL. CHLORIDE t = APPROXIMATE LENGTHS, CONTRACTOR SHALL VERIFY ALL LENGTHS PRIOR TO BIDDING THIS PROJECT R.C.P.- REINFORCED CONCRETE PIPE R.G.J.- RUBBER GASKET JOINT CB- CATCH -BASIN E 0-1 I � PURE C.O.B. U N I mC` _j Q � o � I oLj ,_- SD#2 BOfYJq�ENTURA < Q of LL l it STOGKOALE HiGiiWAY.____._.__.— SS#5 HL ERRY C `z � I TRACT of a //a F_O®.J 72410 �� I' I 'I I Q n OOTL111—E)LL, i/) I D <C/)'C® E co Z NORT HAL= OFPR®,yy�,CT EJunCAn�{�(� v �� uj Q SITESE CTION 3 T.30S., R.26E._N_ _ NORTH HALF OF L SECTION 4 Q T.30S., R.26E. qq� 0 E1� I ILI- KCWA_IROS5 VALLEY CANAL m o � � ypa VICINITY MAP NO SCALE a No "Al Fe", ITWNFIr� ESTIMATED OUA.NTiTIES FOR PLAN CHECK AND INSPECTION FEE CALCULATIONS. NOT TO BE USED FOR BIDDING PURPOSES. SEWER 21" SEWER MAIN 2,067 LF 8" SEWER MAIN 340 LF PVC LINED SEWER MANHOLES 7 EA ADJUST MANHOLES TO FINISH GRADE 7 EA TIE-IN(S) 1 EA STORM DRAIN ccNSTrcuuxQa r�wA C 18" R.C.P. STORM DRAT -- ` a24LF`/ TYPE "A" CATCH BASINS 2 EA STORM DRAIN MANHOLE 2 EA ADJUST MANHOLE TO FINISH GRADE 2 EA OUTLET STRUCTURE 1 EA TEMPORARY SUMP CHAIN-LINK FENCE 1,215 LF SHEET N�INDEXN�INDEX C7 TITLE SHEET �T GENERAL NOTES �� 4� PLAN AND PROFILE STATION 49+53 TO 59+00 (a) PLAN AND PROFILE STATION 59+00 TO 69+00 PLAN AND PROFILE STATION 69+00 TO 75+42 C SUNAPEE DRIVE MONTPELIER COURT SAN BUENAVENTURA STREET BROOKLINE DRIVE O PROPOSED SUMP DETAIL LUM Q SHEET INDEX NUMBER UNDERGROUNDSERVICEALERT (s ss#12 SEWER MANHOLE W/NUMBER OF SOUTHERNCAFORAA P (D) SO$12 STORM DRAIN MANHOLE W/NUMBER ,a, c8#12 CATCH BASIN W/NUMBER PROPOSED SEWER MAIN u PROPOSED STORM DRAIN s -- -S--- EXISTING SEWER MAIN Aa a SD— EXISTING STORM DRAIN TMH- TOP OF MANHOLE ELEVATION INV.-- PIPE INVERT ELEVATION DIA. TOLL FREE 1-80822726N (E,S,N,W)- (EAST, SOUTH, NORTH, WEST) AT LEAST TWO DAYS HEFORE YOU DIG P.V.C.- POLYVINYL. CHLORIDE t = APPROXIMATE LENGTHS, CONTRACTOR SHALL VERIFY ALL LENGTHS PRIOR TO BIDDING THIS PROJECT R.C.P.- REINFORCED CONCRETE PIPE R.G.J.- RUBBER GASKET JOINT CB- CATCH -BASIN E 0-1 REVISIONS APP90VED B FRED V. PORTER, R. .E. N0.33S48 DATE / v7 DANIEL PADILLA, R.C.E. NO. 67008 DATE L�I:i A 1:7x��1��75liir![�)rt� AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT, CITY INSPECTION N_( IE NO CITY INSPECTIONS SHALL BE GIVEN FOR THE WORK IN THIS AREA UNTIL AN ENCROACHMENT PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. STOCKDALE HIGHWAY I / I / I / / / / I / / PARCEL 1 PM 12062-2 / / I � � / TRACT 7317 / PHASE 4 I r -_J r.l 1 e � / TRACT 7317 PHASE 5 7 I PARCEL. 3 PM 12062-2 / Z z Z rT TRACT 7317 PHASE 6 j I I FUTURE4 FREEWAY I INTERCHANGE 1 1 ng u9�y�11 Z0Z yy��Q�C tllmS Ww2 Y�0 P za�onUNOQ�W p�ztU�at�y mffi �ap U'NgZ 24' q"d3ad 3"� "a-ia g�ooWas 4, �3gsU�W�a ap �QO$i L1 j�LLt- �40DWu!�WQ 0Oµ2 ��p�aW 9A 9 R ¢ lr �=1q Q7W U}Z m�l-�Z pW W L_ ��1d-WSZ_UVF- F`" m if>�p0 au Z �oza�vWioor=- LJ a�Z98226R M W O CJ p Q O Q D Z a V / < n LS F(rn Uw~> c)0 (%} U'3 02 4 q�Zww -m V) C5 wow.W� UI m.<T W 2 2 w r b g Q jiO W dd K oz U� dzz zo -zz° ,00 4W}I,NjWXa=� infla 0 zcn� w 0oo>d w W 0 UQir4NUCWK ssp2 f CHj2J / I � PURE C.O.B. U N I mC` _j Q � o � I � I d� a ,_- SD#2 BOfYJq�ENTURA < Q of LL l it SS#5 J < q m W CL Z U) //a F_O®.J rW.v'I �� I' I 'I t�l ,f t if REVISIONS APP90VED B FRED V. PORTER, R. .E. N0.33S48 DATE / v7 DANIEL PADILLA, R.C.E. NO. 67008 DATE L�I:i A 1:7x��1��75liir![�)rt� AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT, CITY INSPECTION N_( IE NO CITY INSPECTIONS SHALL BE GIVEN FOR THE WORK IN THIS AREA UNTIL AN ENCROACHMENT PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. STOCKDALE HIGHWAY I / I / I / / / / I / / PARCEL 1 PM 12062-2 / / I � � / TRACT 7317 / PHASE 4 I r -_J r.l 1 e � / TRACT 7317 PHASE 5 7 I PARCEL. 3 PM 12062-2 / Z z Z rT TRACT 7317 PHASE 6 j I I FUTURE4 FREEWAY I INTERCHANGE 1 1 ng u9�y�11 Z0Z yy��Q�C tllmS Ww2 Y�0 P za�onUNOQ�W p�ztU�at�y mffi �ap U'NgZ 24' q"d3ad 3"� "a-ia g�ooWas 4, �3gsU�W�a ap �QO$i L1 j�LLt- �40DWu!�WQ 0Oµ2 ��p�aW 9A 9 R ¢ lr �=1q Q7W U}Z m�l-�Z pW W L_ ��1d-WSZ_UVF- F`" m if>�p0 au Z �oza�vWioor=- LJ a�Z98226R M W O CJ p Q O Q D Z a V / < n LS F(rn Uw~> c)0 (%} U'3 02 4 q�Zww -m V) C5 wow.W� UI m.<T W 2 2 w r b g Q jiO W dd K oz U� dzz zo -zz° ,00 4W}I,NjWXa=� infla 0 zcn� w 0oo>d w W 0 UQir4NUCWK ssp2 f CHj2J / TRACT 7317 PHASE 3 KEY MAP SCALE: V-200' TRACT 7317 PHASE 2 TRACT 7317 PHASE 1 SS17 ( I I I I -N- 1-�I?y COB RECORDS No. z m m� LU c o ~roM Q w > U .- U N X ® a3 > KC U) �u z Y Q w co N C,6 z o U N N Lu W F_ O � 6J� O O I c:I cwa tj PURE C.O.B. R TANK SITE mC` _j L� � CH1 (6� � I d� a ,_- SD#2 BOfYJq�ENTURA < Q of LL uTj SS#5 J < q m W CL TRACT 7317 PHASE 3 KEY MAP SCALE: V-200' TRACT 7317 PHASE 2 TRACT 7317 PHASE 1 SS17 ( I I I I -N- 1-�I?y COB RECORDS No. z m m� LU c o ~roM Q w > U .- U N X ® a3 > KC U) �u z Y Q w co N C,6 z o U N N Lu W F_ O � 6J� O O I c:I cwa tj _j L� "L -rW z (-) < Q of LL uTj J < q m W CL Z U) LLJ F_O®.J !� i/) I D <C/)'C® co Z W v �� uj Q U) J _ e cW Z 'f' Q qq� 0 E1� 0 8 m o � � ypa a U -Q DATE 1129/2017 PA JOB No. 2709L SHEET OF 7 SHEETS GENERALNOTES 1. ALL CONSTRUCTION SHALL CONFORM TO THIS PLAN, THE CALIFORNIA BUILDING CODE, CITY OF BAKERSFIELD ORDINANCE, LATEST EDITION AND STANDARDS PERTAINING THERETO. THESE DOCUMENTS SHALL BE MADE A PART HEREOF. 2. ALL CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY OR CITY EASEMENTS SHALL BE IN ACCORDANCE WITH CITY OF BAKERSFIELD STANDARDS AND STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS DATED 2010. THESE STANDARDS, DRAWINGS AND DETAILS SHALL BE CONSIDERED A PART OF THESE PLANS AND THE CONTRACTOR SHALL OBTAIN A COPY FOR HIS USE. 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS BEFORE START OF CONSTRUCTION. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK TO BE PERFORMED IN THE EXISTING ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE STREET RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF A PERMIT. 4. 24 HOUR NOTICE: PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE. THE SECTION MAY BE NOTIFIED AT (661) 326-3049. 5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS, DATA AND MEASUREMENTS AT THE BUILDING SITE PRIOR TO CONSTRUCTION. 00 NOT SCALE DRAWINGS. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. PORTER & ASSOCIATES, INC. MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS. 6. EXISTING UTILITY AND UNDERGROUND LINES HAVE BEEN SHOWN ON THIS PLAN ACCORDING TO AVAILABLE RECORDS. THE ENGINEER IS NOT RESPONSIBLE FOR POSSIBLE ERRORS OR OMISSIONS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF THE LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO BEGINNING OF ANY WORK. UNDERGROUND SERVICE ALERT (U.S.A.: 1-800-227-2600) SHALL BE CONTACTED AT LEAST TWO WORKING DAYS PRIOR TO ANY CONSTRUCTION OR EXCAVATION. 7. ANY EXISTING IMPROVEMENTS OR UTILITIES THAT ARE REMOVED, DAMAGED OR UNDERCUT BY CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE ENGINEER AND APPROVED BY THE GOVERNING AUTHORITY. 8. IF A PROBLEM OR CONFLICT SHOULD ARISE DURING THE COURSE OF THE PROJECT, IT IS THE RESPONSIBILITY OF THE OWNER OR THE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY PRIOR TO ANY FURTHER WORK. 9. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SUPERVISION NECESSARY FOR A COMPLETE AND FUNCTIONAL PRODUCT. 10. ALL WORK WHICH IS DEFECTIVE IN ITS CONSTRUCTION OR DEFICIENT IN ANY OF THE REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE REMEDIED, OR REMOVED AND REPLACED BY THE CONTRACTOR IN AN ACCEPTABLE MANNER, AND NO COMPENSATION WILL BE ALLOWED FOR SUCH CORRECTION. 11. IN THE EVENT CONSTRUCTION STAKING BASED ON THE CONSULTANT'S PLANS, DRAWINGS OR OTHER DOCUMENTS IS ACCOMPLISHED BY ANYONE OTHER THAN THE CONSULTANT, THE OWNER OR CONTRACTOR SHALL NOTIFY THE BUILDING OFFICIAL IN WRITING AS TO THE CHANGE OF ENGINEER IN RESPONSIBLE CHARGE. 12. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING EROSION, SEDIMENTATION & DUST CONTROL PLAN AND STORM WATER POLLUTION PREVENTION PLAN IMPLEMENTATION AND THE SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 13. IF THE CONTRACTOR IS IN DOUBT AS TO THE MEANING OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS OR FINDS DISCREPANCIES IN OR OMISSIONS FROM THE DRAWINGS, HE SHALL SUBMIT A WRITTEN REQUEST FOR AN INTERPRETATION OR A CORRECTION THEREOF, PRIOR TO FILING HIS BID PRICE FOR THE PROJECT. 14. PORTER & ASSOCIATES, INC. WILL NOT BE RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS- ANY AND ALL CHANGES TO THESE PLANS MUST BE APPROVED IN WRITING BY PORTER & ASSOCIATES, INC. 15. NORMAL STAKING AND MARKING OF THE PROJECT WILL BE SUPPLIED ONLY ONCE. ALL RESTAKING OR REMARKING SHALL BE AT THE EXPENSE OF THE CONTRACTOR. 16. SEE WATER AND STREET IMPROVEMENT PLANS FOR OTHER IMPROVEMENTS THAT ARE PART OF THIS PROJECT. 17. NO PUBLIC WORKS INSPECTIONS 'MEL BE GIVEN FOR THE WORK IN THE UNDEDICATED ROADWAYS IN THIS PROPERTY UNTIL A SUBDIVISION PERMIT HAS BEEN OBTAINED. 18. NOTE CONTRACTOR SHALL STAMP AND "S" INTO CURB FACE OVER EACH SEWER LATERAL. 19, ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADING AS PER CITY ENGINEER. COB SEWER SPECIEICATIONS 1. ALL MATERIALS INSTALLATION SHALL CONFORM TO CHAPTER 1 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL. AND WITH THE RECOMMENDATIONS OF THE MANUFACTURER. 2- ALL PIPE AND FITTINGS SHALL BE MARKED OR STAMPED WITH THE TRADE BRAND NAME OF THE MANUFACTURER, AND STRENGTH OR CLASS OF PIPE, 3. PVC PIPE INSTALLATION: A. MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF ASTM SPECIFICATIONS D3034 AND SDR -35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE E FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. B. JOINTS: USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE PVC PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. C. INSTALLATION: PIPE AND FITTINGS SHOULD BE INSTALLED IN ACCORDANCE WITH ASTM D2321. ONLY CLASS I OR 11 EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 4. FOR CURVED PIPE: IDENTIFICATION TAPE DESIGNED FOR USE ON SEWERS B SHALL CED E PLACED ON TOP OF SEWER MAIN ALONG ITS ENTIRE LENGTH. IDENTIFICATION TAPE SHALL ALSO BE PLACED ON SEWER LATERALS EXTENDING FROM SEWER MAIN TO RIGHT-OF-WAY LINE. 5. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT PROPERTY LINE PER C.0.6- STD. SW -1, UNLESS OTHERWISE NOTED ON PLANS. o WYE -FITTINGS SHALL BE INJECTION MOLDED IN-LINE AND SHALL BE RAL USED FOR ALL LATERAL E CONNECTIONS AND SHALL 6E ROTATED A MINIMUM OF 23" AND A MAXIMUM OF 45' ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. WYE FITTINGS ONLY SHALL BE USED FOR VCP. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG (SOLVENT WELDED). 7. ALL LATERALS SHALL EXTEND TO A MINIMUM OF FOUR FEET BEYOND THE PROPERTY LINE AND SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS. . 8. THE MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD DRAWINGS SW -4 AND SW -5 AND SECTION 70-1.02H AND 71--1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, LATEST EDITION. 9. THE CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS SW -6. 10. SYSTEM TESTING: INSTALLED PIPE SHALL BE CLEANED AND TESTED IN ACCORDANCE WITH CHAPTER 1.3 OF THE SUBDIVISION DESIGN MANUAL AND WITH THE RECOMMENDATIONS OF THE MANUFACTURER AND ACCEPTABLE TO THE CITY OF BAKERSFIELD. 24 HOURS NOTICE WILL BE REQUIRED FOR TEST AND INSPECTION. 11. PRIOR TO FINAL ACCEPTANCE OF THE SEWER SYSTEM, ALL MAIN LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE AND AS APPROVED BY THE CITY ENGINEER. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 360', IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTIONS SHALL BE WITNESSED BY CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE OF THE SYSTEM, THE VIDEO CASSETTE, FORMS AND LOGS SHALL BECOME THE PROPERTY OF THE CITY. CONNECTION SEAL TO PVC LINED SEWER LINE OR MANHOLE 1. THE CORED HOLE SHALL. BE APPROXIMATELY 3 INCHES GREATER THAN THE OUTSIDE DIAMETER OF THE CONNECTING LINE. THE CORED HOLE SHALL BE DESIGNED TO CUT A HOLE WITH MINIMUM DAMAGE TO THE REINFORCING STEEL PIPE OR PLASTIC LINER. 2. PRIOR TO THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, THE PLASTIC LINER AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC LINER MANUFACTURER'S RECOMMENDATION. THE END OF THE CONNECTING LINE SHALL BE SEALED TO THE PVC BOOT WITH SIKA 449/203 PRIMER AND SIKA FLEX 1A SEALANT OR AN APPROVED EQUAL. 3. THE PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGGLY TO THE OUTSIDE WALL OF THE CONNECTION. 4. THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED FOR HOLIDAYS PER THE PLASTIC LINER MANUFACTURER'S RECOMMENDATIONS. 5. THE CONNECTION LINE SHALL BE CENTERED IN THE CORED HOLE AND PLACED SO IT IS FLUSH WITH THE INSIDE WALL OF THE RCP. 6. THE PVC BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, INC. OR AN EQUAL APPROVED BY THE CITY ENGINEER. COB STORM DRAIN NOTES 1. UNLESS OTHERWISE SPECIFIED ON THESE PLANS, THE STORM DRAIN PIPE SHALL BE THE FOLLOWING: A. REINFORCED CONCRETE PIPE (R.C.P): REINFORCED CONCRETE PIPE SHALL BE CLASS III (ASTM C76) AND SHALL CONFORM TO THE REQUIREMENTS OF SECTION 65 OF THE STANDARD SPECIFICATIONS. (SEE GENERAL NOTE 2) B. JOINTS SHALL BE RUBBER GASKETED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 65-1.06 OF THE STANDARD SPECIFICATIONS. C. CONCRETE PIPE SHALL BE LAID IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 65 OF THE STANDARD SPECIFICATIONS. (SEE GENERAL NOTE 2) D. IN ADDITION TO THE ABOVE REQUIREMENTS, ALL RUBBER GASKETED JOINT RINGS SHALL BE CHECKED WITH A GAUGE ALL THE WAY AROUND THE PIPE AFTER THE JOINT HAS BEEN ASSEMBLED TO DETERMINE THAT THE RING HAS BEEN PROPERLY LOCATED AND SEATED. IMPROPERLY MADE JOINTS SHALL BE PULLED APART AND SATISFACTORILY REMADE. COB TRENCHING NOTA; 1. TRENCHING SHALL MEET THE REQUIREMENTS OF CAL -OSHA TRENCHING ORDERS AND THE CONTRACTOR SHALL COMPLY WITH SECTION 6422 OF THE LABOR CODE. 2. ANY TRENCHING TO BE CONDUCTED WITHIN CITY RIGHT-OF-WAY SHALL BE BACKFILLED AND COMPACTED PER CITY OF BAKERSFIELD STANDARD DETAIL ST -22, 3. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE NTH THE CITY OF BAKERSFIELD DRAWING SI -6- 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ALL TRENCHES, IF TRENCHES OR PIPING BECOME DAMAGED DUE TO WATER INFILTRATION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR THE TRENCH AND PIPING TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. 5. FLOODING OR WATERJETTING SHALL NOT BE USED FOR BACKFILL COMPACTION. 6. CLASS I BEDDING AND EMBANKMENT IS REQUIRED FOR ALL PLASTIC SEWER PIPE WITHIN THE PIPE ZONE. CLASS I BACKFILL. IS NOT REQUIRED IF PIPE SLOPE EXCEEDS 1%. 7. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. THE COST OF RETESTING DUE TO FAILED COMPACTION TESTS WILL BE BACKCHARCED TO THE CONTRACTOR. NOTE TO CO NTRACTO R ALL MANHOLES AND CLEANOUTS WITHIN TRACT, INCLUDING EXISTING MANHOLES, SHALL BE ADJUSTED TO FINISH GRADE IN ACCORDANCE WITH CITY STANDARDS. EXISTING MANHOLES MAY REQUIRE REMOVAL OF EXISTING CONE, AND REMOVAL OR "CHANGE OUT" OF BARREL RINGS. CITY STANDARD PLATES 1. THE FOLLOWING CITY OF BAKERSFIELD STANDARD DRAWINGS SHALL BE CONSIDERED A PART OF THESE PLANS. (CONTRACTOR TO OBTAIN LATEST EDITION, 10-26-89, THEREOF UNLESS OTHERWISE NOTED) CITY STD. No. DESCRIPTION CITY STD. No, DESCRIPTION SW -1 SEWER LATERAL MARKER ❑ D-6 LANDSCAPED CONSTRUCTED CHANNELS ❑ SW -2 TRENCH SECTION FOR CONCRETE ENCASED PIPE ❑ D-7 RIGHT OF WAY FOR CONSTRUCTED CHANNELS ❑ SW -3 PAVEMENT PATCHES ❑ D-8 RIGHT OF WAY FOR LINED CONSTRUCTED CHANNELS 5W-4 MANHOLE, TYPE "A ❑" D-9 PIPE SADDLE DETAIL SW -5 FRAMES & COVER FOR MANHOLES & CLEANOUTS ❑ D-10 SIDEWALK UNDERORAIN ® SW --6 6" CLEAN OUT ® D-11 DRAINAGE BASIN SW -7 HOUSE CONNECTION WITH VCP SADDLE ® D-12 CHAIN LINK FENCES ❑ SW -8 INDUSTRIAL SAND TRAP D-13 CHAIN LINK GATES ❑ SW -10 SAND TRAP D-14 CATCH BASIN, TYPE "A" ❑ SW -11 HOUSE CONNECTION WITH CAST IRON SADDLE ❑ D-15 CATCH BASIN, TYPE "A-1" ❑ SW -12 SEWER LIFT STATION VALVE BOX ® D-16 GUTTER DEPRESSIONS ❑ D-1 INTENSITY VS. DURATION CURVES ❑ D-17 JUNCTION BOX ❑ D-2 RATIONAL METHOD RUNOFF COEFFICIENTS ❑ D-18 MANHOLE, TYPE "B" ❑ D-3 CHANNEL PROTECTION ❑ D-19 DRAINAGE WELL, TYPE "B" ❑ D-4 CHANNEL PROTECTION ® ST -22 DATED 1/11/99 TRENCH BACKFILL AND COMPACTION REQUIREMENTS ❑ D-5 RIGHT OF WAY FOR NATURAL CHANNELS ❑ ST -6 DATED 1/11/99 PAVEMENT PATCHES oS2 0-°�VO wtm f'1 ni A0 wm zww<F..o z o aS�uga M �+ iWzyo �.ma C� SO V/ O z "o w_�ecgo�=`c2irc LLL z i w�x3Q'� a3� Y coN a mSo } - N N a ffi����amw Q ,� N LL C Y 0 Q {M FA N m Wm apW LL} N M oz5 G 0 N g� W M za io o ui r a LL�zF 'o�ap N co z -wt.w s 0 o z�x�aww�h-� _ x �y N o O 2 Z ¢ K 2 '03i � Nk Liao.�'zyw� �;w a, -gin m<m L o m `mw �(N9z U 2 LL VJ W Q � ® M Z W U W W Q W Q� 0,. 0 ®Q VJ ® b W U Z 0 1 W Z ���//��- VJ r h Lil U U s W Q m 0 i N 3 n r � 0 o � I o N a U O I t > v W 3 fL v y DATE 11/29120171 E PA JOB No. 2709L SHEET E COB RECORDS No. OF 7 SHEETS'. CONSTRUCTION „MOTES O INSTALL PVC LINED SEWER MANHOLE O INSTALL SEWER CLEANOUT + INSTALL SEWER -- INSTALL STORM DRAIN �? INSTALL STORM DRAIN MANHOLE Z w' INSTALL TYPE "A" CATCH -BASIN — - - ^^- RIGHT-OF-WAY — Ex s — EXISTING SEWER ---EX SD-- EXISTING STORM DRAIN --�L----''-- EXISTING EDGE OF PAVEMENT SD STORM DRAIN STATION SS SANITARY SEWER STATION ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 4" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNECTION WITH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLINE AND A 2.25' MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE. ® 90' WIDE STREET RIGHT-OF-WAY DEDICATION (STOCKDALE RANCH DRIVE) TO THE CITY OF BAKERSFIELD PER PARCEL MAP 12062-1 RECORDED FEBRUARY 22, 2016 IN HOOK 60 OF PARCEL MAPS, AT PAGE 76 IN THE OFFICE OF THE KERN COUNTY RECORDER. I wmm FRED W. PORTER, R.C.E. NO. 33448 DATE DANIEL PADILLA, R.C.E. NO. 67008 DATE 2 n NAPPROXIMATE DESIGN GRADE ABOVE STORM DRAIN r 12" WATER \ (r X-iNG \ \ NTT} LF 18" CL -3 RCPW/RGJ \ STORM DRAIN 0 4.007 � � l CONSTRUCT OUTLET \ STRUCTURE PER C.O.B. STD. DWG. D-11 18" INV N -E= 345.47 NOTE A�STORMDRAINTO BE te" INv N=27" SWR INV= CONSTRUE V' 338.35 336.3± S�T'ORM DRAIN SECTION -\ '`✓ N.T.S. \FUiFjc pA�R£cF4 t °U 0,41 q-xa\�N 1 \ ------ __- --- — — -. 52 / 54 54+432 ------ 7/7 55 s / FUTUR- SEWER MAIN EXTEN50N� BMJ JM LL LL 0 � a an CONSTRUCT 49.71 Lf. 18°` \ 18" RCP STORM DRAIN STORM DRAtN O 0.209; 342.48 Tu 11NV Lo INV= 342.58 342.5± 342.58 i I 1 NOTE: ALL STORM DRAIN TO BE CONSTRUCTED WITH PHASE "C" � 2Y' SWR INV= w 335.8± -N.T.s. ''R (gl STORM DRAIN SECTION PROPOSED SUMP 8 SEE SHEET 7 N v EX. TEMP SUMP ESMT PER Nh N $• PM 12232, PM BK 84 PG 192 4� + D50 8" RIP -RAP F — - -I-- PROPOSED M +m i , ,--- m+ ss - 1 f CITY OF BAKERSFIE D 3 (90.83• LTY WATER WELL SITE _211-d / (TO BE DEDICATED BY SEPARATE INSTRUMENT) m r AI Id —'- �- TRACT 7317 d -�. EX. 10 WIDE SIDEWALK, LANDSCAPE -�i.� ESMT & FILE PER PARCEL MAP I (PHASE S) P 12232, PM BK. 60, PG 192 I — — —-------- // � It F_�mal a \ N ,yips= � tnlNm LE RANC PCONSTRUCTION PHASE "B" 1 21' PVC SEWER 0 0.087-` TRACT 7317 (PHASE 6) r LANE SEE SHEET 6 57 �- 59 57+15_.24 562'1T161 — ;4 sc NOTE: ALL STORM DRAIN TO BE s Q CONSTRUCTED WITH PHASE "C' A .• J / �. _—.----- —� "'—. -- EX. 13' WADE MULTI -USE TRAIL, 2 LANDSCAPE ESMT & POE PER 0"; < PARCEL MAP 12232, PM BK. 60, P6 192 U TRACT 7317 la (PHASE 6) SN rQ fn" a 9Ia�° Cu'"`Nt"3TRUu'0`Tlu0"`N PHASE B E&Ec:: INSTALL 147.9± L.F. INSTALL 233.8± L.F. � �.k'.XG..SI;1'$$J`$.-g.Q$i�� Ye rte; ltw rl CONSTRUCTION PHASE B"{r" I°"' =wl: CONSTRUCTION PHASE Bo :w a V) 0 HORIZONTAL: t"=40' VERTICAL: 1"=4' INSTALL 374.2± L.F. " SEWER 0 0.01 _j CONSTRUC 8� + wo ^U -r e0 i Nd WN Z w' +M V (C) U) Y z N wt� Z ~ O 3 338 .................. .... .... .....I......... NOTE: PLUG END FOR FUTURE EXTENSION ..............:...........111...:1..:...:...:. . . . as�k .334 .. . .. . . 4 .... .1.. a+ffze+00 18- !'---� AIN ®D.'�7% 330 :...:...:...:.. :...:...:...:...:..:...:...:...:...:...:...:...:...:...:...:...:........................ 330 52+00 53+d0 54+00 55+Od rjs { dd ASE C' +00 59+.. 1j�- SEWER AND STORM DRAIN PROFILE 1.2-7317 z X49 m fA m_ LU Z E O F— w o M 4 > ��, xx� m 20 ow N Q U) 0 NLL /Pi z Y 22 ca N Lu - ccs 06 z mo N LLlz�m w F- C N � M CL '--- vy Q a _j CL m oV 4,8 d LL + UJ -r e0 i Z w' 0(.)0 Lf) V (C) U) Y z Z wt� Z ~ W w V w U. w Egg r K (/)W�' _j CL m oV 4,8 d ZOQN + UJ -r e0 i Z w' 0(.)0 Lf) V (C) U) Y z Z wt� Z ~ W w V Z Q ZZ Q OQ NWN WOT o a DATE 11/29/2017 PA JOB No. 2709L SHEET 3R OF 7 SHEETS QQLISIEUQ310N NOTES T- 0 INSTALL PVC LINED SEWER MANHOLE ® INSTALL SEWER CLEANOUT INSTALL SEWER - ---- INSTALL STORM DRAIN (9 INSTALL STORM DRAIN MANHOLE INSTALL TYPE "A" CATCH -BASIN --- - - -•- RIGHT-OF-WAY — 6x S — EXISTING SEWER —CX SD-- EXISTING STORM DRAIN L0 EXISTING EDGE OF PAVEMENT SD STORM DRAIN STATION SS SANITARY SEWER STATION ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 4" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNECTION WITH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLINE AND A 2.25' MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE, cAi 99• WADE STREET RIGHT-OF-WAY DEDICATION (STOCKDALE RANCH DRIVE) TO THE CITY OF BAKERSFIELD PER PARCEL MAP 12062-1 RECORDED FEBRUARY 22, 2016 IN BOOK 60 OF PARCEL MAPS, AT PACE 76 IN THE OFFICE OF THE KERN COUNTY RECORDER. TRACT 7317 SAN BUENAVENTURA (PHASE 5) STREET SEE SHEET s �1 70• II I TRACT 7317 CONSTRUCTION t CONSTRUCTION (PHASE 5) t _ o' I PHASE B ! PHASES. _p EX. 10' WIDE SIDEWALK, LANDSCAPE ESMT & RUE PER PARCEL MRP-- "__ /2232 PM BK. 60, PG 192'- t++ /2 Bsrn N oso4<••� D T IJ PHASE A EDGE OF PAVEMENT _ �J 62+24.72 z 65109.36 66 — _ h /� 61 N & N79'39'29'W�- TRACT 7317 i^ (PHASE 6) _ ----- _ w l — t--- v EX. 13' WIDE MULTI -USE TRAIL, TRACT 7317 LANDSCAPE ESMT a PUE PER +' — J ��x PARCEL MAP 12232, PM BK. 60, tlJ tale PG 192 �i t- 10' 2 51,6 (PHASE 3) zla;�i v 551 INSTALL 374.2± L.F. 21" PVC SEWER @ 0.01 CHICHESTER COURT SEE SHEET 6 CONSTRUCTION CONSTRUCTION PHASE B PHASE INSTALL. 169.9± L.F. 7 INSTALL 95.21 L°. ' PVC SEWER @ 0.087I�-21" PVC SEWER @ 0.08%__ STALL 403.2± L.F. PVC SEWER 0 0.01 TRACT 7317 (PHASE 2) �1 TRACT 7317 (PHASE 1) TRACT 7317 (PHASE 2) 0 �N- HORIZONTAL: 1"=40' VERTICAL: 1"=4' 346 .........:.... ..........:.......... . . 342 ....:...:...:...:.......:...:.. . . ION. EASE A� . 338 . .. ... ... ... ... .. , .: \ ... . PLUG END CONSTRUCTION R MOVE PLUG WflTH PHASEB CONSTRUCTIONS 1...:342 .................. ..... ......... 338 ... .. :.. :...:...:.. :.. 330 59+00 60+d0 61+66 330 62+d0 63+d0 64+d0 65+dd 66+00 67+00 68+00 69+00 SEWER AND STORM ®RAIN PROFILE cr U 0 d U U T U 2OW w9'LL Imo. Z C a���F~�wge rnu� z �i¢ W Z E' M.M.ax��inzSz� r u �dS b qSq vfoap3 Q > U w aGq C�F wit' Q = a c(0 az g�a�z xo ® N N X za ieo �3�amw � y Q O ONO g VJ t6 owzdo",¢ �vi0 < a m N mzp uJ -c0 oow�oa� 06 Z W o zQwci�0 U' u) r 212 6¢5 W 41 m M �°-p �xUw�zK �uaO n/ p � �'� ASF 2,l NfJ Ldp .-a ¢¢O�}GyOm ((b�tu 33 w�OOu"1jN mQ� Mwz Nw_ �WH3�gu`� AFF-3H INSTALL 198.1± L.F. —�— ' PVC SEWER 0 0.08 1,z- 40 LLJ x! D ! aim .............................................................NNIS+.................. ..........c}}y.........a...................................................... It t+ OO ............��}.+... L0 ww 354 .. :... .. :.. :... .. :...:.. :. g z :.. :. :...:. ...:.. .:... ...:...w �. h ...:... ...:..w .:...:...:.. .:,..: .. ...:.. a .:354 - .. ... .. ... .. .. .. .. .. .. ... ... ... (. .... .A) fOROXLiM7E:DES/GN GRADE 1 BONE- SElER ANO STOR DRAT A.:. ... .... ... .. .. .. .. .. .. . , ,e M N. - -- -- - - 350: >yy ! 8 - - ---.- --. -. -- -: - - -- -- -- -- -- 3 50 ----------------------------- ------------ --- -- -- --- ---- -- 346 .........:.... ..........:.......... . . 342 ....:...:...:...:.......:...:.. . . ION. EASE A� . 338 . .. ... ... ... ... .. , .: \ ... . PLUG END CONSTRUCTION R MOVE PLUG WflTH PHASEB CONSTRUCTIONS 1...:342 .................. ..... ......... 338 ... .. :.. :...:...:.. :.. 330 59+00 60+d0 61+66 330 62+d0 63+d0 64+d0 65+dd 66+00 67+00 68+00 69+00 SEWER AND STORM ®RAIN PROFILE cr U 0 d U U T U 2OW w9'LL Imo. Z C a���F~�wge rnu� z �i¢ W Z E' M.M.ax��inzSz� r u �dS b qSq vfoap3 Q > U w aGq C�F wit' Q = a c(0 az g�a�z xo ® N N X za ieo �3�amw � y Q O ONO g VJ t6 owzdo",¢ �vi0 < a m N mzp uJ -c0 oow�oa� 06 Z W o zQwci�0 U' u) r 212 6¢5 W 41 m M �°-p �xUw�zK �uaO n/ p � �'� ASF 2,l NfJ Ldp .-a ¢¢O�}GyOm ((b�tu 33 w�OOu"1jN mQ� Mwz Nw_ �WH3�gu`� AFF-3H INSTALL 198.1± L.F. —�— ' PVC SEWER 0 0.08 1,z- 40 LLJ x! D ! A .i L0 • • R i 11 SHEET II 4 OF 7 SHEETS CQtySTRUCCTION Lu! ,[V(= 0 INSTALL PVC LINED SEWER MANHOLE Q INSTALL SEWER CLEANOUT INSTALL SEWER INSTALL STORM DRAIN -- i INSTALL STORM DRAIN MANHOLE INSTALL TYPE "A" CATCH -BASIN TRACT 7317 RIGHT-OF-WAY — - -- — (PHASE 1) EXISTING SEWER EX S-- SU- - EXISTING STORM DRAIN - -Q --- EXISTING EDGE OF PAVEMENT SD STORM DRAIN STATION SS SANITARY SEWER STATION ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 4" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNECTION WITH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLiNE AND A 2.25' MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE. o 90' WIDE STREET RIGHT-OF-WAY DEDICATION (STOCKDALE RANCH DRIVE) TO THE CITY OF SAKERSFIELO PER PARCEL MAP 12062-1 RECORDED FEBRUARY 22, 2016 IN BOOK 60 OF PARCEL MAPS, AT PAGE 76 IN THE OFFICE OF THE KERN COUNTY RECORDER. SUNAPEE DRIVE SEE SHEET 6 2p TRACT 7317 a 10 210, SpECIFiC P�Af11 (PHASE 2) sG I5I��° TRACT 7317 I C.0.8. E OCU 1qT AUGtdMENATfON II I�J �II (PHASE 2) t � 043_04 &044-04 EX. 10' WIDE SIDEWALK, LANDSCAPE / ESMT & RUE PER PARCEL MAPEXISTING IRRIGATION MAIN 12232, PM BK. 60, PG 192 I (PROTECT IN PLACE) LIZ INSTALL 403.2± L.F. PVC SEWER 0 0.0 N - 7-+279'20`145"E "' is _ cl tNi 75 4_ - - - ---------- 4__ ., JJ I m EX. 13' WIDE MULTI -USE TRAIL, " y LANDSCAPE ESMT & POE PER j PARCEL MAP 12232, PM BK. 60, a PG 192 1U a� 6� a I N� V INSTALL 198.1± L.F. >i_"-- INSTALL 390.0# L.F. 21' PVC SEWER 0 0.08% 1 - T "-�21" PVC SEWER 0 0.08%� 354 ... .. "=...... ... .. ..:.. :... s o� APPROXMIATfi' DESIGN GRADE ' AjOVE- S6`NER AND STORM DRAIN 1 TRACT 7240 ------------- LL EXISTING IMPROVEMENTS zo X Jj EXISTING IMPROVEMENTS A VI TRACT 7240 z W HORIZONTAL: 1"=40' VERTICAL: 1"=4' EXISTING 51.61 L.F. ' PVC SEWER ® 0.08% mI qt +i �? +r .................. . 4...: nN= 354 342 ..:. .... 342 I NOTE CONTRACTOR SHALL VERIFY LOCATION. AND ELEVATION OF EXISTING STUB STUB PRIOR TO ANY CONSTRUCTION, AL50 VERIFY POSITIVE � 338 �S iG ( SLOPE FROM MANHOLE PRIOR TO.CONNECRON TO EXISTING STUB. IF iiI LI . . . . 33H '82 ti POSITIVE SLOPE DOES NOT EXIST, REPLACE STUB TO MANHOLE.. it nl _ 334 .... s° .................... .............................................................. . ......... ..... ............. zt fl- `- EX.- - ------ -'-u .334 i EX SEWS 27' SEWER 330, .... 70 ...:...:...:...:...:......:...:...:...:......... ......... .. :...:... ... ...: ..:... ...:.. 69+00 +00 71 + 00 72+00 73+00 74+00... 75+00 76+00 330 SEWER AND STORAX DRAIN PROFILE p ado �a owi- a� O N W ®LL F z M gFo� m o y q' 2 `0 w �j'3n y .'^-' N !0 M zda Qdwzg ® y8 LL �3 oowoa�o� � z oGsy z pwaa � zmu. w 0] N QSgoNOZd co _z mo Z�wp1u�Lo h <wr-IXa wFy-orc z cq <n N n�a � o� W W N �zV wniw�¢� F_ c0 vzom Uwaoz ® N " �)QQLLLL` 0 (?di -I 99 2�({Ny�SSSFF ��iy',�o - ¢u�OIX{IX{yyu��WWZO� p'h41-OW=NJ�� }T,ypj�:�pp�4tq 1-2-731)? phairy, i (j ar4! 111291201711 OF 7 SHEETS Lu! La ------------ 0 i 0 g SG TRACT 7317 It ® W (PHASE 1) 8 _ .F bY%i a �i INSTALL 403.2± L.F. PVC SEWER 0 0.0 N - 7-+279'20`145"E "' is _ cl tNi 75 4_ - - - ---------- 4__ ., JJ I m EX. 13' WIDE MULTI -USE TRAIL, " y LANDSCAPE ESMT & POE PER j PARCEL MAP 12232, PM BK. 60, a PG 192 1U a� 6� a I N� V INSTALL 198.1± L.F. >i_"-- INSTALL 390.0# L.F. 21' PVC SEWER 0 0.08% 1 - T "-�21" PVC SEWER 0 0.08%� 354 ... .. "=...... ... .. ..:.. :... s o� APPROXMIATfi' DESIGN GRADE ' AjOVE- S6`NER AND STORM DRAIN 1 TRACT 7240 ------------- LL EXISTING IMPROVEMENTS zo X Jj EXISTING IMPROVEMENTS A VI TRACT 7240 z W HORIZONTAL: 1"=40' VERTICAL: 1"=4' EXISTING 51.61 L.F. ' PVC SEWER ® 0.08% mI qt +i �? +r .................. . 4...: nN= 354 342 ..:. .... 342 I NOTE CONTRACTOR SHALL VERIFY LOCATION. AND ELEVATION OF EXISTING STUB STUB PRIOR TO ANY CONSTRUCTION, AL50 VERIFY POSITIVE � 338 �S iG ( SLOPE FROM MANHOLE PRIOR TO.CONNECRON TO EXISTING STUB. IF iiI LI . . . . 33H '82 ti POSITIVE SLOPE DOES NOT EXIST, REPLACE STUB TO MANHOLE.. it nl _ 334 .... s° .................... .............................................................. . ......... ..... ............. zt fl- `- EX.- - ------ -'-u .334 i EX SEWS 27' SEWER 330, .... 70 ...:...:...:...:...:......:...:...:...:......... ......... .. :...:... ... ...: ..:... ...:.. 69+00 +00 71 + 00 72+00 73+00 74+00... 75+00 76+00 330 SEWER AND STORAX DRAIN PROFILE p ado �a owi- a� O N W ®LL F z M gFo� m o y q' 2 `0 w �j'3n y .'^-' N !0 M zda Qdwzg ® y8 LL �3 oowoa�o� � z oGsy z pwaa � zmu. w 0] N QSgoNOZd co _z mo Z�wp1u�Lo h <wr-IXa wFy-orc z cq <n N n�a � o� W W N �zV wniw�¢� F_ c0 vzom Uwaoz ® N " �)QQLLLL` 0 (?di -I 99 2�({Ny�SSSFF ��iy',�o - ¢u�OIX{IX{yyu��WWZO� p'h41-OW=NJ�� }T,ypj�:�pp�4tq 1-2-731)? phairy, i (j ar4! 111291201711 OF 7 SHEETS CONSTRUCTION NOTEa M INSTALL PVC LINED SEWER MANHOLE a INSTALL SEWER CLEANOUT O INSTALL SEWER i--- INSTALL STORM DRAIN —_=-=- a INSTALL STORM DRAIN MANHOLE e , INSTALL TYPE "A" CATCH -BASIN W p(�� RIGHT-OF-WAY --- - - ^ -- FIX S --- EXISTING SEWER X SD---- EXISTING STORM DRAIN 'D EXISTING EDGE OF PAVEMENT > Ir SD STORM DRAIN STATION SS SANITARY SEWER STATION ® Z ¢ Z RANCH DRIVE O _ i--- SEE SHEET 3 w Mm h L� y 8 Y w 2 Z m W p(�� Z FA r ~W _ i ww w* wUyy ap4�44�++�zzi > Ir 90 u Q 110! 11 _�. __ 34 11' /%/n� VU) Z }–N__ �=2 yz��O , S' 6 K W _ 6' 112''' 6' �y� C.6 W O Z MEOW L,_ m___ N gilxgx zzWQ9Z�KOC III •q_•. ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 4" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STAT?ONING IS AT POINT OF CONNECTION WITH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT CUTTER FLOWLINE AND A 2.26 MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE. ai 90' WIDE STREET RIGHT-OF-WAY DEDICATION (STOCKDALE RANCH DRIVE) TO THE CITY OF BAKERSFIELD PER PARCEL MAP 12062-1 RECORDED FEBRUARY 22, 2016 IN BOOK 60 OF PARCEL MAPS, AT PAGE 76 IN THE OFFICE OF THE KERN COUNTY RECORDER. STOCKDALE RANCH DRIVE SEE SHEET 4 -z- INSTALL 90.81 L.F. �8" PVC SEWER 0 0.25%i HORIZONTAL: 1"=40' �Uik VERTICAL: 1"=4' 354... ..�:. 354 APPROXIMA X DESIGN GRADE I A130VT' SEWER. MAIN ... .. .. ��"r<. ... ... 350:... J ; -_. -=---. - . -----.-- I ......:...: 350 346 ... t ...... ... ..: ..:. 346 342:...:..1 .........:...:...:111..:...:...: 342 338 .. ..'11. .:.. 338 NOTE: PLUG ENO FOR FUTURE EXTENSION 334: . s .. 0 '�ti . �» 334 �I ti` . F 330: . ... : ..: 330 11+00 10+00 SEWER MAIN PROFILE STOCKDALE RANCH DRIVE SEE SHEET 4 STOCKDALE S ERANCH DRIVE 10' 11' 34' 34'�I 5' 6 68' C 12' I6' I , I ' )I iI I z Q Z V J w L�J X ~ 4--' W �� 14' 5'09" I L4.f L j Q o o - y a -{- - ) 10+00.00 1 j \ a I V ` t \ Z�{ SNI W $U ,d.ReeIIJ �N� obi � X12 a+p,.. �WICJ atl� to W b*itN/Il pd INSTALL 79.3± L.F. PVC SEWER 0 0.25%'1 HORIZONTAL: 1"=40' `S,2, VERTICAL: 1"=4' 354: . ... .:I. ...: ...I..: ...354 j APPROXIMA 7E DESIGN GRADE ABOVE SEWER MAIN 350 350 II 346 :...:...:...: ..:...:...:...:1......:....346 342: I. ..:. 1 342 ... 1...... ... ... 338 ........:...:1..: ... ... 338 /-NOTE: PLUG ENO FOR FUTURE EXTENSION 334 334 330 : ... : ..:. .: ..:...:... 330 20+00 19+00 SEWER MAIN PROFILE l oTREET INSTALL 89.8± LF.'� --8° PVC SEWER 0 0.25%� HORIZONTAL: 1"=40' '{��� VERTICAL: 1"=4' go 8�� aN� ao z I � II V 354 ...:.A ..:. .:.... 354 APPROXIMATE DESIGN GRADE ABOVE SEWER MAIN _ t n.. 1 ..) �� 350 35®. 338 338 NOTE: PLUG END FOR FUTURE EXTENSION 334. 334 330 ... :... : ....... :...:...:... : 330 11+00 10+00 SEWER MAIN PROFILE +Isla I,, L LANE �2 INSTALL 79.9± LF. 8 PVC SEWER 0 0.25%y HORIZONTAL: 1"=40' I SIA VERTICAL; 1"=4' APPROXIMA DESIGN GRADE 354:.. ..: .. 1 , d`/..w .. .. ABOVE .,SEWER MAPY .... 354 350:... ....... ...: ..:...: 350 346 ....:.......:111......:.......:1...........346 342:... ..: 342 334 ...:.. . %.:...:"..:...:...: ..:... : ..:334 ... ... .. .. .. _ .._ 330 30+00 29+00 SEWER MAIN PROFILE oa6o nt. STOCKDALE zw¢ RANCH DRIVE O SEE SHEET 3 w Mm y 8 Y w 2 Z m W p(�� Z FA ~W m°m'1. i ww w* wUyy ap4�44�++�zzi > Ir 90 110! 11 _�. __ 34 11' /%/n� VU) Z R �=2 yz��O , S' 6 K W 68 6' 112''' 6' �y� C.6 W O Z MEOW z N gilxgx zzWQ9Z�KOC III •q_•. ZW NM Z. W yfL ¢wcQ.z�zwgz� Y— _ N � N%` Q r- \\ w �YL�jO2y2�2ZC0 M S34'30'STW LLI �) S I Z ti � ILI- c�oID—LLJ �� W z Ui � E w I Ll; fn to Q I x "' 't r W 0Wo 1� I Wff _ — --_:- _ _ co q _ -7 ------� >- In CL H ���YtaEER b/ a o LSI Y J w 71 I I g I I 1 y) { 4 � II 1 �IZ I I I �YJ fAA +Isla I,, L LANE �2 INSTALL 79.9± LF. 8 PVC SEWER 0 0.25%y HORIZONTAL: 1"=40' I SIA VERTICAL; 1"=4' APPROXIMA DESIGN GRADE 354:.. ..: .. 1 , d`/..w .. .. ABOVE .,SEWER MAPY .... 354 350:... ....... ...: ..:...: 350 346 ....:.......:111......:.......:1...........346 342:... ..: 342 334 ...:.. . %.:...:"..:...:...: ..:... : ..:334 ... ... .. .. .. _ .._ 330 30+00 29+00 SEWER MAIN PROFILE oa6o nt. zw¢ O w Mm y 8 Y w 2 Z m W p(�� Z _ ~W m°m'1. i ww w* wUyy ap4�44�++�zzi > Ir U co d��¢y�)S $o(WJ y W guy y m Z C] �^ Gil N Q U. qW r47V� .295, �owsl /%/n� VU) Z R �=2 yz��O d K W mN -cp ti oza �y� C.6 W O Z MEOW z N gilxgx zzWQ9Z�KOC III •q_•. ZW NM Z. W yfL ¢wcQ.z�zwgz� Y— _ N � Q r- yWvs`z"iw+�S ��g$��c�onEF� w �YL�jO2y2�2ZC0 M m Ui E O x fL m Wff ���YtaEER b/ a Y J w 71 �L_731? Pnprc y w a DATE 1 112912 01 7 PA JOB Na. 2709L SHEET OF 7 SHEETS