Loading...
HomeMy WebLinkAboutCPT BILLING APP 3-17-18;� t1 tea. g e v RE- DUE ❑ Alarm - New & Modification (minimum charge) FA $ 288 ACC NO ❑ Over 10,000 sq ft $ 0 .028 x sq ft • Alarm - Minor Modification (Add 1 device /Relocation of 2 devices) $ 98 /hr (2 hrs minimum) = $196 84 • Sprinkler - New & Modification (minimum charge) FIRE $ 288 ❑ Over 10,000 sq ft $ 0 .028 x sq ft • Sprinkler - Minor Modification ( <10 heads) $ 98 /hr (2 hrs minimum) _ $196 84 • Commercial Hood (New & UL 300 Upgrade Modification) FHD Additional Hood $ 241 $ 59 /hood ❑ Commercial Hood - Minor Modification (add /move nozzle) $ 98 /hr (2 hrs minimum) _ $196 84 ❑ Spray Booth (New & Modification) SB $ 241 ❑ Aboveground Storage Tank (i inspection per installation) AST $ 185 /tank ❑ Additional Tank ATI $ 98 /tank ❑ Aboveground Storage Tank (Removal, Mod, or Inspection) ATR $ 112 /tank ❑ Underground Storage Tank (Installation /Inspection) NI $ 900 /tank ❑ Underground Storage Tank (Modification) MOD $ 900 /site ❑ Underground Storage T ank (Minor Modification) MTM $ 171 /site ❑ Underground Storage Tank (Removal) TR $ 587 /tank Mandated UST Testing: Fuel Mont Cert/SB989 /Cath. Prot. NOTE: $98 /hr for each type of test /per site /per UST system even if scheduled at the same time TT $ 98 /hr (2 hrs minimum) $196 c ckl C ❑ Oil well (Installation, Inspection, or re- inspection) X $ 98 /hr 84 ❑ Tent TENT $ 98 /hr ❑ After -hours inspection fee 124/hr 2 hrs minimum = $248 ❑ Pyrotechnic (1 permit per event, plus an inspection fee of $98 /hr during business hours) PYRO NOTE: After hours Pyrotechnic event inspection is @ $124 /hr $ 98 /hr + (5 hrs min standby fee /insp) _ $588 5 hrs min standby fee ins = 620 ❑ Re- inspection /Follow -up Inspection $ 98 /hr 84 ❑ Portable LPG (Propane): # of Cages? $ 98 /hr 84 ❑ Explosive Storage $ 241 84 ❑ Copying & File Research (File Research fee $51 /hr) $ 0.02 /page 84 ❑ Miscellaneous Site Plan Review (Carnival & Fairs/Vehicle Disolay/Motion Picture) $ 98 /hr 84 j i FD2021 (Rev 7/16)