HomeMy WebLinkAbout2016 SB-989 RESULTSTesting and Inspection Certificate
Tanknology Inc.
11000 North MoPac Expressway, Suite 500, Austin, TX 78759
800-800-4633 www.tanknology.com Page 1 of 1
Test Date 4/7/2016 Tanknology WO#SC1-3430333
Test Purpose COMPLIANCE Customer PO#
Customer Location
PENSKE TRUCK LEASING
P.O. BOX 7635
READING, PA 19603
PENSKE CA-094 (CA-094/0198-10)
2929 E. BRUNDAGE
BAKERSFIELD, CA 93307
Attn: BRIAN YAZEMBOSKI Attn: JOE
(610) 603-8450
(661) 322-2600
Test / Inspection Description Item Tested Date
Tested Result
Tank Interstitial T1 4/7/2016
Tank Interstitial T2 4/7/2016
Secondary Pipe (Interstitial) Product Pipe for UDC 1 Main to UDC 1 Satellite 4/7/2016 Pass
Secondary Pipe (Interstitial) Product Pipe for UDC 2 Main to UDC 2 Satellite 4/7/2016 Pass
Secondary Pipe (Interstitial) Other Pipe for OIL LINE A to OIL LINE B 4/7/2016 Fail
Secondary Pipe (Interstitial) Product Pipe for T1 DIESEL STP to UDC 1 MAIN 4/7/2016 Pass
Secondary Pipe (Interstitial) Product Pipe for T1 DIESEL STP to T2 DIESEL STP Manifold 4/7/2016 Fail
Piping Containment Sump Tank T1 - STP Sump 1 Diesel 4/7/2016 Fail
Piping Containment Sump Tank T2 - STP Sump 1 Diesel 4/7/2016 Fail
Dispenser Containment (UDC) See test report for details 4/7/2016 Not Tested
Tanknology Representative: Michelle Cleghorn Technician: Jeffrey Crisostomo
Telephone: (800) 666-2176 Technician Certification: (See forms)
SWRCB, January 2002 Page 1 of 1
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate
pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if
applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: PENSKE CA-094 Date of Testing: 4/7/2016
Facility Address: 2929 E. BRUNDAGE , BAKERSFIELD, CA 93307
Facility Contact: JOE Phone: 661-322-2600
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector (if present during testing): Not present
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY INC.
Technician Conducting Test: Jeffrey Crisostomo
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: A-UT License Number: 743160-8199847
Manufacturer
Manufacturer Training
Component(s)Date Training Expires
vplt/secondary contaiment Sump tester 3/6/2019
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made
Tank Annular# T1 X
Tank Annular# T2 X
Product Pipe for UDC 1 Main to UDC 1 Satellite X
Product Pipe for UDC 2 Main to UDC 2 Satellite X
Other Pipe for OIL LINE A to OIL LINE B X
Product Pipe for T1 DIESEL STP to UDC 1
MAIN X
Product Pipe for T1 DIESEL STP to T2 DIESEL
STP Manifold X
STP Containment for Tank T1 diesel - 1 X
STP Containment for Tank T2 diesel - 1 X
UDC # 1 Sat/ X
UDC # 1/2 X
UDC # 2 Sat/ X
Component Pass Fail Not
Tested
Repairs
Made
UDC # 1 Sat/ X
UDC # 1/2 X
UDC # 2 Sat/ X
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature:Date:4/7/2016
WO: 3430333
SAT UDC #2 not tested due prove won't fit inside UDC. Diesel Main and Diesel syphon STP was not tested Hydrostatically and pressure
due to damaged secondary boots.H20 pump out by Nieto and Sons.
SWRCB, January 2002 Page 1 of 1
4. TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used By: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Vacuum/Gauge Equipment Resolution: 0
Is Tank Exempt From Testing?1
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying pressure/vacuum/water and starting
test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI) :
Pass/Fail Threshold or Criteria:
Test Result:
Was sensor removed for testing?
Was sensor properly replaced and verified functional after testing?
Tank# T1
Yes No
11594
Fiberglass
Diesel
min
+/-
Yes No NA
Yes No NA
Tank# T2
Yes No
11594
Fiberglass
Diesel
min
+/-
Yes No NA
Yes No NA
Tank#
Yes No
min
+/-
Yes No NA
Yes No NA
Tank#
Yes No
min
+/-
Yes No NA
Yes No NA
Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests)
Wet annular with Vr-301 sensors.
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems
that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing.
SWRCB, January 2002 Page 1 of 2
5. SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used By: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: gauge 1-15psi Equipment Resolution: 0
Piping Material:
Piping Manufacturer:
Piping Diameter:
Length of Piping Run:
Product Stored:
Method and location of
piping-run isolation:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or
Criteria:
Test Result:
Product Pipe for UDC
1 Main to UDC 1
Satellite
dwfrg
dwfrg
2 in.
10 ft.
boot
15 min
09:30:00
5.00000 PSI
10:30:00
5.00000 PSI
1 hr
0.00000 PSI
+/- 0.00000
Pass
Product Pipe for UDC
2 Main to UDC 2
Satellite
dwfrg
dwfrg
2 in.
10 ft.
boot
15 min
09:30:00
5.00000 PSI
10:30:00
5.00000 PSI
1 hr
0.00000 PSI
+/- 0.00000
Pass
Other Pipe for OIL
LINE A to OIL LINE B
dwfrg
dwfrg
2 in.
50 ft.
boot
15 min
09:30:00
5.00000 PSI
10:30:00
0.00000 PSI
1 hr
-5.00000 PSI
+/- 0.00000
Fail
Product Pipe for T1
DIESEL STP to UDC 1
MAIN
dwfrg
dwfrg
2 in.
30 ft.
boot
15 min
09:30:00
5.00000 PSI
10:30:00
5.00000 PSI
1 hr
0.00000 PSI
+/- 0.00000
Pass
Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests)
WO: 3430333
Diesel syphon secondary line failed due to damaged boots on Diesel Main STP and Diesel Syphon Man-way.
SWRCB, January 2002 Page 2 of 2
5. SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used By: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: gauge 1-15psi Equipment Resolution: 0
Piping Material:
Piping Manufacturer:
Piping Diameter:
Length of Piping Run:
Product Stored:
Method and location of
piping-run isolation:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or
Criteria:
Test Result:
Product Pipe for T1
DIESEL STP to T2
DIESEL STP Manifold
dwfrg
dwfrg
2 in.
10 ft.
boot
15 min
09:30:00
5.00000 PSI
10:30:00
0.00000 PSI
1 hr
-5.00000 PSI
+/- 0.00000
Fail
in.
ft.
min
+/-
in.
ft.
min
+/-
in.
ft.
min
+/-
Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests)
WO: 3430333
Diesel syphon secondary line failed due to damaged boots on Diesel Main STP and Diesel Syphon Man-way.
SWRCB, January 2002 Page 1 of 1
6. PIPING SUMP TESTING
Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used By: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: VPLT Equipment Resolution: 0.00001 in.
Sump Diameter/Dimensions:
Sump Depth:
Sump Material:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to testing:
Portion of Sump Tested1
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
Turbine shutdown response time
Is system programmed for fail-safe
shutdown?*
Was fail-safe verified to be
operational?*
Wait time between applying
pressure/vacuum/water and starting
test
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI) :
Pass/Fail Threshold or Criteria:
Test Result:
Was sensor removed for testing?
Was sensor properly replaced and
verified functional after testing?
STP Containment for
Tank T1 Diesel - 1
in.
in.
Fiberglass
Yes No NA
sec
Yes No NA
Yes No NA
min
+/-
Fail
Yes No NA
Yes No NA
STP Containment for
Tank T2 Diesel - 1
in.
in.
Fiberglass
Yes No NA
sec
Yes No NA
Yes No NA
min
+/-
Fail
Yes No NA
Yes No NA
in.
in.
Yes No NA
sec
Yes No NA
Yes No NA
min
+/-
Yes No NA
Yes No NA
in.
in.
Yes No NA
sec
Yes No NA
Yes No NA
min
+/-
Yes No NA
Yes No NA
Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is "NO" or "NA", the entire sump must be tested.
WO: 3430333
Diesel Main and Diesel syphon STP failed due to damaged secondary boots.
SWRCB, January 2002 Page 1 of 2
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used By: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: VPLT Equipment Resolution: 0.00001 in.
UDC Manufacturer:
UDC Material:
UDC Depth:
Height from UDC Bottom to Top
of Highest Piping Penetration:
Height from UDC Bottom to
Lowest Electrical Penetration:
Condition of UDC prior to
testing:
Portion of UDC Tested1
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Turbine shutdown response time
Is system programmed for fail-
safe shutdown?*
Was fail-safe verified to be
operational?*
Wait time between applying
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI) :
Pass/Fail Threshold or Criteria:
Test Result:
Was sensor removed for testing?
Was sensor properly replaced and
verified functional after testing?
UDC #1 Sat
frg
Fiberglass
32.00
12.00
8.00
good
2" ABOVE HIGHEST PIPING
Yes No NA
00:00:00 sec
Yes No NA
Yes No NA
15 min
09:19:00
0.18950 in. H20
09:34:00
0.18960 in. H20
15 min
0.00010 in. H20
+/- 0.00200
Pass
Yes No NA
Yes No NA
UDC #1/2
frg
Fiberglass
32.00
12.00
8.00
good
2" ABOVE HIGHEST PIPING
Yes No NA
00:00:00 sec
Yes No NA
Yes No NA
15 min
09:19:00
0.74150 in. H20
09:34:00
0.74090 in. H20
15 min
-0.00060 in. H20
+/- 0.00200
Pass
Yes No NA
Yes No NA
UDC #2 Sat
frg
Fiberglass
32.00
12.00
8.00
good
2" ABOVE HIGHEST PIPING
Yes No NA
00:00:00 sec
Yes No NA
Yes No NA
15 min
+/-
Not Tested
Yes No NA
Yes No NA
UDC #1 Sat
frg
Fiberglass
32.00
12.00
8.00
good
2" ABOVE HIGHEST PIPING
Yes No NA
00:00:00 sec
Yes No NA
Yes No NA
15 min
09:36:00
0.18950 in. H20
09:41:00
0.19000 in. H20
15 min
0.00050 in. H20
+/- 0.00200
Pass
Yes No NA
Yes No NA
Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is "NO" or "NA", the entire UDC must be tested.
WO: 3430333
VPLT prove won't fit inside the SAT 2 UDC.
SWRCB, January 2002 Page 2 of 2
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used By: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: VPLT Equipment Resolution: 0.00001 in.
UDC Manufacturer:
UDC Material:
UDC Depth:
Height from UDC Bottom to Top
of Highest Piping Penetration:
Height from UDC Bottom to
Lowest Electrical Penetration:
Condition of UDC prior to
testing:
Portion of UDC Tested1
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Turbine shutdown response time
Is system programmed for fail-
safe shutdown?*
Was fail-safe verified to be
operational?*
Wait time between applying
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI) :
Pass/Fail Threshold or Criteria:
Test Result:
Was sensor removed for testing?
Was sensor properly replaced and
verified functional after testing?
UDC #1/2
frg
Fiberglass
32.00
12.00
8.00
good
2" ABOVE HIGHEST PIPING
Yes No NA
00:00:00 sec
Yes No NA
Yes No NA
15 min
09:36:00
0.74060 in. H20
09:41:00
0.74010 in. H20
15 min
-0.00050 in. H20
+/- 0.00200
Pass
Yes No NA
Yes No NA
UDC #2 Sat
frg
Fiberglass
32.00
12.00
8.00
good
2" ABOVE HIGHEST PIPING
Yes No NA
00:00:00 sec
Yes No NA
Yes No NA
15 min
+/-
Not Tested
Yes No NA
Yes No NA
UDC #
Yes No NA
sec
Yes No NA
Yes No NA
min
+/-
Yes No NA
Yes No NA
UDC #
Yes No NA
sec
Yes No NA
Yes No NA
min
+/-
Yes No NA
Yes No NA
Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is "NO" or "NA", the entire UDC must be tested.
WO: 3430333
VPLT prove won't fit inside the SAT 2 UDC.
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:3430333
Site ID / Name:CA-094/0198-10 / PENSKE CA-094
Address:2929 E. BRUNDAGE
City:BAKERSFIELD State:CA Zip:93307
W.O.# SC1-3430333
W.O.# SC1-3430333
W.O.# SC1-3430333
Ovf
W.O.# SC1-3430333
Nieto and sons
W.O.# SC1-3430333
Nieto and sons
W.O.# SC1-3430333
W.O.# SC1-3430333
W.O.# SC1-3430333
W.O.# SC1-3430333
W.O.# SC1-3430333