TRANSMITTAL
Secondary Containment Test
Costco Wholesale-BAKERSFIELD-0688
3800 Rosedale Highway
Bakersfield, CA 93308
The following test report(s) are included:
SCT-3 yr
Comments:
Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work.
1664858
SWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
717isform is intendedfor use by contractors pe!forming periodic testing of UST secondm:y containment .~ystems. Use the appropriate
pages ofthisform to report results for all components tested. The completed.form. written test procedures, and printouts.from tests
(!f applicable), should be provided to the .facility owner/operator.for submittal to the local regulat01:y agency.
1. FACILITY INFORMATION
Facility Name: Costco Wholesale -BAKERSFIELD -0688 / Date of Testing: 2/1/2018
Facility Address: 3800 ROSEDALE HIGHWAY, BAKERSFIELD, CA 93308
Facility Contact: Costco -Bal•ersfield j Phone: (661) 636-0822
Date Local Agency Was Notified of Testing: 1/4/2018
Name of Local Agency Inspector (!{present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Belshire Environmental Services, Inc.
Teclmician Conducting Test: Saul Gonzalez
Credentials: 181 CSLB Licensed Contractor D SWRCB Licensed Tank Tester
License Type: A -General Engineering Contractor J License Number: 808313
Manufacturer Training
Manufacturer Component(s) Date Training Expires
See Attached
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
Tank Annulars 3 0 0 ~ 0 Exempt From Testin2:-0 0 0 0
Continuously Monitored
Secondary Pipe 8 0 ~ 0 0 187 A 87 B. 91 B. Vanor Return 0 0 0 0
Failed
Piping Sump 4 ~ 0 0 0 0 0 0 0
UDC 8 0 ~ ~ 0 II/2. 7/8 failed 0 0 0 0
Fill Sump 3 ~ 0 0 0 0 0 0 0
Spill Bucket 7 0 ~ 0 0 91 Fill Bucket Failed 0 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
0 Placed in drums left on site for proper disposition.
0 Transported to next site for use in additional testing.
CERTIFICATION OF TECHNICIAN RESPONSIDLE FOR CONDUCTING THIS TESTING
To the be!>t of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
l.--fj /~ t/ /~~ Technician's Signature: ?~fijL Date: 2/1/2018
?,/ / /i
4. TANK ANNULAR TESTING
Test Method Developed By: 0 Tank Manufacturer I:B:l Industty Standard 0 Professional Engineer
0 Other (Spec(fj1)
Test Method Used: 0 Pressure I:B:l Vacuum 0 Hydrostatic
0 Other (Spec![Y)
Test Equipment Used: Test plugs, venturi tmmp and gauges Equipment Resolution: 0.5% of span
T1 87 T2 87 T3 91
Is Tank Exempt From Testing?1 Yes Yes Yes
Tm1k Capacity: 20,000 20,000 20,000
Tank Material: Fiberglass Fiberglass Fiberglass
Tank Manufacturer:
Product Stored: 87 87 91
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Not Tested Not Tested Not Tested
Was sensor removed for testing? N/A N/A N/A
Was sensor properly_replaced and
verified functional after testing? N/A N/A N/A
Comments-(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests)
Exempt From Testing-Continuously Monitored
1 Secondary containment systems where the continuous monitoring automatically monitors both the primmy and secondmy
contaimnent, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {Califomia Code ofRegulations, Title 23, Section 2637(a)(6)}
5. SECONDARY PIPE TESTING
Test Method Developed By: 0 Piping Manufacturer [g) Industry Standard 0 Professional Engineer
0 Other (Spec(fjl)
Test Method Used: [g) Pressure 0 Vacuum 0 Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Test reducer boots, air compressor and gauges Equipment Resolution: 0,5% of span
~ 87-A 87-B 91-A 91-B
. Plastic Plastic Plastic Plastic
Piping Manufacturer: Environ Environ Environ Environ
Piping Diameter: 2" 2" 2" 2"
Length of Piping Run: 130' 150' 150' 180'
Product Stored: 87 87 91 91
Method and location of Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings .f.HfJlHg-mn isolation:
Wait time between applying
pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes
starting test:
Test Start Time: 12:10 PM 12:10 PM 12:10 PM 12:10 PM
Initial Reading (R1): 5 5 5 5
Test End Time: 01:10PM 01:10PM 01:10PM 01:10PM
Final Reading (RF): 0 0 5 0
Test Duration: 60 Min 60Min 60 Min 60 Min
Change in Reading (RF-RI): -5 -5 0 -5
Pass/Fail Threshold or
Criteria: No Detectable Loss No Detectable Loss No Detectable Loss No Detectable Loss
Test Result: Fail Fail Pass Fail
Comments-(include information on repairs made prior to testing, and recommended.follow-upforfailed tests)
-87 A: torn test boot in UDC #7 /8.
- 87 B: torn test boot in UDC #1/2.
-91 B: torn test boot m UDC #172.
5. SECONDARY PIPE TESTING
Test Method Developed By: D Piping Manufacturer 121 Industry Standard D Professional Engineer
D Other (Spec(/Y)
Test Method Used: 121 Pressure D Vacuum D Hydrostatic
D Other (,'Jpec(/Y)
Test Equipment Used: Test reducer boots, air com(H'essor and gauges Equipment Resolution: 0.5% of span
87 Manifold 87 _§iphon _Va_~r Return Additive
Piping Material: Plastic Fiu~:q~la:s:s Fibngla:s:s Fiberglass
Piping Manufacturer: Environ AO Smith AO Smith Ameron
Piping Diameter: 2" 3" 4" 3"
Length of Piping Run: 12' 12' 280' 80'
Product Stored: 87 87 NA Additive
Method and L of
piping-run isolation Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings
Wait time between applying
pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes
starting test:
Test Start Time: 09:15AM 09:15AM 09:15AM
Initial Reading (Rr): 5 5 5
Test End Time: 10:15 AM 10:15 AM 10:15 AM
Final Reading (RF): 5 5 5
Test Duration: 60 Min 60Min 60 Min
Change in Reading (RF-Rr): 0 0 0
Pass/Fail Threshold or
Criteria: No Detectable Loss No Detectable Loss No Detectable Loss No Detectable Loss
Test Result: Pass Pass Visual Fail Pass
Comments-(include il?(ormation on repairs made prior to testing, and recommended follow-up jor.failed tests)
Vapor Return unable to hold pressure.
6. PIPING SUMP TESTING
Test Method Developed By: D Sump Manufacturer @ Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum @ Hydrostatic
D Other (.S'pecijv)
Equipment Used: I neon TS-STS Sump Test System Equipment Resolution: +/-0.002"
Tl-87 T2-87 T3-91 Additive Trans.~
Sump Diameter: 48" 48" 1_8" 24"x20"
Sump Depth: 70" 67" 64" 32"
Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass
Height from Tank Top to Top of
Highest Piping Penetration: 24" 20" 16" 14"
Height from Tank: Top to Lowest 10" 16" 18" None Electrical Penetration:
Condition of sump prior to testing: Good Good Good Good
Pmiion of Sump Tested1 4" Above Pen. 4 Above Pen. 4 Ab()ve r_en. 4' Ab_Q_ve ~n.
Does turbine shut down when
sump sensor detects liquid (both
p1vuuvt and water)?'
DYesONo @NA DYesDNo @NA OYesONo@NA DYesONo @NA
Turbine shutdown response time N/A N/A N/A N/A
Is system progranuned for fail-safe
shutdown?" DYes D No @NA DYes D No @NA DYesONo@NA DYes D No @NA
Was filil-s~1fe verified to be
ttional?' DYesDNo @NA DYesDNo @NA DYes D No@NA DYes D No @NA
up~eutl .
Wait time between applying
pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes
test:
Test Start Time: 08:25AM 08:25AM 09:01AM 07:47AM
Initial Reading (RI): 4.2164 5.4523 3.2585 7.217
Test End Time: 08:40AM 08:40AM 09:16AM 08:02AM
Final Reading (Rp): 4.2163 5.4516 3.2586 7.2172
Test Duration: 15 min. 15 min. 15 min. 15 min.
Change in Reading (Rp-R1): -0.0001 -0.0007 0.0001 0.0002
Pass/Fail Threshold or Criteria: +!-0.002" +!-0.002 +/-0.002 +!-0.002
Test Result: Pass Pass Pass Pass
Was sensor removed for testing? Yes Yes Yes Yes
Was sensor properly repl11rPrl and Yes verified functional after testing? Yes Yes Yes
Comments-(include iJ?formation on repairs made prior to testing, and recommendedfollow-upfor.failed tests)
Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment Testinl! scope of work.
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to fillY of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)
7. UNDER-DISPENSER CONTAINMENT
Test Method Developed By: D UDC Manufacturer
D Other (Spec(/Y)
TESTING
D Professional Engineer
121 Hydrostatic
DYes 0 No l2l NA 0 Yes D No 121 NA DYes D No 121 NA DYes D No 121 NA
30 minutes 30 minutes 30 minutes 30 minutes
Yes Yes Yes Yes
Comments-(include iJ?formation on repairs made prior to testing, and recommendedfollow-up.forfailed tests)
Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment Testing scope of work
112, 7/8 failed due to torn test boots.
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ill!Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
7. UNDER-DISPENSER CONTAINMENT TESTING
Test Method Developed By:
Test Method Used:
0 UDC Manufacturer
0 Other (.S'peci.M
0 Pressure
0 Other (.S'pec(/jl)
0 Industry Standard 0 Professional Engineer
0 Vacuum 0 Hydrostatic
OYesONo 0NA OYesONo 0NA OYesONo 0NA OYesONo 0NA
0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA
0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA
30 minutes 30 minutes 30 minutes
Yes
Comments-(include information on repairs made prior to testing, and recommended follow-up for failed test.s~
Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment Testing scope of work
13/14 and 15/16 are Exempt From Testing-Continuously Monitored
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ill!Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
D Sump Manufacturer 1:8] Industry Standard D Professional Engineer
D Other
Test Method Used: D Vacuum l:8l Hydrostatic
30" 34"
16" 16" 16"
Good Good Good
30 minutes 30 minutes 30 minutes
DYes D No l:8l NA DYes D No l:8l NA 0 Yes D No l:8l NA
Yes Yes
Comments -(include iJ?formation on repairs made prior to testing, and recommended fol/ow-upforfailed tests)
9. SPILL/OVERFILL CONTAINMENT BOXES
ill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer l2l Industry Standard
0 Other (SpecijjU
Test Method Used: 0 Pressure 0 Vacuum
0 Other (Spec(jj;}
Spill Box# T1-87-FB
Bucket Diameter: 12" 12" 12"
Bucket Depth: 10" 10" 10"
Wait time between applying
0 Professional Engineer
12] Hydrostatic
+/-0.002"
Box# T2-87-VB
12"
10"
pressure/vacuum./water and 30 minutes 30 minutes 30 minutes 30 minutes
test:
Test Start Time: 07:13AM 07:13AM 06:53AM 06:53AM
Initial Reading (R1): 5.5685 2.3338 5.1529 4.9992
Test End Time: 07:29AM 07:29AM 07:08AM 07:08AM
Final Reading (RF): 5.5672 2.3339 5.1526 4.9988
Test Duration: 15 min. 15 min. 15 min. 15 min.
Change in Reading (RF-RI): -0.0013 0.0001 -0.0003 -0.0004
Pass/Fail Threshold or
Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002"
Test Result: Pass Pass Pass Pass
Comments -(include information on repairs made prior to testing, and recommendedfol/ow-up forfailed tests)
9. SPILL/OVERFILL CONTAINMENT BOXES
Spill/Overfill Contaimnent Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer 12.1 Industry Standard
0 Other (SpecifY)
Test Method Used: 0 Pressure 0 Vacuum
0 Other (Spec([v)
Box# T3-9 -FB Silill Box#
Bucket Diameter: 12" 12" 12"
Bucket Depth: 12" 12" 14"
0 Professional Engineer
12.1 Hydrostatic
+/-0.002"
Box#
Wait time between applying
pressure/vacuum/water and 30 minutes 30 minutes 30 minutes
test:
Test Start Time:
Initial Reading (Rr):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or
Criteria:
Test Result:
IS min.
+!-0.002"
Fail
06:53AM 02:21PM
5.898 5.6736
07:08AM 07:36AM
5.898 5.6738
IS min. IS min.
0.0000 0.0002
+/-0.002" +!-0.002"
Pass Pass
Comments -(include il?{ormation on repairs made prior to testing, and recommended.follow-up .for.failed tests)
91 Fill Bucket Failed.
Name
Gonzalez, Saul
Gonzalez, Saul
Gonzalez, Saul
Gonzalez, Saul
Gonzalez, Saul
Gonzalez, Saul
Gonzalez, Saul
Gonzalez, Saul
Manufacturer Training
Training
OPW Fueling Containment Systems-FlexWorks
OPW EVR Phase I -UST
Phil Tite Spill Collectors & Associated Hardware
FiberGlass Systems Piping (Formerly AO Smith)
Modern Welding Tank Installation
Containment Solutions Tank Installation
Xerxes UST Installation Training Seminar
INCON Leve14-Franklin Sump Test System
Completed
5/19/2017
5/19/2017
8/9/2017
6/22/2017
9/2/2015
2/17/2017
9/16/2015
5/30/2016
Expires
5/19/2019
5/19/2019
8/9/2019
6/22/2020
9/2/2018
2/17/2019
9/16/2018
5/30/2018
BUSINESS NAME: COSTCO WHOLESALE GAS STATION #688
SITE ADDRESS: 3800 ROSEDALE HIGHWAY I CITY: BAKERSFIELD I ZIP: 93308
MAP DATE: 04/03/2013 I SURVEY BY: I DRAWN BY: DP I AGENCY FACILITY #:
ENTRANCE>
COSTCO
/STORE
0
N
PARKING LOT
,.... -I
r----+-.~~l~----~~1 1
I , ..
PARKING LOT
L -.,.
I ••••• I
r -.,.
CLARION
**NOTE: ALL PIPING LOCATIONS ARE ESTIMATED & SCALING IS APPROXIMATE**
I HCAS I HEALY CLEAN AIR SEPARATOR • MONITORING VEEDER ROOT L LINE LEAK VEEDER ROOT
8 VENTRISER ((0)) ~;1~~LL PANEL TLS 350 DETECTOR PLLD
+ FIRST AID KIT
~ STORM DRAIN 0 ABSORBENT
VEEDER ROOT
A ANNULAR VEEDER ROOT u UDC SENSOR 794380-323 (SUMP), -U DISPENSER c TELEPHONE SENSOR 794380-301 794380-304
(INTERSTITIAL)
,R~ PRODUCT
EXTINGUISHER --PIPING VEEDER ROOT VEEDER ROOT TURBINE
GAS PUMP VAPOR F FILL SUMP 857080-112 (SUMP), T SUMP 857080-112 (SUMP),
8 EMERGENCY --RETURN/ SENSOR 794380-304 SENSOR 794380-304
SHUTOFF VENT LINE (INTERSTITIAL) (INTERSTITIAL)
BELSHIRE ENVIROMENTAL
COSTCO 0688
3800 ROSEDALE HWY
BAKERSFIELD CA
1-800-984-6266
02/01/2018 8:40 AM
SUMP LEAK TEST REPORT
T187 TS
TEST STARTED 8:25 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 4.2164 IN
END TIME 8:40 AM
END DATE 02/01/2018
END LEVEL 4.2163 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T287 TS
TEST STARTED 8:25 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 5.4523 IN
END TIME 8:40 AM
END DATE 02/01/2018
END LEVEL 5.4516 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T391 TS
TEST STARTED 9:01 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 3.2585 IN
END TIME 9:16 AM
END DATE 02/01/2018
END LEVEL 3.2586 IN
LEAK THRESHOLD 0.002 IN ~TESTRESUL T PASSED
UDC 3-4
TEST STARTED 1:33 PM
TEST STARTED 02/01/2018
BEGIN LEVEL 3.6760 IN
END TIME 1:49PM
END DATE 02/01/2018
END LEVEL 3.6758 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC 5-6
TEST STARTED 1:33 PM
TEST STARTED 02/01/2018
BEGIN LEVEL 4.8176 IN
END TIME 1:49 PM
END DATE 02/01/2018
END LEVEL 4.8186 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC9-10
TEST STARTED 1:33 PM
TEST STARTED 02/01/2018
BEGIN LEVEL 6.2544 IN
END TIME 1:49 PM
END DATE 02/01/2018
END LEVEL 6.2545 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC1112
TEST STARTED 1:33 PM
TEST STARTED 02/01/2018
BEGIN LEVEL 4.2317 IN
END TIME 1:49 PM
END DATE 02/01/2018
END LEVEL 4.2321 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
\ o-P 2
T1B7 FS
TEST STARTED 9:01 AM
TEST STARTED 02/01/201B
BEGIN LEVEL 3.2585 IN
END TIME 9:16 AM
END DATE 02/01/201B
END LEVEL 3.2586 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T1B7 FS
TEST STARTED 9:35 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 6.1430 IN
END TIME 9:50 AM
END DATE 02/01/2018
END LEVEL 6.1438 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
TEST STARTED 10:03 AM
I TEST STARTED 02/01/201B
BEGIN LEVEL 4.7268 IN
END TIME 10:1B AM
END DATE 02/0l/201B
END LEVEL 4.7280 IN
LEAK THRESHOLD 0.002 IN
! TEST RESULT PASSED
GA TB
TEST STARTED 7:47 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 7.2170 IN
END TIME B:02 AM
END DATE 02/01/2018
END LEVEL 7.2172 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T1 87FB
TEST STARTED 7:13 AM
TEST STARTED 02/01/201B
BEGIN LEVEL 5.5685 IN
END TIME 7:29 AM
END DATE 02/01/2018
END LEVEL 5.5672 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T187 VB
TEST STARTED 7:13 AM
TEST STARTED 02/01/2018
I BEGIN LEVEL 2.3338 IN
END TIME 7:29 AM
I END DATE 02/01/2018
END LEVEL 2.3339 IN
I LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T2B7 FB
TEST STARTED 6:53 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 5.1529 IN
END TIME 7:08 AM
END DATE 02/01/2018
END LEVEL 5.1526 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
T391 VB
TEST STARTED 6:53 AM
TEST STARTED 02/01/2018
BEGIN LEVEL 5.B980 IN
END TIME 7:08 AM
END DATE 02/01/201B
END·LEVEL 5.8980 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSCD
TEST STARTED 2:21 PM
TEST STARTED 02/01/2018
BEGIN LEVEL 5.6736 IN
END TIME 2:36 PM
END DATE 02/01/2018
END LEVEL 5.6738 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
2 of' z_