Loading...
HomeMy WebLinkAboutMINOR BILLING APP 1.31.19BILLING & PERMIT STATEMENT PERMIT # Please make checks payable to CITY OF BAKERSFIELD. NO CASK Please. Thank you, El PERMIT TYPE FEE CALCULATION TOTAL DUE ❑ Alarm - New & Modification (minimum charge) FA $ 288 BAKERSFIELD FIRE DEPARTMENT SITE INFORMATION Prevention Services 8 µ PROPERTY OWNER FIRE 4E 2101 H Street aRrM r Bakersfield, CA 93301 8/9/18 8/9/18 Phnna- Ar.1 -l7A -1070 ® Fav• AF1 - Pr.') -')1 71 Please make checks payable to CITY OF BAKERSFIELD. NO CASK Please. Thank you, El PERMIT TYPE FEE CALCULATION TOTAL DUE ❑ Alarm - New & Modification (minimum charge) FA $ 288 ' ONLY TREASURY SITE INFORMATION LOCATION OF PROJECT PROPERTY OWNER 2698 Mt Vernon Ave Saint Peter & Saint Paul LLC STARTING DATE COMPLETION DATE NAME 8/9/18 8/9/18 84 PROJECT NAME ADDRESS PHONE # Mt Vernon & Columbus Arco AmPm 2698 Mt Vernon Ave 661- 472 -5480 PROJECT ADDRESS CITY P��4 f C�iTZS�I �i �� STATE CA ZIP CODE 2698 Mt Vernon Ave • 93306 CONTRACTOR INFORMATION 84 CONTRACTOR NAME CA LICENSE # 1804904 TYPE OF LICENSE EXPIRATION DATE 1 PHONE # Dustin Reese Haz A, C61 -D40 03/31/2020 (661) 631 -3870 CONTRACTOR COMPANY NAME FAX # Confidence UST Services, Inc. (661) 587 -9758 ADDRESS CITY ZIP CODE 16250 Meacham Road Bakersfield 193309 ❑ Please make checks payable to CITY OF BAKERSFIELD. NO CASK Please. Thank you, El PERMIT TYPE FEE CALCULATION TOTAL DUE ❑ Alarm - New & Modification (minimum charge) FA $ 288 ' ONLY TREASURY ❑ Over 10,000 sq ft $ 0 .028 x sq ft • Alarm - Minor Modification (Add 1 device /Relocation of 2 devices) $ 98 /hr (2 hrs minimum) _ $196 84 • Sprinkler - New & Modification (minimum charge) FIRE $ 288 ❑ Over 10,000 sq ft $ 0 .028 x sq ft • Sprinkler — Minor Modification ( <10 heads) $ 98 /hr (2 hrs minimum) _ $196 84 ❑ Commercial Hood (New & UL 300 Upgrade Modification) FHD Additional Hood $ 241 $ 59 /hood ❑ Commercial Hood - Minor Modification (add /move nozzle) $ 98 /hr (2 hrs minimum) _ $196 84 ❑ Spray Booth (New & Modification) SB $ 241 ❑ Aboveground Storage Tank (1 inspection per installation) AST $ 185 /tank ❑ Additional Tank ATI $ 98 /tank D Aboveground Storage Tank (Removal, Mod, or Inspection) ATR $ 112 /tank ❑ Underground Storage Tank (Installation /Inspection) NI $ 900 /tank ❑ Underground Storage Tank (Modification) MOD $ 900 /site Underground Storage Tank (Minor Modification) MTM $ 171 /site ❑ Underground Storage Tank (Removal) TR $ 587 /tank ❑ Mandated UST Testing: Fuel Mont Cert /SB989 /Cath. Prot. NOTE: $98 /hr for each type of test /per site /per UST system even if scheduled at the same time TT $ 98 /hr (2 hrs minimum) _ $196 • Oil well (Installation, Inspection, or re- inspection) X $ 98 /hr 84 • Tent TENT $ 98 /hr • After -hours inspection fee 124/hr 2 hrs minimum = 248 • Pyrotechnic (1 permit per event, plus an inspection fee of $98 /hr during business hours) PYRO NOTE: After hours Pyrotechnic event inspection is @ $124 /hr $ 98 /hr + (5 hrs min standby fee /insp) _ $58 5 hrs min standby fee ins = 620 • Re- inspection /Follow -up Inspection $ 98 /hr 84 • Portable LPG (Propane): # of Cages? $ 98 /hr 84 • Explosive Storage $ 241 84 ❑ Copying & File Research (File Research fee $51 /hr) $ 0.02 /page 84 ❑ Miscellaneous Site Plan Review (Carnival & Fairs /Vehicle Disnlav/Mofion Picture) $ 98 /hr 84 —j FD2021 (Rev 7/16)