Loading...
HomeMy WebLinkAbout1416 golden state hwy - cupa report 2.5.19_2-8Violation Program Requirement 0.0 SOC Comments No 0 <t o 0 a a� W 00 z Q z n U W p> Testing 2030002 Owner /Operator has tested and certified leak ® ❑ ❑ ❑ ❑ ❑ None detection equipment annual) -_23 CCR 16 2638 2030048 Secondary containment testing conducted every 36 months in accordance ® ❑ ❑ ❑ ❑ ❑ None with requirements - 23 CCR 16 2637 2030055 Spill buckets have been tested annually as ® ❑ ❑ ❑ ❑ ❑ None required - HSC 6.7 25284.2 2010009 Secondary containment All UST's are VPH and exempt test results submitted to from secondary containment the CUPA within 30 days ❑ ❑ ® ❑ ❑ ❑ None testing. after the test - 23 CCR 16 2637(e) 2030064 CUPA was poperly notified within the prescribed number of ® ❑ ❑ ❑ ❑ ❑ None hours prior to testing - 23 CCR 16 26370, 2638(e), 2643(8), 2644.1(a)(4) Install/Repair 2060009 Permits obtained to install, replace, repair, or ® ❑ ❑ ❑ ❑ ❑ None modify part of the UST system - 23 CCR 16 2712 UST System Observation General Monitoring 2030003 Leak detection system maintains continuous RD monitoring that activates ® ❑ ❑ ❑ ❑ ❑ None ❑ an audible and visual Yes alarm - 23 CCR 16 2632, 2634, 2636, 2666 2030016 The annular space of the tank, piping and sumps RD are continuously monitored and activates ® ❑ ❑ ❑ ❑ ❑ None ❑ the alarm - 23 CCR 16 Yes 2631(g), 2632(c)(2)(A) &(B), 2633(c), 2636 2030017 Product piping outside the UDC is fail -safe and shuts down the pump or ® ❑ ❑ ❑ ❑ ❑ None restricts flow - 23 CCR 16 2636(1)(5) 2030018 Turbine sump monitor RD activates an audible and visual alarm or stops the ® ❑ ❑ ❑ ❑ ❑ None ❑ flow of at the dispenser - Yes 23 CCR 16 2636(0(1) Underground Storage Tank Program - DW Inspection Report v 2.0