HomeMy WebLinkAbout1416 golden state hwy - cupa report 2.5.19_2-8Violation
Program Requirement
0.0
SOC
Comments
No
0
<t
o
0
a
a� W
00
z
Q
z
n
U
W
p>
Testing
2030002
Owner /Operator has
tested and certified leak
®
❑
❑
❑
❑
❑
None
detection equipment
annual) -_23 CCR 16 2638
2030048
Secondary containment
testing conducted every
36 months in accordance
®
❑
❑
❑
❑
❑
None
with requirements - 23
CCR 16 2637
2030055
Spill buckets have been
tested annually as
®
❑
❑
❑
❑
❑
None
required - HSC 6.7 25284.2
2010009
Secondary containment
All UST's are VPH and exempt
test results submitted to
from secondary containment
the CUPA within 30 days
❑
❑
®
❑
❑
❑
None
testing.
after the test - 23 CCR 16
2637(e)
2030064
CUPA was poperly
notified within the
prescribed number of
®
❑
❑
❑
❑
❑
None
hours prior to testing - 23
CCR 16 26370, 2638(e),
2643(8), 2644.1(a)(4)
Install/Repair
2060009
Permits obtained to
install, replace, repair, or
®
❑
❑
❑
❑
❑
None
modify part of the UST
system - 23 CCR 16 2712
UST System Observation
General Monitoring
2030003
Leak detection system
maintains continuous
RD
monitoring that activates
®
❑
❑
❑
❑
❑
None
❑
an audible and visual
Yes
alarm - 23 CCR 16 2632,
2634, 2636, 2666
2030016
The annular space of the
tank, piping and sumps
RD
are continuously
monitored and activates
®
❑
❑
❑
❑
❑
None
❑
the alarm - 23 CCR 16
Yes
2631(g), 2632(c)(2)(A) &(B),
2633(c), 2636
2030017
Product piping outside the
UDC is fail -safe and shuts
down the pump or
®
❑
❑
❑
❑
❑
None
restricts flow - 23 CCR 16
2636(1)(5)
2030018
Turbine sump monitor
RD
activates an audible and
visual alarm or stops the
®
❑
❑
❑
❑
❑
None
❑
flow of at the dispenser -
Yes
23 CCR 16 2636(0(1)
Underground Storage Tank Program - DW Inspection Report v 2.0