Loading...
HomeMy WebLinkAbout1416 golden state hwy - cupa report 2.5.19_7-8Violation Program Requirement a o SOC Comments No o o a a� C Z o, z .o o> Logs 2030001 Leak detection alarm logs, maintenance and RD records of appropriate ® ❑ ❑ ❑ ❑ ❑ None ❑ follow -up actions Yes maintained - 23 CCR 16 2632, 2634, 2712(b) Maintenance/Tests 2010008 Monitoring, maintenance, repairs, linings, and RD upgrade records ® E] El ❑ El ❑ None El maintained for the proper Yes time period - 23 CCR 16 2712(b) Documentation 2030033 Failure to maintain on site Monitoring plan is not current and an approved monitoring does not reflect the new UST's plan - 23 CCR 16 2632, ❑ ® ❑ ❑ ❑ ❑ None and monitoring equipment. The UST info needs to be updated and 2634, 2711, 2712(i) re- submitted in CERS prior to operating UST systems. 2030037 Written agreement between the tank owner and tank operator to monitor the tank system ® E] F-1 F-] ❑ None is maintained - 23 CCR 16 2620(b); HSC 6.7 25284(a)(3) 2030061 Suspected or actual RD unauthorized release reported in appropriate ❑ ❑ ® ❑ ❑ ❑ None ❑ time frame - HSC 6.7 Yes 29294, 29295 General Operating Requirements Permit Condition /Approval 2030039 Compliance with all operating permit ® ❑ ❑ ❑ ❑ ❑ None conditions - 23 CCR 16 2712; HSC 6.7 25299 2030059 UST system maintained in accordance with exclusion /exemption ® ❑ ❑ ❑ ❑ ❑ None status - HSC 6.7 25281.6, 25283.5 2030014 Owner /Operator received approval and has implemented a training ❑ ❑ ® ❑ ❑ ❑ None program at an unstaffed facility - 23 CCR 16 2715(1) (2 Underground Storage Tank Program - DW Inspection Report v 2.0