HomeMy WebLinkAbout2317 l st inspector report 12-6-12UNIFIED PROGRAM INSPECTION CHECKLIST 6
�w.. =d�'�'.,�Y.t�Xd�i.. mrw�n«w....w, . s".'x .JSw.,^y'AY.:W°vnu.:,.r:reaw.a �dnu.✓ -�u".: ri.m...£%..- .i^Ra+rne.+- ....v,.,..»+. `�
�s
E
Underground Storage Tank Program
l4f
Facility Name:
DOWNTOWN
Address:
2317 L St. Bakersfield, CA. 93301
Contact:
Josh Knight - anager
Phone:
10141,
BAKERSFIELD FIRE DEPARTMENT
Prevention Services Division
2101 H Street
Bakersfield, CA 93301
Phone: 661-326-3979
Fax: 661 - 852 -2171 ¢;
Date of Inspection:
Ell
Time In: 2 30 Al-I I Time Out:
Inspected by: Ernie Medina
ICC# 8012428 -UI
Ty a of Inspection:
Annual Compliance ❑Re- inspection ❑ Complaint
`Permission for Inspection Granted by:
1 f A a
(661)638-0310
Tank ID
Size
Contents
Construction
#1
#21
#3
#4 '
8000
121000
8000
121000
Mid
Reg.-----
Prem.
Diesel
DWF SC
DWF SC
DWF SC
DWF S.0
Tank Monitoring:
DW: Continuous Interstitial Monitoring
" D ❑Brine /H drostatic ❑ Vacuum /Pressure.
SW: SIR and Line Test every 2 years.
SW: ATG 0.1 annual.
SW: ATG 0.2 monthly.
SW: Continuous In -Tank Leak Detection (CITLD).
SW: Tank Gauging.
SW: Vadose/GW Monitoring.
Other Description:
El
El
El
El
❑
El
El
El
El
�'
❑
❑
❑
❑
❑
❑
❑
El
El
❑
El
❑
E
❑
❑
❑
El
Piping'Monitoring:
MA Suction: Continuous Interstitial at UDC and Tank Sump.
DW Pressurized: Interstiti at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto - shutdown and Failsafe.
DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc.
SW Conventional Suction: Triennial 0.1 gph line test., and daily
❑
❑
❑
❑
❑
❑
El
❑
❑
E
❑
❑
monitoring.
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
❑
❑
❑
❑
LLD with Auto - Shutdown.
SW or DW Safe Suction.
SW: Vadose Zone or GW Monitoring.
DW or SW: Gravity Flow Pipe.'
Other Description:
El
El
❑
❑
❑
❑
❑
1;z�- El
❑
❑
❑
❑
E
❑
❑
References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class 11, or Class I, or To
Violations
Determined (TBD) if uncertain and will be determined
later.
j.. ^3' k
.. t
a:
., m.
. :. _
N r ,
`r.
.r`°mJ ., .. 'a'. .. � v r. -Y" Nr.. e a
.� . `T" >Adk . .Y:Yr. A t4s• lk .� ,tea•
-,..y wt: .. w. ...�. g'n•,..nH- .., ;m,.. '. ✓;A .a %2. ,9 ✓ .,.. .,
�`v, ,3yyt+ a ':
1C F . & � '�- v„ r., k': i.. YF•-- 3<.3.. , . -"x:.. E.':.� _. "x ..F?, lc�. ."k-. � .5.
.o- e .. a ., .v, .. .:... °e"G.. C . , t 2 ..u.. -. .. rv. r ... E.,eG,,: < -.,.. , _.
w5 .,3 � . ..i ..°�` 's,. t,- . .'k;.l`4'..
- � .... m �: � ✓. ,.u. .. m ..r �� �. r ., vn .. n ...r 'h-. n . .r- x -' ,
, < , �. < n .. . : X. .... '6 Ka . `n-.a �..: -Y2i.. .. �_ .,.. � ... ....'�,',t.�, ., a .. �e'-il < ��a. .
a : gLL111FF{ ., � ., Mn ., ,. 'mu, aT+. ..a�.. ... ...a .a .,. �.
� "�a ; ., ,.m ; ., . .. k, r.. ;, .„,w r. ,,... :: .. �� .�.., .„5 �� ,,,- � '.��, .>, :,� . '.� ✓, h
,�' .. � z. 3 r In t a• .,. .. , <... ,. `Y lE- .. _ >. yv ., _
.. §. �",., ��.��...�• b. _mss' � ?k,.�i� ,�.,..,w
x.
,.;N
HY ....,...
.il:
"\ <.r.
�.. .«•...
r 5- ,..
v �.v.
..'3. ,.
irk
�
.. .:ti✓"..
.,,?f `�
,. ,�iz''wt�$'d !b ..
.Y"' .�-
d^�x'•:
_ r _ .,: �<
..tr*.,..
�. . -„ ,
, _ ., �,
.� h.Yx .<r.y
-k:�n ..:
�,
a �
., s .�
�Yi^grff.
.... _
- �.
.ary
�
'.. k� �.
�_
3_Yry
:�
� zM v.
:r..
A. ,
°wTp , 1'
'✓4= %:`~w "..
:.,.
s; "".eG h �
. '> ..
: -5'r..
': ,,. t ,
„.
� Y°'FL --'3:?
,: ,`.`�:cF �<..-
� � - 4 .
'�.... r(c' .;, ....fN' -�. K.
G�
-. � ', � � t. " ,..`�
' � � 4. pvt'
9�..a;J- +➢, w $'rt ,,:f
r,. -. '.• j -.: :�
�. 7
.'a�_5r '.. Kr.'^. .���5'r
,. :.�. „�..<�
, `, .
'”. ..
, . .�canQ - tto a`I Com • li ce .�• �> � � �� � �.,,
:�^ �M✓a.?a.- ,,. .a , ,. n .. ,aYi, ^`r -»,. ✓. °� ��., ^skit, .. � �. „vl.+' � � ,'Sv.,4� ,'3dk�
...,
S "
��
>
F.
� „� '
,;�
.NI
p�' "�
k
�i�G�Y�. $ae J'
^
u
a.y �. ,� '+a v n ��_ . • , .., . � _. e- :''�.. _ as c, tiwc�?' a . ! �,z - �2 av
�. 5 -
4 �..
a. �?;S
a.,r,
� �a. rv� ,
� `ab z<e' a r :
^. .A.. .
Y�� �.. ...:: :.. : ..w p..... �.. w'. _.: +.,- d'.:!a .�. wl':✓,h .-. a';' rrW;?: & �t, �.` Yt,' �] S�Jv:,' �� ''Y \.teS';E'::�4.vi�L'�'w,dn.`:
�:ak.1i,. -.�K�.
:-r.,£u'K��:{
�s:.y3:iw:.�,1v
Y'.'VY
,X�..w+�r�etad.
.w(pGU� Zv`,:��r�e 4.�...�� 4ti'£&'�,a].. :?�✓�wwS��i':
File Review
1
UST Permit to Operate is current. HSC 25284(a), 25299(a)(1) 25299 (b)(1)
❑
❑ 2
Transfer of permit and /or change of information provided within
30 days of ownership /information changes. HSC25284(b) (c); T23
CCR 2712(d)
UST form information current/correct for facility, including BOE
❑
number. HSC 25286(x)
Fees are paid up -to -date. HSC 25285(x), 25287
❑
5
Monitoring Plan approved for current owner with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
6
Current Emergency Response Plan submitted with appropriate
content and level of detail. T23 CCR 2632 d
co O , 2634 (d), 2641(h)
` 7
Plot Plan /Site Map submitted with appropriate content and
❑
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
❑
Owner /Operator agreement submitted, if required. HSC 25284(x)(3)
9
Certification of Compliance and Designated Operator
❑
Certification submitted by current tank owner. T23 CCR 2715
Certificate of Financial Responsibility submitted and is current
X10
for the permit period. HSC 25292.2, 25299.30- 25299.34; T23 CCR 2711; 2808.1;
❑
2809 - 2809.2
11
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. HSC
25284.1 a 4 (c); T23 CCR 2638
12
Spill- bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
3
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
❑
passing results. 40 CFR 280.40(a)(2), 280.43(9)(1) &(2), 280.44(a); HSC 25292(e);
T23 CCR 2638, 2641 a
4
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
❑
a passing test. HSC 25284.1(a)(4)(8); T23 CCR 2637(x)
015
Pipe and /or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 2636(0,
2643(b)(3), (c)(3), d (e
❑16
Repaired tanks /piping are tightness tested within 30 days of
RD
RD
RD
RD
the repair. 40 CFR 280.33; T23 CCR 2661
017
ELD test conducted within allowable time frame. Most recent
test results submitted and passing results achieved. T23 CCR
El
2644.1
018
The corrosion protection system is checked by a corrosion
specialist within six months of installation /repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP
adequate. Impressed current inspected every 60- calendar
days. 40 CFR 280.31, 280.70, T23 CCR 2635(a)(2)
019
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(1)(fi,);
RP
RP
RP
RP
T23 CCR 2663(h)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
Facility Name:
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Date:
Genera/
0 Tank systems meet current construe
for type of system. HSC 25288
1 Hazardous substance tanks have se
CFR 280.42(b); T23 CCR 2631
2 Electronic monitoring system has aui
O eratin g condition. T23 CCR 2632, 2634, ;
3 Monitor console programmed appror
option used. T23 CCR 2638, 2643, 2643.1
❑24 Tank systems in temporary closure r
280.70, T23 CCR 2670 & 2671
5 Overfill Prevention mechanism prese
according to type: ❑Flapper valve ❑
❑ball float. ❑ AN alarm and Ball Flc
280.21(d); T23 CCR 2635(b)(2), 2631 d 4
6 Spill prevention device is present any
condition and drain mechanism oper
280.20 c 1 1, 280.21(d); T23 CCR 2635(b)(1);266,1
7 Piping and piping penetration boots
good condition. HSC 25288(x), 25292.1
28 All sumps, spill buckets, and UDC's 1
HSC 25291(e), 25290.1, 25290.2; T23 CCR 2635(b)
9 Areas around vents appear to be fre(
releases. HSC 25288(a), 25290.1, 25290. 2, 252
X-1 Release Detection methods are pres
le standards. See LG -113. 40 CFR 280.40(
31 All sensors are correct for the type of
40 CFR 280.40 a 2 , 280.43(g)(1)&(2); HSC 25290,
32 All sensors are located in the proper
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 2529(
2632(c);2641(a)
33 All secondary containment, including
with a continuous monitoring system
AN alarm or stops the flow of produc
detects a leak. T23 CCR 2636 (0(1)
Tank.:Monitpring .
�� /
y�'Nl
�., 4 Interstitial monitoring conducted p
280.43(g)(1)&(2); T23 CCR 2632 (q)(2); 2634 d 1
❑35 ❑ VPH monitoring conducted proper
O SIR
❑36 SIR and Biennial 0.1 gph tank test p(
280.41, 280.43; T23 CCR 2643, 2646.1
❑37 Non - passing SIR monitoring report r(
investigated properly. 40 CFR 280.41(a), 2
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
..........
C� O
On -Site Review
This Inspection is being conducted d
monitoring certification. D YES 7I'
The service technician has provided
manufacturers training documentatic
tes is license or works under a CSC
,KYES O NO
s � � ` �
�� , onklPrp�ng�Gamponen�s lion
b.J'.? e
e' WaS aia.. Shy �'P:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
i t
y
p
yy
: x _
....... -----
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection CITLD
8
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
RD
RD
RD
RD
❑
280.43; T23 CCR 2643(b)(1), 2643(b)(5)
9
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
❑
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643 b 1
O Manual Tank Gauging (SW tanks <1=1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43;
RD
RD
RD
RD1
T23 CCR 2645
041
Tank Integrity test performed, if necessary. 40 CFR 280.43; T23 CCR
RD
RD
RD
RD
2645
O Vadose Zone and/or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2647 -48
*Tank Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
monitoring records are kept up -do -date. HsC 25283.5
Pi a Monitorin
O Continuous Monitoring System
4
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
RD
RD
RD
RD
❑
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 (0(1)
5
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
❑
activates an" alarm. T23 CCR 2636(0(1)
O Line Integrity Testing for Pressurized Piping
046
An annual 0.1 gph line integrity test is performed properly.
(Either third party or by Enhanced Line Leak Detection) T23 CCR
RD
RD
RD
RD
2636 f 4
;K47
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
RD
RD
RD
❑
detected and the monitoring system shuts down the pump or
RD
flow restriction occurs when a leak is detected in the UDC. T23
CCR 2636(0(5)
O Line Leak Detectors (LLD)
048
LLD's installed, annually tested, and operational on DW7_
pressurized piping that detects a 3.0 -gph leak, and restricts or
RD
RD
RD
RD
❑
4- 1LD
shuts off flow of product. T23 CCR 26360(2)
3 Vc
O DW Emergency Generator Tank
049
LLD activates AN alarm and monitoring system is checked
RD
RD
RD
RD
daily. T23 CCR 2636(f)(2)
050
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
and logs are kept. T23 CCR 2636 (0(6)
µ W
.. f ^5✓ :'^M1 ..... i 3 _.... Y.L Y :.: ,C .r ...,
„wn l.c. i}X+2�3 z .. u..,b: xn .,.,
.,:
✓.t .
,. / _
..F,_;
...
i ,V. r` .,.. fr ...::..
O Line Integrity Testing
051
SW pressurized piping: annual 0.1 gph line integrity test or a
RD
RD
RD
RD
monthly 0.2 gph line integrity test is performed properly. 40 CFR
280.41, 280.44; T23 CCR 2643 (c) 2 , 3
052
SW conventional suction system: 0.1 gph line integrity test is
RD
RD
RD
RD
performed every three years. 40 CFR 280.40, 280.41; T23 CCR 2643(d)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
053
SW conventional suction system: inspections conducted for
El
presence of air in the pipeline. Daily monitoring records are
65
kept. T23 CCR 2643(d)
054
SW gravity flow piping: biennial 0.1 gph integrity test or overfill
RD
RD
RD
RD
❑
tank integrity test is conducted within allowable time frames.
066
T23 CCR 2643(e)
r issou�j 2-� ,Xo ic)
O Safe Suction (SS) System
El
�- - .x.01 t 59 —
055
Piping meets the SS requirements. 40 CFR 280.41; T23 CCR 2636(x)(3)
RD
RD
RD
RD'
S , '''
7
A -D)
❑
)48-
O LLD for Pressurized Piping
❑
056
LLD's installed, annually tested and operational on SW
9
pressurized piping. Pump shuts down when a leak occurs and
RD
RD
RD
RD
❑
when the LLD fails or is disconnected. T23 CCR 2666
❑57
LLD's installed, annually tested, and operational on SW
El
emergency generator systems; LLD is connected to an AN
;L21
alarm. 40 CFR 280.40(x)(2), 280.43(g)(1), (2), 280.44(a); T23 CCR 2666
❑
Corrosion Protection
058
Metal Tanks and piping components have corrosion protection,
RP
RP
RP
RP
or are isolated from the backfill. 40 CFR 280.20, 280.21
RD
RD
RD
RD
❑
059
Corrosion protection equipment turned on, functioning properly
and provides continuous protection. 40 CFR 280.31(a),(b)(1); T23 CCR
RP
RP
RP
3
2635
1
P
060
Cathodic protection system is tested within 6 months of
1771
installation and then every 3 years. 40 CFR 280.31(a) & (b)(1); T23 CCR
RP
RP
RP
RP
2635 a (2
❑61
Impressed current systems checked every 60- calendar days
RP
RP
RP
RP
and records are up-to-date. 40 CFR 280.31(c); T23 CCR 2635(x)(2)
On -site ft etWork
2
Permit and conditions available on -site. Facility is operated
❑
according to permit and conditions. HSC 25293, 25299, T23 CCR 2712(1)
3
Monitoring and response plans are on -site and are the
❑
approved version. T23 CCR 2712(1); 2632 ;2634; 2641
734
Site plan depicts current site conditions and has all required
El
elements. T23 CCR 2632(d)
65
All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection
RD
RD
RD
RD
❑
method. 40 CFR 280.41, 280.45
066
All monitoring /testing records /documents are available for the
r issou�j 2-� ,Xo ic)
required timeframe. (3 years, 6 Y2 years, five years, life of tank) T23 CCR
El
�- - .x.01 t 59 —
2712
S , '''
7
Equipment maintenance records /logs available. T23 CCR 2712(b)
❑
)48-
Alarm logs /tapes available and appropriate follow -up actions
❑
occurred. T23 CCR 2712(b); 2632; 2634
9
Visual observation logs available, up -to -date, and appropriate
❑
follow-up actions to problems occurred. T23 CCR 2712(b); 2642
0
Designated UST Operator monthly reports available and
El
com lete. T23 CCR 2715
;L21
Employee training records available and training appropriate
❑
and up-to-date. T23 CCR 2715
2
Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non-
RD
RD
RD
RD
❑
passing test results. Leak and Spill Logs available. 40 CFR 280.50,
T23 CCR, 2650, 2652
3
Financial Responsibility Certificate and mechanisms (CFO
Letter, etc.) on -site and up -to -date. HSC 25292.2, 25299.30- 25299.34; T23
1771
CCR 2711; T23 2808.1; 2809 - 2809.2
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
. I UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facilitv Name: Date:
On -Site Observation' of- Periotlic Testin
4 Spill- bucket testing conducted appropriately and a passing test
achieved.
pff�5 Secondary Containment testing conducted appropriately and a
aassina test achieved.
r
R 3Trknd: dab s.
# o n car a on �fo 1 O QOS on
, . w �, �; _3
a. This facility is in compliance with Release Detection (RD) requirements only. (No
violations in boxes marked RD, but one or more in boxes marked RP.)
❑
b. This facility is in compliance with Release Prevention (RP) requirements only. (No
violations in boxes marked RP, but one or more in boxes marked RD.)
❑
c. This facility is in compliance with BOTH Release Detection (RD) and Release
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
❑
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
❑
and RP.)
rY es,
�:.
� . ;
A Red Tag was issued to this facility based on the results of this inspection.
Red Tag #
❑
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2797(a)(9)
❑
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2797(a)(2)
❑
3. Chronic violation or committed by a recalcitrant violator. CCR 2797(a)(3)
❑
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979