HomeMy WebLinkAbout2051 taft hwy 10-24-13w m� a BAKERSFIELD FIRE DEPARTMENT
UNIFIED PROGRAM INSPECTION CHECKLIST `' Prevention Services Division
s s F z n 2101 H Street
FIRE
I` AR N r Bakersfield, CA 93301
Underground Storage Tank Program Phone: 661 -326 -3979
Fax: 661- 852 -2171
Facility Name: Date of Inspection: 1 r �
Arco Time In: Time Out:
Address: I Inspected by,./Esther Duran
2051 Taft Hwy. Bakersfield, CA. 93313 ICC# 5 6325 -UI
Contact: Xnn of Inspection:
ual Compliance ❑Re- inspection ❑Complaint
Ja dish Patel
Phone: Permission for Inspection Granted by:
(661) 663 -9334
Tank ID
#1.
#2
#3
Size
20,000
1, 21 000
81000
Contents
REG
PREM
REG
Construction
DWF
DWF
DWF
Tank Monitoring:,
DW: Continuous Interstitial Monitoring
D El Brine/Hydrostatic El Vacuum /Pressure.
❑
SW: SIR and Line Test every 2 years.
❑
❑ .
❑
0'7 1
SW: ATG 0.1 annual.
❑
❑
❑
SW: ATG 0.2 monthly.
❑
❑
❑
❑
SW: Continuous In -Tank Leak Detection (CITLD).
❑
El'
❑
❑ '
SW: Tank Gauging.
❑
El
❑
SW: Vadose /GW Monitoring.
❑
❑
❑
❑
Other Description:
El
El
El
❑
Piping Monitoring:
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
Ell
❑
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or , Auto - shutdown and Failsafe.
0
DW VPH Monitoring:'lncludes lines, sumps, fill pipe, vapor lines, etc.
❑
❑
❑
SW Conventional Suction: Triennial 0.1 gph line test., and daily
monitoring.
❑
❑
❑
❑
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
LLD with Auto - Shutdown.
❑
ET
❑
❑
SW or DW Safe Suction.
❑
❑
❑
❑
SW: Vadose Zone or GW Monitoring.
❑
❑
❑
DW or SW: Gravity Flow Pipe.
❑
❑
❑
❑°
Other Description:
❑
❑
❑
❑:�
Rafaranrrac to tha Haalth and Safety Code_ the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA. 93301 (661) 326 -3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class II, or Class I, or To
Violations
Be Determined (TBD) if uncertain and will be determined
later.
_ .:c, a
'��py"+. . , YR,
T.'. _.
.. .. � §. ..
., . k.
.�;u
...
�..
_.
.r.= �... .,., u ,.b s,. :. '. p.'n 3. :3 -, T.. n- .l. 1. ..,,rF -t §Y :l,
'i .. �a_e k,l f:.. r t z. a.,e
<y r, -.. v. ,. , 1„ ,.tai., N,s - �. ,. u` .� ,w' � 3 -:
,� ..: _' ..rN , '. Y . ,.. .. .. ;(` ..� - e`ait ��. fs„ Uri ..Y. , a .., -. , U Fin.. 3L .L.
.. ,. n L .r , r :-... e.y 'N-ti ax. n . �:. . u, _ ?r i
.. ! , - . 4d'' �..�41�+. .. ✓... S tst- '. ', yKi . . �, t.. h.M' . n . •N
%. ��� .e� 1 .. r" ., fM1.r<?. .�.F .k <Y S .,r .>h .,, `� . :3
�. .� s .v. y. .: K .. .... 1.,. X ,.. :r ..'��:� ,�.. ,r ,. r ,.�, :.:r. , X
r ..Y "F w .. :4Ir r '1 r. < <l 6 � b i _`"Yy..kY ...aV r '<.. r.
1 `� ✓� S'(
{1- .. .: G�'.- =`fit f'� . _ - >,E•4'r,: h�_ v, c.`, h4... ,_.e,ro�'et ., <y : r•�, . �+.. r'4
S �- ,. f
. �
,. , ,.
,�.,
II��MI�k
.�. ,'
,r ....
r .
, _ 5.4
� �
4 ,_:
.. "5 , ",/+�
i�. ,
r a
.5.G v a
�' ....fid .'�,.
rV,'aS1'F
�. �
,v.
.�5
.�. -..
. Y -.
•x
� a
_ r ...
... 3`(,`
.6 ..
�.-
r � _ r. � a�. „f - ✓��:
�,v � ?„,; �h �.._.,,v r, �.-
-':-
.ft„
cz; fYt _
�' G
_
. , <..
>:
$. ��..:
.: �..
,.
,.
: ✓ � a�...a
, h n �4 ,N� {S''d f. `� „f, (F' . 1 f e _ } fu M1.- .'�'.(,n. � £Y .',l' M1- .-:�P -t,_ _. i h,M1v..,J' `% _ :f.
�,
.. 'i.. C �: ',?aA Z,_ Y. .,✓«. Y Y. Y.a§+. '* ,..�. Y ',<. Y.9., ,.c.�.. � Y.
:k3" ':., L�... .':j?�. �r�.._. "s -.,, >1Ft _�. ::, ��.t -.. .r... � y v,t Y :.; � "f:.e s....
. u..r. v5, � y � `�`:� a. r)c+.. ,, a'a �,t, .. .:r..'r ?t.,, ..✓F.3'r fc. ":E .:^,gR - -'"� " ..1a F ".� W" z. ktt...
.. 'rY '.. : . . $ . . ::. ' , '/.� �<, F?�?"...i_ -.v,: :tl,. •,'. �;�°w`e �r- Yt- c�2S,,� t. �.. c 1:i �` � .i'iY�`
fil'¢�� �. ratio � � + C,. vb , . R .::uY,3'- s Y � .� 'id R„
.n .. �`��„,µ„...
�: ✓ � ��'""� . '. .. 1 ... r. $ W e? �" - . �;, 'N . � � 2 k �" }tp .... <..>.,
W=t �
�
: ?v �
..
:� s
rV va.
?..1..��
vd �'
fib: "<+�,
,
' c.
WINNOW
.� .,
vii
:.:.: .,. ,j.
,, .f �: .� �'
h. 1!I .r%
.R.TV*
N
a..
�. wY/..
NL • .f.
'i: ,,
�'. :F:j �'..
..Q. �
e{ ✓ u� Y
.4. ,
Y�...
,..�tt � V �
�.t�' .TS
5
i
.._ . /� .
-: ..,
; -" ��:.2`3.i..
jY., ..�
.ti5� s¢.5
- r 5 -
..§F <� n f.. :. 5-_ m
�•` ..4cF. ,.Y �.^... . :.� .
, f _ �+ .:!?''e'>y> " :�.. - -3+$.r... � 'r �.
: ?f.t � 4 .•�fi, n 1L . >f'
+. �3 sYB. . tiµ 9 Y.v . �.J
.':j,Y ,<� u�".- � -. ?Y' - N� •_ -
' �� cix'.,F�'� ).k
�y q ;.
,u
o., x' Otto,
.'u. ".
x. ,. ', / ia, , .. , kk.,> >Y .. :'z .tea , ,... :.'r. � ., •�r�
�.. "`,.
.<.
.. --< .,..:.., k�, ., a _,.>ro-��4.. ._ r .. �'. €�� ✓, .u.a.., rr. .< 4x... .v' ,.�" -�',.. :�. x..�_ -va
., .Z _ / ... . s:. �'. � �.. §. xa _._ ., � w ,... �: _ 3 . ,,c h .f- , '..,
". �c:. s>,- m�,:,:. �r-.,." �' �.' Lr` 1. �EaY�'" ,r�x�,5!u41�`�r..tic`�- ii,.rn,r. .- ;�`�'��a;.�x.KY4_'.'�... ��`a. ... ,- .<p.�w:.._.,.Y�..-,... �,.� «.t�„v,�:n'.c�:u+._�'.,<
File• Review
y
re�.f ,.t -�..
.nY: s,,:;. .;
_.>ia...tt,•.§':f'.e.�
'7,
Y° . , .s
x*..�s�i...:ke�....
5.. h�r
.. s
,�':z<c�.<�
i ,�e
--Ssf'
�.,,�% ":�a�`
r .:� .:b' .. u. �.
✓�; '`,?+�' �,u � 2'.ia.
,.d �Sst:.�.m3�.�.,u..: sr. ts.,.�.;.z�"r� `e��',�t: ��
❑ 1
UST Permit to Operate is current. HSC 25284(x), 25299(a)(1) 25299(b) (1)
❑
❑ 2
Transfer of permit and /or change of information provided within
30 days of ownership /information changes. HSC 25284(b) (c); T23
CCR 2712(d)
❑ 3
UST form information current/correct for facility, including BOE
❑
�lrc"� ��'
number. HSC 25286(x)
ask h
❑ 4
Fees are paid up -to -date. HSC 25285(c), 25287
❑
;5
Monitoring Plan approved for current owner with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
6
Current Emergency Response Plan submitted with appropriate
El
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
7
Plot Plan /Site Map submitted with appropriate content and
❑
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
❑ 8
Owner /Operator agreement submitted, if required. HSC 25284(x)(3)
..�
;99
Certification of Compliance and Designated Operator
❑
Certification submitted by current tank owner. T23 CCR 2715
x'10
Certificate of Financial Responsibility submitted and is current
for the permit period. HSC 25292.2, 25299.30- 25299.34; T23 CCR 2711; 2808.1;
❑
2809 - 2809.2
)911
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. Hsc
25284. 1 a 4 c ; T23 CCR 2638
)612
Spill- bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
)413
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
❑
passing results. 40 CFR 280.40(a)(2), 280.43(g)(1) &(2), 280.44(a); HSC 25292(e);
T23 CCR 2638, 2641 '
X14
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
❑
a pas sin g test. HSC 25284. 1 (a) (4) (B); T23 CCR 2637(a)
015
Pipe and /or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 2636(f),
2643(b)(3), (c )(q), d (e
016
Repaired tanks /piping are tightness tested within 30 days of
RD
RD
RD
RD1
the repair. 40 CFR 280.33, T23 CCR 2661
017
ELD test conducted within allowable time frame. Most recent
test results submitted and passing results achieved. T23 CCR
2644.1
018
The corrosion protection system is checked by a corrosion
specialist within six months of installation /repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP'
adequate. Impressed current inspected every 60- calendar
days. 40 CFR 280.31, 280.70, T23 CCR 2635(a)(2)
019
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(1)(r,);
RP
RP
RP
RP`
T23 CCR 2663(h)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA. 93301 (661) 326 -3979
racility Name:
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Date:
�
.General`
020 Tank systems meet current construction standarc
fort a of system. HSC 25288
021 Hazardous substance tanks have secondary con
CFR 280.42(b ); T23 CCR 2631
022 Electronic monitoring system has audible and vis
operating condition. T23 CCR 2632, 2634, 2636
❑23 Monitor console programmed appropriately for m
option used. T23 CCR 2638, 2643, 2643.1
024 Tank systems in temporary closure meet requires
280.70; T23 CCR 2670 & 2671
❑25 Overfill Prevention mechanism present and oper,
according to type: ❑Flapper valve ❑ Audible -vise
❑ball float. ❑ AN alarm and Ball Float 40 CFR 280.:
280.21 d ; T23 CCR 2635(b)(2), 2631 d 4
026 Spill prevention device is present and functional I
condition and drain mechanism operational if apr
280.20 c 1 I , 280.21(d); T23 CCR 2635(b)(1);2665
027 Piping and piping penetration boots within sump:
good condition. HSC 25288(a), 25292.1
028 All sumps, spill buckets, and UDC's free from del
HSC 25291(e), 25290.1, 25290.2; T23 CCR 2635(b)(1)(C)
❑29 Areas around vents appear to be free from signs
releases. HSC 25288(a), 25290.1, 25290. 2, 25295.5
030 Release Detection methods are present and meE
standards. See LG -113. 40 CFR 280.40(a)(3)
031 All sensors are correct for the type of system anc
40 CFR 280.40 a 2 , 280.43(g)(1)&(2); HSC 25290.1(e), 25290.2, 25
032 All sensors are located in the proper positioniloc"
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 C
2632 c ; 2641 a
033 All secondary containment, including UDC shall I
with a continuous monitoring system that either
AN alarm or stops the flow of product at the disp
detects a leak. T23 CCR 2636 (0(1)
Tank Monitoring -
-
d
034 ❑ Interstitial monitoring conducted properly. 40Cf
280.43 1 & 2 ; T23 CCR 2632 (c)(2); 2634 d 1
035 ❑ VPH monitoring conducted properly. H.S.C. 25290.
O SIR
❑36 SIR and Biennial 0.1 gph tank test performed prc
280.41, 280.43; T23 CCR 2643, 2646.1
❑37 Non - passing SIR monitoring report results are re
investigated properly. 40 CFR 280.41(a), 280.43(h)(1),(2); 7
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
t
:On -Site :Keview�
This Inspection is being conducted during the ani
monitoring certification. OYES ONO
The service technician has provided ICC Certific�
manufacturers training documentation, and poss(
tester's license or works under a CSLB contracto
O YES O NO
VRZ .ankfRINpmg Gornpoen,s Monrfor�nganc
P"e'''Sci �
�,
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
«y
�
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection CITLD
038
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
RD
RD
RD
RD
❑
280.43; T23 CCR 2643(b)(1), 2643 b 5
039
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
❑
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643 b 9
O Manual Tank Gauging (SW tanks </ =1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43;
RD
RD
RD
RD
❑
T23 CCR 2645
041
Tank Integrity test performed, if necessary. 40 CFR 280.43, T23 CCR
RD
RD
RD
RD
❑
2645
O Vadose Zone and /or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40 CFR
RD
RD
RD
RD
❑
280.43; T23 CCR 2647 -48
OTank Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
❑
monitoring records are kept up -do -date. HsC 25283.5
Pi a Monitorin
, -. ii
y
4 r
A.
O Continuous Monitoring System
044
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
RD
RD
RD
RD
❑
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 (0(1)
045
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
❑
activates an AN alarm. T23 CCR 2636(0 (1)
O Line Integrity Testing for Pressurized Piping
❑46
An annual 0.1 gph line integrity test is performed properly.
(Either third party or by Enhanced Line Leak Detection) T23 CCR
RD
RD
RD
RD
❑
2636M(4)
❑47
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
RD
RD
RD
❑
detected and the monitoring system shuts down the pump or
RD
flow restriction occurs when a leak is detected in the UDC. T23
CCR 26360(5)
O Line Leak Detectors (LLD)
048
LLD's installed, annually tested, and operational on DW
pressurized piping that detects a 3.0 -gph leak, and restricts or
RD
RD
RD
RD
❑
shuts off flow of product. T23 CCR 2636(0(2)
O DW Emergency Generator Tank
049
LLD activates AN alarm and monitoring system is checked
RD
RD
❑
daily. T23 CCR 26360(2)
RD
RD
❑50
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
❑
and logs are kept. T23 CCR 2636 0(6)
a..[.a. � . L' ti.:
..xl: +m=wY1w'.::.vemtdn -w. x3.^':t >•v'.Y Y. +v:tnw. ,.w ,. ,::., .„ w e;au _3ti ., vay..vLx., .v .. ...,.x : C ..... .. -_.n„ a..�� w,....:; c .rte ,... �::
-
O Line Integrity Testing
051
SW pressurized piping: annual 0.1 gph line integrity test or a
monthly 0.2 gph line integrity test is performed properly. 40 CFR
RD
RD
RD
RD
❑
280.49, 280.44; T23 CCR 2643(c)(2),(3)
052
SW conventional suction system: 0.1 gph line integrity test is
RD
RD
RD
❑
performed every three years. 40 CFR 280.40, 280.49; T23 CCR 2643(d)
RD
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
053 SW conventional suction system: inspections conducted for
presence of air in the pipeline. Daily monitoring records are
kept. T23 CCR 2643(d)
054 SW gravity flow piping: biennial 0.1 gph integrity test or overfill
tank integrity test is conducted within allowable time frames.
T23 CCR 2643(e)
O Safe Suction (SS) System
055 Piping meets the SS requirements. 40 CFR 280.49; T23 CCR 2636(a)(3) RD RD RD RD
O LLD for Pressurized Piping
17156 LLD's installed, annually tested and operational on SW
pressurized piping. Pump shuts down when a leak occurs and RD RD RD RD
when the LLD fails or is disconnected. T23 CCR 2666
057 LLD's installed, annually tested, and operational on SW
emergency generator systems; LLD is connected to an AN
alarm. 40 CFR 280.40(x)(2), 280.43(g)(1), (2), 280.44(a); T23 CCR 2666
Corrosion P, rotedion
17158 Metal Tanks and piping components have corrosion protection,
RP RP RP RP
or are isolated from the backfill. 40 CFR 280.20, 280.21
❑59 Corrosion protection equipment turned on, functioning properly
and provides continuous protection. 40 CFR 280.31(a),(b)(1); T23 CCR RP RP RP RP
2635
060 Cathodic protection system is tested within 6 months of
installation and then every 3 years. 40 CFR 280.31(x) & (b)(1); T23 CCR RP RP RP RP
061 Impressed current systems checked every 60- calendar days RP RP RP RP
and records are U -to -date. 40 CFR 280.31(c); T23 CCR 2635(a) (2)
`On4ite Pa erwork
062 Permit and conditions available on -site. Facility is operated
according t0 permit and conditions. HsC 25293; 25299; T23 CCR 2712(1)
063 Monitoring and response plans are on -site and are the
approved version. T23 CCR 2712(i); 2632 ;2634; 2641
❑64 Site plan depicts current site conditions and has all required
elements. T23 CCR 2632(d)
065 All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection RD RD RD RD
method. 40 CFR 280.41, 280.45
066 All monitoring /testing records /documents are available for the
required timeframe. (3 years, 6'/z years, five years, life of tank) T23 CCR
2712
❑67 Equipment maintenance records/logs available. T23CCR2712(b)
068 Alarm logs /tapes available and appropriate follow -up actions
occurred. T23 CCR 2712(b); 2632; 2634
❑69 Visual observation logs available, up -to -date, and appropriate
follow-up actions to problems occurred. T23 CCR 2712(b); 2642
❑70 Designated UST Operator monthly reports available and
complete. T23 CCR 2715
071 Employee training records available and training appropriate
and up-to-date. T23 CCR 2715
❑72 Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non- RD RD RD RD
passing test results. Leak and Spill Logs available. 40 CFR 280.50,
T23 CCR, 2650, 2652
073 Financial Responsibility Certificate and mechanisms (CFO
Letter, etc.) on -site and up -to -date. HsC 25292.2, 25299.30- 25299.34; T23
CCR 2711; T23 2808.1; 2809 - 2809.2
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
1=acil
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
,. e .... r :'.
, �
,. :L^4. - ,,.s.... P.. _. •s.. s.^e, -' . w^
,. � y k a`P6. - 4`' s '"Cy;v .F': .ate-
_ .$ .,■ . -s,��'
S�y � j:u � :1ec on IN
y
N
X
a. This facility is in compliance with Release Detection (RD) requirements only. (No
violations in boxes marked RD, but one or more in boxes marked RP.)
El
b. This facility is in compliance with Release Prevention (RP) requirements only. (No
violations in boxes marked RP, but one or more in boxes marked RD.)
El
c. This facility is in compliance with BOTH Release Detection (RD) and Release
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
El
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
and RP.)
>
a
4u � 'MI p+"e i• ?A'QR .z, w .R .�F`4 ? i ., -...
'� e. vim.
'''ate,,, +"^, 'may`r,.F 5 ''r� -= F...sx "Y Y" ` 7.,`.G._y,,x " n..c.: .q 37 .4P, qY ..yxa't,'' r.0
,'148 y:. .. "¢� ,3F -.. 'k- `k "Av^k .'- •'+". 's{:
g a�� ,y
7R' "`�'�'
A Red Tag was issued to this facility based on the results of this inspection.
Red Tag #
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2717(a)(1)
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2717(a)(2)
3. Chronic violation or committed by a recalcitrant violator. CCR 2717(a)(3)
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979