HomeMy WebLinkAbout5609 stine inspector report 3-13-13Facility Name:
Stine Road Chevron
Address:
Loung Chao
Phone:
L'661) 34.15:6208
Date of Inspection:
Time In: ;vC) Time Out:
Inspected by: Ernie Medina
ICC# 8012428 -UI
Type of Inspection:
`Annual Compliance
❑Re- inspection ❑
Permission for Inspection Granted by:
laint
Tank ID
#1
#2
#3
,r t fib;
BAKERSFIELD FIRE DEPARTMENT
UNIFIED PROGRAM INSPECTION CHECKLIST
._
Wa
Prevention Services Division
s R s F D
2101 H Street
Preen.
FIRS'
CA 9330
Bakersfield, 1
Construction
ABTA/ f
F
DW 'SC
Underground Storage Tank Program
Phone: 661 - 326 -3979
Fax: 661- 852 -2171
Facility Name:
Stine Road Chevron
Address:
Loung Chao
Phone:
L'661) 34.15:6208
Date of Inspection:
Time In: ;vC) Time Out:
Inspected by: Ernie Medina
ICC# 8012428 -UI
Type of Inspection:
`Annual Compliance
❑Re- inspection ❑
Permission for Inspection Granted by:
laint
Tank ID
#1
#2
#3
Size
127000
12, 000 e
12,000
Contents
Reg.
Preen.
DSL
Construction
DWF SC
F
DW 'SC
DWF SC
1AWIVIonitoring:
DW: Continuous Interstitial Monitoring
0
%pry ❑ Brine/Hydrostatic ❑ Vacuum /Pressure.
SW: SIR and Line Test every 2 years.
❑
❑`
❑
❑ < '
SW: ATG 0.1 annual.
❑
❑
❑
❑
SW: ATG 0.2 monthly.
El
SW: Continuous In -Tank Leak Detection (CITLD).
❑❑
❑❑
SW: Tank Gauging.
❑
❑
SW: Vadose /GW Monitoring.
❑
❑
❑...
Other Description:
❑
❑
❑
-'. ❑:
Piping Moniitoring:
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
❑
❑
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto - shutdown and Failsafe.
DW VPH Monitoring: Vcludes lines, sumps, fill pipe, vapor lines, etc.
❑
❑ ;
❑
SW Conventional Suction: Triennial 0.1 gph line test., and daily
❑
❑�
❑
❑ ��
monitoring.
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
❑
❑
❑
LLD with Auto - Shutdown.
SW or DW Safe Suction.
❑
❑
❑`
SW: Vadose Zone or GW Monitoring.
❑
❑: :,
❑
❑.
DW or SW: Gravity Flow Pipe.
❑
❑ '
❑
-`:❑
Other Description:
❑
' ❑�
❑
❑
RPfPrPnr.PC to the Health and Safetv Code. the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class 11, or Class 1, or To
Violations
Determined (TBD) if uncertain and will be determined
later.
-, S ✓k.Y �.:it���2 v,X+,"- R� ?��� i'i� `, �'?
h'
N1
F H
� yAN
wr
-
File °Review
✓❑
1
UST Permit to Operate is current. HSC 25284(a), 25299(a)(1) 25299 (b)(1)
❑
❑ 2
Transfer of permit and /or change of information provided within
30 days of ownership /information changes. HSC 25284(b) (c); T23.
CCR 2712(d)
UST form information current/correct for facility, including BOE
❑
number. HSC 25286(a)
Fees are paid up -to -date. HSC 25285(c), 25287
❑
)<5
Monitoring Plan approved for current owner with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
6
Current Emergency Response Plan submitted with appropriate
1:1
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
7
Plot Plan /Site Map submitted with appropriate content and
❑
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
❑ 8
Owner /Operator agreement submitted, if required. HSC 25284(a)(3)
F-19
Certification of Compliance and Designated Operator
❑
Al -/V 506'X;7-
Certification submitted by current tank owner. T23 CCR 2715
°10
Certificate of Financial Responsibility submitted and is current
for the permit period. HSC 25292.2,25299,30-25299.34; T23 CCR 2711; 2808,1;
❑
2809 - 2809.2
1,1
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. Hsc
25284.1 a 4 c ; T23 CCR 2638
Nn 2
Spill- bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
1913
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
❑
passing results. 40 CFR 280.40(a)(2), 280.43(8)(1) &(2), 280.44(a); HSC 25292(e);
T23 CCR 2638, 2641 6)
14
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
❑
a passing test. HSC 25284.1(a)(4)(8); T23 CCR 2637(a)
015
Pipe and /or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 2636(0,
2643(b )(3 ), c (3 ), (d) e
016
Repaired tanks /piping are tightness tested within 30 days of
RD
RD
RD
RD
the rep air. 40 CFR 280.33, T23 CCR 2661
❑17
ELD test conducted within allowable time frame. Most recent
test results submitted and passing results achieved. T23 CCR
2644.1
❑18
The corrosion protection system is checked by a corrosion
specialist within six months of installation /repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP
adequate. Impressed current inspected every 60- calendar
days. 40 CFR 280.31, 280.70; T23 CCR 2635(a)(2)
❑19
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(1)(#j;
RP
RP
RP
RP
T23 CCR 2663(h)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
T�
a
_
.
Site Review
7:
This Inspection is being conducted during the annually
monitoring certification. KYES ONO
The service technician has provided ICC Certification and
find fY
manufacturers training documentation, and possesses a tank
I
tester's license or works under a CSLB contractor's license.
u 'R 3'08 so
YES a NO
2`7 h
�
... ,.
� v: .. I., ,. , `I.., n,
S „'xv-
�a
:<
n; etH -,t'. t
ents Mon�tor�h anal...�11'on�for
,. - ..
p ,�a �-
Iii
+d' r
�` .ff
S:-
l_.:. f �i Y. d `F .:7•v...
tom..
.
s � .� t. , -�"
r.,
1. $ „v..._.C;:
• �'
R r
zw
9
.'.F =
.1. „
.'.ST
: h' :.
_ �) .;.. M? ,T.. ➢.
�.
SF '�...✓ :.� .....
end r �
a,.�...��w.�:..�����,>.����.�A�
+-...
r$.�. ..
�. m.
..., ... ....
.,
r . ....3` :.. � � ,. .r�...m
General ,
0
Tank systems meet current construction standards as required
❑
for type of system. HSC 25288
1
Hazardous substance tanks have secondary containment. 40
RP
RP
RP
RP
❑
CFR 280.42(b); T23 CCR 2631
>142
Electronic monitoring system has audible and visual alarm in
❑
operating Condition. T23 CCR 2632, 2634, 2636
)�23
Monitor console programmed appropriately for monitoring
❑
option used. T23 CCR 2638, 2643, 2643.1
024
Tank systems in temporary closure meet requirements. 40 CFR
RD
RD
RD
RD'
280.70; T23 CCR 2670 & 2671
025
Overfill Prevention mechanism present and operational�sl�
according to type: ❑Flapper valy udible- visual alarm
�
RP
RP
RP
RP
❑
❑ball float. ❑ AN alarm and Balll 40 CFR 280.20(c)(1)(ii),
��✓f"�'
� ��l�
280.21(d); T23 CCR 2635(b)(2), 2631(d)(4)
_IhCF� 52IF"id:�
026
Spill prevention device is present and functional (in good
j->`csc/ sv /C 130ae ,
condition and drain mechanism operational if applicable). 40 CFR
RP
RP
RP
RP
;-1
280.20 c 1 (i ), 280.21(d); T23 CCR 2635(b)(1);2665
Piping and piping penetration boots within sumps /UDC are in
El
ood condition. HSC25288(a), 25292.1
028
All sumps, spill buckets, and UDC's free from debris and liquid.
❑
i e lv e-` Via
HSC 25291(e), 25290.1, 25290.2; T23 CCR 2635(b)(1)(C)
,9
Areas around vents appear to be free from signs of liquid
❑
releases. HSC 25288(a), 25290.1, 25290.2, 25295.5
Release Detection methods are present and meet performance
RD
❑
standards. See LG -113. 40 CFR 280.40(a)(3)
RD
RD
RD
1
All sensors are correct for the type of system and operational.
RD
RD
RD
RD
❑
40 CFR 280.40 a 2 , 280.43 1 & (2); HSC 25290.1(e ), 25290.2, 25291; T23 CCR 2638
2
All sensors are located in the proper position /location. 40 CFR
l-0 cz7z
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
RD
RD
RD
RD
C.aCA-F
)2632(c);2641(a)
All secondary containment, including UDC shall be equipped
with a continuous monitoring system that either activates an
❑
A/V alarm or stops the flow of product at the dispenser when it
detects a leak. T23 CCR 2636 (0(1)
Tank�Momtonng
:, -.,
w
.... .. x. 'S ,... .... 'rt ... � Ste, .....
.., ✓'Yi' T 'b
.. .ti� � .>< ,..., ... ., r..... .+'. ....-
s ..::..
.!
✓ ,:: ,. ..
s
:Y u r ...
....
. na r .,.....
+a , .£.. ,,.
''.,'.x �L�,.�.a
❑ Interstitial monitoring conducted properly. 40 CFR 280.40(x)(2),
4
�
RD
RD
RD
RD
❑
280.43(g)(1)&(2); T23 CCR 2632 (c)(2); 2634 d 1
❑35
in conducted properly. rl HSC 25290.1
❑ VPH monitoring p p y
RD
RD
RD
RD
_.;,. . Pe
.. e
{
P , .
.z,`
Ca
;. m.
�t.'S
--
.1..
mug
-f` �.
O SIR
❑36
SIR and Biennial 0.1 gph tank test performed properly. 40 CFR
RD
RD
RD
RD
°C
280.41, 280.43; T23 CCR 2643, 2646.1
037
Non - passing SIR monitoring report results are reported and
RD
RD
RD
RD
Investigated properly. 40 CFR 280.41(a), 280.43(h)(1),(2); T23 CCR 2646.1 1[
-
---
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
T�
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
.k
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection CITLD
❑38
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
280.43; T23 CCR 2643(b)(1), 2643 b 5
I 39
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643 b 1
O Manual Tank Gauging (SW tanks <1=1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43,
T23 CCR 2645
041
Tank Integrity test performed, if necessary. 40 CFR 280.43; T23 CCR
2645
O Vadose Zone and /or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40CFR
280.43; T23 CCR 2647 -48
*Tank Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
monitoring records are kept up-do-date. HsC 25283.5
PIP Monitorin
O Continuous Monitoring System
44
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 (1
%5
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
activates an AN alarm. T23 CCR 2636(0(1)
O Line Integrity Testing for Pressurized Piping
046
An annual 0.1 gph line integrity test is performed properly.
(Either third party or by Enhanced Line Leak Detection) T23 CCR
2636 (0(4)
47
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
detected and the monitoring system shuts down the pump or
flow restriction occurs when a leak is detected in the UDC. T23
CCR 2636(0(5)
O Line Leak Detectors (LLD)
8
LLD's installed, annually tested, and operational on DW
pressurized piping that detects a 3.0 -gph leak, and restricts or
shuts off flow of product. T23 CCR 2636(0(2)
O DW Emergency Generator Tank
❑49
LLD activates AN alarm and monitoring system is checked
daily. T23 CCR 2636(0(2)
050
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
and logs are kept. T23 CCR 2636 (0(6)
+xt,pw,'",,{y= �l'� ,�-yk"l,sFE�'� V"`+� ',�. -i�Y ��ra- Lr MU -i.bk i M i, k C4f'� C ;p
tyrsa..'t..l
asM3.
3:41r'
eX`. E,Obi'Vi^..MP.?'�.mK..tE�.iwi4l e.•+.. 3w�.' Cs' w{'"-~:. GLe >C »_- 3'3".k'sYY...rv- d'..i.. vea. 4%.+. vY...i ._.v.ax.n.k'4.'a ^..3'a..a.Lnn. ..
O Line Integrity Testing
051
SW pressurized piping: annual 0.1 gph line integrity test or a
monthly 0.2 gph line integrity test is performed properly. 40 CFR
280.41, 280.44; T23 CCR 2643(c)(2),(3)
052
SW conventional suction system: 0.1 gph line integrity test is
performed every three years. 40 CFR 280.40,280.41; T23 CCR 2643(4)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facilitv Name: Date:
❑53 SW conventional suction system: inspections conducted for
presence of air in the pipeline. Daily monitoring records are
kept. T23 CCR 2643(d)
054 SW gravity flow piping: biennial 0.1 gph integrity test or overfill
tank integrity test is conducted within allowable time frames.
T23 CCR 2643(e)
O Safe Suction (SS) System
055 Piping meets the SS requirements. 40 CFR 280.41; T23 CCR 2636(x)(3)
A -D
O LLD for Pressurized Piping
056 LLD's installed, annually tested and operational on SW
pressurized piping. Pump shuts down when a leak occurs and
when the LLD fails or is disconnected. T23 CCR 2666
❑57 LLD's installed, annually tested, and operational on SW
emergency generator systems; LLD is connected to an AN
alarm. 40 CFR 280.40(8)(2), 280.43(g)(1),(2), 280.44(a); T23 CCR 2666
Corrosion Protection
058 Metal Tanks and piping components have corrosion protection,
or are isolated from the backfill. 40 CFR 280.20, 280.21
059 Corrosion protection equipment turned on, functioning properly
and provides continuous protection. 40 CFR 280.39(a),(b)(1); T23 CCR
2635
060 Cathodic protection system is tested within 6 months of
installation and then every 3 years. 40 CFR 280.31(x) & (b)(1); T23 CCR
2635 a 2
❑61 Impressed current systems checked every 60- calendar days
and records are up-to-date. 40 CFR 280.31(c); T23 CCR 2635(a)(2)
.On -sitef Pa erwork
62 Permit and conditions available on -site. Facility is operated
according to permit and conditions. HsC 25293,,25299; T23 CCR 2712(1)
3 Monitoring and response plans are on -site and are the
approved version. T23 CCR 2792(1); 2632;2634; 2649
064 Site plan depicts current site conditions and has all required
elements. T23 CCR 2632(d)
<65 All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection
method. 40 CFR 280.49, 280.45
66 All monitoring /testing records /documents are available for the
required timeframe. (3 years, 6 Y2 years, five years, life of tank) T23 CCR
2712
7 Equipment maintenance records /logs available. T23 CCR 2712(b)
068 Alarm logs /tapes available and appropriate follow -up actions
occurred. T23 CCR 2712(b); 2632; 2634
❑69 Visual observation logs available, up -to -date, and appropriate
follow-up actions to problems occurred. T23 CCR 2712(b); 2642
R70 Designated UST Operator monthly reports available and
complete. T23 CCR 2795
K71 Employee training records available and training appropriate
and up -to -date. T23 CCR 2795
072 Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non -
passing test results. Leak and Spill Logs available. 40 CFR 280.50;
T23 CCR, 2650, 2652
3 Financial Responsibility Certificate and mechanisms (CFO
Letter, etc.) on -site and up -to -date. HsC 25292.2, 25299.30- 25299.34, T23
CCR 2791: T23 2808.1; 2809 - 2809.2
P�
OMMm1 ►=
RD
RD
RD
RD
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RP
RD
RD
RD
RD
❑
El
❑
�� y, rt
�.
�: ss�� hoc- ����ia��o•�'
RD
RD
RD
RD
❑
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
074 Spill- bucket testing conducted appropriately and a passing test 45
achieved.
5 Secondary Containment testing conducted appropriately and a ❑
passing test achieved.
S OC AND RED TAG
{
a. This facility is in compliance with Release Detection (RD) requirements only. (No
violations in boxes marked RD, but one or more in boxes marked RP.)
b. This facility is in compliance with Release Prevention (RP) requirements only. (No
violations in boxes marked RP, but one or more in boxes marked RD.)
❑
c. This facility is in compliance with BOTH Release Detection (RD) and Release
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
and RP.)
El
ga 1115 1
.v .,
E
A Red Tag was issued to this facility based on the results of this inspection.
Red Tag #
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2717(a)(1)
El
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2717(a)(2)
El
3. Chronic violation or committed by a recalcitrant violator. CCR 2717(a)(3)
El
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979