HomeMy WebLinkAbout6501 s union inspector report 6-19-13Facility Name:
VG Mini Market
Date of Inspection: / /g /`
Time In: �' ��
Time Out:
Address:
6501 S. Union Ave. Bakersfield, CA. 93307
Inspected by: Ernie Medina
ICC# 8012428 -Ul
Contact:
Raj Kumar
Type of Inspection:
(Annual Compliance ❑Re- inspection ❑ Complaint
Phone:
661 398 — 6152, 24hr (661 ) 703 - 2014
Permission for nspection Granted by:
Tank ID
#1
#2
#3
Size
12,000
000
Contents
REG
-0 SZ,.
Construction
DWF SC
DWF SC
DWF SC
Tank Monitoring::
DW: Continuous Interstitial Monitoring
XDry ❑ Brine/Hydrostatic ❑ Vacuum /Pressure.
❑
SW: SIR and Line Test every 2 years.
❑
❑
❑
❑�'
SW: ATG 0.1 annual.
❑
EJ
❑
❑
SW: ATG 0.2 monthly.
❑
❑
❑
❑
SW: Continuous In -Tank Leak Detection (CITLD).
❑
❑
❑
❑
SW: Tank Gauging.
❑
❑
❑
❑
SW: Vadose /GW Monitoring.
❑
❑
❑
❑
Other Description:
❑
❑
❑
❑
Piping Monitoring:
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
E]
❑
❑
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto- shutdown and Failsafe.
91
T
DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc.
❑
❑
❑
El
SW Conventional Suction: Triennial 0.1 gph line test., and daily
monitoring.
El
F-
❑
0
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
LLD with Auto - Shutdown.
❑
❑
❑
❑
SW or DW Safe Suction.
❑
❑
❑
❑
SW: Vadose Zone or GW Monitoring.
❑
❑
❑
❑
DW or SW: Gravity Flow Pipe.
❑
❑
❑
❑,
Other Description:
❑
❑
❑
❑"
References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
FA
M
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326-3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class 11, or Class 1, or To
Violations
Be Determined (TBD) if uncertain and will be determined
later.
W
H,
..........
WN Na:' ,
Le, W R,
File Revi ew
01
UST Permit to Operate is current. HSC 25284(a), 25299(a)(1) 25299 (b)(1)
02
Transfer of permit and/or change of information provided within
30 days of ownership/information changes. HSC25284(b) (c); T23
CCR 2712(d)
03
LIST form information current/correct for facility, including BOE
number. HSC 25286(a)
Fees are paid up-to-date. HSC 25285(c), 25287
❑
❑ 5
Monitoring Plan approved for current owner with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
06
Current Emergency Response Plan submitted with appropriate
F71
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
❑ 7
Plot Plan/Site Map submitted with appropriate content and
❑
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
❑ 8
Owner/Operator agreement submitted, if required. HSC 25284(a)(3)
❑
❑ 9
Certification of Compliance and Designated Operator
❑
Certification submitted by current tank owner. T23 CCR 2715
010
Certificate of Financial Responsibility submitted and is current
El
for the permit period. HSC 25292. Z 25299.30-25299.34; T23 CCR 2711; 2808.1;
2809-2809.2
1
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. HSC
25284.1 a 4 c ; T23 CCR 2638
^12
Spill-bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
1113
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
❑
passing results. 40 CFR 280.40(a)(2), 280.43(g)(1)&(2), 280.44(a); HSC 25292(e);
T23 CCR 2638,2641 a)
10114
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
❑
a pass i g test. HSC 25284.1(a)(4)(8); T23 CCR 2637(a)
❑15
Pipe and/or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 2636(0,
2643(b)(3) (c)(3), (d) (e)
❑16
Repaired tanks/piping are tightness tested within 30 days of
RD
RD
RD
RD
the rep air. 40 CFR 280.33, T23 CCR 2661
❑17
ELD test conducted within allowable time frame. Most recent
X
❑
test results submitted and passing results achieved. T23 CCR
2644.1
❑18
The corrosion protection system is checked by a corrosion
specialist within six months of instal lation/repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP
adequate. Impressed current inspected every 60-calendar
days. 40 CFR 280.31, 280.70, T23 CCR 2635(a)(2)
❑19
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(1)(fij;
RP
RP
RP
R
;K
T23 CCR 2663(h)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326-3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
g,
5
i
c
R
r
,
On= Site -Re�iew .
_
This Inspection is being conducted during the annual
monitoring certification. YES O NO
v "ea '03Z 0* 6;40..
The service technician as provided ICC Certification and
oAa-5 ,z. rKA ii-%
p
manufacturers training documentation, and possesses a tank
, S # o2_ 16 jz
testers license or works under a CSLB contractors license.
YES O NO
w �F
-f ,
�' \. .,��.1:. F"".r, 9 ,
� w «!. n. .. - s r ..
f 1
ankfPr m >Com onen�s��Mon�tonn
,vim
r7 �
1
Y:
1 �
'C'.
P"4 ) t � - � �Cp :}:. � .kr• -.1
.2
General
0
Tank systems meet current construction standards as required
❑
for type of system. HSC 25288
1
Hazardous substance tanks have secondary containment. 40
RP
RP
RP
RP
❑
CFR 280.42(b); T23 CCR 2631
Electronic monitoring system has audible and visual alarm in
operating condition. T23 CCR 2632, 2634, 2636
❑
23
Monitor console programmed appropriately for monitoring
❑
option used. T23 CCR 2638, 2643, 2643.1
❑24
Tank systems in temporary closure meet requirements. 40 CFR
RD
RD
RD
RD
;<
280.70; T23 CCR 2670 & 2671
5
Overfill Prevention mechanism present and operational
according to type:9Flapper valve ❑ Audible- visual alarm
RP
RP
RP
RP
❑
❑ball float. ❑ A/V alarm and Ball Float 40 CFR 280.20(c)(1)(Y),
280.21(d); T23 CCR 2635(b)(2), 2631 d 4
X6
Spill prevention device is present and functional (in good
condition and drain mechanism operational if applicable). 40 CFR
RP
RP
RP
RP
❑
280.20 c (1 )(I , 280.21(d); T23 CCR 2635(b)(1);2665
7
Piping and piping penetration boots within sumps /UDC are in
❑
good condition. HSC25288(a), 25292.1
8
All sumps, spill buckets, and UDC's free from debris and liquid.
❑
HSC 25291(e), 25290.1, 25290.2; T23 CCR 2635(b)(1)(C)
X9
Areas around vents appear to be free from signs of liquid
❑
releases. HSC 25288(a), 25290.1, 25290. 2, 25295.5
)CO
Release Detection methods are present and meet performance
RD
RD
RD
RD
❑
standards. See LG -113. 40 CFR 280.40(x)(3)
V331
All sensors are correct for the type of system and operational.
RD
RD
RD
RD
El
CFR 280.40 a 2), 280.43( 1 & 2 ; HSC 25290.1(e ), 25290.2, 25291; T23 CCR 2638
32
All sensors are located in the proper position /location. 40 CFR
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
RD
RD
RD
RD
El
2632(c);2641(a)
33
All secondary containment, including UDC shall be equipped
with a continuous monitoring system that either activates an
❑
A/V alarm or stops the flow of product at the dispenser when it
detects a leak. T23 CCR 2636 (0(1)
Tank 91'
.: l.Y,
r _<
§`5.. „r. s:� �. T, �`a . P 3{1,'J.l r. -!.. :, ,:a $-, :.; ,..,,: .•. .c ..
... I 7 ':.l
.:...
L�,
..,
F,
TY..
-:a
.,
li f `n
�:
.,�".:� }
_:�.h..'{� .�,_P
::r��<.;`Pl "� , Y ✓. ..:' :,':
v„`��, �:: . vt✓'„..... �, ..n <�...<.a�,�<:.,s,�r .<.,.d..,�.:�', t. �, ,. .a..�. r,,. +c.'a..r. ,�..,v. .vi s.. ->,i.. a... ,�.., w.U.,.„s �,.d..,�.
re .:+
, -;, r
h Ts 1.
034
Interstitial monitoring conducted properly. 40 CFR 280.40(x)(2),
RD
RD
RD
RD
❑
280.43(g)(1)&(2); T23 CCR 2632 (c)(2); 2634 d 1
035
❑ VPH monitoring conducted properly. HSC 25290.1
RD
RD
RD
RD
.. . dP2 ,
.... or,,..
,n. :< 3..
..,., �."
NNW
..>W 2
r 1
... :...,
.. .; n.
,< 'a ,,:cx� MEMO
... ;. .,. _ , r...
,:... `� ,..: ..
. O ��.. X c ,4 :,
_ ?�.: ._.. ..s...S :.• __, Tr- +.- ,,....vi,_
h.r.... a,.:l
.. _., c, !r..x...
�� ,..��x ...
u.....«�
.. �. -w..�. a, c_
-,. x_ .. v.. s:.:- :...,a .. ,...vu:�....,_ Via..,: _�..,. +,.v.::.' .,._. ,.�...a....
O SIR
036
SIR and Biennial 0.1 gph tank test performed properly. 40 CFR
RD
RD
RD
RD
280.41, 280.43; T23 CCR 2643, 2646.1
037
Non - passing SIR monitoring report results are reported and
RD
RD
RD
RD
investigated properly. 40 CFR 280.41(a), 280.43(h)(1),(2); T23 CCR 2646.1
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
Facility Name:
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection CITLD
038
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2643(b)(1), 2643 b 5
9
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
❑
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643(b)(1)
O Manual Tank Gauging (SW tanks </ =1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43;
RD
RD
RD
RD
T23 CCR 2645
041
Tank Integrity test performed, if necessary. 40 CFR 280.43; T23 CCR
RD
RD
RD
RD
2645
O Vadose Zone and /or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2647 -48
OTank Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
monitoring records are kept up-do-date. HsC 25283.5
Pi ,e :Monitorin
✓R. e °�.t ,. _. .,.. .+"G'Zsk". .Y._., . ,. -.
'. ,TXc
��.w�a..'. a w....a = li'.�- pxX>w� t�� � ..,vuK,Uv.>rP.Plei +� '�edCS[✓.fC >,s }..vY ..:: :.r. .. - -, -a_ a,r a^b:.. S
r< -: C,..?.
}. _
:�
', >' .v.
_
.,s
_. ,...
:..%... -a ,awl
.v i y.. .,
;. 3.,
O Continuous Monitoring System
;9L4
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
RD
RD
RD
RD
❑
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 (1
45
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
❑
activates an AN alarm. T23 CCR 2636(0(1)
O Line Integrity Testing for Pressurized Piping
046
An annual 0.1 gph line integrity test is performed properly.
(Either third party or by Enhanced Line Leak Detection) T23 CCR
RD
RD
RD
RD
2636 (0(4)
A,
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
detected and the monitoring system shuts down the pump or
RD
RD
RD
RD
❑
flow restriction occurs when a leak is detected in the UDC. T23
CCR 26360(5)
O Line Leak Detectors (LLD)
C8
LLD's installed, annually tested, and operational on DW
pressurized piping that detects a 3.0 -gph leak, and restricts or
RD
RD
RD
RD
❑
shuts off flow of product. T23 CCR 26360(2)
O DW Emergency Generator Tank
049
LLD activates AN alarm and monitoring system is checked
RD
RD
RD
RD
daily. T23 CCR 26360(2)
050
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
and logs are kept. T23 CCR 2636 (0(6)
v R
..
amdiau.nts:.U.s
u.,. a., _.. .}'h',.., t 3 '>' .� r' .>� t• ; :.
.w O. ... .. Y .,
.....
im .. <.'xe.
A`Y qe,>n+ .rT *. ,a. - ...sS.v �..,lA.. - u+,+4....w¢Ay4!S,vJ4.. A,.sK.:.:c.::Cetx,_ _.,:a>_., ✓_ .
O Line Integrity Testing
.v.
.....
"All
.,....bs
....
t
.,...
-_/
„ ....."
.'
..
.. .. ... .
❑51
SW pressurized piping: annual 0.1 gph line integrity test or a
monthly 0.2 gph line integrity test is performed properly. 40 CFR
RD
RD
RD
RD,
3
280.41, 280.44; T23 CCR 2643(c) (4,Q)
052
SW conventional suction system: 0.1 gph line integrity test is
performed every three years. 40 CFR 280.40,280.41; T23 CCR 2643(d)
RD
RD
_RD
RD
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
0 n'
S i Observation. of Periodic Testin
_
74 Spill- bucket testing conducted appropriately and a passing test El
achieved.
075 Secondary Containment testing conducted appropriately and a
passing test achieved.
SOC AND RED TAG
Item
# ( Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
�� rh
. 9 A fi'us' s ��� F 8 �� •z 8 iE '
��ib \Own— �lL�w.�
a. This facility is in compliance with Release Detection (RD) requirements only. (No
violations in boxes marked RD, but one or more in boxes marked RP.)
❑
b. This facility is in compliance with Release Prevention (RP) requirements only. (No
violations in boxes marked RP, but one or more in boxes marked RD.)
❑
c. This facility is in compliance with BOTH Release Detection (RD) and Release
❑
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
❑
and RP.)
a-77
A Red Tag was issued to this facility based on the results of this inspection.
❑
Red Tag #
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2797(a)(1)
❑
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2797(a)(2)
❑
3. Chronic violation or committed by a recalcitrant violator. CCR 2797(a)(3)
❑
Item
# ( Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979