HomeMy WebLinkAbout13001 stockdale inspector report 9-12-13Facility Name: Date of Inspection:
.-/
Mobil Stockdale Time In: T & O
Address. Inspected by: Esther Duran
13001 Stockdale Hyyy. Bakersfield, CA. 93312 ICC# 5296325 -UI
Contact: T e of Inspection:
Annual Compliance ❑Re- inspection ❑ Complaint
Fonig Chao
Phone:
661) 204 -7966
Permission for Inspection Granted by:
Tank ID
#1
#3
Size
10,000
10 0.00
10,000
Contents
REG
PREM . "
DSL
Construction
DWF
DWF
DWF
DWF
Tank Monitoring:
DW: Continuous Interstitial Monitoring
❑ Brine /H drostat is ❑ Vacuum /Pressure.
SW: SIR and Line Test every 2 years.
El
❑ .
❑
❑
SW: ATG 0.1 annual
❑
❑�
❑'�-
SW: ATG 0.2 monthly.
❑
❑:
❑'❑
.
SW: Continuous In -Tank Leak Detection (CITLD).
El
❑,°
❑`
❑
SW: Tank Gauging.
❑
❑�''�
❑.0.
SW: Vadose /GW Monitoring.
❑❑
.,
❑
❑
Other Description:
❑
0
❑
❑
PipIing Monitoring
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
❑
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto - shutdown and Failsafe.
❑
DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc.
El
El
.
SW Conventional Suction: Triennial 0.1 gph line test., and daily
❑
❑
❑
❑
monitoring.
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
❑
❑
❑
LLD with Auto - Shutdown.
❑❑
❑
❑ �
SW or DW Safe Suction.
-
SW: Vadose Zone or GW Monitoring.
❑❑
❑
=AEI
DW or SW: Gravity Flow Pipe.
❑
❑❑
Other Description:
❑
❑
❑❑
�'
References to the Health and Safetv Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or ae relevant to a specrnc comp lance aeLerrnniduUi►.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class II, or Class I, or To
Violations
Determined (TBD) if uncertain and will be determined
later.
F■ . �L.x y" < ' � :xd � 9'.: "iiF`ia �u'Y
—
�
�'
3 .
F " i9e...
d r.
.
C✓1
File R01ew 1
❑ 1
UST Permit to O erate Is Current. HSC 25284(x), 25299(x)(1) 25299 (b)(1)
❑
17712
Transfer of permit and /or change of information provided within
30 days of ownership /information changes. HSC 25284(b) (c); T23
CCR 2712(d)
3
UST form information current/correct for facility, including BOE
❑
number. HSC 25286(x)
4
Fees are paid up -to -date. HSC 25285(c), 25287
❑
5
Monitoring Plan approved for current owner with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
)56
Current Emergency Response Plan submitted with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
;97
Plot Plan /Site Map submitted with appropriate content and
❑
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
❑ 8
Owner /Operator agreement submitted, if required. HSC 25284(a)(3)
❑ 9
Certification of Compliance and Designated Operator
El
a/E s '`�•`
Certification submitted by_ current tank owner. T23 CCR 2715
10
Certificate of. Financial Responsibility submitted and is current
for the permit period. HSC 25292.2, 25299.30- 25299.34; T23 CCR 2711; 2808.1;
❑
2809 - 2809.2
11
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. Hsc
25284.1 a (4 )(c ; T23 CCR 2638
� 12
Spill- bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
13
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
❑
passing results. 40 CFR 280.40(a)(2), 280.43(g)(1) &(2), 280.44(a); HSC 25292(e);
T23 CCR 2638, 2641 '
'>-4.14
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
❑
a passing test. HSC 25284.1(a)(4)(8); T23 CCR 2637(a)
015
Pipe and /or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 26360,
2643 b (3 , (c)(3), d e
❑16
Repaired tanks /piping are tightness tested within 30 days of
RD
RD
RD
RD
,1
the repair. 40 CFR 280.33, T23 CCR 2661
017
ELD test conducted within allowable time frame. Most recent
test results submitted and passing results achieved. T23 CCR
2644.1
❑18
The corrosion protection system is checked by a corrosion
specialist within six months of installation /repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP
adequate. Impressed current inspected every 60- calendar
days. 40 CFR 280.31, 280.70; T23 CCR 2635(x)(2)
019
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(1)(f,);
RP
RP
RP
RP
T23 CCR 2663(h)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
Facility Name:
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
C✓f H
On Site l eview
This Ins p ection is being conddcted during the annual
monitoring certification ES o NO
The service technicia s provided /CC Certification and
RP
RP
tester's license or works under a CSLB contractor's license.
L7 YES O NO
a`.Y.r ..
RD
RD
RP
RP
RP
RP
Tank systems meet current construction standards as required
for type of system. HSC 25288
Hazardous substance tanks have secondary containment. 40
RD
RD
RD
RD
RD
RD
3
k!operating
Monitor console programmed appropriately for monitoring
option used. T23 CCR 2638, 2643, 2643.1
yyi
RD
l
RD
RD
RD
ti�X1rI',n �
P N'xrv4Tf'
according to type: ❑Flapper valve ❑ Audible- visual alarm
RD
RD
RD
RD
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
C✓f H
On Site l eview
This Ins p ection is being conddcted during the annual
monitoring certification ES o NO
The service technicia s provided /CC Certification and
manufacturers training documentation, and possesses a tank
tester's license or works under a CSLB contractor's license.
L7 YES O NO
a`.Y.r ..
�W'• -w. xeu'°is"E'. 'Y,c fin1�k'y Fm'r a�p§anenGs.°'' s M fo...,,J r 8 r rn#a xg ka, ? a / d qMi o"Dno#shrL tonh �
Z0.4 o rnS g Y
.
07"
General x
Tank systems meet current construction standards as required
for type of system. HSC 25288
Hazardous substance tanks have secondary containment. 40
CFR 280.42(b); T23 CCR 2631
022
Electronic monitoring system has audible and visual alarm in
Condition. T23 CCR 2632, 2634, 2636
3
k!operating
Monitor console programmed appropriately for monitoring
option used. T23 CCR 2638, 2643, 2643.1
❑24
Tank systems in temporary closure meet requirements. 40 CFR
280.70; T23 CCR 2670 & 2671
025
Overfill Prevention mechanism present and operational
according to type: ❑Flapper valve ❑ Audible- visual alarm
❑ball float. ❑ AN alarm and Ball Float 40 CFR 280.20(c)(1)(ll),
280.21(d); T23 CCR 2635(b)(2), 2631 d 4
6
Spill prevention device is present and functional (in good
condition and drain mechanism operational if applicable). 40 CFR
280.20 c 1 1, 280.21 d ; T23 CCR 2635 b (1); 2665
027
Piping and piping penetration boots within sumps /UDC are in
d condition. HSC25288(a), 25292.1 1
oo
k8jAII
sumps, spill buckets, and UDC's free from debris and liquid.
HSC 25291(e), 25290.1, 25290.2; T23 CCR 2635(b)(1)(C)
❑29
Areas around vents appear to be free from signs of liquid
releases. HSC 25288(a), 25290.1, 25290.2, 25295.5
Release Detection methods are present and meet performance
standards. See LG -113. 40 CFR 280.40(a)(3)
1
All sensors are correct for the type of system and operational.
40 CFR 280.40 a 2 , 280.43 (g) (1)&(2); HSC 25290.1(e ), 25290. 2, 25291; T23 CCR 2638
2
All sensors are located in the proper position /location. 40 CFR
280.40(x)(2), 280.43(8)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
2632 (c);2 641 a
All secondary containment, including UDC shall be equipped
_
with a continuous monitoring system that either activates an
AN alarm or stops the flow of product at the dispenser when it
detects a leak. cR 2s3s (i)(1)
Tank Monitoring
4�{'S2Ybr':'T Tf,rt
zJYw'�"f- 'fa,a.. a.�.
❑ Interstitial monitoring conducted properly. 40 CFR 280.40(a)(2),
034
280.43 1 & 2 ; T23 CCR 2632 (c)(2); 2634 d 1
❑35
❑ VPH monitoring conducted properly. HSC 25290.1
Y
O SIR
036
SIR and Biennial 0.1 gph tank test performed properly. 40 CFR
280.41, 280.43, T23 CCR 2643, 2646.1
037
Non - passing SIR monitoring report results are reported and
Investigated properly. 40 CFR 280.41(x), 280.43(h)(1),(2); T23 CCR 2646.1
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
Y
a
f
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection CITLD
038
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
RD
RD
RD
RD..
280.43; T23 CCR 2643(4)(1), 2643 b 5
�439
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
❑
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643(b)(9
O Manual Tank Gauging (SW tanks </ =1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43;
RD
RD
RD
RD
T23 CCR 2645
041
Tank I ntegrity test performed, if necessary. 40 CFR 280.43; T23 CCR
RD
RD
RD
RD
INC
2645
O Vadose Zone and/or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2647 -48
*Tank Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
monitoring records are kept up-do-date. HsC 25283.5
p a Monitorin
> w
.��.. .a �.
+' r ro a .. .. .. .v ", n v . " „S
z .y., .. ... ,. :+.tx...:f.1'i. f <. 1. 1. T. �.. .. r.:. _... . ,.�:..
'°R 4'f .�.T , c.. ,�. ri �4. .:; d ,.:: . >;, h -. .4
:...�.,
.. 1.
...... d.
,� a ..
>v �:. "•n.
Sf t
- -,.hk .1
.. ;5' „
'� .-n4...
� -...
�.a „%
,•
a, �,. m.. : r.
✓,is �.. 'S?r' ..s ..Kf. 1.... r, .. .k3.:. ...
. .t*'t.s"
O Continuous Monitoring System
❑44
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
RD
RD
RD
RD
❑
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 9
❑45
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
❑
activates an AN alarm. T23 CCR 2636(0(9)
O Line Integrity Testing for Pressurized Piping
046
An annual 0.1 gph line integrity test is performed properly.
(Either third party or by Enhanced Line Leak Detection) T23 CCR
RD
RD
RD
RD
❑
2636 (0(4)
047
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
RD
RD
RD
❑
detected and the monitoring system shuts down the pump or
RD
flow restriction occurs when a leak is detected in the UDC. T23
CCR 2636(0(5)
O Line Leak Detectors (LLD)
048
LLD's installed, annually tested, and operational on DW
pressurized piping that detects a 3.0 -gph leak, and restricts or
RD
RD
RD
RD
❑
shuts off flow of product. T23 CCR 2636(0(2)
O DW Emergency Generator Tank
❑49
LLD activates AN alarm and monitoring system is checked
RD
RD
RD
RD
daily. T23 CCR 2636(0(2)
❑50
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
and logs are kep t. T23 CCR 2636 (0(6)
.. r...
...
__
". 'A. .n _::, .. ..�. .'.4'v
.. . ,. ,.. - :..�
.'. �r
,.. ..�. ,..�
y
�
,rv. k
d`. YU
s ,.LL.
✓ at`. .. k , f !fu. ..
. ..Y..,u,
_» .. .. ,.{. ... ���..
,.a'
* Line Integrity Testing
051
SW pressurized piping: annual 0.1 gph line integrity test or a
monthly 0.2 gph line integrity test is performed properly. 40 CFR
RD
RD
RD
RD
280.49, 280.44; T23 CCR 2643(c)(2),(3)
❑52
SW conventional suction system: 0.1 gph line integrity test is
RD
RD
RD
1
RD
performed every three years. 40 CFR 280.40,280.41; T23 CCR 2643(d) 11
1
1
JEL
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility dame: Date:
❑53 SW conventional suction system: inspections conducted for
presence of air in the pipeline. Daily monitoring records are
kept. T23 CCR 2643(d)
054 SW gravity flow piping: biennial 0.1 gph integrity test or overfill
tank integrity test is conducted within allowable time frames.
T23 CCR 2643(e)
O Safe Suction (SS) System
055 Piping meets the SS requirements. 40 CFR 280.41; T23 CCR 2636(a)(3) RD RD RD RD
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
O LLD for Pressurized Piping
056
LLD's installed, annually tested and operational on SW
pressurized piping. Pump shuts down when a leak occurs and
RD
RD
RD
RD
when the LLD fails or is disconnected. T23 CCR 2666
057
LLD's installed, annually tested, and operational on SW
emergency generator systems; LLD is connected to an AN
alarm. 40 CFR 280.40(a)(2), 280.43(g)(1), (2), 280.44(a); T23 CCR 2666
CorrosIon4 Protection
058
Metal Tanks and piping components have corrosion protection,
RP
RP
RP
RP
or are isolated from the backfill. 40 CFR 280.20, 280.21
059
Corrosion protection equipment turned on, functioning properly
and provides continuous protection. 40 CFR 280.31(a),(b)(1); T23 CCR
RP
RP
RP
RP
2635
060
Cathodic protection system is tested within 6 months of
installation and then every 3 years. 40 CFR 280.31(a) & (b)(1); T23 CCR
RP
RP
RP
RP
2635(a)(2)__
17161
Impressed current systems checked every 60- calendar days
RP
RP
RP
RP
and records are up-to-date. 40 CFR 280.31(c); T23 CCR 2635(a)(2)
On =site P,.a erwork
2
Permit and conditions available on -site. Facility is operated
according to permit and conditions. HsC 25293; 25299; T23 CCR 2712(i)
Monitoring and response plans are on -site and are the
approved version. T23 CCR 2712(1); 2632;2634; 2641
4
Site plan depicts current site conditions and has all required
elements. T23 CCR 2632(d)
5
All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection
RD
RD
RD
RD
method. 40 CFR 280.41, 280.45
6
All monitoring /testing records /documents are available for the
required timeframe. (3 years, 6 Y2 years, five years, life of tank) T23 CCR
Af
2712
67
Equipment maintenance records/logs available. T23 CCR 2712(b)
8
Alarm logs /tapes available and appropriate follow -up actions
occurred. T23 CCR 2712(b); 2632; 2634
9
Visual observation logs available, up -to -date, and appropriate
follow-up actions to problems occurred. T23 CCR 2712(b); 2642
0
Designated UST Operator monthly reports available and
complete. T23 CCR 2715
Employee training records available and training appropriate
EA71
"
and up -to -date. T23 CCR 2715
072
Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non-
RD
RD
RD
RD
passing test results. Leak and Spill Logs available. 40 CFR 280.50;
T23 CCR, 2650, 2652
3
Financial Responsibility Certificate and mechanisms (CFO
Letter, etc.) on -site and up -to -date. HsC 25292.2, 25299.30 - 25299.34; T23
CCR 2711: T23 2808.1; 2809 - 2809.2
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
074 Spill- bucket testing conducted appropriately and a passing test ❑
achieved.
075 Secondary Containment testing conducted appropriately and a ❑
passina test achieved.
SOC AND RED TAG
a. This facility is in compliance with Release Detection (RD) requirements only. (No El
violations in boxes marked RD, but one or more in boxes marked RP.)
b. This facility is in compliance with Release Prevention (RP) requirements only. (No El
violations in boxes marked RP, but one or more in boxes marked RD.)
c. This facility is in compliance with BOTH Release Detection (RD) and Release El
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
and RP.)
A Red Tag was issued to this facility based on the results of this inspection.
Red Tag #
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2717(a)(1) E]
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2717(a)(2) El
3. Chronic violation or committed by a recalcitrant violator. CCR 2717(x)(3) ❑
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979