HomeMy WebLinkAbout13004 stockdale inspector report 3-29-13Facility Name:
t®cale Chevron
Address:
13004 Stockdale Hwy. Bakersfield, CA. 93312
Contact:
Kheng Chao
Phone:
Date of In7-,--g- ection�"�
Time In: [U, U' ti C)O I Time Out:
Inspected by: Esther Duran
ICC# 5296325 -UI
Type of Inspection:
Annual Compliance ❑Re- inspection ❑ Complaint
Permission for Inspection Granted by:
(6611331-1732 (24 hr.)
Tank ID
Size
Contents
Construction
TankMonitoring.
DW: Continuous Interstitial Monitoring
)ry ❑ Brine/Hydrostatic ❑ Vacuum /Pressure.
SW: SIR and Line Test every 2 years.
SW: ATG 0.1 annual.
SW: ATG 0.2 monthly.
SW: Continuous In -Tank Leak Detection (CITLD).
SW: Tank Gauging.
SW: Vadose /GW Monitoring.
Other Description:
Piping Monitoring -a �
DW Suction: Continuous Interstitial at UDC and Tank Sump.
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto - shutdown and Failsafe.
DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc.
SW Conventional Suction: Triennial 0.1 gph line test., and daily
monitoring.
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
LLD with Auto - Shutdown.
SW or DW Safe Suction.
SW: Vadose Zone or GW Monitoring.
DW or SW: Gravity Flow Pipe.
Other Description:
#1
#2.
#3
44
127000
20,000
"20')0,00
REG.
MID .�..
PREM.
DSL
DWF SC
DWF =SC !
DWF SC
DWF SC
❑
El
❑
❑
El
❑
El
❑l�
El
❑
❑
�",.. ..
❑
El
❑
❑
El
❑
El
Ell
El
1D
El
El
El
❑
0
❑
❑
❑
E:]
Y�l
(' ❑�
E]
El
❑
❑
❑
❑
[�
❑
F-1
❑
❑
❑
❑
❑
❑
❑
El
"❑
`' ❑
❑
❑
❑
❑
References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
a
v
- n Site Review
This Inspection is being conducted during the annual
monitoring certification. O YES ONO
The service technician has provided ICC Certification and
manufacturers training documentation, and possesses a tank
tester's license or works under a CSLB contractor's license.
L7 YES O NO
x r
0 FA r�x z
ank/�prrg Components;[ Monitoring antl Mon�tor�ng y
r�
4 ur rnent� A,. w
General
❑20
Tank systems meet current construction standards as required
for typ e of system. HSC 25288
❑21
Hazardous substance tanks have secondary containment. 40
CFR 280.42(b); T23 CCR 2631
❑22
Electronic monitoring system has audible and visual alarm in
operating condition. T23 CCR 2632, 2634, 2636
023
Monitor console programmed appropriately for monitoring
option used. T23 CCR 2638, 2643, 2643.1
1:124
Tank systems in temporary closure meet requirements. 40 CFR
280.70; T23 CCR 2670 & 2671
025
Overfill Prevention mechanism present and operational
according to type: ❑Flapper valve ❑ Audible- visual alarm
❑ball float. ❑ AA/ alarm and Ball Float 40 CFR 280.20(0)(1)(11),
280.21 d ; T23 CCR 2635(b)(2), 2631 d 4
026
Spill prevention device is present and functional (in good
condition and drain mechanism operational if applicable). 40 CFR
280.20(c )(1 )(l , 280.21(d); T23 CCR 2635(b)(1);2665
027
Piping and piping penetration boots within sumps /UDC are in
good condition. HSC 25288(x), 25292.1
028
All sumps, spill buckets, and UDC's free from debris and liquid.
HSC 25291(e), 25290.1, 25290.2, T23 CCR 2635(b)(1) (Q)
029
Areas around vents appear to be free from signs of liquid
releases. HSC 25288(8), 25290.1, 25290.2, 25295.5
030
Release Detection methods are present and meet performance
standards. See LG -113. 40 CFR 280.40(x)(3)
031
All sensors are correct for the type of system and operational.
40 CFR 280.40 a 2 , 280.43( 1 & 2 ; HSC 25290.1 e , 25290.2, 25291; T23 CCR 2638
32
All sensors are located in the proper position /location. 40 CFR
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
2632(c); 2641 a
033
All secondary containment, including UDC shall be equipped
with a continuous monitoring system that either activates an
A/V alarm or stops the flow of product at the dispenser when it
detects a leak. T23 CCR 2636 (0(1)
Tank Monitoring
g Interstitial monitoring conducted properly. 40 CFR 280.40(x)(2),
V34
280.43 1 & 2 ; T23 CCR 2632 (c)(2); 2634 d 1
035
❑ VPH monitoring conducted py. roper) . HSC 25290.1
O SIR
036
SIR and Biennial 0.1 gph tank test performed properly. 40 CFR
280.41, 280.43, T23 CCR 2643, 2646.1
037
Non - passing SIR monitoring report results are reported and
Investigated properly. 40 CFR 280.41(a), 280.43(h)(1),(2); T23 CCR 2646.1
RP 1 RP 1 RP I RP I
RD 1 RD I RD I RD I
®®®®
mmmm
Wo men
ommm
WOMMM
v
D
D
D
e
In
I"
D
D
D
n
ir■n
On
Lea 2S' i"l�
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
ry - s Y
"
T
E
r r
¢
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection ( CITLD
038
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2643(b)(1), 2643 b 5
` Z9
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
El
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643 b 1
O Manual Tank Gauging (SW tanks </ =1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43;
RD
RD
RD
RD
T23 CCR 2645
041
Tank Integrity test performed, if necessary. 40 CFR 280.43; T23 CCR
RD
RD
RD
RD
2645
O Vadose Zone and/or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40CFR
RD
RD
RD
RD
280.43, T23 CCR 2647 -48
OTan.k Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
monitoring records are kept up-do-date. HSC 25283.5
Pi a °Monitorin'
r :
.;.
O Continuous Monitoring System
4
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
RD
RD
RD
RD
❑
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 (0(1)
745
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
❑
activates an AN alarm. T23 CCR 2636(1)(1)
O Line Integrity Testing for Pressurized Piping
046
An annual 0.1 gph line integrity test is performed properly.
RD
RD
RD
RD
(Either third party or by Enhanced Line Leak Detection) T23 CCR
2636 (0(4)
15Z47
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
RD
❑
detected and the monitoring system shuts down the pump or
RD
RD
RD
flow restriction occurs when a leak is detected in the UDC. T23
CCR 26360 (5)
O Line Leak Detectors (LLD)
048
LLD's installed, annually tested, and operational on DW
pressurized piping that detects a 3.0 -gph leak, and restricts or
RD
RD
RD
RD
❑
shuts off flow of product. T23 CCR 2636(1)(2)
O DW Emergency Generator Tank
049
LLD activates AN alarm and monitoring system is checked
RD
RD
RD
RD
daily. T23 CCR 2636(1)(2)
❑50
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
and logs are kept T23 CCR 2636 (0(6)
.l. .._
£.. .i .i`.'.. .. [ .. .. a.... ....v _. .: - _...
.,..
..:.._.
ter.. _
.._.. w
e.. .. _...,. .. S .. .. -._
Nil S kit :> .ftx
O Line Integrity Testing
0151
SW pressurized piping: annual 0.1 gph line integrity test or a
monthly 0.2 gph line integrity test is performed properly. 40 CFR
RD
RD
RD
RD
280.41, 280.44; T23 CCR 2643(c)(2),(3)
052
SW conventional suction system: 0.1 gph line integrity test is
RD
RD
RD
1
RD
F-kT
performed every three years. 40 CFR 280.40 280.41; T23 CCR 2643(d) 11
1
1
j
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
053 SW conventional suction system: inspections conducted for
presence of air in the pipeline. Daily monitoring records are
kept. T23 CCR 2643(d)
❑54 SW gravity flow piping: biennial 0.1 gph integrity test or overfill
tank integrity test is conducted within allowable time frames.
T23 CCR 2643 e
O Safe Suction (SS) System
055 Piping meets the SS requirements. 40 CFR 280.41; T23 CCR 2636(a)(3) RD RD RD I RD
O LLD for Pressurized Piping _
056 LLD's installed, annually tested and operational on SW
pressurized piping. Pump shuts down when a leak occurs and RD RD RD RD
when the LLD fails or is disconnected. T23 CCR 2666
1357 LLD's installed, annually tested, and operational on SW
emergency generator systems; LLD is connected to an AN
alarm. 40 CFR 280.40(a)(2), 280.43(g) (1), (2), 280.44(a); T23 CCR 2666
Corrosion "Protection -; ,
❑58 Metal Tanks and piping components have corrosion protection,
RP RP RP RP
or are isolated from the backfill. 40 CFR 280.20, 280.21
059 Corrosion protection equipment turned on, functioning properly
and provides continuous protection. 40 CFR 280.3 1 (a), (b)(1); T23 CCR RP RP RP RP
2635
❑60 Cathodic protection system is tested within 6 months of
installation and then every 3 years. 40 CFR 280.31(x) & (b)(1); T23 CCR RP RP RP RP
061 Impressed current systems checked every 60- calendar days
and records are u -to -date. 40 CFR 280.31(c) T23 CCR 2635(a) (2)
On, site Pa erwork
A, Permit and conditions available on -site. Facility is operated
according to permit and conditions. HSC 25293,,25299; T23 CCR 2712(1)
Monitoring and response plans are on -site and are the
approved version. T23 CCR 2712(►); 2632 ;2634; 2641
4 Site plan depicts current site conditions and has all required
elements. T23 CCR 2632(d)
065 All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection
method. 40 CFR 280.41, 280.45
6 All monitoring /testing records /documents are available for the
required timeframe. (3 years, 6 Y2 years, five years, life of tank) T23 CCR
2712
7 Equipment maintenance records /logs available. T23CCR2712(b)
68 Alarm logs /tapes available and appropriate follow -up actions
occurred. T23 CCR 2712(b); 2632; 2634
69 Visual observation logs available, up -to -date, and appropriate
follow-up actions to problems occurred. T23 CCR 2712(b); 2642
0 Designated UST Operator monthly reports available and
IN
complete. T23 CCR 2715
71 Employee training records available and training appropriate
and up-to-date. T23 CCR 2715
❑72 Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non -
passing test results. Leak and Spill Logs available. 40 CFR 280.50;
T23 CCR, 2650, 2652
3 Financial Responsibility Certificate and mechanisms (CFO
Letter, etc.) on -site and up -to -date. HSC 25292.2, 25299.30 - 25299.34; T23
CCR 2711; T23 2808.1; 2809 - 2809.2
RP I RP I RP I RP
N.M Elam tOOR■
mm OEM SEE
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
❑74 Spill- bucket testing conducted appropriately and a passing test Fl
achieved.
075 Secondary Containment testing conducted appropriately and a
passing test achieved.
SOC AND RED TAG
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
oo�:e�J-'cne era= III ase .
yW.ftre,sb...+wve: S .5:wlaa�ac:v 5,'es%.wdM:i: 41 �ir.w'�,L'-
a. This facility is in compliance with Release Detection (RD) requirements only. (No
-
violations in boxes marked RD, but one or more in boxes marked RP.)
❑
b. This facility is in compliance with Release Prevention (RP) requirements only. (No
violations in boxes marked RP, but one or more in boxes marked RD.)
❑
c. This facility is in compliance with BOTH Release Detection (RD) and Release
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
❑
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
❑
and RP.)
a
^E R � BONN.
* .. K.. ;. .. .
.. .
A Red Tag was issued to this facility based on the results of this inspection.
Red Tag #
❑
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2717(a)(1)
❑
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2717(x)(2)
❑
3. Chronic violation or committed by a recalcitrant violator. CCR 2717(a)(3)
❑
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979