HomeMy WebLinkAbout7851 rosedale inspector report 6-24-13Facility Name:
Arco AM/PM Rosedale Plaza Groui
Date of Inspection: c12411 -
Time In: ( Time Out:
Inspected by: Ernie Medina
7851 Rosedale Hwy. Bakersfield, CA. 93308 lCC# 8012428 -Ul
Contact: Type of Inspection:
Annual Compliance ❑Re- inspection ❑ Complaint
Victor J. Supertino
Phone: Permission for Inspection Granted by: .�
(661) 588 -0557
LW
(661) 301 -2132 (24hr.)
Tank ID
#1
4
#3
#4
Size
10,000
20:1,000'
121 000
Contents
REG
REG
PREMDSL`'
Construction
DWF
DWF_ '
DWF
DWF
Tank„Monitoring
DW: Continuous Interstitial Monitoring
D re /H d r static ❑ Vacuum /Pressure.
91
SW: SIR and Line Test every 2 years.
❑
Ell
El
SW: ATG 0.1 annual.
❑
❑
❑
SW: ATG 0.2 monthly.
❑
❑ '
❑
❑ -'
SW: Continuous In -Tank Leak Detection (CITLD).
❑
❑
❑
❑
SW: Tank Gauging.
❑
❑
❑
SW: Vadose /GW Monitoring.
El
0
❑❑
-
Other Description:
❑
❑
❑
Piping Monitoring:
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
❑
❑
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto - shutdown and Failsafe.
DW VPH Monitoring: In- cludes lines, sumps, fill pipe, vapor lines, etc.
❑
❑
❑
SW Conventional Suction: Triennial 0.1 gph line test., and daily
monitoring.
❑
❑
❑
.
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
LLD with Auto - Shutdown.
SW or DW Safe Suction.
❑
❑
E
E
❑
❑
El
SW: Vadose Zone or GW Monitoring.
❑
❑
❑
DW or SW: Gravity Flow Pipe.
El
El
❑❑
Other Description:.
❑
� ❑
❑
❑`
References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name:
Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
❑53
SW conventional suction system: inspections conducted for
presence of air in the pipeline. Daily monitoring records are
kept. T23 CCR 2643(d)
054
SW gravity flow piping: biennial 0.1 gph integrity test or overfill
tank integrity test is conducted within allowable time frames.
T23 CCR 2643(e)
O Safe Suction (SS) System
❑55
Piping meets the SS requirements. 40 CFR 280.41; T23 CCR 2636(x)(3)
RD
RD
RD
RD
A -D
O LLD for Pressurized Piping
056
LLD's installed, annually tested and operational on SW
pressurized piping. Pump shuts down when a leak occurs and
RD
RD
RD
RD
when the LLD fails or is disconnected. T23 CCR 2666
❑57
LLD's installed, annually tested, and operational on SW
emergency generator systems; LLD is connected to an AN
alarm. 40 CFR 280.40(a)(2), 280.43(g)(1),(2), 280.44(a); T23 CCR 2666
Corrosion I Protecfion
058
Metal Tanks and piping components have corrosion protection,
RP
RP
RP
RP
or are isolated from the backfill. 40 CFR 280.20, 280.21
❑59
Corrosion protection equipment turned on, functioning properly
RP
RP
RP
RP
and provides continuous protection. 40 CFR 280.31(a),(b)(1); T23 CCR
2635
060
Cathodic protection system is tested within 6 months of
installation and then every 3 years. 40 CFR 280.31(x) & (b)(1); T23 CCR
RP
RP
RP
RP
2635 a 2
❑61
Impressed current systems checked every 60- calendar days
RP
RP
RP
RP
and records are up-to-date. 40 CFR 280.31(0); T23 CCR 2635(x)(2)
On- site;;Pa erwoik
62
Permit and conditions available on -site. Facility is operated
according to permit and conditions. HsC 25293; 25299; T23 CCR 2712(1)
3
Monitoring and response plans are on -site and are the
❑
approved version. T23 CCR 2712(1); 2632,"2634,,2641
�K64
Site plan depicts current site conditions and has all required
❑
elements. T23 CCR 2632(d)
65
All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection
RD
RD
RD
RD
❑
method. 40 CFR 280.41, 280.45
066
All monitoring /testing records /documents are available for the
required timeframe. (3 years, 6'/2 years, five years, life of tank) T23 CCR
T'
❑
2712
67
Equipment maintenance records/logs available. T23 CCR 2712(b)
❑
8
Alarm logs /tapes available and appropriate follow -up actions
El
occurred. T23 CCR 2712(b); 2632; 2634
169
Visual observation logs available, up -to -date, and appropriate
❑
follow -u actions to problem s occurred. T23 CCR 2712(b); 2642
0
Designated UST Operator monthly reports available and
❑
com Iete. T23 CCR 2715
JR71
Employee training records available and training appropriate
❑
and u -to -date. T23 CCR 2715
072
Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non-
RD
(±D
RD
RD
❑
passing test results. Leak and Spill Logs available. 40 CFR 280.50;
T23 CCR, 2650, 2652
3
Financial Responsibility Certificate and mechanisms (CFO
Letter, etc.) on -site and up -to -date. HsC 25292.2, 25299.30- 25299.34; T23
El
CCR 2711; T23 2808.1; 2809 - 2809.2
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class II, or Class I, or To
Violations
Be Determined (TBD) if uncertain and will be determined
later.
C
4
s
File - Review
1
UST Permit to Operate is current. HSC 25284(x), 25299(x)(1) 252.9.9 (b)(1)
❑
❑ 2
Transfer of permit and /or change of information provided within
30 days of ownership /information changes. HSC 25284(b) (d); T23
CCR 2712(d)
3
UST form information current/correct for facility, including BOE
El
number. HSC 25286(a)
4
Fees are paid up -to -date. HSC 25285(c), 25287
❑
5
Monitoring Plan approved for current owner with appropriate
El
content and level of detail. T23 CCR 2632(4), 2634 (d), 2641(h)
6
Current Emergency Response Plan submitted with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
":7'7
Plot Plan /Site Map submitted with appropriate content and
E]
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
❑ 8
Owner /Operator agreement submitted, if required. Hsc 25284(x)(3)
9
Certification of Compliance and Designated Operator
❑
Certification submitted by current tank owner. T23 CCR 2715
10
Certificate of Financial Responsibility submitted and is current
for the permit period. HSC 25292.2, 25299.30- 25299.34; T23 CCR 2711; 2808.1;
❑
2809 - 2809.2
11
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. Hsc
25284. 1 a 4 c ; T23 CCR 2638
12
Spill- bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
13
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
❑
passing results. 40 CFR 280,40(a)(2), 280.43(g)(1) &(2), 280.44(a); HSC 25292(e);
T23 CCR 2638, 2641 6)
14
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
❑
a passing test. HSC 25284.1(a)(4)(8); T23 CCR 2637(a)
015
Pipe and /or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 2636(f),
2643(b)(3), (c)(3), d) e)
016
Repaired tanks /piping are tightness tested within 30 days of
RD
RD
RD
RD
the repair. 40 CFR 280.33, T23 CCR 2661
F-1 17
ELD test conducted within allowable time frame. Most recent
test results submitted and passing results achieved. T23 CCR
2644.1
018
The corrosion protection system is checked by a corrosion
specialist within six months of installation /repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP
adequate. Impressed current inspected every 60- calendar
days. 40 CFR 280.31, 280.70, T23 CCR 2635(a)(2)
019
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(1)(ii,);
RP
RP
RP
RP
T23 CCR 2663(h)
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
-, UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
This Inspection is being conducted during the annual
monitoring certification. L7 YES XNO
The service technician has provided ICC Certification and
manufacturers training documentation, and possesses a tank
tester's license or works under a CSLB contractor's license.
AYES ONO
I20 Tank systems meet current construction standards as required
for type of system. HSC 25288
1 Hazardous substance tanks have secondary containment. 40
CFR 280.42(b); T23 CCR 2631
2 Electronic monitoring system has audible and visual alarm in
operating condition. T23 CCR 2632, 2634, 2636
3 Monitor console programmed appropriately for monitoring
option used. T23 CCR 2638, 2643, 2643.1
❑24 Tank systems in temporary closure meet requirements. 40 CFR
280.70; T23 CCR 2670 & 2671
;925 Overfill Prevention mechanism present and operational
according to type: ❑Flapper valve Audible- visual alarm
❑ball float. ❑ AA/ alarm and Ball Float 40 CFR 280.20(c)(1)(ll),
280.21(d); T23 CCR 2635(b)(2), 2631 d (4
6 Spill prevention device is present and functional (in good
condition and drain mechanism operational if applicable). 40 CFR
280.20 c 1 1, 280.21(d); T23 CCR 2635(b)(1);2665
27 Piping and piping penetration boots within sumps /UDC are in
ood condition. HSC 25288(x), 25292.1
8 All sumps, spill buckets, and UDC's free from debris and liquid.
HSC 25291(e), 25290,1, 25290.2, T23 CCR 2635(B)(1)(C)
9 Areas around vents appear to be free from signs of liquid
releases. HSC 25288(a), 25290,1, 25290, 2, 25295.5
(5630 Release Detection methods are present and meet performance
standards. See LGA 13. 40 CFR 280.40(a)(3)
)31 All sensors are correct for the type of system and operational.
40 CFR 280.40(a )(2 , 280.43(g)(1)&(2); HSC 25290.1 e , 25290.2, 25291; T23 CCR 2638
)ilK All sensors are located in the proper position /location. 40 CFR
280.40(a)(2), 280.43(8)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
2632(c);2641(a)
,003 All secondary containment, including UDC shall be equipped
with a continuous monitoring system that either activates an
AN alarm or stops the flow of product at the dispenser when it
detects a leak. T23 CCR 2636 (0(1)
Interstitial monitoring conducted properly. 40 CFR 280.40(x)(2),
280 43(g)(1) &(2); T23 CCR 2632 (c)(2); 2634(d)(1)
b4-VPH monitoring conducted properly. HSC 25290.1
O SIR
036 SIR and Biennial 0.1 gph tank test performed properly. 40CFR
280.41, 280.43, T23 CCR 2643, 2646.1
037 Non - passing SIR monitoring report results are reported and
investigated properly. 40 CFR 280.41(a), 280.43(h)(1),(2); T23 CCR 2646.1
RP I RP I RP I RP
RDIRD IRD IRD
RP I RP I RP I RP
RP I RP I RP 1 RP I
RD I RD I RD I RD
RD I RD I RD I RD
mmm
RD I RD I RD RD
-^?. i "zi i C vlH
Lve�.'x5P/!M u �ki'ssmrxivx+ld r,1� pryc`..ucll
WWWW
mm��►1�
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
9
i
o ve
4a` n.. zf., u "a'`('�r..;s,_.,...�..},k_..,L,
❑
Asa.
,rJ
sx.a.�w:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
9
i