HomeMy WebLinkAbout9600 brimhall inspector repoer 4-30-13UNIFIED PROGRAM INSPECTION CHECKLIST
k
Underground Storage Tank Program 0
z
Facility Name:
7- Eleven #32376
Address:
Shasik & Veena Kamboj
Phone:
I. .
BAKERSFIELD FIRE DEPARTMENT
Prevention Services Division
2101 H Street
Bakersfield, CA 93301
Phone: 661- 326 -3979
Fax: 661 - 852 -2171
Date of Inspection:
Time In: 2` V Time Out:
Inspected by: Esther Duran
ICC# 5296325 -UI
Ty "e of Inspection:
Annual Compliance ❑Re- inspection ❑ Complaint
Permission for Inspection Granted by:
Tank ID
#1
#2
Size
10,000
10; 000
Contents
REG.
PREM.
Construction
DWF SC
DWF SC
Tank Monitoring:
DW: Continuous Interstitial Monitoring
Dry ❑ Brine /H drostatic ❑ Vacuum /Pressure.
❑
SW: SIR and Line Test every 2 years.
El
0,
❑.�❑
SW: ATG 0.1 annual.
❑
❑
❑
❑
SW: ATG 0.2 monthly.
❑
❑
❑
. ❑. _"
SW: Continuous In -Tank Leak Detection (CITLD).
❑
❑
❑
❑
SW: Tank Gauging.
❑
❑ _
❑
❑ .
SW: Vadose/GW Monitoring.
❑
❑ .
❑
❑l
Other Description:
❑
❑
❑
❑ .,
, Piping Monitoring:
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
❑
❑'.
❑..
DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD,
❑ Annual Line Test or Auto - shutdown and Failsafe.
❑
❑�
DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc.
❑
El:'
❑
E
SW Conventional Suction: Triennial 0.1 gph line test., and daily
monitoring.
❑
-,E
El
.. ❑ - �
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
LLD with Auto - Shutdown.
❑
❑
' ❑
SW or DW Safe Suction.
❑
.❑
❑❑
SW: Vadose Zone or GW Monitoring.
❑
El:
❑
,❑ ..
DW or SW: Gravity Flow Pipe.
❑
E]
❑
❑ ,
Other Description:
❑
❑
1:1
E3,
References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326-3979
If in compliance, check the box. Check NA if not applicable.
If a violation, determine if Minor, Class 11, or Class 1, or To
Violations
Be Determined (TBD) if uncertain and will be determined
later.
119 ISO=
&'�gg.n 1001
< Ml
mg
M,
He Review.
❑ 1
UST Permit to Operate is current. HSC 25284(a), 25299(a)(1) 25299 (b)(1)
❑
02
Transfer of permit and/or change of information provided within
30 days of ownership/information changes. HSC 25284(b) (c); T23
-
CCR 2712(d)
IA3
UST form information current/correct for facility, including BOE
number. HSC 25286(a)
❑
154
Fees are paid up-to-date. HSC 25285(c), 25287
1:1
Monitoring Plan approved for current. owner with appropriate
❑
content and level of detail. T23 CCR 2632(4), 2634 (d), 2641(h)
%B
ICurrent Emergency Response Plan submitted with appropriate
❑
content and level of detail. T23 CCR 2632(d), 2634 (d), 2641(h)
A7
Plot Plan/Site Map submitted with appropriate content and
❑
level of detail. T23 CCR 2632(d), 2634(d), 2641(h), 2711(a)(8)
Owner/Operator agreement submitted, if required. HSC 25284(a)(3)
❑
Certification of Compliance and Designated Operator
171
Certification submitted by current tank owner. T23 CCR 2715
X-10
Certificate of Financial Responsibility submitted and is current
for the permit period. HSC 25292.2,25299.30-25299,34, T23 CCR 2711; 2808.1;
❑
2809-28M2
11
Monitoring system certification (most recent) conducted within
allowable timeframe (sensors and console). Results submitted
❑
and show all required components with passing results. Hsc
25284.1 a 4 c ; T23 CCR 2638
2
Spill-bucket test results (most recent) conducted within
allowable time frame. Results submitted and indicate a passing
❑
test. HSC 25284.2
X-3
Leak Detector testing conducted within allowable time frame.
The most recent annual certification submitted and shows
RD
RD
RD
RD
171
passing results. 40 CFR 280.40(a)(2), 280.43(8)(1)&(2), 280.44(a); HSC 25292(e);
T23 CCR 2638, 2641 6)
04
Secondary containment testing conducted within allowable
time frame. Most recent testing results submitted and indicate
171
a passing test. HSC 25284.1(a)(4)(8); T23 CCR 2637(a)
❑15
Pipe and/or tank integrity testing conducted within allowable
time frame. Most recent testing results submitted and indicate
passing results. 40 CFR 280.33, 280.40, 280.41, 280.44; T23 CCR 2636(f),
2643(b)(3), (q)(3), (d) (e)
,p4 6
Repaired tanks/piping are tightness tested within 30 days of
RD
RD
RD
RD
❑
the repair. 40 CFR 280.33; T23 CCR 2661
❑17
ELD test conducted within allowable time frame. Most recent
test results submitted and passing results achieved. T23 CCR
X
2644.1
❑18
The corrosion protection system is checked by a corrosion
specialist within six months of instal lation/repair and at least
every three years thereafter; results show protection to be
RP
RP
RP
RP
%Cn
adequate. Impressed current inspected every 60-calendar
days. 40 CFR 280.31, 280.70, T23 CCR 2635(a)(2)
❑19
Tank Lining recertification is current (within 10 years of lining
and every 5 years thereafter) and compliant. 40 CFR280.21(b)(I)(Tj;
T23 CCR
RP
RP
RP
RP
2663(h)
'X
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326-3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facilitv Name: na+A-
u3u
meiease veiecuon memoas are present ana meet perrormance
RD
RD
RD
RD
❑
standards. See LG -113. 40 CFR 280.40(a)(3)
031
All sensors are correct for the type of system and operational.
RD
�.
RD
RD
❑
1
40 CFR 280.40 a 2 , 280.43(g)(1)&(2); HSC 25290.1 e , 25290.2, 25291; T23 CCR 2638
032
All sensors are located in the proper position /location. 40 CFR
d
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
RD
RD
RD
RD
El
On =Site Review
2632(c);2641(a)
Q
033
All secondary containment, including UDC shall be equipped
This Inspection is being co ducted during the annual
monitoring certification. YES O NO
with a continuous monitoring system that either activates an
&
X4411
The service technician IYas provided ICC Certification and
A/V alarm or stops the flow of product at the dispenser when it
manufacturers training documentation, and possesses a tank-
❑
detects a leak. T23 CCR 2636 (0(1)
>�f-f5
tester's license or works under a CSLB contractor's license.
4
YES a NO
Tr' x�.;,ty'F�""�
p�k
t;�' � .,.9w3, i T•. .Fa w 05 : N ::.. -� S.rK �, r•' l y., �a'lm "i +.i' ,Y:. -.. .'.-, S [. �.
d'CaX.
v .. .. a. .. , "-,.... ro,
y �.,. a..,
t. f .:r. .::
ta, ,a.. sir :�
TanlP� N:
s n o onent5 _ M �
� on for.�n �anal»M , ,:
F f o form
-r -„
,
;..�,.
,
....,._ ,
f
.., -3 .:
m
n ,. Y - -. �. `�>:, ,..r• ... r Y`. ... Y Y ::. w.. �3... A.- r r 3.'�r.... -... r..
, &,
T
S. ., t ,..
i ,
...,:�..�,..�- _ee..,,.,a.,,.,. 'f
ur'
a.
' ...
. -
., ..'.s
`General
020
Tank systems meet current construction standards as required
fort a of system. HSC 25288
El
021
Hazardous substance tanks have secondary containment. 40
CFR 280.42(b); T23 CCR 2631
RP
RP
RP
RP
❑
022
Electronic monitoring system has audible and visual alarm in
operating condition. T23 CCR 2632, 2634, 2636
❑
023
Monitor console programmed appropriately for monitoring
❑
option used. T23 CCR 2638, 2643, 2643.1
024
Tank systems in temporary closure meet requirements. 40 CFR
280.70; T23 CCR 2670 & 2671
RD
RD
RD
RD
❑
❑25
Overfill Prevention mechanism present and operational
according to type: ❑Flapper valve ❑ Audible- visual alarm
RP
RP
RP
RP
❑
❑ball float. ❑ AA/ alarm and Ball Float 40 CFR 280.20(c)(1)(u),
280.21(d); T23 CCR 2635(b)(2), 2631 d (4
026
Spill prevention device is present and functional (in good
condition and drain mechanism operational if applicable). 40 CFR
RP
RP
RP
RP
❑
280.20 c 1 / , 280.21(d); T23 CCR 2635(b)(1);2665
❑27
Piping and piping penetration boots within sumps /UDC are in
❑
OOd condition. HSC25288(a), 25292.1
028
All sumps, spill buckets, and UDC's free from debris and liquid.
❑
HSC 25291(e), 25290.1, 25290.2; T23 CCR 2635(b)(1)(C)
029
Areas around vents appear to be free from signs of liquid
❑
releases. HSC 25288(a), 25290.1, 25290.2, 25295.5
u3u
meiease veiecuon memoas are present ana meet perrormance
RD
RD
RD
RD
❑
standards. See LG -113. 40 CFR 280.40(a)(3)
031
All sensors are correct for the type of system and operational.
RD
RD
RD
RD
❑
40 CFR 280.40 a 2 , 280.43(g)(1)&(2); HSC 25290.1 e , 25290.2, 25291; T23 CCR 2638
032
All sensors are located in the proper position /location. 40 CFR
280.40(a)(2), 280.43(g)(1) &(2); HSC 25290.1, 25290.2, 25291; T23 CCR 2630(d);
RD
RD
RD
RD
El
2632(c);2641(a)
033
All secondary containment, including UDC shall be equipped
with a continuous monitoring system that either activates an
A/V alarm or stops the flow of product at the dispenser when it
❑
detects a leak. T23 CCR 2636 (0(1)
4 1 ;K Interstitial monitoring conducted properly. 40 CFR 280.40(a)(2), RD RD RD I RD ❑
280.43(g)(1)&(2); T23 CCR 2632 c 2 ; 2634 d 1 1 1
035 ❑ VPH monitoring conducted Drogerly. HSC 25290.1 RD RD RD RD
O SIR
036 SIR and Biennial 0.1 gph tank test performed properly. 40 CFR RD RD RD RD
280.41, 280.43, T23 CCR 2643, 2646.1
037 Non - passing SIR monitoring report results are reported and RD RD RD RD i
investigated properly. 40 CFR 280.41(a), 280.43(h)(1),(2); T23 CCR 2646.1
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
I MA ILy
I14a111C. uate:
O Automatic Tank Gauging (ATG) / Continuous In -Tank Leak
Detection CITLD
038
ATG or CITLD 0.2 gph monthly test performed properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2643(b)(1), 2643 b 5
39
ATG generates a hard copy printout of all data reported
including time and date, tank I.D., fuel depth, water depth,
temperature, liquid volume and duration of test. If installed after
❑
1/1/95 printout includes calculated leak rate and leak threshold.
T23 CCR 2643 b 9
O Manual Tank Gauging (SW tanks </ =1000 gal. ONLY)
040
Weekly manual tank gauging performed properly. 40 CFR 280.43;
RD
RD
RD
RD
T23 CCR 2645
041
Tank Integrity test performed, if necessary. 40 CFR 280.43; T23 CCR
RD
RD
RD
RD
2645
O Vadose Zone and/or Groundwater Monitoring
042
Monitoring system is installed and monitored properly. 40 CFR
RD
RD
RD
RD
280.43; T23 CCR 2647 -48
*Tank Exemption
043
Tanks /piping meet tank exemption criteria, and weekly visual
,
monitoring records are kept up-do-date. HsC 25283.5
Pi a Monitorin
.. ...::a
,... .: ,:.
.E ..... s:... .. .....mw.ah..�u2:.:.a...:.ieP, ....: 'v . . �......
:.. F
..3
'i{ L .. 5
O Continuous Monitoring System
044
DW piping (gravity, suction, pressure) in the turbine sump has
continuous monitoring system that activates an audible and
RD
RD
RD
RD
❑
visual alarm or restricts or stops flow at dispenser. T23 CCR
2636 (9
045
DW piping in the UDC is continuously monitored and method
either shuts down the flow of product to the dispenser or
❑
activates an AN alarm. T23 CCR 2636(0(9)
O Line Integrity Testing for Pressurized Piping
❑46
An annual 0.1 gph line integrity test is performed properly.
(Either third party or by Enhanced Line Leak Detection) T23 CCR
RD
RD
RD
RD
❑
2636 (0(4)
047
In lieu of the annual tightness test for DW pressurized piping,
the monitoring system for all product piping outside the
dispenser is fail -safe and shuts down the pump when a leak is
detected and the monitoring system shuts down the pump or
RD
RD
RD
RD
❑
flow restriction occurs when a leak is detected in the UDC. T23
CCR 26360 (5)
O Line Leak Detectors (LLD)
❑48
LLD's installed, annually tested, and operational on DW
pressurized piping that detects a 3.0 -gph leak, and restricts or
RD
RD
RD
RD
❑
shuts off flow of product. T23 CCR 2636(0(2)
O DW Emergency Generator Tank
049
LLD activates AN alarm and monitoring system is checked
daily. T23 CCR 26360(2)
RD
RD
RD
RD
❑
050
In lieu of LLD, continuous monitoring system of DW emergency
generator tank activates AN alarm, system is checked daily,
❑
and logs are kept. T23 CCR 2636 0(6)
}:K!su 3,...rm..ix. sa6usr.S;,L•...
san3am..,'.'b1 .:c.a..: :..<xax.S... ,_r..._ wi.,.«.<.r ..,.. iY..frw t).: .: ".fib :<:Sa]ns)a.a:_:, x.,.. ?.i:.. :. ....u. ✓.:' -.
:. +.c.
_6.
..., ,.i
.:.
.,;...E -�:n.
Man
,..
1
v .... .. t
,., ew..:.,
1..- =..<„�.,..... .. d<.e.b.«
: X.
..
"..
�.5 �:,-b... .,_
>_,.,,. 4� a5
I ...
., ,..,
s.. < -'. ...
,e ...
\�.,7..a, a.
a .. ....
� f" A
l .. F.
4 f.a f
<. �. _:::
..
sarJ�dl� iii�4.u:�a'-
F. }..X"t C .y W
� A J - r.._
4 _ f
f"..s:. ... °': T. ,"-i,
.. .?r: '.n E_ 3:
�. .�. Y- ...,... ..<
._, ... .... .... i f k...,
u2xata a...'rav"e .. 2L -�-n� i Zess {�. i
O Line Integrity Testing
051
SW pressurized piping: annual 0.1 gph line integrity test or a
monthly 0.2 gph line integrity test is performed properly. 40 CFR
RD
RD
RD
RD
❑
280.49, 280.44; T23 CCR 2643(c)(2), 3)
052
SW conventional suction system: 0.1 gph line integrity test is
performed ever three years. 40 CFR 280.40,280.41; T23 CCR 2643(d)
RD
RD
RD
RD
❑
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
❑53
SW conventional suction system: inspections conducted for
presence of air in the pipeline. Daily monitoring records are
kept. T23 CCR 2643(d)
054
SW gravity flow piping: biennial 0.1 gph integrity test or overfill
tank integrity test is conducted within allowable time frames.
T23 CCR 2643(e)
O Safe Suction (SS) System
055
Piping meets the SS requirements. 40 CFR 280.41; T23 CCR 2636(x)(3)
RD
RD
RD
RD
A -D
O LLD for Pressurized Piping
056
LLD's installed, annually tested and operational on SW
pressurized piping. Pump shuts down when a leak occurs and
RD
RD
RD
RD
when the LLD fails or is disconnected. T23 CCR 2666
057
LLD's installed, annually tested, and operational on SW
emergency generator systems; LLD is connected to an AN
alarm. 40 CFR 280.40(a)(2), 280.43(8)(1), (2), 280.44(a); T23 CCR 2666
Corrosion Protection
❑58
Metal Tanks and piping components have corrosion protection,
or are isolated from the backfill. 40 CFR 280.20, 280.21
RP
RP
RP
RP
059
Corrosion protection equipment turned on, functioning properly
and provides continuous protection. 40 CFR 280.31(a),(b)(1); T23 CCR
RP
RP
RP
RP
2635
060
Cathodic protection system is tested within 6 months of
installation and then every 3 years. 40 CFR 280.31(x) & (b)(1); T23 CCR
RP
RP
RP
RP
2635 a 2
061
Impressed current systems checked every 60- calendar days
and records are up -to -date. 40 CFR 280.31(c); T23 CCR 2635(a)(2)
RP
RP
RP
RP
,
On -site, Pa erwork
% 2
Permit and conditions available on -site. Facility is operated
El
according to permit and conditions. HSC 25293; 25299, T23 CCR 2712(1)
3
Monitoring and response plans are on -site and are the
❑
approved version. T23 CCR 2712(1); 2632;2634; 2641
64
Site plan depicts current site conditions and has all required
❑
elements. T23 CCR 2632(x)
65
All release detection records for monitoring method are
available, up -to -date, and appropriate for leak detection
RD
RD
RD
RD
❑
method. 40 CFR 280,41, 280.45
66
All monitoring /testing records /documents are available for the
required timeframe. (3 years, 6 Y2 years, five years, life of tank) T23 CCR
❑
2712
67
Equipment maintenance records/logs available. T23CCR2712(b)
❑
68
Alarm logs /tapes available and appropriate follow -up actions
❑
occurred. T23 CCR 2712(b); 2632; 2634
Visual observation logs available, up -to -date, and appropriate
❑
follow-up actions to problems occurred. T23 CCR 2712(b); 2642
70
Designated UST Operator monthly reports available and
❑
complete. T23 CCR 2715
Employee training records available and training appropriate
❑g
/�j- zzrniny ce
and up-to-date. T23 CCR 2715
�J ,-
072
Suspected or actual unauthorized releases are recorded
and /or reported within allowed timeframes, including non-
RD
RD
RD
RD
❑
passing test results. Leak and Spill Logs available. 40 CFR 280,50;
T23 CCR, 2650, 2652
3
Financial Responsibility Certificate and mechanisms (CFO
(a_i
Letter, etc.) on -site and up -to -date. HSC 25292.2, 25299.30- 25299.34; T23
❑
I
CCR 2711; T23 2808.1; 2809- 2809.2
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
UNDERGROUND STORAGE TANK COMPLIANCE INSPECTION REPORT
Facility Name: Date:
074 Spill- bucket testing conducted appropriately and a passing test
achieved.
075 Secondary Containment testing conducted appropriately and a 0
passinq test achieved.
SOC AND RED TAG
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979
a. This facility is in compliance with Release Detection (RD) requirements only. (No
violations in boxes marked RD, but one or more in boxes marked RP.)
❑
b. This facility is in compliance with Release Prevention (RP) requirements only. (No
violations in boxes marked RP, but one or more in boxes marked RD.)
❑
c. This facility is in compliance with BOTH Release Detection (RD) and Release
Prevention (RP) requirements. (No violations in boxes marked RD or RP.)
❑
d. This facility is NOT in compliance with both Release Detection (RD) and Release
Prevention (RP) requirements. (One or more violations marked in (both) boxes RD
❑
and RP.)
MM IN d +, u .. e ?
�' wviw.w. INS,
„
A Red Tag was issued to this facility based on the results of this inspection.
Red Tag #
❑
Reason for Red Tag (Choose one):
1. Violation that causes or threatens to cause a liquid release. CCR 2717(a)(1)
❑
2. Violation that impairs the ability of an UST system to detect a leak. CCR 2717(a)(2)
❑
3. Chronic violation or committed by a recalcitrant violator. CCR 2717(a)(3)
❑
Item Inspection Comments:
Bakersfield Fire Department — Prevention Services Division, 2101 H Street, Bakersfield, CA 93301 (661) 326 -3979