Loading...
HomeMy WebLinkAbout2051 TAFT HWY SB-989 '134 3 (QS HOODS ALARMS SPRINKLER SYSTEMS .F", V WCo) v H, AST UST Permit No. Permit No. Permit No. Permit No. Permit No. Permit No. 13-/31 / File Number: 7-76 Address: C;;2C) / (m. 4-7 y Bakersfield, CA 933 Date Received: - z 7 - ( 72 Business Name: ,sdrea SYSTEM: BUILDING SQUARE FEET: ONSPECTM LOG New Mod. minor modification removal Commercial Hood System Fire Alarm System Fire Sprinkler System Aboveground Storage Tank Underground Storage Tank Underground Storage Tank Underground Storage Tank 17,-' Other: — g' Building Sq. Feet: Calculation Bldg. Sq. Ft: FoAr Date Time Signature 13 BAKERSFIELD CITY FIRE DEPARTMENT -- INSPECTION RECORD Post this Card at the Job Site and DO NOT Remove for Duration of Work Inspection Request Phone No. (661) 326 -3979 UST NEW INSTALL DESCRIPTION DATE SIGNATURE BACKFILL PRIMARY PIPE SECONDARY PIPE SECONDARY CONTAINMENT SENSORS AUTHORIZATION FOR FUEL ELECTRICAL SEAK -OFF TANKTESTING A UST REMOVAL DESCRIPTION DATE SIGNATURE AST NEW INSTALL DESCRIPTION DATE SIGNATURE MODIFICATIONS MINOR / MAJOR AST REMOVAL DESCRIPTION DATE SIGNATURE EVR UPGRADE PRIORTO ^OPE RATION -OF ANY SYSTEM,) ALLUST A_ND /OR AST SYSTEMS_ SHALL BE INSTALL, COMPLETE.AND_ACCEP_TED -BYI MISC. ACTIVITY (THE BAKERS FIELD- CITY- FIRE_DEPARIM NT. FIRE_ DEPARTMENT (FINAL) REMARKS: BUILDING ADDRESS: o?0 5- JOB DESCRIPTION: -1::4 C_._ OCCUPANCY TYPE: OWNER: PERMIT NO. CONTRACTOR: A vr. c_ c PHONE # FD 1743 UNU,RGROUND STORAGE TANKS APPLICATION TO PERFORM ELD / LINE TESTING SB989 SECONDARY CONTAINMENT TESTING TANK TIGHTNESS TEST AND TO PERFORM FUEL MONITORING CERTIFICATION PERMIT NO. ENHANCED LEAK DETECTION LINE TESTING BAKERSFIELD FIRE DEPT. B s P Prevention Servicess ARrpigN Ir 2101 H Street Bakersfield, CA 93301 Tel.: (66 1) 326 -3979 Fax: (661) 852 -2171 Page 1 of 1 X SB-989 SECONDARY CONTAINMENT TESTING TANK TIGHTNESS TEST TO PERFORM FUEL MONITORING CERTIFICATION Cathodic Protection Testing SITE INFORMATION FACILITY ARCO NAME & PHONE NUMBER OF CONTACT PERSON ADDRESS 2051 Taft Hwy. Bakersfield, Ca. OWNERS NAME Same OPERATORS NAME Same PERMIT TO OPERATE NO. NUMBER OF TANKS TO BE TESTED IS PIPING GOING TO BE TESTED? YES NO TANK# VOLUME CONTENTS 1 87 UL 2 87 UL 3 91 UL TANK TESTING COMPANY NAME OF TESTING COMPANY Advanced Compliance Bruce W. Hinsley 661- 706 -4321 MAILING ADDRESS 3704 Littlefalls Ct. Bakersfield, Ca. 93312 Bruce W. Hinsley 661 -706 -4321 CERTIFICATION #: A25212 DATE & TIME TEST TO BE CONDUCTED Icc #: 8032698 SIGNATURE OF APPLICANT DATE 6/26/2013 APPROVED BY DATE %•2 FD 2095 (Rev. 09/05) BILLING & PERMIT STATEMENT PERMIT # FIRB A PTN' BAKERSFIELD FIRE DEPARTMENT Prevention Services 2101 H Street Bakersfield, CA 93301 Phone: 661- 326 -34179 • Fax- 661 -R52 -2171 INFORMATIONSITE LOCATION OF PROJECT ARCO PROPERTY OWNER Same STARTING DATE COMPLETION DATE NAME PROJECT NAME ADDRESS PHONE # PROJECT ADDRESS 2051 Taft Hwy. cm g 41_ER.S IEI A STATE aA ZIP CODE INFORMATION CONTRACTOR NAME CA LICENSE tAdvancedCompliance971259 TYPE OF LICENSE EXPIRATION DATE C61 D40 3/31/2014 PHONE t 661- 706 -4321 CONTRACTOR COMPANY NAME Advanced Compliance FAX S 661- 589 - 9329, ADDRESS 3704 Littlefalls Ct. CIIY Bakersfield ZIP CODE 93312 All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK. Alarm - New & Modification (minimum charge) $280 Over 10,000 sq ft 0.028 x sq ft Sprinkler - New & Modification (minimum charge) 280 Over 10,000 sq ft 0.028 x sq ft Minor Sprinkler Modification ( <10 heads) 96 (Inspection only) commercial Hood (Neva & Modification) 470 Additional hood 58 Spray Booth (New & Modification) 470 98 Aboveground Storage Tank (1 Inspection per installation) AST 180 /tank 82 Additional Tank ATI 96/tank 82 Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR 109 /tank 82 Underground Storage Tank (Installation/Inspection) NI 878 /tank 82 Underground Storage Tank (Modification) MOD 878 /site 82 Underground Storage Tank (Minor Modification) MTM 167 /site 82 Underground Storage Tank (Removal) TR 573 /tank 84 III Mandated Leak Detection (test) /Fuel Mont Cert/SB989 NOTE: $96 /hr for each type of test/per site even If scheduled at the same time TT 96/hr (2 hrs minimum) =$192 82 Oil well (Installation, Inspection, or re- inspection) X 96 /hr 82 Tent # 96 /tent 84 After -hours inspection fee 121 /hr (2 hrs minimum) =$242 Pyrotechnic (1 permit per event, plus an inspection fee of 96/hr during business hours) Py NOTE: After hours Pyrotechnic event Inspection Is @ 121 /hr 96 /hr + (5 hrs min standby fee/Insp) =$576 5 hrs min stand fee Ins = 605 84 Re- Inspection /Follow -up Inspection 96 /hr 84 Portable LPG (Propane): # of Cages? _ 96/hr 84 Explosive Storage 266 84 Copying & File Research (File Research fee $50 /hr) 0.25 /page 84 13 Miscellaneous 84 021 (gird 641101 0'. SWRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages ofthis form to report results for all components tested. The completedform, written testprocedures, and printoutsfrom tests (fapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: ARCO Date of jesting: 7/24/2013 Facility Address: 2501 Taft Hwy. Bakersfield, Ca. Facility Contact: Phone: 661- 397 -1497 Date Local Agency Was Notified of Testing: Name ofLocal Agency Inspector (fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Advanced Compliance Pass Technician Conducting Test: Bruce W. Hinsley Not Tested Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61/1340 License Number: 971259 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS -STS 9/17/2014 X 87 UL Annular Space X 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made Tank # 1 STP Sump X 87 UL Annular Space X Tank #2 STP Sump X 87/91 UL Annular Space X Tank #3 STP Sump X UDC #1-2 X Tank #1 Fill Sump X UDC #3 -4 X Tank #2 Fill Sump X UDC #5 -6 X Tank #3 Fill Sump X UDC #7 -8 X 87 UL Product Line X UDC #9 -10 X 91 UL Product Line X UDC #11-12 X Tank #1 Fill Bucket X UDC #13 -14 X Tank #1 Fill Bucket X UDC #15 -16 X Tank #2 Fill Bucket X Tank #3 Fill Bucket X 1 If hydrostatic testing was performed, describe what was done with the water after completion oftests: Containments were clean, water was removed from site and be used in future testing. CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated In this document are accurate and infull compliance with legal requirements Technician's Signature: Date: 7/24/2013 f. SWRCB, January 2002 4. TANK ANNULAR TESTING Page of Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure X Vacuum Hydrostatic Other (Spec) Used: Equipment Resolution: iEquipment Tank # 1 Tank # 2/3 Tank # Tank # Is Tank Exempt From Testing ?' Yes x No Yes x No Yes No Yes No Tank Capacity: 19,951 11,873/10,306 Tank Material: FRP FRP Tank Manufacturer: Xerxes Xerxes Product Stored: 87 UL 87/91 UL Wait time between applying pressure /vacuum/water and starting test: 10 Min. 10 Min. Test Start Time: 13:00 13:00 Initial Reading (R,): 10" Hg. 10" Hg. Test End Time: 14:00 14:00 Final Reading (RF): 10" Hg. 10" Hg. Test Duration: 1 Hr. 1 Hr. Change in Reading (RF -Rj): 0" Hg. 0" Hg. Pass /Fail Threshold or Criteria: 2.0" Hg. 2.0" Hg. Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail Was sensor removed for testing? X Yes No NA X Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: X Pressure Vacuum Hydrostatic Other (Spec) I Test Equipment Used: Nitrogen / Pressure Gauge I Equipment Resolution: 11 Piping Run # 87 UL Piping Run # 91 UL Piping Run # Piping Run # Piping Material: Fiberglass Fiberglass Piping Manufacturer: A/O Smith A/O Smith Piping Diameter: 3" 3" Length of Piping Run: 70' 70' Product Stored: 87 UL 91 UL Method and location of piping-run isolation: Test Boot Test Boot Wait time between applying pressure /vacuum/water and starting test: 10 Min. 10 Min. Test Start Time: 12:30 12:30 Initial Reading (111): 5.0 Psi. 5.0 Psi. Test End Time: 13:30 13:30 Final Reading (RF): 5.0 Psi. 5.0 Psi. Test Duration: 1 Hr. 1 Hr. Change in Reading (RF -R,): 0.0 Psi. 0.0 Psi. Pass/Fail Threshold or Criteria: 0.2 Psi. 0.2 Psi. Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor failed tests) I i SWRCB, January 2002 Page of 7. PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: Incon TS -STS Equipment Resolution: 0.0002 Sump # l Sump # 2 Sump # 3 Sump # Sump Diameter: 48" 48" 48" Sump Depth: 65" 65" 68" Sump Material: FRP FRP FRP Height from Tank Top to Top of Highest Piping Penetration: 22„ 21" 19„ Height from Tank Top to Lowest Electrical Penetration: 14" 15" 17" Condition of sump prior to testing: Clean Clean Clean Portion of Sump Tested' 35% 35% 35% Does turbine shut down when sump sensor detects liquid (both product and water)?* X Yes No NA X Yes No NA X Yes No NA Yes No NA Turbine shutdown response time 3 Sec. 3 Sec. 3 Sec. Is system programmed for fail -safe shutdown ?' X Yes No NA X Yes No NA X Yes No NA Yes No NA Was fail -safe verified to be operational?* X Yes No NA X Yes No NA X Yes No NA Yes No NA Wait time between applying pressure /vacuum/water and starting test: 10 Min. 10 Min. 10 Min. Test Start Time: 12:15/12:31 11:04/11:21 11:04/11:21 Initial Reading (Rj): 5.2845/5.2842 6.8460/6.8458 6.6831/6.6828 Test End Time: 12:30/12:47 11:20/11:36 11:20/11:36 Final Reading (RF): 5.2838/5.2831 6.8460/6.8459 6.6829/6.6829 Test Duration: 30 Min. 30 Min. 30 Min. Change in Reading (RF -R,): 0.0007/0.0009 0.0000 /0.0001 0.0002/0.0001 Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 Test Result: X Pass Fail X Pass Fail X Pass Fail Pass Fail Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor failed tests) 1 Ifthe entire depth of the sump is not tested, specify how much was tested. If the answer to aM ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) r SWRCB, January 2002 8. UNDER- DISPENSER CONTAINMENT (UDC) TESTING Page of Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: Incon TS -STS Equipment Resolution: 0.0002 UDC # 1-2 UDC # 3 -4 UDC # 5 -6 UDC # 7 -8 UDC Manufacturer: Unknown Unknown Unknown Unknown UDC Material: FRP FRP FRP FRP UDC Depth: 29" 29" 29" 29" Height from UDC Bottom to Top of Highest Piping Penetration: 10" 10" 10" 10" Height from UDC Bottom to Lowest Electrical Penetration: 6" 6" 6" 6" Condition of UDC prior to testing: Clean Clean Clean Clean Portion of UDC Tested 50% 50% 50% 50% Does turbine shut down when UDC sensor detects liquid (both product and water)?* X Yes No NA X Yes No NA X Yes No NA X Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown ?* X Yes No NA X Yes No NA X Yes No NA X Yes No NA Was fail -safe verified to be operational?* X Yes No NA X Yes No NA X Yes No NA X Yes No NA Wait time between applying pressure /vacuum /water and starting test 10 Min. 10 Min. 10 Min. 10 Min. Test Start Time: 10:40/10:58 10:40/10:58 11:34/11:53 11:34/11:53 Initial Reading (Rj): 3.4085/3.1006 5. 9906/5.9888 7.6328/7.6330 1.6187/1.1604 Test End Time: 10:55/11:13 10:55/11:13 11:49/12:08 11:49/12:08 Final Reading (RF): 3.1680/2.8718 5. 9893/5. 9880 7.6328/7.6318 1.2835/0.8585 Test Duration: 30 Min. 30 Min, 30 Min. 30 Min. Change in Reading (RF -R,): 0.2405/0.2288 0.0013/0.0008 0.0000/0.0012 0.3352/0.3019 Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 Test Result: Pass X Fail X Pass Fail X Pass Fail Pass X Fail Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SWRCB, January 2002 9. UNDER- DISPENSER CONTAINMENT (UDC) TESTING Page of Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer Other (Specie) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: Incon TS -STS Equipment Resolution: 0.0002 UDC # 9 -10 UDC # 11 -12 UDC # 13 -14 UDC # 15 -16 UDC Manufacturer: Unknown Unknown Unknown Unknown UDC Material: FRP FRP FRP FRP UDC Depth: 29" 29" 29" 29" Height from UDC Bottom to Top of Highest Piping Penetration: 10" 10" 10" 10" Height from UDC Bottom to Lowest Electrical Penetration: 6" 6" 6" 6" Condition of UDC prior to testing: Clean Clean Clean Clean Portion of UDC Tested 50% 50% 50% 50% Does turbine shut down when UDC sensor detects liquid (both product and water) ?' X Yes No NA X Yes No NA X Yes No NA X Yes No NA Turbine shutdown response time Is system programmed for fail - safe shutdown ?* X Yes No NA X Yes No NA X Yes No NA X Yes No NA Was fail -safe verified to be operational?* X Yes No NA X Yes No NA X Yes No NA X Yes No NA Wait time between applying pressure /vacuum/water and starting test 10 Min. 10 Min. 10 Min. 10 Min. Test Start Time: 14:59/15:16 15:16/15:16 14:59/15:16 14:59/15:34 Initial Reading (R,): 3.5834/1.3441 6.8062/6.8112 6.7569/6.7570 7.3095/7.2068 Test End Time: 15:14/15:31 15:31/15:31 15:14/15:31 15:14/15:51 Final Reading (RF): 1.7192/0.3331 6.8051/6.8112 6.7570/6.7564 7.2803/7.1538 Test Duration: 30 Min. 30 Min. 30 Min. 30 Min. Change in Reading (RF -R,): 1.8642/1.0110 0.0011 /0.0000 0.0001/0.0006 0.0292/0.0530 Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 Test Result: Pass X Fail X Pass Fail X Pass Fail Pass X Fail Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests J SWRCB, January 2002 Page of FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: Incon TS -STS Equipment Resolution: 0.0002 Fill Sump # 1 Fill Sump # 2 Fill Sump # 3 Fill Sum # 4 Sum Diameter: 36" 36" 36" Sum Depth: 63" 62" 58" Height from Tank Top to Top of Highest Piping Penetration: N/A N/A N/A Height from Tank Top to Lowest Electrical Penetration: 41" 41" 41" Condition of sump prior to testing: Clean Clean Clean Portion of Sump Tested 50% 50% 50% Material: FRP FRP FRPSump Wait time between applying pressure /vacuum/water and test: 10 Min. 10 Min. 10 Min. starting Test Start Time: 11:04/11:21 14:59/15:16 11:04/11:21 Initial Reading (R,): 5.7126/5.7128 3.5834/1.3441 4.8178/4.8192 Test End Time: 11:20/11:36 15:14/15:31 11:20/11:36 Final Reading (RF): 5.7128/5.7123 1.7192/0.3331 4.8189/4.8179 Test Duration: 30 Min. 30 Min. 30 Min. Change in Reading (RF -R,): 0.0002/0.0005 1.8642/1.0110 0.0011/0.0013 Pass /Fail Threshold or Criteria: 0.002 0.002 0.002 Test Result: X Pass Fail X Pass Fail X Pass Fail Pass Fail Is there a sensor in the sump? X Yes No X Yes No X Yes No Yes No Does the sensor alarm when either product or water is detected? X Yes No NA X Yes No NA X Yes No NA Yes No NA Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) SWRCB, January 2002 10. SPILL /OVERFILL CONTAINMENT BOXES Page of Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: Incon TS STS Equipment Resolution: 0.0002 Spill Box # 1 Spill Box # l Spill Box # 2 Spill Box # 3 Bucket Diameter: 11" 11" 11" 11" Bucket Depth: 15" 15" 15" 15" Wait time between applying pressure /vacuum/water and starting test: 10 Min. 10 Min. 10 Min. 10 Min. Test Start Time: 14:20/14:36 14:20/14:36 12:15/12:31 14:20/14:36 Initial Reading (Rj): 4.7629/4.7630 4.3408/4.3412 5.9765/5.9776 3.9691/3.9681 Test End Time: 14:35/14:51 14:35/14:51 12:30/11:47 14:35/14:51 Final Reading (RF): 4.7629/4.7636 4.3410/4.3413 5.9772/5.9778 3.9681/3.9684 Test Duration: 30 Min. 30 Min, 30 Min. 30 Min. Change in Reading (RF -Ri): 0.0000/0.0006 0.0002/0.0001 0.0017/0.0002 0.0010/0.0003 Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) ARCO I 2501 TAFT HWY 2.36 PM BAKERSFIELD CA 07/24/2013 07/24/2013 11:36 Aret 250 "R1 -O TAR- HWY BEGIN LEVEL 3MKERSFIELD CASLUMPLEAKTESTREPORT 07/24/2013 END TIME 07/24/2013 2:35 Prv. 87W FS 2:20 P` -) .' END DATE SUMP LEAK TEST REPORTTESTSTARTED11:21 AM 07/24/2013: j TEST STARTED 07/24/2013 87E= =BBEGINLEVEL5.7128 IN 4.3408 IN END TIME 11:36 AM TEST STARTED 2:20 PMENDDATE07/24/2013 TEST STARTED 07/24/2013ENDLEVEL5.7123 IN BEGIN LEVEL 4.7629 IN . LEAK THRESHOLD 0.002 IN END TIME 2:35 PriTESTRESULTPASSEDENDDATE07/24/2013 ND LEVEL END LEVEL . ?629 IN LEAK THRESHOLD 0.002 I tv '. 87W :ATP TESTTEST RESULT PASSED TEST STARTED i1:21 AM TEST STARTED 2.36 PM TEST STARTED 07/24/2013 87E2 F8BEGINLEVEL6.8458 IN END DATE 07/24/2013 END TIME 11 :36 AM TES- STARTED 2:20 P` -) .' END DATE 07/24/2013 T*ST STARTED 07/24/2013: j END LEVEL 6.8459 IN BEGIt:' LEVEL 4.3408 INLEAKTHRESHOLD0.002 IN END TIME 2:35 PM. TEST RESULT PASSED END DATE 07/24/2013 ND LEVEL 4.3410 IN: LEAK THRESHOLD 0.002 IN91PSTESTRESULTPASSED 1 TEST STARTED 11:21 AM,: TEST STARTED 07/24/2013 BEGIN LEVEL 4.8192 IN j END TIME 11:36 Ali rFST STARTED tENDDATE07/24/2013 T STARTED iENDLEVEL4.8179 IN BEG VELLEAKTHRESHOLD0.002 IN END TIM tTESTRESULTPASSED1DDATF 0.N,' END LEL 31 STP LE iRESH T RESULT TEST STARTED 11:21 AM TEST STARTED 07/24/2013 1 i_BBEGIN' LEVEL 6.6828 IN END TIME 11:36 AM TEST STARTED 2:20 PN END DATE 07/24/2013 TEST STARTED 07/24/2013• END LEVEL 6.6829 IN BEGIN LEVEL 3.96911 INLEAKTHRESHOLD0.002 IN 5 PMTESTRESULTPASSEDENDDATE07/24/2013 .. END LEVEL 3.9681 i N LEAK THRESHOLD 0.002 It' . TEST :RESULT PASSED„ k ARCO 250! TAFT HWY BAKERSFIELD CA 07/24/2013 2:56 PM SUMP LEAK TEST REPORT 87E! FS TEST STARTED 2.36 PMTESTSTARTED07/24/2013 BEGIN LEVEL 4.7630 INENDTIME2:51 PM END DATE 07/24/2013ENDLEVEL4.7636 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 87E2 FB TEST STARTED 236 PM TEST STARTED 07/24/2013 BEGIN LEVEL 4.3412 IN END TIME 2:51 PM END DATE 07/24/2013 END LEVEL 4.3413 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 91 FE: TEST STARTED 2:36 PM TEST STARTED 07/24/2013 BEGIN LEVEL 3.7365 IN END TIME 2:51 PM END DATE 07/24/2013 END LEVEL 3.7372 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 91 FB TEST STARTED 2 :36 PM TEST STARTED 07/24/2013 BEGIN LEVEL 3.9681 IN END TIME 1 2 :51 PM END DATE 07/24/2013 END LEVEL 3.9684 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED ARCO 2501 TAFT H6)Y AKER:;FIELD CA 07/24.2013 12:30 Pni SUMP LEAK TEST REPORT 7W FS TEST STARTED 12:15 PMTESTSTARTED07/24/2013BEGINLEVEL4.5616 INENDTIME12:30 PhiENDDATE07/24/2013ENDLEVEL4.5633 INLEAKTHRESHOLD0.002 INTESTRESULTPASSED 87E STP TEST STARTED 12:15 PhiTESTSTARTED07/24/2013BEGINLEVEL5.2845 INTIME12:30 PMENDDATE07/24/2013ENDLEVEL5.2838 INLEAKTHRESHOLD0,002 INTESTRESULTPASSED gwwft ST STARTED 12;15TETARTED07/2' BEG UEL .>6 I; END TI 2:30 pP' END DAT 7/24/2013ENDLE7INLERESHOLD0. NTRESULT 7W FS TEST STARTED 12 :15 PMTESTSTARTED07/24/28138EGINLEVEL5.9765 INENDTIME12:30 FroENDDATE07/24/2013ENDLEVEL5.9772 INLEAK. THRESHOLD 0.002 INTESTRESULTPASSED a ARCO 2501 TAFT HWY AKERSF!ELD CA 07x24/2013 12:47 Pm SUMP =AK "TEST REPORT 87W FB EST STARTED 12:31 PM TEST STARTED', 07/24/2013 j BEGIN LEVEL 4.5639 IN END TIME 112 :47 PM END DATE 07/24/2013 END LEVEL 4.5649 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 87E STP TEST STARTED 12:31 Pm TEST STARTED 07/24/2013 BEGIN LEVEL 5.2842 IN END TIME 12:47 PM END DATE 07/24/2013 END LEVEL 5.2831 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED BEGIN END TIME END DATE END LEUW 87W FS TEST STARTED 12:31 PM TEST STARTED 07/24/2013 BEGIN? LEVEL 5.9776 IN END TIME 12:47 PM END DATE 07/24/2013 END LEVEL 5.9778 IN LEAK THRESHOLD 0.002 IN TEST RESULT` PASSED ARCO 2501 TAFT HWY SAKERSFIELD CA 07/24/2013 ).1 :20 AM SUMP LEAK TEST REPORT 87W FS TEST STARTED 11:04 AM TEST STARTED 07/24/2013 BEGIN LEVEL 5.7126 INENDTIME11 :20 AM END DATE 07/24/2013ENDLEVEL5.7128 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 87W STP TEST STARTED 11:04 AM TEST STARTED 07/24/2013BEGINLEVEL6.8460 IN END TIME 11:20 AMENDDATE07/24/2013 END LEVEL 6.8460 INLEAKTHRESHOLD0.002 IN TEST RESULT PASSED 91 FS TEST STARTED 11:04 AM TEST STARTED 07/24/2013 BEGIN LEVEL 4.8178 INENDTIME11 :20 AM END DATE .07/24/2013ENDLEVEL4.8189 IN LEAK THRESHOLD 0.002 IN TEST RESULT " PASSED 91 STP TEST STARTED 11:04 AM TEST STARTED 07/24/2013 BEGIN LEVEL 6.6331 IN END TIME 11:20 AMENDDATE07/24/2013 END LEVEL 6.6829 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED l ! 07/25/2017 10.55 AM 2501 TAF D HWV SFIELD CA f SUMP LEAK TEST REPORT i 2501 RFT8AKERSFIELDWABAKER 11:49 AM 4` 1 -2 UDC 0 ?r25i201., 07/25/2013 EST REPORT TEST STARTED 10:40 Atl 1Y:13 AMSUMPLEAK7-E,37- SUMP LEAK TEST STARTED 07/25/2013 REPORTR7. g -6 UDC LEVEL END TIME 3.4085 IN 10:55 AM 1 -2 UD8 TEST STARTED 11:34 Ate STARTED 07/V,/201328IN END DATE END LEVEL LEAK THRESHOLD 07/25/2013 3.1680 IN 0.002 IN EST STARTEDSTART 10:58SEINLEVELD / 25/2813TEST BEGIN LEVEL 11.49 AA TEST RESULT FAILED 3ENDTIME3.100, INDATEENDTIME07/25/201DATE7.. 00 3 AMEND _EVE 0"ZS/2013LEAKTHRESHOLD2.8i1 ND END LEAK£ L 0,002 INTHRESHOLDPASSED 3 -4 UDC ITESTRESULT0.002 IN TEST RESULT TEST STARTED 10:40 AM FAILED TEST STARTED 07/25/2013 1 UDC BEGIN LEVEL 5.9906 IN 3 -4 1DC STAR 11;34 AM TEST TED 07/25/2013 f END TIME i END DATE END LEVELt 10:55 AM 07/25/2013 5.9893 IN TEST TES STARTED 9EGINSTARTED 97i 9.58 AMLEVEL25/ TEST START 1,6187BEGINL£UEL 11;49 AM LEAP, THRESHOLD 0.002 IN TEST RESULT PASSED END TIME 5'8S$INDATE11:13ENDTIME07/252013 END DATE IN END LEVEL 07125120130131.2835 END LEVEL 0.002 INTHRESHOLDFAILED LEAK THR 5.98g ESHO INTESTRESULTLD8.002 INLEAK TEST RESULT PASSED 25 KERI D 4Cfl R.A 12:0` Pt+ 07 2`7/ 201z TESS REPdR BUMP LEAK 5-6 UDC TARiED 1j5520 Srt STflRTED 077,6330 PM TGIN LEU£L 1 5/2013 END TDI E 47.631$ 11 1 END LS4 RE'dLD 0'p ED g7 RESULT 11:53 AWSO /25'20ItA TESL SSARZf3> 01.1604 PO GIN LEUEL' 12'213 6 DDA£ 07/7S1B5IS END ASH SHdLD g' fA1L L REgULT- f ARCO 2501 TAFT HWYBAKERSFIELDCA 07/25/2013 3 :31 PM SUMP i_EAK TEST REPORT 9 -10UDC TEST STARTED 3:16 PM TEST STARTED 0,1/25/2013 0BGINLEVEL3;31 PMENDTIME07/25/2013ENDDATE0ENDLEVEL ,3331 IN LEAK THRESHOLD O'OILED TEST RESULT 1112UDC TEST STARTED 3 :16 PM TEST STARTED 07/25/201'3 BEGIN LEVEL 3;31 PMENDTIME07/25/2013ENDDATE6ENDLEUEL . 8051 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 1314UDC TEST STARTED 3:16 PM TEST STARTED '07/ 257013 BEGIN LEVEL . 6.757 PM END TIME 07/25/2013ENDDATE6ENDLEVEL .7564 IN LEAK THRESHOLD 0.002 SEDTESTRESULT l ARCO 2501 TAFT HWY BAKERSFIELD CA ARCO 2501 TAFT HWY07/25/2013 3 :14 PM BAKERSFIELD CA SUMP LEAK TEST REPORT i 07/25/2013 3 :51 PM 9 -10UDC SUMP LEAK -TEST REPORT 1 TEST STARTED 259 PM 1112UDC TEST STARTED 07/25/2013 BEGIN LEVEL 3.5834 IN TEST STARTED 3 :35 PMENDTIME3:14 PM TEST STARTED 07/25/2013ENDDATE07/25/2013 BEGIN LEVEL 5.3374 IN END LEVEL 1.7192 IN END TIME 3 :51 PM LEAK THRESHOLD 0.002 IN I QVEND DATE 07/25/2013 TEST RESULT FAILED END LEVEL 5.3376 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 1112UDC TEST STARTED 2 :59 PM 11.12UDC TEST STARTED 07/25/2013 BEGIN LEVEL 6.8007 IN TEST STARTED 3:35 PM END TIME 3:14 PM TEST STARTED 07/25/2013 END DATE 07/25/2013 BEGIN LEVEL 6.8112 IN END LEUEL 6.8060 IN END TIME 3:51 PM LEAK THRESHOLD 0.002 IN END DATE 07/15/2013TESTRESULTINCREASEDENDLEUEL6.8112 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 1314UDC TEST STARTED 2:59 PM 1516UDC TEST STARTED 07/25/2013 BEGIN LEVEL 6.7569 IN TEST STARTED 3:35 PM END TIME 3 :14 PM TEST STARTED 07/25/2013ENDDATE07/25/2013 BEGIN LEVEL 3.2914 INENDLEVEL6.7570 IN END TIME 3:51 PM LEAK THRESHOLD, 0.002 IN END DATE +7/25/2013TESTRESULTPASSEDENDLEVEL3.2614 IN f LEAK THRESHOLD 0.002 IN j TEST RESULT FAILED 1516UDC 1 TEST STARTED 2:59 PM i 1516UDCTESTSTARTED07/25/2013 BEGIN LEVEL 7.3095 IN f TEST STARTED 3:35 PM END TIME 3:14 PM TEST STARTED 07/25/2013 END DATE 07/25/2013 BEGIN LEVEL ' ,,, 7.2086 IN END LEVEL 7.2803 IN END.TIME.• 3:51 PM LEAK THRESHOLD 0.002 IN f END DATE •07/25/2013TESTRESULTFAILEDENDLEVEL7.1538 IN LEAK THRESHOLD 0.002 IN TEST RESULT FAILED WA SWRCB, January 2002 Page of Secondary Containment Testing Report Form This form is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and printoutsfrom tests (fapplicable), should be provided to the facility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: ARCO Date of Testing: 8/19/2013 Facility Address: 2501 Taft Hwy. Bakersfield, Ca. Facility Contact: Phone: 661- 397 -1497 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (rfpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Advanced Compliance Pass Technician Conducting Test: Bruce W. Hinsley Not Tested Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61 /1340 License Number: 971259 Manufacturer Manufacturer Training Component(s) Date Training Expires Incon TS -STS 9/17/2014 X 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made UDC #1 -2 X X UDC #7 -8 X X UDC #9 -10 X X 1 1 UDC #15 -16 X X 1 1 1 If hydrostatic testing was performed, describe what was done with the water after completion of tests: Containments were clean, water was removed from site and be used in future testing. CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated in this document are accurate and infull compliance with legal requirements Technician's Signature: , -, ti' Gi/ 1Z ,,/ Date: 8/19/2013 000 .- SWRCB, January 2002 UNDER- DISPENSER CONTAINMENT (UDC) TESTING Page of Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: Incon TS -STS Equipment Resolution: 0.0002 UDC # 1 -2 UDC # 7 -8 UDC#9_10 UDC # 15 -16 UDC Manufacturer: Unknown Unknown Unknown Unknown UDC Material: FRP FRP FRP FRP UDC Depth: 29" 29" 29" 29" Height from UDC Bottom to Top of Highest Piping Penetration: 10" 10" 10" 10" Height from UDC Bottom to Lowest Electrical Penetration: 6" 6" 6" 6" Condition of UDC prior to testing: Clean Clean Clean Clean Portion of UDC Tested 50% 50% 50% 50% Does turbine shut down when UDC sensor detects liquid (both product and water) ?' X Yes No NA X Yes No NA X Yes No NA X Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown ?* X Yes No NA X Yes No NA X Yes D No NA X Yes No NA Was fail -safe verified to be operational?* X Yes No NA X Yes No NA X Yes No NA X Yes No NA Wait time between applying pressure /vacuum /water and starting test 10 Min. 10 Min. 10 Min. 10 Min. Test Start Time: 10:23/10:39 10:23/10:39 12:28/12:44 12:28/12:44 Initial Reading (R,): 7.2733/7.2733 7.4403/7.4407 7.9503/7.9504 7.3969/7.3946 Test End Time: 10:38/10:55 10:38/10:55 12:43/13:00 12:43/13:00 Final Reading (RF): 7.2735/7.2740 7.4405/7.4407 7.9503/7.9503 7.3954/7.3929 Test Duration: 30 Min. 30 Min. 30 Min. 30 Min. Change in Reading (RF -R,): 0.0002/0.0007 0.0003/0.0000 0.0000 /0.0001 0.0015/0.0017 Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) r