HomeMy WebLinkAbout2800 PANAMA LANE FMC 2013HOODS ALARMS SPRINKLER SYSTEMS SPRAY BOOTH AST UST
Permit No. Permit No. Permit No. Permit No. Permit No. Permit No.
File Number: 5 S
Date Received: - ( 3
Address: 22'66 A.
Bakersfield, CA 933
Business Name: qL-4.('c-C
SYSTEM: BUILDING SQUARE FEET:
New Mod.
Commercial Hood System
Fire Alarm System
Fire Sprinkler System
Spray Finish System
Aboveground Storage Tank
Underground Storage Tank
minor
modification Underground Storage Tank
removal Underground Storage Tank
her. 7 GW C_
Building Sq. Feet:
Calculation Bldg. Sq. Ft: 1.
2.
3.
4.
INSPECTION LOG
Date Time
r/y"1
Signature
Signature
Comments: &4rc:- _4 a . &;,,Izae
232b9R- 9M '3113
1.'M # 2 i L E?e- l O /ZCj3
BILLING & PERMIT STATEMENT ' BAKERSFIELD FIRE DEPARTMENT
Prevention Services
PERMIT # R /Re 2101 H Street
Bakersfield, CA 93301
Dhnno Fmv KK1 -RS7 -7171
All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK.
a• - +"Aayc icim timnur moumcaaon) MTN
SITE INFORMATION
LOCATIOk OF PROJECT PROPERTY OWNER
ARCO Same
STARTING DATE COMPLETION DATE NAME
PROJECT NAME ADDS PHONE #
PROIECTADORE55
2800 Panama Lane CITY F%KFi— S EI STATE CA ZIP CODE
CONTRACTOR INFORNIATION
96 /hr
CONTRACTOR NAME CA LICENSE # Advanced Compliance 971259
TYPE OF LICENSE EXPIRATION DATE
C61 D40 3/31/2014
PHONE !
661- 706 -4321
CONTRACTOR COMPANY NAME FAX '#
Advanced Compliance 661- 589 -9329
ADDRESS CITY ZIPCODE
13704 Littlefalls Ct. Bakersfield 93312
All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK.
a• - +"Aayc icim timnur moumcaaon) MTN 167 /site 82
Underground Storage Tank (Removal) TR 573/tank 84
111 Mandated Leak Detection (test) /Fuel Mont Cert/SB989
NOTE: $96 /hr for each type of test/per site even If
scheduled at the same time TT
96/hr (2 hrs mirlimum) =$197
Cs tU Q 3 6K-
01
Kam' l a M
j q a
82
0 Oil well (Installation, Inspection, or re- Inspection) X 96 /hr 82
Tent # 96 /tent 84
After -hours Inspection fee 121 /hr (2 hrs minlmum) =.$242
Pyrotechnic (1 permit per event, plus an inspection fee of
96 /hr during business hours) PY
OTE: After hours Pyrotechnic event Inspection Is @ 121 /hr
96 /hr + (5 hrs min standby fee /Insp) =$576
5 hrs min standby fee Ins 605
84
Re- Inspection /Follow -up Inspection 961hr 84
Portable LPG (Propane): * of Cages? _ 961hr 84
Explosive Storage 266 84
Copying & File Research (File Research fee $50 /hr) 0.25 /page 84
Miscellaneous 84
M2021 (Riv 04/101
BILLING & PERMIT STATEMENT ' BAKERSFIELD FIRE DEPARTMENT
Prevention Services
PERMIT # Arms 2101 H StreetAffrAV
Bakersfield, CA 93301
Phnne- 661 -126 -3979 • Fay- 661 -R52- 2171___
SITE INFORMATION
Spray Booth (New & Modification)
LOCATION OF PROJECT PROPERTY OWNER
ARCO Same
STARTING DATE COMPLETION DATE NAME
PROJECT NAME ADDRESS PHONE S
PROJECT ADDRESS
2800 Panama Lane crTY $A1GERS:F1 EL. D STATE aA ZIP CODE
CONTRACTOR INFORMATION
Underground Storage Tank (Modification) MOD
CONTRACTOR NAME CA LICENSE ? Advanced Compliance 971259
ITYPE OF LICENSE EXPJRATION DATE
C61 D40 3/31/2014
PHONE !
661- 706 -4321
CONTRACTOR COMPANY NAME FAX #
Advanced Compliance 661- 589 -9329
ADDRESS CITY ZIPCODE
3704 Littlefalls Ct. Bakersfield 93312
All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK.
Alarm - New & Modification (minimum charge) $280
Over 10,000 sq ft $0.028 x sq ft
Sprinkler - New & Modification (minimum charge) $280
Over 10,000 sq ft $0.028 x sq ft
Minor Sprinkler Modification ( <10 heads) $96 (inspection only) 84
Commercial Hood (News & Modification) $470
Additional hood $S8
Spray Booth (New & Modification) 470
Aboveground Storage Tank (1 Inspection per installation) AST 180 /tank
Additional Tank ATI 96 /tank
Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR 109 /tank
Underground Storage Tank (instal latlon/Inspectlon) NI 878 /tank
Underground Storage Tank (Modification) MOD 878 /site
Underground Storage Tank (Minor Modification) MTM 167 /site
Underground Storage Tank (Removal) TR 573 /tank
11 Mandated Leak Detection (test) /Fuel Mont Cert/SB989
NOTE: $96 /hr for each type of test/per site even If
scheduled at the same time TT
961hr (2 hrs mirl1mum) =$197
a (,( 13 , K 12
Oil well (Installation, Inspection, or re- inspection) X 96 /hr
Tent # 96 /tent
After -hours inspection fee 121 /hr (2 hrs minimum) =$242
Pyrotechnic (1 permit per event, plus an Inspection fee of
961hr during business hours) PY
NOTE: After hours Pyrotechnic event Inspection Is Cep 121/hr
96 /hr + (5 hrs min standby fee/insp) =$576
5 hrs min standby fee ins = 605
Re- Inspection /Follow -up Inspection 96 /hr
Portable LPG (Propane): * of Cages? _ 96/hr
Explosive Storage 266
Copying & File Research (File Research fee $50 /hr) 0.25 /page
Miscellaneous
Iq
82
82
82
82
82
82
84
2
82
84
84
84
84
84
84
84
i.
UNDERGROUND STORAGE TANKS
APPLICATION
TO PERFORM ELD / LINE TESTING
SB989 SECONDARY CONTAINMENT TESTING
TANK TIGHTNESS TEST AND TO PERFORM
FUEL MONITORING CERTIFICATION
PERMIT NO.
ENHANCED LEAK DETECTION
TANK TIGHTNESS TEST
B 9 P I
FIRE
ARTM I r
BAKERSFIELD FIRE DEPT.
Prevention Services
1501 Truxtun Ave., 1st Floor
Bakersfield, CA 93301
Tel.: (661) 326 -3979
Fax: (661) 852 -2171
Page 1 of 1
LINE TESTING S &989 SECONDARY CONTAINMENT TESTING
X TO PERFORM FUEL MONITORING CERTIFICATION Cathodic Protection Testing
SITE INFORMATION
FACILITY ARCO NAME & PHONE NUMBER OF CONTACT PERSON
ADDRESS 2800 Panama Lane Bakersfield, Ca.
OWNERS NAME Same
OPERATORS NAME Same PERMIT TO OPERATE NO.
NUMBER OF TANKS TO BE TESTED IS PIPING GOING TO BE TESTED? YES NO
TANK# VOLUME CONTENTS
1 87 UL
2 87 UL
3 87 UL
4 91 UL
TANK.TESTING COMPANY.
NAME OF TESTING COMPANY Advanced Compliance Bruce W. Hinsley 661- 706 -4321
MAILING ADDRESS 3704 Littlefalls Ct. Bakersfield, Ca. 93312
Bruce W. Hinsley 661- 706 -4321 CERTIFICATION #: A25212
DATE & TIME TEST TO BE CONDUCTED Icc #: 8032698
SIGNATURE OF APPLICANT A. DATE 6/5/2013
APPROVED BY DATE
FD 2095 (Rev. 09/05)
BAKERSFIELD CITY FIRE DEPARTMENT — INSPECTION RECORD
Post this Card at the Job Site and DO NOT Remove for Duration of Work
Inspection Request Phone No. (661) 326 -3979
UST NEW INSTALL
DESCRIPTION DATE SIGNATURE
BACKFILL
PERMIT NO. /3-16 <5 00 :Z-7 7
PRIMARY PIPE
PHONE # ? - q 3Z
SECONDARY PIPE
SECONDARY CONTAINMENT
SENSORS
AUTHORIZATION FOR FUEL
ELECTRICAL SEAK -OFF
TANK TESTING
nl1 l WIM—AI I r
UST REMOVAL
DESCRIPTION DATE SIGNATURE
AST NEW INSTALL
DESCRIPTION DATE SIGNATURE
MODIFICATIONS MINOR / MAJOR
AST REMOVAL
DESCRIPTION DATE SIGNATURE
EVRUPGRADE
PRIOR TO OPERATION OF ANY SYSTEM,
ALL UST AND/Olt AST SYSTEMS SHALL BE
INSTALL, COMPLETE AND ACCEPTED BY
MISC. ACTIVITY THE BAKERSFIELD CITY FIRE DEPARTMENT.
FIRE DEPARTMENT (FINAL)
REMARKS:
BUILDING ADDRESS:
JOB DESCRIPTION: ;! wk C_ OCCUPANCY TYPE: /3
OWNER: -A, V' C C PERMIT NO. /3-16 <5 00 :Z-7 7
CONTRACTOR: PHONE # ? - q 3Z
FD 1743
ga s5
Appendix VI
Copies of Monitoring System Certification form and UST Monitoring Plot Plan available at http://www.waterboards.ca.00v.)
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of Califomia
Authority Cited., Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of
Regulations
This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for
each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system
owner /operator. The owner /operator must submit a copy ofthis form to the local agency regulating UST systems within 30 days of test date.
A. General information
Facility Name: ARCO Bldg. No.:
Site Address: 2800 Panama Ln. City: Bakersfield Zip:
Facility Contact Person: Contact Phone No.: (
Make/Model of Monitoring System: Veeder -Root TLS -350 Date of Testing /Servicing: -§_J1 6 / 2013
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to Indicate specific equipment Inspected /serviced:
Tank ID: 87 LIL Master Tank ID: 87 LIL Siphon
X In -Tank Gauging Probe. Model: Map. X In -Tank Gauging Probe. Model: Mao.
X Annular Space or Vault Sensor. Model: 794380 -409 X Annular Space or Vault Sensor. Model: 794380 -409
X Piping Sump / Trench Sensor(s). Model: 794380 -208 X Piping Sump/ Trench Sensor(s). Model: 794380 -208
X Fill Sump Sensor(s). Model: 794380 -208 X Fill Sump Sensor(s). Model: 794380 -208
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
X Electronic Line Leak Detector. Model: 99 LD -2000 Electronic Line Leak Detector. Model:
Tank Overfill / High -Level Sensor. Model: Tank Overfill / High -Level Sensor. Model:
Other(specify equipment a and model in Section E on Page 2). Other (specify equipment a and model in Section E on Page 2).
Tank ID: 87 UL Siphon Tank ID: 91 LIL
X In -Tank Gauging Probe. Model: Maa. X In -Tank Gauging Probe. Model: Maa.
X Annular Space or Vault Sensor. Model: 794380 -409 X Annular Space or Vault Sensor. Model: 794380 -409
X Piping Sump / Trench Sensor(s). Model: 794380 -208 X Piping Sump/ Trench Sensor(s). Model: 794380 -208
X Fill Sump Sensor(s). Model: 794380 -208 X Fill Sump Sensor(s). Model: 794380 -208
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: X Electronic Line Leak Detector. Model: 99 LD -2000
Tank Overfill / High -Level Sensor. Model: Tank Overfill / High -Level Sensor. Model:
Other(specify equipment and model in Section E on Page 2). Other(specify ui ment and model in Section E on Page 2)..
Dlspenser ID: 1 -2 Dispenser ID: 7 -8
X Dispenser Containment Sensor(s). Model: 794380 -208 X Dispenser Containment Sensor(s). Model: 794380 -208
X Shear Valve(s). X Shear Valve(s).
Dispenser Containment Floats and Chain(s). Dispenser Containment Floats and Chain(s).
DlspenserlD: 3 -4 Dispenser ID:
X Dispenser Containment Sensor(s). Model: 794380 -208 X Dispenser Containment Sensor(s). Model:
X Shear Valve(s). X Shear Valve(s).
n Dispenser Containment Floats and Chain(s). n Dispenser Containment Floats and Chain(s).
DlspenserlD: 5 -6 Dispenser ID:
X Dispenser Containment Sensor(s). Model: 794380 -208 X Dispenser Containment Sensor(s). Model:
X Shear Valve(s). X Shear Valve(s).
Dispenser Containment Floats and Chains Dispenser Containment Floats and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification - I certify that the equipment Identified in this document was inspected /seryiced In accordance with the manufacturers'
guidelines. Attached to this Certification is Information (e.g. manufacturers' checklists) necessary to verity that this information Is correct
and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a
copy of the report; (check all that apply): X System set -up X Alarm history report
Technician Name (print): Bruce W. Hinslev Signature: Iv ghjNt?.i
Certification No.: A25212 License. No.: 971259 C61/1340
Testing Company Name: Advanced Compliance Phone No.:(661) 706 -4321
Testing Company Address: 3704 Littlefalis Ct. Bakersfield, Ca. 93312 Date of Testing /Servicing: 6 / 18 / 2013
Monitoring System Certification Page 1 of 4 12/07
2/21/07
D. Results of Testing /Servicing
Software Version Installed: 18.01
Comolets the followina checklist:
X Yes 1 No' Is the audible alarm operational?
X Yes 0 No' Is the visual alarm operational?
X Yes u No' Were all sensors visually inspected, functionally tested, and confirmed operational?
X Yes No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their
proper operation?
Yes No' If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational ?.
X N/A
X Yes No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system
N/A detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply)
X Sumpfrrench Sensors; X Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks pod sensor
failure /disconnection? X Yes; No.
ri Yes No' For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention
X N/A valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent
of tank capacity does the alarm trigger? %
Yes' X No Was any monitoring equipment replaced? If yes, identity speck sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
X Yes' No Was liquid found Inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If
es, describe causes in Section E below.
X Yes No' I Was monitoring system set -up reviewed to ensure proper settings? Attach set up reports, if applicable
Yes No' Is all monitoring equipment operational per manufacturer's specifications?
In Section E below, describe how and when these deficiencies were orwill be corrected.
E. Comments:
Monitoring System Certification Page 2 of 4 12/07
2/21/07
F. In -Tank Gauging /SIR Equipment: X Check this box iftank gauging is used only for inventory control.
Check this box ifno tank gauging or SIR equipment is installed.
This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring.
Complete the following checklist:
Yes No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
Yes n No* Were all tank gauging probes visually inspected for damage and residue buildup?
Yes No* Was accuracy of system product level readings tested?
Yes No* Was accuracy of system water level readings tested?
Yes No* Were all probes reinstalled properly?
Yes No* Were all items on the equipment manufacturer's maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD): Check this box if LLDs are not installed.
Complete the following checklist:
X Yes No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all
o N/A that apply) Simulated leak rate: X 3 g.p.h.; 0.1 g.p.h ; 0.2 g.p.h.
X Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements?
X Yes No* Was the testing apparatus properly calibrated?
X Yes No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
N/A
p Yes No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
X N/A
p Yes No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or
X N/A disconnected?
n Yes n No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or
X N/A fails a test?
p Yes No* For electronic LLDs, have all accessible wiring connections been visually inspected?
X N/A
X Yes No* Were all items on the equipment manufacturer's maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H, Comments:
Monitoring System Certification Page 3 of 4 12/07
2/21/07
5
Monitoring System Certification
Site Address: 2800 Panama Ln., Bakersfield Ca.
vm
m
d
m
CDW
UST Monitoring Site Plan
N
Monitor' .
Store
ESO - . . . . . . . . . . .
STP . . . R ' ' Annular . . . .
87. .
oc . G
UDC . . UDC . . . . . . . . . . . . . . . . . . . . .
M."
o s5-, ®...... .
Date map was drawn:
Instructions
If you already have a diagram that shows all required information, you may include it, rather than this page, with your
Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify
locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular
spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak
detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan
was prepared.
Page of 05100
Advanced Compliance
3704 Littlefalls Ct.
Bakersfield, Ca. 93308
661 - 706 -4321 Fax# 661 -589 -9329
VAPORLESS MANUFACTURING, INC.
LDT -890 Leak Detector Test Record
Contractor: Advanced Compliance Customer: ARCO
Date: 6/18/2013 Location: 35300 Panama Ln.
Bakersfield, Ca.
Product: 87 UL Technician: Bruce W. Hinsle
Submersible Pump Identification
Manufacturer: Red'acket Model No.:
Serial No.: Notes:
Leak Detector Identification
Manufacturer: VMI Description: 99 LD -2000
Diaphragm-type: Piston-type: X
Tamper -proof seal installed: Other Style Leak Detector:
Notes:
Leak Detector in Submersible Pump Test at Dispenser
Operating Pump Pressure (psi): 28 para. 15
Gallons per hour rate: 3.0 ara. 22
Line pressure with pump shut off (psi): 28 para. 23
Bleed -back Test with pump off (ml): 80 para. 26
Step-through time to full flow (secs): 3 para. 30
Leak detector stays in leak search position (Yes/No): Yes para. 42
Leak Detector Test
Pass / Fail Notes:
Pass
Complete thermal ex anion test beforefailing leak detector
Advanced Compliance
3704 Littlefalls Ct.
Bakersfield, Ca. 93308
661 - 706 -4321 Fax# 661 -589 -9329
VAPORLESS MANUFACTURING, INC.
LDT -890 Leak Detector Test Record
Contractor: Advanced Compliance Customer: ARCO
Date: 6/18/2013 Location: 35300 Panama Ln.
Bakersfield, Ca.
Product: 91 UL Technician: Bruce W. Hinsle
Submersible Pump Identification
Manufacturer: Red'acket Model No.:
Serial No.: Notes:
Leak Detector Identification
Manufacturer: VMI Description: 99 LD -2000
Diaphragm-type: Piston-type: X
Tamper -proof seal installed: Other Style Leak Detector:
Notes:
Leak Detector in Submersible Pump Test at Dis enser
Operating Pump Pressure (psi): 26 para. 15
Gallons per hour rate: 3.0 para. 22
Line pressure with pump shut off (psi): 26 para. 23
Bleed -back Test with pump off (ml): 85 para. 26
Step-through time to full flow (secs): 3 para. 30
Leak detector stays in leak search position (Yes/No): Yes para. 42
Leak Detector Test
Pass / Fail Notes:
Pass
Complete thermal expansion test beforefailing leak detector
SWRCB, January 2006
Spill Bucket Testing Report Form
Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and
printouts from tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: ARCO Date of Testing: 6/18/2013
Facility Address: 2800 Panama Ln. Bakersfield, Ca.
Facility Contact: Phone:
Date Local Agency Was Notified ofTesting:
Name ofLocal Agency Inspector (ifpresent during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Advanced Compliance
Technician Conducting Test: Bruce W. Hinsley
Credentials: X CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Spec)
License Number(s): 971259
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: X Hydrostatic Vacuum Other
Test Equipment Used: Visual Equipment Resolution:
Identify Spill Bucket (By Tank
Number, Stored Product, etc.
1 87 UL Master 2 87 UL Siphon 3 87 UL Siphon 4 91 UL
Bucket Installation Type: Direct Bury
X Contained in Sump
Direct Bury
X Contained in Sump
Direct Bury
X Contained in Sump
Direct Bury
X Contained in Sum
Bucket Diameter: 12" 12" 12" 12"
Bucket Depth: 14" 14" 14" 14"
Wait time between applying
vacuum /water and start oftest:
10 min. 10 min. 10 min. 10 min.
Test Start Time (Ti): 09:30 09:30 09:30 09:30
Initial Reading (111): 9.50" 9.25" 10.00" 09.50"
Test End Time (TF): 10:30 10:30 10:30 10:30
Final Reading (RF): 9.50" 9.25" 10.00" 09.50"
Test Duration (TF — Tj): 1 Hr. 1 Hr. 1 Hr. 1 Hr.
Change in Reading (RF - Rj): 0.0" 0.0" 0.0" 0.0"
Pass/Fail Threshold or
Criteria: 0.25" 0.25" 0.25" 0.25"
Test Result: 11 X Pass Fail X Pass Fail X Pass Fail X Pass Fall
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements.
Technician's Signature:_ Date: 6/18/2013
State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements
may be more stringent.