Loading...
HomeMy WebLinkAbout4013 H STREET SB-989 2013HOODS ALARMS SPRINKLER SYSTEMS SPRAY BOOTH AST UST Permit No. Permit No. Permit No. Permit No. Permit No. Permit No. File Number: 36 z- Z Address: -9,d 3 5 • -,q 5'- Bakersfield, CA 933 Date Received: Business Name: " =S-; SYSTEM: BUILDING SQUARE FEET: INSPECTION LOG New Mod. Commercial Hood System Fire Alarm System Fire Sprinkler System Spvay FWsh System Aboveground Storage Tank Underground Storage Tank minor modification Underground Storage Tank removal Underground Storage Tank Building Sq. Feet: Calculation Bldg. Sq. Ft: W 0,- Other. S 3 g X 2 Comments: 3. 4. Date Time Signature A304, C'rl L IL- Signature A304, C'rl SWRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing ofUSTsecondary containment systems. Use the appropriate pages ofthisform to report results for all components tested. The completedform, written test procedures, and printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: #7721 Fastrip # 22 (North) Date ofTesting: May 7 -8, 2013 Facility Address: 4013 South -H- Street Bakersfield, CA 93304 Facility Contact: Omero Garcia I Phone: 661 - 393 -7000 Date Local Agency Was Notified of Testing: 5/1/2013 Name of Local Agency Inspector (fpresent during testing): Esther Duran SWRCB Licensed Tank Tester 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Pass Fail Technician Conducting Test: Repairs Made Component Credentials: x CSLB Licensed Contractor SWRCB Licensed Tank Tester Not Tested License Type: CSLB 87 Annular License Number:804904 Manufacturer Manufacturer Training Component(s) Date Training Expires UST Installaton/Retrofit 11/22/2013 UST Service technician ICC 1 -28 -2015 Star. Smith. Fibercast Fiber Glass Systems N.A. UDC 17 -18 X 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made 87 Annular X UDC 15 -16 X X 91 Annular X UDC 17 -18 X Diesel Annular X UDC 19 -20 X 87 Secondary Line X 87 Vapor Spill Bucket X 91 Secondary Line X 91 Vapor Spill Bucket X Diesel Annular Line X X 0 87 STP Sump X X 91 STP Sump X 0 0 0 0 Diesel STP Sump X UDC 9 -10 X 0 UDC 11 -12 X 1 X 0 0 0 0 UDC 13 -14 X 0 0 0 0 If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was put back into test trailer and waste drum CERTIFICATION OF TECHNICIA VESP NSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, facts stated i this are accurate and infull compliance with legal requirements Technician's Signature: Date: 05/07- 08/2013 SWRCB, January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure x Vacuum Hydrostatic Other (Specie) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Tank # 87 Tank # 91 Tank # Diesel Tank # Is Tank Exempt From Testing ?' Yes X No Yes X No Yes X No Yes No Tank Capacity: 12,000 12,000 12,000 Tank Material: STEEL/ FRP STEEL/ FRP STEEL /FRP Tank Manufacturer: Modern Welding Modern Welding Modern Welding Product Stored: 87 Annular 91 Annular Diesel Annular Wait time between applying pressure /vacuum /water and starting test: 5 Mins 5 Mins 5 Mins Test Start Time: 9:45 am 9:45 am 9:45 am Initial Reading (Rj): 10.00" Hg 10.00" Hg 10.00" Hg Test End Time: 10:45 am 10:45 am 10:45 am Final Reading (RF): 10.00" Hg 10.00" Hg 10.00" Hg Test Duration: 1 Hour 1 Hour 1 Hour Change in Reading (RF -Ri): 0.00" 0.00" 0.00" Pass/Fail Threshold or Criteria: 0.00" 0.00" 0.00" Test Result: X Pass 0 Fail X Pass Fail X Pass "' Fail'- Pas's ' Fail'" Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes No NA X Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) Single Wall Tanks Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) T SWRCB, January 2002 5. SECONDARY PIPE TESTING Page of Test Method Developed By: Piping Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: x Pressure Vacuum Hydrostatic Other (Specie) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run # 87 Piping Run # 91 Piping Run #Diesel Piping Run # Piping Material: FRP FRP FRP Piping Manufacturer: Smith Smith Smith Piping Diameter: 3.00" 3.00" 3.00" Length of Piping Run: 120' 120' 120' Product Stored: 87 Secondary 91 Secondary Diesel Secondary Method and location of piping-run isolation: Test Boot Test Boot Test Boot Wait time between applying pressure /vacuum/water and starting test: 5 Min 5 Min 5 Min Test Start Time: 10:30 am 10:30 am 10:30 am Initial Reading (Rj): 5.00 "PSI 5.00 "PS1 5.00 "PSI Test End Time: 11:30 am 11:30 am 11:30 am Final Reading (RF): 5.00 "PSI 5.00 "PSI 5.00 "PSI Test Duration: 1 Hour 1 Hour l Hour Change in Reading (RF -R,): 0.00" 0.00" 0.00" Pass/Fail Threshold or Criteria: 0.00" 0.00" 0.00" Test Result: X Pass. Fail X .Pass O'Fail r X, Pass ' " 0 F il P.,Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) I I SWRCB, January 2002 Page of 6. PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer x Industry Standard Professional Engineer Other (Specie) Test Method Used: Pressure Vacuum x Hydrostatic Other (Spec) Test Equipment Used: Ts -sts Equipment Resolution: Sump # 87 Sump # 91 Sump # Diesel Sump # Sump Diameter: 37.00" 37.00" 37.00" Sump Depth: 47.00" 47.00" 47.00" Sump Material: FRP FRP FRP Height from Tank Top to Top of Highest Piping Penetration: 10.00" 14.00" 13.00" Height from Tank Top to Lowest Electrical Penetration: 10.00" 15.00" 15.00" Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry Portion of Sump Tested' High Penetration High Penetration High Penetration Does turbine shut down when sump sensor detects liquid (both product and water)?* Yes No X NA Yes No X NA Yes No X NA Yes No NA Turbine shutdown response time N/A N/A N/A Is system programmed for fail -safe shutdown ?* Yes No X NA Yes No X NA Yes No X NA Yes No NA Was fail -safe verified to be operational?* Yes No X NA Yes No X NA Yes No X NA Yes No NA Wait time between applying pressure /vacuum/water and starting test: 5 Min 5 Min 5 Min Test Start Time: Initial Reading (Rj): Test End Time: See INCON Final Reading (RF): Resuh Test Duration: Change in Reading (RF -Ri): Pass /Fail Threshold or Criteria: Test Result: X Pass . Fail : X Pass.' ` 0 Fail X Pass. ,Fail. D Pass_ 0 Fair ;, : Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Ifthe entire depth of the sump is not tested, specify how much was tested. If the answer to qny of the questions indicated with an asterisk(*) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -l60) t \'A SWRCB, January 2002 7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING Page of Test Method Developed By: UDC Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum x Hydrostatic Other (Spec) Test Equipment Used: Ts -sts Equipment Resolution: UDC # 9 -10 UDC # 11 -12 UDC # 13 -14 UDC # 15 -16 UDC Manufacturer: Gilbarco Gilbarco Gilbarco Gilbarco UDC Material: Polly Polly Polly Poll UDC Depth: 29.00" 29.00" 29.00" 29.00" Height from UDC Bottom to Top of Highest Piping Penetration: 12.00" 10.00" 10.00" 10.75" Height from UDC Bottom to Lowest Electrical Penetration: 4.00" 4.00" 4.00" 4.00" Condition of UDC prior to testing: Clean & Dry Clean & Dry Clean & Dry Clean & Dry Portion ofUDC Tested High Penetration High Penetration Hi h Penetration High Penetration Does turbine shut down when UDC sensor detects liquid (both product and waterp. Yes No X NA Yes No X NA Yes No X NA Yes No X NA Turbine shutdown response time N/A N/A N/A N/A Is system programmed for fail- safe shutdown ?' Yes No X NA Yes No X NA Yes No X NA Yes No X NA Was fail -safe verified to be o erational ?` Yes No X NA Yes No X NA Yes No X NA Yes No X NA Wait time between applying pressure /vacuum /water and starting test 5 Min 5 Min 5 Min 5 Min Test Start Time: Initial Reading (Ri): See- Test End Time: Egg] Final Reading (RF): Res Test Duration: Change in Reading (RF -Ri): Pass/Fail Threshold or Criteria: Test Result: X Pass . Fail' ; X .Pass Fair- - X Pass. - Fair X lass t..FAAI;, -: Was sensor removed for testing? JXYes No NA X Yes No NA X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Ifthe entire depth ofthe UDC is not tested, specify how much was tested. If the answer to as of the questions indicated with an asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) f z,- ,a- :ra_a : s: :s-u: {:sy.:c!t cayaac.;rr i i 8 b;,`' ua+;a r'+nr!,asxtnircrw..auvrc tf rb`i3srme:at'7e<< SWRCB, January 2002 Page of 7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum x Hydrostatic Other (Spec) Test Equipment Used: Ts -sts Equipment Resolution: UDC # 17 -18 UDC # 19 =20 UDC # UDC # UDC Manufacturer: Gilbarco Gilbarco UDC Material: Polly Poll UDC Depth: 29.00" 29.00" Height from UDC Bottom to Top of Highest Piping Penetration: 12.00" 12.00" Height from UDC Bottom to Lowest Electrical Penetration: 6.00" 6.00" Condition of UDC prior to testing: Clean & Dry Clean & Dry Portion of UDC Tested High Penetration High Penetration Does turbine shut down when UDC sensor detects liquid (both product and water) ?` Yes No X NA Yes No X NA Yes No NA Yes No NA Turbine shutdown response time N/A N/A Is system programmed for fail- safe shutdown ?* Yes No X NA Yes No X NA Yes No NA Yes No NA Was fail -safe verified to be operational?* Yes No X NA Yes No X NA Yes No NA Yes No NA Wait time between applying pressure /vacuum /water and starting test 5 Min 5 Min Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Results Test Duration: Change in Reading (RF -Ri): Pass/Fail Threshold or Criteria: Test,Result:- - - X Pass_. Fail X .Pass Fail 1- -.. Pass Fail h - Pass f7 Fail Was sensor removed for testing? X Yes No NA X Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. Ifthe answer to any of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) I I SWRCB, January 2002 8. FILL RISER CONTAINMENT SUMP TESTING Page of Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested X Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: Equipment Resolution: Fill Sump # Fill Sump # Fill Sump # Fill Sump # Sump Diameter: Sump Depth: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure /vacuum/water and starting test: Test Start Time: Initial Reading (R,): Test End Time: Final Readin (RF): Test Duration: Change in Reading (RF -R,): Pass/Fail Threshold or Criteria: Test Result: Pass.. D Fail . Pass. Fail_ Pass,,,_.D,Fail 0 Pass.._ D Fail,, Is there a sensor in the sump? Yes No Yes No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA Yes No NA j Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? yes No NA Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SWRCB, January 2002 Page of 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum x Hydrostatic Other (Specie) Test Equipment Used: Ts -sts Equipment Resolution: Spill Box # 87 Vapor Spill Box # 91 Vapor Spill Box # Spill Box # Bucket Diameter: 12.00" 12.00" Bucket Depth: 12.00" 12.00" Wait time between applying pressure /vacuum /water and starting test: 5 Mins 5 Mins Test Start Time: 9:45 am 9:45 am Initial Reading (Rj): 10.25" 11.00" Test End Time: 10:45 am 10:45 am Final Reading (RF): 10.25" 11.00" Test Duration: 1 Hour 1 Hour Change in Reading (RF -Rj): 0.00" 0.00" Pass/Fail Threshold or Criteria: 0.00" 0.00" Test Result: X Pass Fail : X, Pass , Fail r Pass Fail : 0 Pass . Fail-- Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) 4O F GEN t.UST= y Job Order / Invoice # 3 U-7 U BUILD WITH CONFIDENCE" Date Call Made Time To Whom Station Control Number Repajr Daze Invoice DateTollFree #: 1- 800 - 339 -9930 ` Y /GV/ Name Confidence UST Construction Inc. Site Name: s Street 16250 Meacham Road o Street / JUW City Bakersfield,Ca 93314 City Stat Zip01U Terms Store Number: 7 Description of work performed: r S vt r Yl G Labor Date Name /Number Class Hours Hourly Amount Arrived Departed Labor Travel Total Rate } t PM O P AM AM PM PM AM AM PMI PM mPlayee S gna ! ire Dale Ver;dor S gna[uro Dtcie Contractor Supplied - Materials - Rentals Amount Sub -Total Quantity Total A Labor Total B Material Total C Mileage Total Amount Invoice A + B + C Accounting Breakdown Mileage Miles Rate Total Sub Total Handling % Tax ( If applicable) Total C I Total B May we please have your comments regarding service / equipment provided by the above named contractor: Store Employee Printed Name ' elure Date Approved By Date INVOfCE - WHITE Y SITE-CANARY 1 I 7721 FASTRIP 7721 FASTRIP 4013 SOUTH H 7721 FASTRIP BAKERSFIELD CA 4013 SOUTH H 661- 393 -7000 BAKERSFIELD CA WO -30708 661- 393 -7000 NO -30708 WO -30708 05/08/2013 8:16 AM C 5/09/2013 9:21 AM 05/08/2013 8:32 AM 05/09/2013 8:48 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 19 -20 87 -STP 19-20 87 -STP TEST STARTED 8 :01 AM TEST STARTED 9:05 AM TEST STARTED 05/08/2013 TEST STARTED 8:33.AM BEGIN LEVEL 3.3526 IN TEST STARTED 05/09/2013 END TIME 8:16 AM BEGIN LEVEL 3,2130 IN END DATE 05/08/2013 END TIME 8:48 AM END LEVEL 3,3519 IN END DATE 05/09/2013 EAK THRESHOLD 0,002 IN END LEVEL 3,2116 IN IEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT . PASSED TEST RESULT PASSED 7721 FASTRIP 4013 SOUTH H BAKERSFIELD CA 661 - 393 -7000 NO -30708 05/07/2013 10:50 AM SUMP LEAK TEST REPORT DIE -STP TEST STARTED 10:35 AM TEST STARTED 05/07/2013 BEGIN LEVEL 3,7319 IN END TIME 10:50 AM END DATE 05/07/2013ENDLEVEL3.7329 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED ST( TEF , 1.M TE 'ED ,'/2013 BEGiti . °, - 72 IN END TIME ?`:50 AM END DAIC 0:,Ur12013 END LEVEL 2, 9678 If, LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 7721 FASTRIP 7721 FASTRIP 4013 SOUTH H 4013 SOUTH H BAKERSFIELD CA BAKERSFIELD CA 661- 393 -7000 661- 393 -7000 WO -30708 NO -30708 C 5/09/2013 9:21 AM 05/08/2013 8:32 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 87 -STP 19-20 TEST STARTED 9:05 AM TEST STARTED 8:17 AM TEST STARTED 05/09/2013 TEST STARTED 05/08/2013 BEGIN LEVEL 3,2085 IN BEGIN LEVEL 3,3516 IN END TIME 9:20 AM END TIME 8:32 AM END DATE 05/09/2013 END DATE 05/08/2013 END LEVEL 3.2069 IN END LEVEL 3,3517 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT . PASSED 7721 FASTRIP 4013 SOUTH H BAKERSFIELD CA 661 - 393 -7000 NO -30708 05/07/2013 10:50 AM SUMP LEAK TEST REPORT DIE -STP TEST STARTED 10:35 AM TEST STARTED 05/07/2013 BEGIN LEVEL 3,7319 IN END TIME 10:50 AM END DATE 05/07/2013ENDLEVEL3.7329 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED ST( TEF , 1.M TE 'ED ,'/2013 BEGiti . °, - 72 IN END TIME ?`:50 AM END DAIC 0:,Ur12013 END LEVEL 2, 9678 If, LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 7721 FASTRIP 4013 SOUTH H BAKERSFIELD CA 661 - 393 -7000 WO-30708 05/07/2013 11 :06 AM SUMP LEAK TEST REPORT DIE —STP TEST STARTED 10:51 AM TEST STARTED 05 /07/2013 BEGIN LEVEL 3,7329 IN END TIME 11:06 AM END DATE 05/07/2013 END LEVEL 3,7334 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 91 -STP TEST STARTED 10:51 AM TEST STARTED 05 /07/2013 BEGIN LEVEL 2,9680 IN END TIME 11:06 AM END DATE 05 /07/2013 END LEVEL 2,9682 IN LEAK THRESH' o., JA TEST RESULT 'ASSED FASTRIP 7721 BACKERSFIELD 1 -800- 984 -6266 05/10/2013 12:41 PM SUMP LEAK TEST REPORT UBC1516 TEST STARTED 12:25 PM TEST STARTED 05/10/2013 BEGIN LEVEL 5,5195 IN END TIME 12:41 PM END DATE 05/10/2013 END LEVEL 5.5195 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FASTRIP 7721 BACKERSFIELD 1- 800 -984 -6266 05/10/2013 12:56 PM SUMP LEAK TEST REPORT UDC1516 TEST STARTED 12:41 PM TEST STARTED 05/10/2013 BEGIN LEVEL 5,5195 IN END TIME 12:56 PM END DATE 05/10/2013 END LEVEL 5.5193 IN LEAK THRESHOLD 0,002 -IN TEST RESULT PASSED 772?. hr, 4011 BACKE 66i -3' -r'L 5/07/101' - UDC1718 EST STARTED PM TEST 0' `13 BEGIN LEVEL 217 IN END TIME l3 ?I dD DATE 05, r,/ NP LEVEL v AK THRESHOLD 0.- TEST RESULT (E0 721 iIP 41? ~ 3A XF. 3/07/201' LIMP LEAK TEE.-T UX171S, EST STARTED 1:14 PP7.ST STARTED 05/07/ 3LEVEL5.4217 TIME 1. ?,,RmATE05/07, r'..:• ND LEVEL 5 { , EA9 THRESHOLD 0. 2• inSTRESULTpASED 7721 FASTRIP 7721 FASTRIP 4013 SOUTH H 4013 SOUTH H BAKERSFIELD CA BAKERSFIELD CA 661- 393 -7000 661- 393 -7000 WO-30708 WO -30708 05/07/2013 2:03 PM 05%07/2013 1:47 PM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 9 -10 9-10 TEST STARTED 1:48 PM TEST STARTED 1:32 PM TEST STARTED 05/07/2013 TEST STARTED 05/07/2013 BEGIN LEVEL 6,3825 IN BEGIN LEVEL 6.3827 IN END TIME 2:03 PM END TIME 1:47 PM END DATE 05 /07/2013 END DATE 05/07/2013 END LEVEL 6,3823 IN END LEVEL 6,3825 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED 11 -12 11 -12 TEST STARTED 1:48 PM TEST STARTED 1:32 PM TEST STARTED 05/07/2013 TEST STARTED 05 /07/2013 BEGIN LEVEL 2,0291 IN BEGIN LEVEL 2.0300 IN END TIME 2:03 PM END TINE 1 :47 PM END DATE 05/07/2013 END DATE 05/07/2013 END LEVEL 2,0289 IN END LEVEL 2.0290 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED 13 -14 13 -14 TEST STARTED 1:48 PM TEST STARTED 1:32 PM TEST STARTED 05 /07/2013 TEST STARTED 05/07/2013 BEGIN LEVEL 5,9272 IN BEGIN LEVEL 5,9276 IN END TIME 2:03 PMENDTIME1:47 PM END DATE 05/07/2013ENDDATE05/07/2013 END LEVEL 5.9270 IN END LEVEL 5,9274 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED BAKERSFIELD CITY FIRE DEPARTMENT — INSPECTION RECORD Post this Card at the Job Site and DO NOT Remove for Duration of Work Inspection Request Phone No. (661) 326 -3979 UST NEW INSTALL DESCRIPTION DATE SIGNATURE BACKFILL PRIMARY PIPE SECONDARY PIPE SECONDARY CONTAINMENT SENSORS AUTHORIZATION FOR FUEL ELECTRICAL SEAK -OFF TANK TESTING UST REMOVAL DESCRIPTION DATE SIGNATURE AST NEW INSTALL DESCRIPTION DATE SIGNATURE MODIFICATIONS MINOR / MAJOR AST REMOVAL DESCRIPTION DATE SIGNATURE EVR UPGRADE PRIOR TO OPERATION OF ANY SYSTEM, ALL UST AND /OR -AST SYSTEMS SHALL BE INSTALL, COMPLETE AND ACCEPTED BY MISC. ACTIVITY THE- BAKERSFIELD CITY FIRE DEPARTMENT. FIRE DEPARTMENT (FINAL) BUILDING ADDRESS: (3 5 • f-i is-(, JOB DESCRIPTION: 3 - OCCUPANCY TYPE: OWNER: - tom siT i PERMIT NO. 13 -/ Ql CONTRACTOR: Cow Yvc PHONE # /-- 39'j6 FD 1743 0 BILLING ~ PERMIT STATEMENT nNi" ag -1 1- D PERMIT # FIREdj!ARTM T ilnulpl. LOCATION OP PROJECT STARTING DATE COMPLETION DATE 11RO)VCT NAME: PROJECT AD RUSS Iih1?. G..,1k- oIk11 ADDRESS P(AME 1 --U L OWNER BAiKERSFIELD FIRE DEPARTMENT Prevention Services 2101 H Street Bakersfield, CA 93301 hone_ 6611-32 -3979 • Fax: 6F1 -RS? -?171 1I .....,.- _..Si.G. lR IICLZf1C? _._ rU!GU eY ADDRESS 1u.. PHONE M —.... _..—. 82515 CITY BA`-Er,,,,Sr- IEL-D STATE CA ZIP cODF c-133Z - 2515 CA LICENSE # i TYPE OF LICENSF. 313 i CITY Please make checks payabile to CITY OF BAKERSFIELD. Thank you. PHONE 9 FAX # Cl.a1.o_ 5?5 =1 —`'ice ZIP CODE CI x'A t s.a°±F 5^ dpS'^Z x:.Gr 140 uft 'i C 'k.a r,945 § {v, - Fi1 r- z F-i 4t3€'4.'• f ;.x.7`.} .k 7 fir. k,.=i .. xr r a z !':;k rL`.cav -.t y t _ ?c y.' .: - 'tit T.N j..`t t ;". '^' - (» +• -.,, . aPAYTOTFiE ,. 384.00 ft u t a DOLLARS z Clty of Bakersfield Y r - MEMO Permit 1100L093211' i:32227L7241: 009S34L489iS?lie Underground Storage Tank (Minor Modification) M I m X10/ /Sloe .._ 1 Underground Storage Tank (Removal) TR 573 /tank 84 y p. Mandated UST Testing: Fuel Mont Cert /SB989 /Cath. Prot. NOTE: $96 /hr for each type of test /per site /per UST system even if scheduled at the same time 96 /hr (2 hrs minimum) _ $192 82 0 Oil well (Installation, Inspection, or re- inspection) X 96 /hr 82 Tent # 96 /tent 84 I After -hours inspection fee 121 /hr (2 hrs minimum) _ $242 Pyrotechnic (1 permit per event, plus an inspection fee of 96 /hr during business hours) PY NOTE: After hours Pyrotechnic event inspection is @ $121 /hr 96 /hr + (5 hrs min standby fee /insp) _ $576 5 hrs min standby fee /insp) = $605 84 Re- inspection /Follow -up Inspection 96 /hr 84 Portable LPG (Propane): # of Cages? _ 96 /hr 84 Explosive Storage 266 84 Copying & File Research (File Research fee $50 /hr) 0.25 /page 84 Miscellaneous 84 PW "R r- y UNDERGROUND STORAGE TAMRS APPLICATION l'O PI-RUDRUM 'nzS-r.jNG/ S119',39 SECONDAPY r-OKI-I'AINMENT n— FNIIIANI-I.:0 1j:AK BAKERSHELID FIRE DEPART14EAGy WOO *1'1'1.1)-'I.'Ll)) Ave., Sj.fij:(, 0 #YPAN AjVjjVr CA 9330). Phone: r)c)], J).-,) 6-3979 c SIT17- INrOJIMATTrIft. I OI COPITACT 11qtl surfSoA\ Itt'lil.ft RAN( WING GII)INc; H) 1.41: U I.D TA N K .1 V 0 I. 1.1 M 11 OF TftfqK$ TO 106 'll: C0 N TANVITSTING COMPANY NA •1: P, P1101-111 11 01• (:QNI*A(:')' NAtlr,l Illf.11 Z 0)• Tv's,f): D ;PPVIAI, 114"OTC101( J) 7 I 0,)If & I ICU Wv) 11, '114 (MM"'? UX p 5.11M q AITI 1(:A:41 UIZI; I)ATI: THIS APPLICATION BECOMES A PERWIXY WHEN APPROVED DAYI: 1:112.11,15 (1?,!v 4(;J(Iej nwILi1NG-& FERNY STATEMENT ,l lili p;q;;• I L D PERMIT A/PfAI ! ns w isniw - BAKERSFIELD FIRE DEPARTMENT Prevention: Services 2101 H Street Bakersfield, CA 93301 Phnna.,f,F,:1.- - Q7Q..Fav• 1_ar_ O5 Y1 -4 5V r,.,. , .. .. - _,.r T,.,- .- .,._•Y --,.. _.._._r,- .. P RTY OWNER Qin 1 STARTI DATE CID ON DATE q AM NAME Gard' \ MI PROJECT NAME ADDRESS PHONE # 1,2 U 1 - - IkLOPROJECTApbREss 11 CITY $ ERS 16L_D STATE CA z QP i - 5 CONTRACTOR, INFORIM AT'ON CO CTOR'N{N1E CA LICE SE # X10 TYPE OF LICENSE EXPIRATION ATE ` ?PHONE'# 0 3181 %l 1 o .._ ..- ......: _.._ _ . . 3 - CONTRACTOR COMPANY NAME FAX # 15"1 -158 ADDRESS CITY 2IP CODE 3 Please make checks oavable to CM OF BAKERSFIELD. Thank you. EI PERMIT TYPE FEE CALCULATION TOTAL DUE Alarm New & Modification (minimum charge) $280 TRE'S ccT Over 10,000 sq ft 0 .028 x sq ft Sprinkler - New & Modification (minimum charge) 280 Over 10,000 sq ft 0 .028 x sq ft Sprinkler - Minor Modification ( <10 heads). 96 (inspection only) 84 Commercial Hood (New & UL 300 Upgrade Modification) Additional Hood 470 58 hood Commercial Hood - Minor Modification (add /move nozzle) 96 (Inspection only) 84 Spray Booth (New & Modification) 470 98 O Aboveground Storage Tank (1 Inspection per installation) AST 180 /tank 82 Additional'Tank ATI 96 /tank 82 Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR 109 /tank 82 Underground Storage Tank (Installation /Inspection) NI 878 /tank 82 Underground Storage Tank (Modification) MOD 878 /site 82 Underground Storage Tank (Minor Modification) MTM 167 /site 82 Underground Storage Tank (Removal) TR 573 /tank 84 Mandated UST Testing: Fuel Mont Cert/SB989 /Cath. Prot. NOTE: $96 /hr for each type of test/per site /per UST system even if scheduled at the same time 96 /hr (2 hrs minimum) _ $192 82 Oil well (Installation, Inspection, or re- inspection) X 96 /hr 82 Tent # 96 /tent 84 After -hours inspection fee 121 /hr (2 hrs minimum) = $242 Pyrotechnic (1 permit per event, plus an inspection fee of 96/hrduring business hours) Py NOTE: After hours Pyrotechnic event Inspection is @ $121 /hr 96 /hr + (5 hrs min standby fee /insp) _ $576 5 hrs min standby fee Ins = 605 84 Re- inspection /Follow -up Inspection 96 /hr 84 Portable LPG (Propane): # of Cages? _ 96 /hr 84 Explosive Storage 266 84 Copying & File Research (File Research fee $50 /hr). 0.25 /page 84 Miscellaneous 84 FD2021_lRev.05/111___.