Loading...
HomeMy WebLinkAboutORD NO 4977ORDINANCE NO. 4 9 7 7 AN ORDINANCE OF THE BAKERSFIELD CITY COUNCIL APPROVING AN AMENDMENT TO TITLE 17 OF THE BAKERSFIELD MUNICIPAL CODE TO CHANGE THE ZONE DISTRICT GENERALLY LOCATED AT 5601 CALIFORNIA AVENUE (ZC NO. 19-0021). WHEREAS, McKently Malak Architects, Inc. (applicant), on behalf of Dollinger Properties (property owner), filed an application with the City of Bakersfield Development Services Department requesting to change the zone district from a Planned Commercial Development (P.C.D.) zone to a revised P.C.D. zone on approximately 1.95 acres of a larger 16.75 acre commercial center generally located at 5601 California Avenue as shown in attached Exhibit 2 (the "Project"); and WHEREAS, the Planning Commission held a public hearing on May 16, 2019, and approved Resolution No. 55-19, which recommended that the City Council approve the Project; and WHEREAS, the City Council considered all facts, testimony, and evidence concerning the Project, including the staff report, and the Planning Commission's deliberation, and action; and WHEREAS, the Project is consistent with the Metropolitan Bakersfield General Plan. SECTION 1. NOW, THEREFORE, BE IT ORDAINED by the Bakersfield City Council as follows: 1. The recitals above are true and correct and incorporated herein by this reference. 2. The Planning Commission's findings as contained in its Resolution No. 55-19 are hereby adopted. 2. The project is exempt from CEQA. 3. The Project is hereby approved and incorporating the change into the official zoning map as described in Bakersfield Municipal Code Section 17.06.020 located on the map as shown in Exhibit 2 and as specifically described in Exhibit 3, all of which are incorporated herein. SECTION 2. This ordinance must be posted in accordance with the Bakersfield Municipal Code and will become effective not less than 30 days from and after the date of its passage. -----000---- Page 1 of 2 o�gPKF9sM > m t7 r u0RGNAL I HEREBY CERTIFY that the foregoing Ordinance was passed and adopted by the Council of the City of Bakersfield at a regular meeting held on JUN 0 5 2019 by the following vote: ✓ ✓ r/ ✓ ✓ AYES: COUNCILMEMBER: RIVER .GONZALES. WEIR, SMITH, FREE. N, SULUVAN, PARLIER NOES: COUNCILMEMBER:C ABSTAIN: COUNCILMEMBER: ABSENT: COUNCILMEMBER: 3 tMll WA I JULIE DRIMAKIS, CMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED JUN 05 2019 Am -2� KAREN OH MAYOR of the City of Bakersfield APPROVED as to form: VIRGINIA GENNARO City Attorney By: v RICHARD IGER Deputy City Attorney Exhibits: 1. Conditions of Approval 2. Zone Change Map 3. Legal Description 4. Site Plan BY: PJoh=n\S:\Counlw OpemhomYUD d PCD\20W% 21_W I Callontlo MexkWS \_Cky Coonan WRedir \CCZC 00.d.. Page 2 of 2 1<gAA 0 t ORiGAAI Exhibit 1 (Conditions of Approval) oIgAX�SR > m r m 3 v ORIGINAL EXHIBIT 1 Zone Change No. 19-0021 Conditions of Approval The following are specific items that you need to resolve before you can obtain a building permit or be allowed occupancy. These items include conditions and/or mitigation required by previous site entitlement approvals (these will be specifically noted), changes or additions that need to be shown on the final building plans, alert you to specific fees, and other conditions for your project to satisfy the City's development standards. The item will usually need to be shown on the final building plans or completed before a building permit is issued. Each has been grouped by department so that you know whom to contact if you have questions. A. DEVELOPMENT SERVICES— BUILDING (1715 Chester Avenue) (Staff contact - Paul Archambault 661-326-3607 or PArchambault@bakemfleldcity.us) Prior to review of improvement plans by the City, the developer shall submit a grading plan for the proposed site to be reviewed and approved by the City Engineer and Building Official (Bakersfield Municipal Code Section 16.44.010). With the grading plan, if the project is subject to the provisions of the National Pollutant Discharge Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction Activity (WQ Order No. 99-08- DWQ) must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity. Compliance with the general permit requires that a Storm Water Pollution Prevention Plan (SWPPP) be prepared, continuously carried out, and always be available for public inspection during normal construction hours. 2. A grading permit is required prior to final plan approval. The developer shall submit four (4) copies of grading plans and two (2) copies of the preliminary soils report to the Building Division. A final soils report shall also be submitted to the Building Division before they can issue a building permit. Please note that grading plans must be consistent with the final building site plans and landscaping plans. Building permits will not be issued until the grading permit is approved by the Building Division, Planning Division (HCP), and Public Works Department. 3. Show on the final building plan how and where water will be drained from the property. 4. Show on the final building plan pedestrian access from the public way and handicap parking. Private streets are not the public way. S. The developer shall include fire resistive wall construction details with the final building plans for all exterior walls of any building that is within the distance as set forth in Table 602 of the California Building Code. 6. Include with or show on the final building plans information necessary to verify that the project complies with all disability requirements of Title 24 of the California Building Code. oeeAXF9 m* OR:G;NAL ZC #19-0021 Page 12 of 12 7. The developer shall obtain all required approvals from the Kern County Environmental Health Services Department (2700 "M" Street, Bakersfield, CA., 93301; PH 661-862- 8700) for any food handling facility (i.e.: market, delicatessen, ca%, concession, restaurant) before building permits can be issued. 8. Buildings or structures shall require installation of an automatic fire sprinkler system where required by current California Building Code and City ordinance. 9. The Building Division will calculate and collect the appropriate school district impact fee at the time they issue a building permit. 30. Final Building plans shall show pedestrian access pathways or easements for persons with disabilities from public rights -of -ways that connect to all accessible buildings, facilities, elements, and spaces in accordance with the California Building Code. These pedestrian access ways shall not be parallel to vehicular lanes unless separated by curbs or railings. 11. Prior to granting occupancy, the Building Division will verify that a water meter serving the development is in place. Therefore, it is recommended that the developer contact the applicable water purveyor to inquire about their process for obtaining water service for the development as soon as possible. To determine who the water purveyor for the development is, you may contact the City of Bakersfield Water Resources Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715). 12. Show on the final building plan, electric vehicle supply equipment to facilitate future installation as required by the California Green Code. B. DEVELOPMENT SERVICES —PLANNING (171S Chester Avenue) (Staff contact -Whitney Jackson; 661-326-3673 or WJackson@bakersfieldcity.us) The minimum parking required for this project has been computed based on use and shall be as follows: Proposed Square Parking Required Use Footage Ratio Parking Existing Bldg 10 (restaurant) Bldg 3 (multi -tenant) 35,000 SF 1/200 SF 175 spaces 21,948 SF 23,118 SF 1/2505F 92 spaces Bldg 4 (multi -tenant) 3,150 SF 1/250 SF 13 spaces Bldg 6 (multi -tenant) 8,850 SF 1/250 SF 35 spaces Bldg 7 (retail) 30,386 SF 1/250 SF 122 spaces Bldg 8 (retail) 25,078 SF 1/250 SF 100 spaces Bldg 9 (multi -tenant) 3.982 SF 1/250 SF 16 spaces Sub Total: 125,582 SF 553 spaces Freestanding Satellite Pads (existing) Bldg 5 (general retail) 14,655 SF 1/250 SF 59 spaces Bldg 30 (restaurant) 3,311 SF 1/75 SF 44 spaces Bldg 10 (restaurant) Drive-thru Credit (2) spaces Sub Total: 21,948 SF 101 spaces OReAKe9N r- m J � ORIG;hMrt" ZC &19-0021 Page 13 of 12 Proposed Bldg 1(multi-tenant) 5,160 SF 1/250 SF 21 spaces Bldg 2 (multi -tenant) 10,000 SF 1/250 SF 40 spaces Sub Total: 15,160 SF 61 spaces Total: 162,6905F Required 715spaces Parking Provided Area 1 Area 2 Total: 296 spaces 113 spaces Provided 773 spaces (Note: 773 parking spaces are shown on the proposed site plan. By ordinance, compact and tandem spaces cannot be counted towards meeting minimum parking requirements.( 2. Minimum parking stall dimensions shall be 9 feet wide by 18 feet long and shall be designed according to standards established by the Traffic Engineer. Vehicles may hang over landscape areas no more than 2-1/2 feet provided required setbacks along street frontages are maintained, and trees and shrubs are protected from vehicles. 3. All parking lots, driveways, drive aisles, loading areas, and other vehicular access ways, shall be paved with concrete, asphaltic concrete (A. C.), or other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15.76.020 and 17.58.060.A.). Lighting is required for all parking lots, except residential lots with four units or less (Section 17.58.060.A.). Illumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light. No light poles, standards and fixtures, including bases or pedestals, shall exceed a height of 40 feet above grade. However, light standards placed less than 50 feet from residentially zoned or designated property, or from existing residential development, shall not exceed a height of 15 feet. The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. Please note that staff can require additional adjustments to installed lighting after occupancy to resolve glare or other lighting problems if they negatively affect adjacent properties. 5. Because parking and/or access is being shared with adjacent properties, the developer shall file with the Planning Division before any building permits are issued a copy of a recorded map, C. C. and R.'s, or other instrument that ensures that drive aisles, parking, and access is legally shared in common with adjoining properties as depicted on the site plan for the life of the project. ZC #19-0021 Page 14 of 12 6. The developer shall include a copy of a final landscape plan with each set of the final building plans submitted to the Building Division. Building permits will not be issued until the Planning Division has approved the final landscape plan for consistency with approved site plans and minimum ordinance standards. Please refer to the landscaping requirements In Chapter 17.61. Landscape plans shall include, but are not limited to, data on: gallon/box size, spacing, species (reference approved parking lot tree list), ratio of deciduous vs. evergreen, shade calculations, ground cover calculations, etc. (Note 1: At the time a final site inspection is conducted, it is expected that plants will match the species identified and be installed in the locations consistent with the approved landscape plan. Changes made without prior approval of the Planning staff may result in the removal and/or relocation of installed plant materials and delays in obtaining building occupancy.) (Note 2: No mature landscaping or existing turf shall be removed without prior approval by the Planning Director.) (Note 3: Prior to issuance of Certificate of Occupancy, the developer shall identify any trees that have been removed and/or missing from the parking area associated with 5200 Stockdale Highway, and replace with a species approved by the Planning Director.) (Note 4: On a regular basis, including during construction, irrigation systems shall be inspected and maintained to ensure landscaping is sustained in a healthy condition.) (Note 5: Developer shall provide pedestrian access to Business Center Drive.) Street addresses for the project shall be designated by staff. These numbers will be the only addresses assigned by the city unless you wish to have a different address program. Internal building unit addresses will be only by suite number and will be the responsibility of the owner or developer to assign to each tenant. )Note: It is recommended that you assign suite numbers beginning with 100, 200, 300 etc. instead of an alphabetic character. If in the future a tenant space were split, you would then be able to assign a suite number between the existing numbers, which would keep your suites in numerical order. Keeping an orderly numbering system will make it easier for customers, emergency personnel, and mail delivery to find the business.) Business identification signs are neither considered nor approved under this review. A separate sign permit reviewed by the Planning and Building Divisions and issued by the Building Division, is required for all new signs, including future use and construction signs. Signs must comply with the Sign Ordinance (Chapter 17.60 of the Bakersfield Municipal Code.) pFZAKF9d ORIG;NALL ZC 419-0021 Page 15 of 12 The following conditions are required as part of a grading permit a. Habitat Conservation fees shall be required for this project and will be calculated based on the fee in effect at the time we issue an urban development permit (includes grading plan approvals) as defined in the Implementation/Management Agreement (Section 2.21) for the Metropolitan Bakersfield Habitat Conservation Plan. Upon payment of the fee, the applicant will receive acknowledgment of compliance with Metropolitan Bakersfield Habitat Conservation Plan (Implementation/Management Agreement Section 3.1.4). This fee is currently $2,145 per gross acres, payable to the City of Bakersfield (submit to the Planning Division). This fee must be paid before any grading or other site disturbance occurs. Forms and instructions are available at the Planning Division or on the city's web site at www.bakersfieldcitv.us (go to Development Services Department). The current Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) expires in year 2019. Projects may be issued an urban development permit, grading plan approval, or building permit and pay fees prior to the 2019 expiration date under the current MBHCP. As determined by the City of Bakersfield, only projects ready to be issued an urban development permit, grading plan approval or building permit before the 2019 expiration date will be eligible to pay fees under the current MBHCP. Early payment or pre -payment of MBHCP fees shall not be allowed. The ability of the City to issue urban development permits is governed by the terms of the MBHCP. Urban development permits issued after the 2019 expiration date may be subject to a new or revised Habitat Conservation Plan, if approved, or be required to comply directly with requests of the U.S. Fish and Wildlife Service and the California Department of Fish and Wildlife. Burrowing Owl Notification: The burrowing owl is a migratory bird species protected by international treaty under the Migratory Bird Treaty Act (MBIA) of 1918 (16 U.S.C. 703-711). The MBTA makes it unlawful to take, possess, buy, sell, purchase, or barter any migratory bird listed in 50 C.F.R. Part 30 including feathers or other parts, nests, eggs, or products, except as allowed by implementing regulations (50 C.F.R. 21). Sections 3503, 3503.5, and 3800 of the California Fish and Game Code Prohibit the taking, possession, or destruction of birds, their nests or eggs. To avoid violation of the provisions of these laws generally requires that project related disturbance at active nesting territories be reduced or eliminated during critical phases of the nesting cycle (March 1 - August 15, annually). Disturbance that causes nest abandonment and/or loss of reproductive effort (e.g., killing or abandonment of eggs or young) may be considered "taking' and is potentially punishable by fines and/or imprisonment. Prior to ground disturbance, the developer shall have a California Department of Fish and Wildlife approved MBHCP biologist survey the location for kit fox, and comply with the provisions of the Metropolitan Bakersfield Habitat Conservation Plan. Survey protocol shall be recommended by the California o�gRKF9v' T J tORv:ka ZC #19-0021 Page 16 of 12 Department of Fish and Wildlife. Developer shall be subject to the mitigation measures recommended by the biologist. Copies of the survey shall be provided to the Development Services Department, California Department of Fish and Wildlife, and the U.S. Fish and Wildlife Service prior to ground disturbance. 10. A Park Development and Improvement Fee shall be paid at the time of the building permit being issued for each independent residential unit. We will base the fee at the rate in effect at the time the permit is issued. 11. Rooftop areas of commercial buildings (e.g., office, retail, restaurant, assembly, hotel, hospital, church, school), and industrial buildings adjacent to residentially zoned properties, shall be completely screened by parapets or other finished architectural features constructed to a height of the highest equipment, unfinished structural element or unfinished architectural feature of the building. 12. Open storage of materials and equipment shall be surrounded and screened with a solid wall or fence (screening also applies to gates). This fence shall be at least 6 feet in height and materials shall not be stacked above the height of the fence. (Note: Fences taller than 6 feet are allowed in commercial and industrial zones but they will require a building permit.) 13. Areas used for outside storage shall be treated with a permanent dust binder or other permanent dust control measure consistent with the regulations of the San Joaquin Valley Air Pollution Control District. (Note: All passenger vehicle -parking areas must be paved.) 14. Outside work, storage, sales and display of merchandise and materials is prohibited. All activities and all storage of merchandise and materials shall be conducted and/or contained within an enclosed building. (Note: This does not include outdoor seating areas for restaurants.) 15. Refuse collection bin enclosures and container areas are subject to all required structural setback from street frontages, and shall not reduce any parking, loading or landscaping areas as required by the Zoning Ordinance. 16. In the event a previously undocumented oil/gas well is uncovered or discovered on the project, the developer is responsible to contact the Department of Conservation's Division of Oil, Gas, and Geothermal Resources (DOGGR). The developer is responsible for any remedial operations on the well required by DOGGR. The developer shall also be subject to provisions of BMC Section 15.66.080.8. 17. The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control District (Regulation VIII) concerning dust suppression during construction of the project. Methods include, but are not limited to; use of water or chemical g)kk`% O r� DRINA ZC #19-0021 Page 17 of 12 stabilizer/suppressants to control dust emission from disturbed area, stock piles, and access ways; covering or wetting materials that are transported off-site; limit construction -related speed to 15 mph on all unpaved areas/washing of construction vehicles before they enter public streets to minimize carryout/track out; and cease grading and earth moving during periods of high winds (20 mph or more). 18. Prior to receiving final building or site occupancy, you must contact the Planning Division (staff contact noted above) for final inspection and approval of the landscaping, parking lot, lighting and other related site improvements. Inspections will not be conducted until all required items have been installed. Any deviations from the approved plans without prior approval from the Planning Division may result in reconstruction and delays in obtaining a building or site occupancy. C. FIRE DEPARTMENT (2301 H Street) (Staff contact - Ernie Medina; 661-326-3682 or EMedina@bakersfieldcity.us) Show on the final building plans the following items: a. All fire lanes. Any modifications shall be approved by the Fire Department. Fire lane identification signs shall be installed every 100 feet with red curbing when curbing is required. All work shall be completed before occupancy of any building or portion of any building is allowed. All fire hydrants. both offsite (nearest to site) and on-site. Include flow data on all hydrants. Hydrants shall be in good working condition and are subject to testing for verification. Fire flow requirements must be met prior to construction commencing on the project site. Please provide two (2) sets of the water plans stamped by a licensed Registered Civil Engineer to the Fire Department and two (2) sets to the Water Resources Department (1000 Buena Vista Road, Bakersfield, CA. 93311; 661-326-3715). (Note: Show: 1) distance to the nearest hydrant; and 2) distance from that hydrant to the farthest point of the project site.) All fire sprinkler and/or stand Pipe systems fire alarms and commercial hood systems. These suppression systems require review and permits by the Fire Department. The Fire Department will issue guidelines for these various items as they may apply to this project. d. Project address including suite number if applicable. If the project is within a shopping or business center, note the name and address of the center. e. Name and ohone number of the appropriate contact person The developer must pay required fees to and request an inspection from the Water Resources Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715) for any underground sprinkler feeds at least 2 full business days before they are buried. The Prevention Services Division (2101 H Street, Bakersfield CA, Ph. 661/326-3979) must complete all on-site inspections of fire sprinkler systems and fire alarm systems before any building is occupied. ,tOpKFy NT > m VOR ;RAL ZC #19-0021 Page 18 of 12 3. Where fire apparatus access roads or a water supply for fire protection are required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. 4. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other driving surface approved by the fire chief. Must be capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds and shall be surfaced with the first lift of asphalt as to provide all-weather driving capabilities. All access (Permanent and temporary) to and around any building under construction must be a least 20 feet wide (26 feet wide where building height exceeds 30 feet), with an overhead clearance of 13 feet 6 inches, and contain no obstruction. The fire apparatus access road shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. S. Turning Radius: The minimum turning radius shall be thirty-seven feet. 6. If you handle hazardous materials or hazardous waste on the site, the Prevention Services Division may require a hazardous material management and/or risk management plan before you can begin operations. Please contact them at 661-326- 3979 for further information. 7. All projects must comply with the current California Fire Code and current City of Bakersfield Municipal Code. D. WATER RESOURCES (1000 Buena Vista Roadl (Staff contact - Tylor Hester; 661-326-3715 or THester@bakersfieldcity.us) Developer shall submit two (2) sets of water plans signed by a California Registered Civil Engineer to the Water Resources Department showing all offsite and onsite improvements, including connections to the existing water main and underground fire waterlines and related apparatuses. Include any existing nearby on or off-site hydrants on the plans. Plans shall be submitted along with applicable plan check fees and any other associated fees per the current fee schedule. Plans shall comply with current City Standards and Specifications, California Fire Code, and City of Bakersfield Municipal Code. City Standards and Specifications are available for download from the City's website at www.bakersfieldcity.us/gov/depts./water_resources. 2. The Contractor responsible for construction of waterlines and appurtenances within the City's right of way or easement, shall have an active Class "A" or "C-34" License from the State of California. 3. Developer shall complete and submit to the Water Resources Department the Application for Water Service. The application is available for download from the City's website at www.bakersfieldcity.us/gov/depts/water_resources. o``gAt<F9N Q�pKf9d 1. OR;G;NAL G � OOV'G',NAI ZC #19-0021 Page 19 of 12 Developer shall submit to the Water Resources Department the Contractors itemized construct cost for all off-site water improvements within the City's right of way or easement. Inspection fees are calculated as five percent (5%) of the approved Contractors water construction cost. The construction costs are subject to review and approval by the Water Resources Department. 5. Developer shall pay the required domestic inspection fees and request an inspection from the California Water Company at least two (2) full business days before permanent construction within the City's right of way or easement. The California Water Company may be contacted at 661-837-7200. 6. Developer shall pay the required fire water fees and submit an Inspection Request Form to the Water Resources Department for any underground fire waterlines and their apparatuses at least two (2) full business days before permanent construction. The form is available for download from the City's website at www.bakersfieldcity.us/gov/depts/water-resources. E. PUBLIC WORKS —ENGINEERING (1501 Truxtun Avenue) (Staff contact— Manpreet Behl; 661-326-3581 or MBehlfbakersfieldcity.us) 1. The developer shall construct curbs, gutters, cross gutters, 5 -foot 6 -inch wide sidewalks, and street/alley paving along California Avenue and Business Center Drive according to adopted city standards. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 2. The developer shall install streetlights along California Avenue and Business Center Drive. The developer shall be responsible for providing the labor and materials necessary to energize all newly installed streetlights before occupancy of the building or site. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 3. The developer shall construct standard handicap ramps along California Avenue and Business Center Drive (the project frontage) according to adopted city standards. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 4. The developer shall install new connection(s) to the public sewer system. This connection shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 5. Show on the final building plans all existing connection(s) to the public sewer system. 6. All on-site areas required to be paved (i.e. parking lots, access drives, loading areas, etc.) shall consist of concrete, asphaltic concrete (Type B. A. C.) or other paved street material approved by the City Engineer. Pavement shall be a minimum thickness of 2 inches over 3 inches of approved base material (i.e. Class II A. B.) if concrete is used, it shall be a minimum thickness of 4 inches per Municipal Code Section 17.58.060.A. This paving standard shall be noted on the final building plans submitted to the Building Division before any building permits will be issued. o�ibAKF" m r m p r" ONG,wu° ZC #19-0021 Page 110 of 12 7. If a grading plan is required by the Building Division, building permits will not be issued until the grading plan is approved by both the Public Works Department and the Building Division. 8. All storm water generated on the project site, including the street frontage shall be retained onsite unless otherwise allowed by the Public Works Department (please contact the Public Works Department—Subdivisions at 661-326-3576). 9. If the project generates industrial waste, it shall be subject to the requirements of the Industrial Waste Ordinance. An industrial waste permit must be obtained from the Public Works Department before issuance of the building permit. To find out what type of waste is considered industrial, please contact the Wastewater Treatment Superintendent at 661-326-3249. 10. Before any building or site can be occupied, the developer must reconstruct or repair substandard off-site street improvements that front the site to adopted city standards as directed by the City Engineer. Please call the Construction Superintendent at 661- 326-3049 to schedule a site inspection to find out what improvements may be required. 11. A street permit from the Public Works Department shall be obtained before any work can be done within the public right-of-way (streets, alleys, easements). Please include a copy of this site plan review decision to the department at the time you apply for this permit. 12. A sewer connection fee shall be paid at the time a building permit is issued. We will base this fee at the rate in effect at the time a building permit is issued. 13. If the project is subject to the provisions of the National Pollutant Discharge Elimination System (NPDES), a "Notice of Intent" (NOI) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction Activity (WQ Order No. 92-08- DWQ) must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity. Compliance with the general permit required that a Storm Water Pollution Prevention Plan (SWPPP) be prepared, continuously carried out, and always be available for public inspection during normal construction hours. 14. Prior to the issuance of each building permit, or if no building permit is required, the first required City approval prior to construction, the developer/owner shall pay a Transportation Impact Fee (TIF) for regional facilities. This fee will be based on the rate in effect at the time the applicable approval is issued or in accordance with the Subdivision Map Act, as applicable. The Public Works Department will calculate an estimate of the total fee upon submittal of construction plans for the project. 35. The developer shall form a new Maintenance District. Undeveloped parcels within an existing Maintenance District are required to update Maintenance District documents. Updated documents, including Proposition 218 Ballot and Covenant, shall be signed and notarized. If there are questions, contact Alerik Hoeh at 661-326-3576. (Note: If already within a maintenance district, may need to update the maintenance district form.) ZC #19-0021 Page 1 11 of 12 F. PUBLIC WORKS —TRAFFIC (1501 Truxtun Avenue) (Staff contact— Manpreet Behl; 661-326-3581 or MBehl@bakersfieldcity.us) 1. Show on the final building plans existing driveway's width (top -to -top) drive approach. Drive approaches must be centered on drive aisles. All dimensions shall be shown on the final building plans. 2. Two-way drive aisles shall be a minimum width of 24 feet. If perpendicular (902) parking spaces are proposed where a vehicle must back into these aisles, the minimum aisle width shall be 25 feet. All drive aisle dimension shall be shown on the final building plans. 3. Show the typical parking stall dimension on the final building plans (minimum stall size is 9 feet x 18 feet and shall be designed according to standards established by the Traffic Engineer). 4. The Bakersfield Municipal Code (Section 17.58.050.K.) prohibits vehicles from backing out of a parking space into a street. Please revise the parking design on the final building plans to eliminate these spaces. (Note: This prohibition does not include single-family homes in residential zones, or multiple family units on local streets where the Traffic Engineer has determined that backing onto a street will not adversely affect traffic and is similar to a single family residential driveway use.) Walls, fences, or trash enclosures within 10 feet of a sidewalk at an alley or driveway shall not exceed 3 feet in height above the curb flow line. You must either revise the circulation design or show on the final building plans that the maximum fence/wall height will not exceed three feet. 6. The developer shall dedicate additional road right-of-way to the City of Bakersfield along California Avenue to full 0 arterial ❑ collector ❑ local street width according to adopted city standards. 7. The developer shall construct additional roadway, including ❑ expanded intersection and/or right turn lanes, along California Avenue to full 0 arterial ❑ collector O local street width according to adopted city standards. G. PUBLIC WORKS—SOLID WASTE 14101 Truxtun Avenue) (Staff Contact - Jesus Carrera; 661-326-3114 or jcarrera@bakersfieldcity.us) You must contact the staff person noted above before building permits can be issued or work begins on the property to establish the level and type of service necessary for the collection of refuse and/or recycled materials. Collection locations must provide enough containment area for the refuse that is generated without violating required zoning or setback restrictions (see Planning Division conditions). Levels of service are based on how often collection occurs as follows: OQ0kKF9 r r rn v L ORIG�hA ZC #19-0021 Page 112 of 12 • Cart service -- 1 cubic yard/week or less 1 time per week • Front loader bin services — 1 cubic yard/week -12 cubic yards/day • Roll -off compactor service — More than 12 cubic yards/day Show on the final building plans refuse/recycle bin enclosures. Each enclosure shall be designed according to adopted city standard (Detail # ST -27 and ST -28), at the size checked below ®. Before occupancy of the building or site is allowed, 8 (eight), 3 -cubic yard front loading type refuse/recycle bin(s) shall be placed within the required enclosure(s). ❑ 6' deep x 8' wide (1 bin) ❑ 8' deep x 15' wide (3 bins) ❑ 8' deep x 10' wide (2 bins) 0 2 -8' deep x 20' wide (4 bins) (Note: All measurements above are curb -to -curb dimensions inside the enclosure. If both refuse and recycling containers are to be combined in the same enclosure area, this area must be expanded in size to accommodate multiple containers/bins - contact the staff person above for the appropriate enclosure size.) 3. Examples of enclosure styles can be found on (Detail # ST -32). 4. Facilities that require infectious waste services shall obtain approval for separate infectious waste storage areas from the Kern County Health Department. In no instances shall the refuse bin area be used for infectious waste containment purposes. S. Facilities that require grease containment must provide a storage location that is separate from the refuse bin location. This shall be shown on the final building plans. 6. Facilities with existing refuse service must improve the service location area(s) according to adopted City standards (Detail # ST -27 and ST -28). These improvements shall be clearly shown on the final building plans. IgNKFa ORVOiN; Exhibit 2 (Location Map) 0�0AKF T s m r r_ 'ORIG NAP zc 19-0021 CITY OF BAKERSFIELD X�„R P.U.D. P.U.D. $ A At L' p ' v - 7 W P.U.D. Q Q = P.UA. C R4 Ca O WLWSSffXIRN FROM: P.C.D. TO: P.C.D. Y 0, CS STOCKDALE HWY RSI L1 L3 Cs GI O = Ca 1 - ca ca N WCa Z GAASN]I GO 412 RJ / Rn LEGEND (ZONE DISTRICTS) w♦om rmir q.drAq � 6WOpRrrin ld tire x+e.50m rmiry Uwenrnq AFWR RAI d.sox qn mMlm rHe LLffi woos we mre murx Nnmtl.mHl mx.nm $1040p New H4 nq unn xN lPngamul ]ulm em 1, 25,]er l0 min lo151re Ri LYnNf YMnm•nmlly owHlmq RAXr,,,, crow ramie e�me megre kmilrl .o ,A mmllMnm u=.Immuvl uoA wnlmxwewnnq.en ro Y.na. nmlry q.,weq e 000 wn mre lm m• nxsogn mr.miewnrmq yen Rn nJ XigARmSp YUltiple remYYXMIiq R1 eWo qrt mmd Sire EL 00 b00 pttrM erm/errtlnnq vnX RXntiOeMia Xalernq G 11 20 A. mmlol5e. AN ... ft ... Q 6.WLyA mmld Hx XXRHAM AVE m xxAN^<°nor. � hxo¢mmm lM rax wo mm•a wlmrvdmm•m i mreml nHl¢P.m RS Ri 0.J Z Yx YOX'Mome L-0vroh5tbnelane Mminelreuw %lu LI x•IpAbmoW Commmul D$xgmrtl[mmmHl L[Lummreal [eller LB LmnH9c RU WnM CemmmeHl Orr•lepmml WI LqA� Wnu Murnq AA IF$4•nrel Yenul¢Lnnq IF]Xmry 1A1x1Ml (,.a rlubmop4 rerFnq R evMon LwW OS OµrreSpeu xoxr xmpna orma rPl rlweple .. rPSlle App, 3¢wMry M GrPonAWrmeA mmiYglwea wnLXn=Ibn CorMNM SL SmIa LX'em Owney Orvnpmegtanxinirq Y x Yleq Sr•Hxo rkn 40 S PA.U. �mpS C-0 �• N ca A Feet C-0 0 760 320 mmrz= Exhibit 3 (Legal Description) oQ 6AK,4 'ORIG:NAe -S___ I :_ 057,7 PARCELS 1, 2 AND 3 OF PARCEL MAP No. 10748 PER MAP RECORDED APRIL 27, 2001 AS DOCUMENT No. 201.057612, FLO IN BOOK 51 OF PARCEL MAPS AT PAGE 158 IN THE OFFICE OF THE KERN COUNTY RECORDER. CONTAWS 4.50 ACRES MORE OR LESS IG:raC':aSiY11i PARCELS B AND C OF LOT UNE ADJUSTMENT No. P00-0256 PER CERTIFICATE OF COMPLIANCE RECORDED JUNE 27, 2000 AS DOCUMENT No. 0200077240 OF OFFCAI. RECORDS. CONTAINS 3.04 ACRES MORE OR LESS E •_f S1:! [I4iYIa PARCELS 1, 2, 3 AND 4 INCLUSNE, OF LOT UNE ADJUSTMENT No. 377 PER (CERTIFICATE OF COMPLIANCE RECORDED FEBRUARY 7, 2000 AS DOCUMENT No. 020014631 OF OFFICIAL RECORDS. 10 Oa!7WAL� Exhibit 4 (Site Development Plan) okgp�F9 s � m v v OR;u;NAL 'BUSINESS CENTER DRIV x SUILDING6 IBUILDING7 s N N N N N N SITE MEA -1 A PART fl�' BUILDINGS 3 SITE DATA v`e•m.� mo m....+W.•.mB..1-77;= ..mm >ve -7 [[.mow®.,, AEta": I-A. ii V ;tea -W.-AR ®s 10P= T. litQ m. — 1.. 1. OnMsr,gwry.a.o n PRO�PO�• C,EwF# SE� NUY II ftriGSryy W�Af f00`A� USED ON GREENBERG NRNI WE RAN Y 1.7 SITE MNIS USED ON AREALIWIGE P2ELUnrvnrzY WE EUN EASIER TO C OE aFmEDA^D +I N.E.C. OF STOCKDALE HIGHWAY & CALIFORNIA AVENUE `CT �;•MCKaly BAKERSFIELD, CALIFORNIA U m c C, J l�B] OO ..ry.e........... f V 'lam \r ISI � B I181NE88 CENTER DRIVE 'lam \r ISI � v ��o 33 1 �.I x5.14 SF ,Fs SF b x5,180 SF SSSrnoWPMDmre&.Sk N.E.C. OF STOCKDALE HIGHWAY & CALIFORNIA AVENUE i Baan CABINS a�.n+• =•+Id 69.WB8d BAKERSFIELD. CALIFORNIA PROPOSED FLOOR PIAN BUILDING 1 .. McKenttYE�,aL,�KN ma,a A-10 - ii PI I FLOOR ARE ROOF ACCES TOTALAAEA li zemu. v ��o 33 1 �.I x5.14 SF ,Fs SF b x5,180 SF SSSrnoWPMDmre&.Sk N.E.C. OF STOCKDALE HIGHWAY & CALIFORNIA AVENUE i Baan CABINS a�.n+• =•+Id 69.WB8d BAKERSFIELD. CALIFORNIA PROPOSED FLOOR PIAN BUILDING 1 .. McKenttYE�,aL,�KN ma,a A-10 - yEAST EIf VATION_'V ruxrcaa+s e R-. uNONTN ELEVATION ¢� ^500TH ELEVATION car a Amjjj /1WEST ELEVATION li -ern-w BUILDING 1 CONCEc,�s ^G su�eao oN N.E.C. OF STOCKDALE HIGHWAY & CALIFORNIA AVENUE��pKE9: — mcgntly ,v Te �osLE BAKERSFIELO. CALIFORNIA p A-201 .,.W.._...-... u� o 711 PROPOS D UILDI G 2 A RARERSB,BSZ SF - g. ACCESS WSF TO AREA S1p,0OJ5F � I I 1 II I i i r �� I ¢rau. wsu ossa ,anu. �aau. ,n,au. "A 1 I I _ Y•R�I .I TI{ 4111 �PROPOSED FLOOR PLAN BUILDING 2 D 'aF S='e F-- N.E.C. OF STOCKDALE HIGHWAY & CALIFORNIA AVENIJ AK =• C'J 1 IA3La�KE 1165 bB f IAM1fPSFlfLD, CALIFORNIA AT A-102 r ...W.....w.. m uONINAL (�SOIITX ELEVATION lJ orvw-v LST ELEVAT�Ov V/ as c'� D M N.E.C. OF STOCKDALE HIGHWAY & CALIFORNIA AVENUgEAKF —u.m io T4 Room BAKERSFIELO. CALIFORNIA (C 9s � T i 0y r F•.� M e r-� e a -=- e BUILDING 2 A-202.1