HomeMy WebLinkAbout1.2-7300 Ph 4 & 5CE MULTIPLE UTILITY I TRENCH R * 7' MAX.. I TYP 1X M,IN. ON DEEP SEWER, SLOPE LATERALS-/ TO LOT UNE SO THAT THE END OF LATERAL IS WITHIN REQUIRED TOLERANCE. STAMP AN 'S' INTO CURB FACE OMR EACH SEWER LATERAL rE SEWER MAIN R H45 WATERLINE FINISHED STREET 9 GRADE 3 MIN. x SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES DETAIL TYPICAL SEWER LATERAL INSTALLATION �k FOR SHALLOW INSTALLATION OF SEVER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. NOTE: CONTRACTOR TO VERIFY THAT WATER MAIN AND SEWER LATERAL CROSSINGS ARE IN CONFORMANCE WITH CALIFORNIA HEALTH CODE REQUIREMENTS. 7' MAX.* C.L. STOCKDALE SMH SEWER MANHOLE T. 30 S, a R. 26 E. h�gy SO STORM DRAIN SDMH STORM DRAIN MANHOLE M.H. 0 EX. EXISTING CB s ELEV. ELEVATION & LANDSCAPING AREA PROJECT SITE SCP STREET CMSTRUC11ON PLAN T.O.M. TOP OF MANHOLE w STATION T.O.C. TOP OF CLEANOUT � MING J0000 AVENUE 1- a� axa ---------- PROPERTY UNE / RIGHT-OF-WAY ----------- % TRACT BOUNDARY - - — - — o � — o a PROPOSED CURB 0 `p A0 a N m r to \ LANE 5r M u o a a W U w DO LL � 14 0 73 N W m m DUTHERN PACIFIC RAILROAD 7' MAX.* C.L. LEGEND: ABBREVIATIONS CENTERUNE SMH SEWER MANHOLE INV. INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE M.H. MANHOLE EX. EXISTING CB CATCH BASIN ELEV. ELEVATION L.S. LANDSCAPING AREA PA PROPERTY LINE SCP STREET CMSTRUC11ON PLAN T.O.M. TOP OF MANHOLE STA. STATION T.O.C. TOP OF CLEANOUT TEMP. TEMPORARY RAD. RADIAN 1- UNIT BOUNDARY ---------- PROPERTY UNE / RIGHT-OF-WAY ----------- TRACT BOUNDARY - - — - — CENTERUNE — o a PROPOSED CURB VICINITY MAP NO SCALE �9�� ' � � ' ' a1�1�II�►il� 8" SEWER LINE 554 LF 479 LF 1033 LF 4" LATERALS 383 LF 505 LF 888 LF STANDARD MANHOLE 2 EA 3 EA 5 EA STORM DRAIN IMPROVEMENTS UNIT 4 UNIT 5 TOTAL 18" DRAIN LINE 240 LF 427 LF 667 LF 24" DRAIN LINE 297 LF - 297 LF CATCH BASINS 1 EA 2 EA _..._3 EA STANDARD MANHOLE 2 EA 3 EA 5 EA w PROPOSED WATER PER SEPARATE PLANS T O.M, 363. TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE 3. TYPE "A" PER C.O.B. STD. SW -4 AND SW -5. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. —D CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE Z TYPE 'A" PER C.O.B. STD. SW -4 & SW -5. or CONSTRUCT CATCH BASIN TYPE "A" PER C.O.S. STD. D-14. ESTING TENTATIVE TRACT 7300 �N I TRACT 7302 i (NOT A PART) SCALE: 1'=200' N ® SHEET NO. INDEX NOTE: ALL IMPROVEMENTS CONSTRUCTED PER THESE PLANS TO BE PRIVATELY MAINTAINED, INDEX OF SHEETS SHEET TITLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS 3. DELAMERE STREET 4. BOON WAY NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5 OPENINGS PER C.O.B. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4' IN SIZE, UNLESS OTHERWISE NOTED. UNITS -4 & 5 49 NOTE: 1. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 326-3049. NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. 2. ALL FACILITIES TO BE PRIVATELY MAINTAINED UNLESS OTHERWISE NOTED ON PLAN. 3. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS & STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DESIGN CRITERIA SHALL BE ENCOUNTERED DURING CONSTRUCTION AND SUCH CORRECTIONS WILL BE REFLECTED ON CORRECTED PLANS AND SUBMITTED TO THE CITY A. McINTOSH R.C.E. 33322 DATE IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS HEREIN ARE PRIVATE AND ARE TO BE PRIVATELY MAINTAINED. UNLESS OTHERWISE NOTED ON PLAN. APPROVED BY: NICOLAS FIDLER4UBLIC WORKS DIRECTOR DATE R.C.E. NO. 61069 REVIEWED BY: STUART J. PATTESON, ASSISTANT PUBLIC WORKS DIRECTOR DATE R.C.E. NO. 44898 BASIS OF BEARINGS: THE BEARING OF N 01'02'20" E SHOWN FOR THE EAST LINE SECTION 10, T. 30 S., R. 26 E. AS SHOWN ON RECORD OF SURVEY, BOOK 25, PAGE 49 WAS USED AS THE BASIS OF BEARING SHOWN HEREON. BENCHMARK USED: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE INTERSECTION OF MING AVENUE AND ALLEN RD., ALSO BEING THE NORTHWEST CORNER OF SECTION 12, T.30S., R.26E., ELEV = 367.96' (NAVD 88 DATUM) 93 Know whaYs below. 0811 before you dig. 1.2-7300 Ph 4 & 5 CITY .RECORDS NO: J ,w m N Z ® W Vw 1- Z V o a �. 0 a N m r to \ G V b M u o a W U DO LL � w m W m m P� 4 m 0 5 rc c.i �w z IL s, O z W = o CCS J � ¢W O y o C) 0 0 z W 0> Lu W 93 in cc1 x c 3 F W r 1 CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION, UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT GROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFUCT WITH ANY UTUTIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE AUGNMENT. IF RELOCATION OF EXISTING UTIUTIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION, IN THE EVENT A UTIUTY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTIUTIES SHALL BE DAYLIGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRIOR TO TRENCHING. ALL EXISTING IMPROVEMENTS, (CUR& GUTTER. SIDEWALK, CROSS GUTTER, FENCES, EX) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY TUE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE NIH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. STAMP AN "S" INTO THE CURB FACE OVER EACH SEWER LATERAL AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY 'WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT- OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE YORK PERFORMED WITHIN THE RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT COMPACTION TESTS SHALL BE THE RESPONSIBLHTY OF THE DEVELOPER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINE BY THE CITY ENGINEER 2. STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: D -11J D-14, D-16, D-18 SW -1, SW -2, SW -3, SW -4, SW -5, SW -6, SW -9, SW -11, ST -6, ST -22 SEWER PIPE 3. VCP INSTALLATION MATFRIAIS : THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING i0 CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS O SECTION 71 O THE STANDARD SPECIFICATIONS O THE STATE OF CALIFORNIA, DEPARTMENT O TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND. A SPIGOT END NTH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. THE PIPE AND FITTINGS FOR 6", 8', 10", AND 12" SANITARY SEWER MAINS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING OATH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS DORPORATON FOR THEIR 'MAINUNE` BANDSEAL COMPRESSION COUPUNG, OR APPROVED EQUAL SHALL BE REQUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4. ABS PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTMS E FICATIGNS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS FITTINGS. SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY SOLVENT WELDED JOINTS THE ASSEMBLY O JOINTS SHALL BE IN ACCORDANCE OATH THE MANUFACTURER'S RECOMMENDATIONS WHERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY O BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE W1TH 114E CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, HI, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 5. PVC PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASIA SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS HOES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY O JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY O BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 4 II, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE 6. REINFORCED CONCRETE PIPE WITH PVC LINING. REINFORCED CONCRETE PIPE WITH PVC LINING SHALL MEET THE FOLLOWING REQUIREMENTS: I.A. MATERIALS. REINFORCED CONCRETE PIPE (RCE) SHALL BE EITHER CLASS IV OR CLASS V WITH WALLS °B" OR "C'. RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND UNER TESTS IN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE. WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN OATH A CONTAINED 0 -RING GASKET. PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360' O THE PIPE. ALL WORK FOR AND IN CONNECTION 'NTH THE INSTALLATION O THE UNING IN CONCRETE PIPE AND FIELD SEALING AND WELDING O ,DINTS SHALL BE DONE IN STRICT CONFORMITY WITH ALL APPUCABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS O THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING REQUIREMENTS I.B. PHYSICAL PROPERTIES O LINER. ALL PLASTIC UNER PLATE SHEETS, WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES WHEN TESTED AT 77T t5 (25'C ±3 ). PROPERTY INITIAL (FAIL 1,C) TENSILE STRENGTH 2200 PSI MIN, 2100 PSI MIN. (15 MPA MIN.) (14.5 MPA MIN.) ELONGATION AT BREAK 200% MIN. 200% MIN. SHORE DUROMETER, TWE D 1 -SEC. 50-60 t5 (NTH RESPECT TO INITAL TEST RESULT) 10 -SEC. 35-50 t5 WEIGHT CHANGE 11.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE NTH ASTM D412 USING DIE 8, WEIGHT CHANGE SPECIMENS SHALL BE 1 -INCH (25 -MM) BY 3 -INCH (75 -MM) SAMPLES. SPECIMENS FOR TESTING OF INITIAL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND 'WELDING STRIP AT ANY TIME PRIOR TO FINAL ACCEPTANCE O THE WORK. LINER PLATE LOCKING EXTENSIONS EMBEDDED IN. CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD O ONE MINUTE, WITHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70' - 80' F(21' - 27' C) INCLUSIVE. ALL PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE O CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS O THE MATERIAL THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS THE UNING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4 -INCH (6 MM) SETTING CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE JOINT AFTER INSTALLATIONS, WITHOUT DAMAGE TO THE LINING. I.C. CHEMICAL RESISTANCE O UNEL' AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD O 112 DAYS AT 77' F 35 (25' C 33 ). AT 28 -DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL 13E REMOVED FROM EACH O THE CHEMICAL SOLUTIONS AND TESTED IN ACCORDANCE WITH SECTION 7-2.03(7.8) PARA 2 ABOVE IF ANY SPECIMEN FAILS TO MEET THE 112 -DAY REQUIREMENTS BEFORE COMPLETION OF THE 112 -DAY EXPOSURE, THE MATERIAL WILL BE SUBJECT TO REJECTION. CHEMICAL SOLUTION CONCENTRATION SULFURIC AGED 20%-- 0%"SODIUM SODIUMHYDROXIDE 5% AMMONIUM HYDROXIDE 5%" NITRIC AGO i% - FERRIC CHLORIDE 1% 1% SOAP 0.1% DETERGENT 0.1% (LINEAR ALKYL BENZYL SULFONATE OR LAS PIPES 48' IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BACTERIOLOGICAL ROD NOT LESS THAN 700 PPM 'THIS IS TO BE USED AS A PRE -QUALIFICATION TEST AND WHEN MATERIAL FORMULATIONS ARE CHANGED. •'VOLUMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS. 1.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHALL BE A MINIMUM OF 0.065 INCH (1.65 MM) IN THICKNESS, LOCKING EXTENSORS OF THE SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED WITH THE. SHEET. I.E. INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING OF SHEETS IN COLD WEATHER AND THE WELDING O ALL JOINTS, SHALL BE DONE IN ACCORDANCE WATH THE RECOMMENDATIONS OF THE LINER MANUFACTURER. COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON THE PLANS. THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL WITH THE LONGITUDINAL AXIS OF THE PIPE. THE LINING SHALL BE HELD SNUGLY IN PLACE AGAINST INNER FORMS LOCKING EXTENSION SHALL TERMINATE NOT MORE THAN 1-1/2 INCHES (38 MM) FROM THE END OF THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 MM) BEYOND THE END OF THE INSIDE SURFACE. CONCRETE POURED AGAINST UNING SHALL BE MBRATED, SPADED OR COMPACTED IN A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE. HOMOGENOUS CONCRETE, SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE CONCRETE IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE LINING FROM DAMAGE SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINE SURFACES. WREN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING SHALL BE PULLED. WTHOUT TEARING THE LINING, AND THE RESULTING HOLES CLEARLY MARKED. ALL NAIL AND TIE HOLES AND ALL CUT, TORN AND SERIOUSLY ABRADED AREAS IN THE LINING SHALL BE PATCHED. PATCHES MADE ENTIRELY WITH WELDING STRIP SHALL BE FUSED TO THE LINER OVER THE ENTIRE PATCH AREA LARGER PATCHES MAY CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA 'NTH ADHESIVE ALL EDGES MUST BE COVERED WITH WELDING STRIP FUSED TO THE PATCH AND THE SOUND LINING ADJOINING THE DAMAGED AREA. HOT JOINT COMPOUNDS, SUCH AS COAL TAR, SHALL NOT BE POURED OR APPLIED TO THE UNING THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO INSTALLED UNING FROM EQUIPMENT AND MA101ALS USED IN OR TAKEN THROUGH THE WORK. 1.F APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING SHALL BE SET FLUSH WITH THE INNER EDGE O THE BELL OR SPIGOT END OF A PIPE SECTION AND SHALL EXTEND TO THE OPPOSTE END OR TO APPROXIMATELY 4 INCHES (100 MM) BEYOND THE OPPOSITE END DEPENDING UPON THE TWE OF UNING JOINT TO BE MADE WITH THE ADJOINING CONCRETE PIPE WHEREVER CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES PROTECTED WITH LINING, JON STRUCTURES NOT SO LINED (SUCH AS BRICK STRUCTURES, CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES WITH CLAY LINING OR CLAY PIPE), THE UNING SHALL BE EXTENDED OVER AND AROUND THE END O THE PIPE AND BACK INTO THE STRUCTURE FOR NOT LESS THAN 4 INCHES (100 MM). THIS PROTECTING CAP MAY BE MOLDED OR FABRICATED FROM THE LINING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE. WHERE A PIPE LATERAL (NOT OF PLASTIC LINED CONCRETE) IS INSTALLED THROUGH LINED CONCRETE PIPE, THE SEAL BETWEEN THE LINED PORTION AND THE LATERAL SHALL BE PER THE MANUFACTURER'S RECOMMENDATIONS. LINED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS CARE SHALL BE EXERCISED IN HANDLING TRANSPORTING AND PLACING LINED PIPE TO PREVENT DAMAGE TO THE LINING. NO INTERIOR. HOOKS OR SLINGS STALL BE USED IN LIFTING PIPE. ALL HANDUNG OPERATION SHALL BE DONE WITH AN EXTERIOR SUNG OR WITH A SUITABLE FORK LIFT. ON PIPE HAVING A 360' UNER COVERAGE, THE LONGITUDINAL EDGES O THE SHEET SHALL BE BUTT WELDED. WHEN PIPE TUBES ARE FURNISHED, THESE ARE SHO -WELDED JOINTS. NO PIPE WITH DAMAGED LINING WELL BE ACCEPTED UNTIL THE DAMAGE HAS BEEN REPAIRED TO THE SATISFACTION O THE ENGINEER. T.C. FIELD JOINTS IN LINING FOR CONCRETE PIPE. THE JOINT BETWEEN SECTIONS O LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER: IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED WITH CEMENT MORTAR IN SUCH A MANNER THAT THE MORTAR SHALL NOT, AT ANY POINT, EXTEND INTO THE PIPE BEYOND THE STRAIGHT LINE CONNECTING THE SURFACES O THE ADJACENT PIPE SECTIONS PIPE JOINTS MUST BE DRY BEFORE LINING JOINTS ARE MADE ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY. FIELD JOINTS IN THE UNING AT PIPE JOINTS MAY BE EITHER OF THE FOLLOWING DESCRIBED TYPES TYPE P-1: THE JOINT SHALL BE MADE WITH A SEPARATE 4 -INCH (100 -MM) JOINT STRIP AND TWO WELDING STRIPS. THE 4 -INCH (100 -MM) JOINT STRIP SHALL BE CENTERED OVER THE JOINT HEAT -SEALED TO THE LINING, THEN WELDED ALONG EACH EDGE TO ADJACENT LINER SHEETS WITH A i -INCH (25 -MM) WELD STRIP. THE 4 -INCH (100 -MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM O 1/2 INCH (13 MM). TWE P-2 THE JOINT SHALL BE MADE WITH A JOINT FLAP NTH LOCKING EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND THE PIPE END. THE JOINT FLAP SHALL OVERLAP THE LINING IN THE ADJACENT PIPE SECTION A MINIMUM O 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELTING THE FLAP TO THE LINING OF THE ADJACENT PIPE USING 1 -INCH (25 -MM) WELD STRIP. CARE SHALL BE TAKEN TO PROTECT THE FLAP FROM DAMAGE EXCESSIVE TENSION AND DISTORTION IN BENDING BACK THE FLAP TO EXPOSE THE PIPE JOINT DURING LAYING AND JOINT MORTARING SHALL BE AVOIDED. AT TEMPERATURES BELOW 50 F(10 C), HEATNG O THE LINER MAY BE REWIRED TO AVOID DAMAGE THE JOINT FLAP OR STRIP ON BEVELED PIPE SHALL. BE TRIMMED TO A MOTH (MEASURED FROM THE END O THE SPIGOT) O APPROXIMATELY 4 INCHES (100 MM) FOR THE ENTIRE CIRCUMFERENTIAL LENGTH OF THE LINING. ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE VAIN THE SPECIFICATIONS AND INSTRUCTIONS O THE UNING MANUFACTURER. WELDING SHALL FUSE BOTH SHEETS AND WELD STRIP TOGETHER TO PROVIDE A CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER PLATE. HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE JOINED AT A TEMPERATURE BETWEEN 500 AND 600 F (260 AND 316 C). WELDING TOOLS SHALL BE HELD APPROXIMATELY 1/2 INCH (13 MM) FROM AND MOVED BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE WELDING TOO. SHALL BE MOVED SLOWLY ENOUGH AS THE WELD PROGRESSES TO CAUSE A SMALL BEAD OF MOLTEN MATERIAL TO BE VISIBLE ALONG BOTH EDGES AND IN FRONT O THE WELD STRIP. THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY WHEN THE LINER COVERAGE IS 360. DEGREES WHEN GROUNDWATER IS ENCOUNTERED THE LINING JOINT SHALL NOT BE MADE UNTIL PUMPING O GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT. OMEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FLAP, DO NOT WIELD 6 TO 8 INCHES (150 TO 2DO MM) AT THE PIPE INVERT TO PROVIDE RELIEF OF POTENTIAL FUTURE GROUNDWATER BUILD-UP. I.H. APPLICATOR TO CAST -IN-PLACE CONCRETE STRUCTURES - SPECIAL REQUIREMENTS. UNER SHEETS SHALL BE CLOSELY FITTED AND PROPERLY SECURED TO THE INNER FORMS. SHEETS SHALL BE CUT TO FIT CURVED AND WARPED SURFACES USING A MINIMUM NUMBER O SEPARATE PIECES. UNLESS OTHERWISE SHOWN ON THE PLANS„ THE LINING SHALL BE RETURNED AT LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE STRUCTURE AND ITEMS NOT O CONCRETE (INCLUDING MANHOLE FRAMES, CATE GUIDES, CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES). THE SAME PROCEDURE SHALL BE FOLLOWED AT JOINTS WHERE THE. TWE O PROTECTIVE LINING IS CHANGED OR THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT EACH RETURN, THE RETURNED LINER SHALL BE SEALED TO THE ITEM IN CONTACT WITH THE PLASTIC-UNED CONCRETE. IF THE LINER CANNOT BE SEALED. WATT ADHESIVE BECAUSE O THE JOINT AT THE RETURN BEING TOO WIDE OR ROUGH OR BECAUSE O SAFETY REGULATIONS THE JOINT SPACE SHALL BE DENSELY CAULKED WITH LEAD WOOL OR OTHER APPROVED CAULKING MATERIAL TO A DEPTH O 2 INCHES (50 MM) AND FINISHED WITH A MINIMUM OF 1 INCH 925 MM) O AN APPROVED CORROSION RESISTANT MATERIAL I.I. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS INSTALLED IN THE TRENCH, ALL SURFACES COVERED MIN LINING, INCLUDING WELDS, SHALL BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR (TINKER & RASOR MODEL NO. AP -W WITH POWER PACK OR APPROVED EQUAL) WITH THE INSTRUMENT SET BETWEEN 18.000 AND 22,000 VOLTS. ALL WELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD. ALL PATCHES OVER HOLES, OR REPAIRS TO THE LINER WHEREVER DAMAGE HAS OCCURRED, SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SECTION 7-2.03(1.E) PARA. 8 ABOVE EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER ELL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2 INCHES (5D MM) BELOW THE LINER TO PROVIDE A TAB. A 10 -POUND (5 KG) PULL WILL BE APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF THE STRUCTURE BY MEANS OF A SPRING BALANCE. UNER ADJOINING THE WELDING STRIP WELL BE HELI) AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE THE 10 -POUND (5 KG) PULL WILL BE MAINTAINED IF A WIELD FAILURE DEVELOPS, UNTIL NO FURTHER SEPARATION OCCURS DEFECTIVE WELDS WILL BE RETESTED AFTER REPAIRS HAVE BEEN MADE TABS SHALL BE TRIMMED AWAY NEATLY BY THE INSTALLER OF THE LINER AFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPECTION SHALL BE MADE WITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. SHOP DRAWINGS CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION SHOEING DIMENSIONAL. MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW. PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION V. RCP CLASS V SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION V. PVC FOR PIPE SIZES 18" AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET THE FOLLOWING REQUIREMENTS: 1. MATERIAL PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH IN ASTM D 3034 WITH SDR OF 35, ELASTOMERIC SEALS AND JOINTS SHALL CONFORM TO ASTM D 3212 AND ASTM F 477. 2. TESTING MANUFACTURING TESTING METHODS SHALL CONFORM TO ASTM F-679 (T -WALL). CERTIFlGATES OF COMPLIANCE SHALL BE MADE AVAILABLE TO THE ENGINEER. 3. INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S GUIDELINES, THESE SPECIFICATIONS AND ASTM D 2321 'UNDERGROUND INSTALLATION O FLEXIBLE THERMOPLASTIC SEWER PIPE.". 4. FIELD TESTS. IN -FIELD PRESSURE TESTS SHALLCONFORM TO THESE SPECIFICATIONS AND THE FOLLOWING: DEFLECTION MEASUREMENT O PVC PIPE AFTER 30 DAYS O INSTALLATION THE CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A GO -NO-GO 5% MANDREL THE MANDREL SHALL BE PULLED THROUGH THE PIPE WITH ROPE BY ONE PERSON WITHOUT MECHANICAL ADVANTAGE THE MANDREL SHALL HAVE VANES AT LEAST AS LONG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE WITH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS. THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER = BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) WHERE Y = ALLOWABLE DEFLECTION IN % (% BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE MANUFACTURER) THE MANDREL SHALL HAVE AN ODD NUMBER OF VANES WITH SEVEN (7) MINIMUM. THE MINIMUM LENGTH O THE CIRCULAR PORTION O THE MANDREL STALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE EXCAVATED, RE -BACKFILLED; RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD S-39, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS 7. TRENCH EXCAVATION THE EXCAVATION O TRENCHES FOR PIPING WD IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE O THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH O THE PIPE. IT IS THE INTENTION O THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION O TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES O PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTIUTY CONDUIT INSTALLATIONS SHALL MEET CITY STANDARD S-39. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. & BRACING AND SHORING EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES ORDERS, AND REGULATIONS OF THE STATE DIVISION O INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION O INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY O THESE RULES ORDERS AND REGULATIONS SHALL BE SUFFlGE14T CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFIWNG, THE BOTTOM O THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 O THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO THE ENGNEER A DETAILED PLAN, DRAWING THE DESIGN O SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD O CAVING GROUND WRING THE EXCAVATION O TRENCHES NECESSARY FOR THE CONSTRUCTION O THE PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 9. TRENCH BACKFILL TRENCHES SHALL. NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR THEREOF. UNLESS OTHERWISE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS O THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARD ST -22 EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30') FROM FINISHED GRADE BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE O THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS AUGNMENT AND GRADE BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE O DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION. AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER SHALL BE THOROUGHLY. COMPACTED BY VIBRATORY OR MECHANICAL TAMPING OR BY A COMBINATION O THESE METHODS FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST ONE FOOT O COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWED. IMPORTED BEDDING AND BACKFILL MAIERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL O THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION O IN-SITU MATERIALS. ACHIEVING FIRM BEDDING BELOW PIPE SPRINgmL CONTRACTOR SHALL PROVIDE 'FIRM BEDDING' SUPPORT FOR THE PIPE BELOW THE SPRINGUNE. FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART O THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING BEDDING AND BACKRWNG, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS %, !i THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS, MANHOLES SHALL BE TYPE 'A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE $` FOR ; HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT SHOVEL-SLICINGTHQUA PIPES 48' IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE UP TO THE QUARTER PONT OF THE PIPE TE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2° MORTAR BED OR SET ON TRUEST BACKFILL, 'BEDDING MATERIAL AS SPECIFIED BY ASTM 2321-8 SHALL BE USED KENT -SEAL, IN A GROOVED FOUNDATION,,,,,, ^ IN THE PIPE ZONE FOR INITIAL BACKFILL AFTER THE PIPE HAS BEEN PROPERLY LAID 15. 15. STORM DRAIN PIPE111" AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT AFTER THOROUGHCONSOLIDATION, THE FINAL DEPTH STORM DRAIN PIPE. CONTRACTOR SHALL UTIUZE RCP PIPE, CLASS III WITIH RUBBER 0 SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. .VwJ MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE s _ - OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE PROVISIONS IN SECTION 65, 'REINFORCED CONCRETE PIPE', OF THE STANDARD z RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WALL NOT BE SPECIFICATIONS AND THESE SPECIAL PROVISIONS. PERMITTED. SUBSEQUENT ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE w BACKFlU.ED NTH ATE NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE SPECIFICATIONS JONES FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. " MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROVING HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE s USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. PIPE', OF THE STANDARD SPECIFICATIONS 'WILL NOT SE REQUIRED. S" WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROVING, THE BACKFILL ® REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASCETED JOINTS CONFORMING TO MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE SECTION BS-1.O6B, "RUBBER GASKETED JOINTS°, OF THE STANDARD SPECIFICATIONS. C ) z DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROVING v q BEFORE SUCCEEDING LAYERS ARE PLACED. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES ONLY SUITABLE AND PROPER EQUIPMENT AND COMPACTION OF SUBSEQUENT BACKFILL 'WITHIN TWO AND ONE-HALF 2-1 2 FEET OF ( /) APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING. HANDLING FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPUSHED BY TAMPING AND/OR AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED ROWING AS SPECIFIED ABOVE WHERE THE TRENCH IS WITHIN THE PAVEMENT ON RESIDENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90%) RELATIVE REJECTED. COMPACTION. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES 0 SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROVING SHALL BE FREE FROM THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS n r MATTER, OR OTHER UNSATISFACTORY MATERIALS. r- ( ¢ `r m PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS � m ro IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE 0 2 - WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS. TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT p _ H WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE z w I BACKFILL TESTING AND COMPACTION. TESTING OF BACKFILL MATERIALS AND COMPACTION WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND SHALL BE IN ACCORDANCE WITH SECTION 19. `EARTHWORK' AND SECTION 6-3, DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE w Uo w 'TESTING", OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, T PUBLIC WORKS, DIVISION HIGHWAYS EACH LAYER O BACKFILL MATERIAL SHALL OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. lmM . I MEET THE COMPACTION, SAND EQUIVALENT. AND GRADATION REQUIREMENTS BEFORE THE WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED Ai EACH JOINT 70 W o LL eD 2 NEXT LAYER IS PLACED. FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY O SUFFICIENT SIZE FOR THAT o N SO N x m EACH LAYER O BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN Y COMPACTION m B OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39 SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT O .L 9 5 AS MODIFIED ON THE CONIRAC7 PLANS. EXCEPT THAT COMPACTION WITHIN THE THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS m ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90%) THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM RELATIVE ODMPAC11ON FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY BEING FLUSHED INTO AN EXISTING STORM DRAIN UNE Qll CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE - OTHE FOLLOWING D2922 OR 07556.CUTTING PIPE THE CONTRACTOR SHALL PERFORM ALL WORK O CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION O THE W IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED THE TRENCH SHALL RE WORK. ALL PIPE SHALL BE CUT m FIT ACCURATELY, V47H SMOOTH EDGES AND FACES.* * PERCENTAGE, BE -EXCAVATED AND RE -COMPACTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO 6 ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED COMPACTION TESTS TELL BE THE SUBDIVIDERS RESP THE NUMBER AND OR INCORRECTLY CUT. CITTY. LOCATIO ONS THE TESTS SHALL BE DETERMINED BYY THE THE GEtt ENGINEER. � 10, SEWER PIPE INSTALLATION 16. BORED/JACKED PIPE a > I `•'P 8 , SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE PRICE PER UNEAL FOOT SHALL INCLUDE BUT NOT BE UNITED TO EXCAVATION, BEDDING INSTALLED. IT SHALL HAVE EVEN BEATING TH T ITS LENGTH AND SHALL SLOPE AND BACKFILL TOWARD ONE END. SPACE BETWEEN CASING ANNDD PPIPIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE HANDLING O MATERIALS ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CASING ALSO SHALL BE BACKFILLED PATH GROUT OR SAND. THE ENDS O SPACE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH A APPUANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDUNG OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL AND PLACING O MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING SHALL BE FURNISHED AT THE CONTRACTORS EXPENSE. WITH A JOINT DAMAGED OR FLATTENED WELL CAUSE THAT PIPE OR FITTING TO BE REJECTED. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF ' BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING PIPE LAYING. NO PIPE STALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION O THE BOTTOM O THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFLUENT MANNER, ACCORDANCE WITH MANUFACTURER'S RECOMMENDARONS. PIPE LAYING SHALL BEGIN CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE FROM THE DOWNSTREAM END OF THE TRUNK SEVER OR AS DIRECTED BY THE ENGINEER. PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL PIPE LAYING SHALL PROCEED PATH EACH PIECE LAID TRUE i0 UNE AND GRADE, AND IN ALLOW THE REPLACEMENT O THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE THE PLANS. AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE AS THE WORK PROGRESSES THE INTERIOR O THE PIPE SHALL BE CLEARED O ALL DIRT AND. DEBRIS O EVERY UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION O THE TRENCH OR THE PIPELINE TO GRADE, THE VOD BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION WEATHER IS UNSUITABLE AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE O AIR -BLOWING PIPE AND FITTINGS SHALL BE CLOSED. SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL z WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT IT IS THE CONTRACTOR'S RESPONSIBIUTY TO MAINTAIN A SAFE OPERATION AT ALL S PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR m SIX (6) HOLES SHALL BE EXCAVATED AHEAD O ACTUAL PIPE LAYING, ON ACCOUNT OF UNREASONABLE SLOUGHING O MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS WORKERS OR THE STABIUTY O THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FAO CLOSURE WITH CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK O CUTTING PIPE AND SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE. SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION O 111E THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, NTH SMOOTH EDGES AND FACES. DETAILED PLAN O PRECEDING WITH THE WORK, FOR HIS'REVIEW AND APPROVAL THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS O CUTTING AND NO ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED PRICE AND NO ADDITIONAL COMPENSATION WELL BE MADE THEREFORE OR INCORRECTLY CUT. 17. MINOR STRUCTURES PIPELINE TESTING ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED AND READY FOR SERVICE TESDNG SHALL BE CONDUCTED IN ACCORDANCE WITH THE MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC 318-6(4), OR THE WATER CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF o EXFILTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, 'TESTING PIPELINES' SECTIONS 70-1.02 H O THE STANDARD SPECIFICATIONS AND THESE SPECIAL O THE 1994 EDITIONS 'STANDARD SPECIFICATIONS' FOR PUBLIC WORKS CONSTRUCTION, PROVISIONS MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS AND CHAPTER 1.3 O THE CITY O BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE HOURS PRIOR TO ANY TESTING. PLANS CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET 771E EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL WHEN PIPE LAYING IS INTERRUPTED, STRENGTH REQUIREMENT O ASTM. C-47& EACH SUCCESSIVE MANHOLE SECTION SHALL AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND BE SET ON A BED O PORTLAND CEMENT GROUT OR 'KENT SEAL" TO MAKE A BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND T. WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET REMOVE ANY DIRT OR MATERIALS WHICH WDUED CLOG PUMPS, EQUIPMENT, S. EQUIPMENT. PLUMB. N HE CON SPRAY HEADS, ETC. THE CONTRACTOR STALL MAKE PROVISIONS FOR PREVENTING 18. ADJUST SURVEY MONUMENT ENCASF_M_ENTS ti FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEEDIER UNE Z SEWER SEWER SHALL CONFORM TO THIS REGARD. COVER WITH ENCASEMENTS SHALL ADJUSTED OR SURVEY MONUMENT AND FRAMERADE _ Hn Z O LATERALS LATERALS EVERY INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN AT A K e T EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO ACCORDANCE WI1FH THESE SPECIAL PROVISIONS AND CITY STANDARD 5-29. ° T='4 Q AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS ALS. COMPRESSION CWPUNGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS POSITIVE GRADE THE SURFACE O THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FORA -L = d Q TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON MINIMUM O THREE DAYS. F..H U a Z THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH AT THE OPTION O THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM O O - THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE - SEVEN SACKS O CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR a < PAID AS SEWER FOR THE APPROPRIATE DIAMETERS PROTECTION O THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM O ONE DAY. Q V 11. SYSTEM TESTING co C-.;) I W A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE THE MONUMENT WILL BE SET BY OTHERS THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OMER 24 ARE REQUIRED.0 g d IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE HOURS NOTICE WHEN SURVEYS RECOMMENDATIONS OF THE MANUFACTURER. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS W F v) PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.,� i (p DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY O ROTATING 18. CONNECTION SEAL TO PVC LINED SEWER UNE OR MANHOLE 0 G 8 360', IN. ORDER TO VIEW AND RECORD THE TOP AND SIDES O THE PIPE, AS REQUIRED. THE VIDEO ® Z Z INSPECTION SHALL BE WITNESSED BY THE CRY'S CONSTRUCTION INSPECTOR, WHO WELL ALSO INITIAL 'CHAIN THE CORED HOLE SHALL BE APPROXIMATELY 3 INCHED GREATER THAN C_.�)¢S < Q AND DATE THE O CUSTODY FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF THE OUTSIDE LINE. THE CORED HOLE SHALL BE DESIGNED TO CYT A F ANY PIPE LOCATIONS REVEALED 70 BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED 'CHAIN HOLE WITH MINIMUM DAMAGE TO THE REINFORCING STEEL, PIPE OR W (II VIDEO CASSETTE, THE COMPLETED O CUSTODY FORM AND A WRITTEN LOG (WHICH INCLUDES PLASTIC LINER.`� THE STATIONING, BASED ON THE STATIONING O THE APPROVED PLANS, O ALL CONNECTED LATERALS) ?: � i O THE INSPECTION SHALL BE PROVIDE FOR VIEWING AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL 13ECOIME THE PROPERTY O A THE PLASTIC LINER AROUND THE PIPE AT THE CORED HOLE SHALL BE � y THE CITY. CLEANED PER THE PLASTIC LINER MANUFACTURE'S RECOMMENDATION. -N� 0 THE END OF THE CONNECTING LINE SHALL BE SEALED TO THE PVC N onZ j 72 WYE FITTINGS SHALL BE INJECTION MODE IN -UNE TWE AND SHALL BE USED FOR ALL BOOT WITH SIKA 449/203 PRIMER AND SIKA FLEX to SEALANT OR AN LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM O 23 DEGREES ABOVE THE APPROVED EQUAL C__�) HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. ALL LATERALS SHALL BE 4' IN DIAMETER EXCEPT AS NOTED ON PLANS. EXTENDING A MINIMUM THE PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGLY TO. THE 7 OF 4' BEYOND THE PROPERTY LINE OR RIGHT-OF-WAY UN0" O E NTH 3COVER AT FLOW LINE OUTSIDE WALL O THE CONNECTION. • LL SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY UNE OR RIGHT -O- "SEWER THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED 4 $ WAY LINE AS SHOWN IN THE LATERAL MARKER" DETAIL C.O.B. STD. DET. SW -i. FOR HOLIDAYS PER THE PLASTIC LINER MANUFACTURE'S LATERALS SHALL BE A MINIMUM 5.0' DEEP AND A MAXIMUM O 7' DEEP AT PROPERTY UNE OR RECOMMENDATION. ® OF RIGHT --WAY AND A MINIMUM O 2.5' DEEP AT FLOWUNE THE CONNECTION UNE SHALL BE CENTERED IN THE CORED HOLE AND PLACED SO IT IS FLUSH WITH THE INSIDE WALL OF THE RCP. 13. ALL SEWER STUBS STALL BE CLOSED WITHA STANDARD PLASTIC PWG. SOLVENT WELDED. THE PVC BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, 14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY O BAKERSFIELD L,, INC. OR AN EQUAL APPROVED BY THE CITY ENGINEER. Know what's below. 111111111 � I STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE SPECIFICATIONS THE DEPARTMENT Call before dig. b W O O NS STANDARD STATE CALIFORNIA, TRANSPORTATION, you V CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WATT THE Citt r, O BAKERSFIELD STANDARD DRAWING S-20. _ _ _ IU JN 1,T 8 , 1 .�-- --� 1 NOT A IPART I I UJN1T 4 i t U 1 II 1 61L 6 4 in 3 JL 5 J J y l II' j I n f Wh 8 S S.I J O KJJ 1 J � N I � � U �N 1 T 7 s a� M wp� �`� I y KZ.�K � OO. WC -i M 2NMW 2 �M yob Jv Iz .N Fr }X I %3<' NOT A PART e IWC I m tV ai �W�4O 0 I=og 'NW N♦ I N ad1 ^' N LS LOT-----�-- ~ �— �« Q N P/L N N I -I- S -ii �- i 1 E%. SEWER LAT. -1�- -- --1--- N N N 1 h (SEE APPROVE r. TRACT U N 1 T 7300 UNIT 3) �\ NOT A PART m o 8" SEVER N2424 49'W - SEWER 155.68 - \ 11+00 5 12+00— �" sza a'w 7006 _ ' - S�WER��) 14+00 - E%. 8° SEItfR 24" DRAIN m b 17.32' -- N242019 16297' m 24° DRAIN 24 DRAIN (L1) RAM L _ SEE APPROVED �`S 2 8'SEWER 1 8" DRAIN (L4) _- TRACT 7300 -UNITS) DRAI N2424'49'W PPA C1 .M --_-_ _ A ------'R,---- M w _o' Q I'7 F P/L Ei 74" EX 24" GRAIN -.... 8" WATERrc-= - N ® �LS LOT n F a m w i LS LOT c3 < t.,T 3 n % o+d dW LL W�Q� M� SCALE: 1" = 40, u^ I a o N~I U maw Lzi �n \� a \\\ 40' 20' 0' 40' 80' od N m'T+ I rowI L3 W2C 12 N Q BOON WAY 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 DELAMERE STREET (PRIVATE STREET) (STA. 10+00.00 C.L. TO 15+00.00 C.L.) SCALE 1" = 40' HORIZONTAL. CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA C1 500.00' 222.12' 112.92' 2527'10" C2 500.00' 78.18' 39.17 08.5T32° 11+00 VINSTALL 17.32 LF 12+00 13+00 OF 8" PVC SEWER 00.25% (STA. 10+00.00 C.L. TO 15+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL LEGEND: ABBREVIATIONS C.L. CENTERLINE SMH SEWER MANHOLE INV. INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE M.H. MANHOLE EX. EXISTING CB CATCH BASIN ELEV. ELEVATION L.S. I I PA PROPERTY LINE SCP STREET CONSTRUCTION RAN I 4STALL 50. • 8 LF OF STATION T.O.C. TOP OF CLEANOUT TEMP. l ww y RAD. RADIAN a . a UNIT BOUNDARY INSTALL 16297 LF OF 24' -RCP ® DO8% TRACT BOUNDARY -0.08% 1 24" R RCP 0 -0.08% i a UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4' IN SIZE, O2 CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 AT Q CONSTRUCT SEWER MANHOLE z z UNLESS OTHERWISE NOTED. LOCATIONS OF CROSSING PIPES PATH CLEARANCE , TYPE "A" PER C.O.B. STD. SW -4 AND SW -5. O+ Ny MM z Nzw 'wJ ol- O_ g • C 3 �- N J J zN zmz J •y.YPo O N m O aw CONSTRUCT STORM DRAIN PER CIN STANDARDS �- 32 a- ---� 0 CONSTRUCT STORM DRAIN MANHOLE "A" ,J 01020 Know below. TYPE PER C.O.B. STD. SW -4 & SW -5. m O Whars CONSTRUCT CATCH BASIN Call before you dig. 4 MATE BNI ED ADE OVER IPE QO zz _II d- O m INV. 1� zm 6 YTv. rc -W1 C3 �tVN O COT T44 m`Yj1 i11 N Www ~— !SO4_ — J I 0. ROXIMAIE AOE O CEN WISHED NE i — _ I I , I I i INV. 2¢" DRAIN -, '. INV. 24° DRAIN INV' 24' GRAN � INV. EX. 24° DRAIN .�. i -7---i' i $E APPROVED I TRACT 7 UNIT 3) INY J _ - 8' SEWER w 3 INV EX B" SE11 ¢ aa�n z 'dn, z Zvi MV !8' SEWER 1 (SE€ APPROVEDI oo —, - UNIT 3)--:i w m z p J m m gp _- - 00.E J mN N mm mm' N vz Mm O'o0 +M.M QN mmZ... ��j+WW F-F NIOw J� JJ ww I y 3Q ww I NVOj i MM ily • n++m yrc{J1}a}m INSTALL 15 .68 LF OF 18" PVC O -0.21 X IN A 13 .26 LF OF 8' PVC SEWER O -0.258 z ~ I 11+00 VINSTALL 17.32 LF 12+00 13+00 OF 8" PVC SEWER 00.25% (STA. 10+00.00 C.L. TO 15+00.00 C.L.) SCALE: 1" = 40' HORIZONTAL SCALE: 1" = 4' VERTICAL LEGEND: 14+00 362 360 358 356 354 352 350 348 346 344 342 340 338 R TRACT 336 334 332 - -- 330 dww wm wq"Ii ABBREVIATIONS C.L. CENTERLINE SMH SEWER MANHOLE INV. INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE M.H. MANHOLE EX. EXISTING CB CATCH BASIN ELEV. ELEVATION L.S. LANDSCAPING AREA PA PROPERTY LINE SCP STREET CONSTRUCTION RAN T.O.M. TOP OF MANHOLE STA. STATION T.O.C. TOP OF CLEANOUT TEMP. TEMPORARY RAD. RADIAN a . a UNIT BOUNDARY ---------- zw PROPERTY ONE / RIGHT-OF-WAY ---------- j TRACT BOUNDARY — - - — - CENTERLINE —.—s— CONSTRUCT SEWER PER CITY STANDARDS PROPOSED CURB 14+00 362 360 358 356 354 352 350 348 346 344 342 340 338 R TRACT 336 334 332 - -- 330 dww wm wq"Ii Ex. 12ao LF of a' Pvc 328 t5+00 SEWER 50.38' 0.25% S18 6 E UNE TABLE ONE BEARING DISTANCE L1 S 2420'15° E 50.38' L2 S18 6 E 13226' L3 S 242449' E 26.60' L4 S 6T34'41" W 7.42' LS S 16'42'33° E 83.31' 362 360 358 356 354 352 350 348 346 APPRI 1 344 342 340 SECTION 3 SCALE: 1 40' HORIZONTAL 1" = 4' VERTICAL I STALL 7.421 LF OF CONSTRUCTION NOTES: RGd-RP--O- — W PROPOSED WATER PER SEPARATE PLANS NOTES 1). ALL CATCH BASINS ARE TO BE TYPE "A" Oi 011% : DRAIN/SEWER. CONTRACTOR TO VERIFY LOCATION n WITH 3.5' OPENINGS PER C.O.B. STD. D-14 AND INVERT OF EXISTING STORM DRAIN/SEWER TO.M• 363.2 TOP OF MANHOLE TOP OF CLEANOUT ELEVATION / UNLESS OTHERWISE NOTED. z PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER zw j ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS OF ANY DISCREPANCIES. —.—s— CONSTRUCT SEWER PER CITY STANDARDS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4' IN SIZE, O2 CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 AT Q CONSTRUCT SEWER MANHOLE z z UNLESS OTHERWISE NOTED. LOCATIONS OF CROSSING PIPES PATH CLEARANCE , TYPE "A" PER C.O.B. STD. SW -4 AND SW -5. O+ Ny MM OW z 'wJ SECTIONDESIGNATION: O_ g • z �- N J J w N + N 2 M SECTWN LETTER PRIOR TO PLUGGING AND BACKnWNG TRENCH. aw CONSTRUCT STORM DRAIN PER CIN STANDARDS �- 32 a- ---� 0 CONSTRUCT STORM DRAIN MANHOLE "A" ,J 01020 Know below. TYPE PER C.O.B. STD. SW -4 & SW -5. \ O Whars CONSTRUCT CATCH BASIN Call before you dig. 4 MATE BNI ED ADE OVER IPE I� w INV. 1� DRAIN -W1 362 360 358 356 354 352 350 348 346 344 342 340 CONSTRUCTION NOTES: — W PROPOSED WATER PER SEPARATE PLANS NOTES 1). ALL CATCH BASINS ARE TO BE TYPE "A" Oi REMOVE CAP & CONNECT TO EXISTING STORM : DRAIN/SEWER. CONTRACTOR TO VERIFY LOCATION WITH 3.5' OPENINGS PER C.O.B. STD. D-14 AND INVERT OF EXISTING STORM DRAIN/SEWER TO.M• 363.2 TOP OF MANHOLE TOP OF CLEANOUT ELEVATION / UNLESS OTHERWISE NOTED. PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS OF ANY DISCREPANCIES. —.—s— CONSTRUCT SEWER PER CITY STANDARDS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4' IN SIZE, O2 CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 AT 0 CONSTRUCT SEWER MANHOLE UNLESS OTHERWISE NOTED. LOCATIONS OF CROSSING PIPES PATH CLEARANCE , TYPE "A" PER C.O.B. STD. SW -4 AND SW -5. LESS THAN 12". ® CONSTRUCT SEWER CLEANOUT SECTIONDESIGNATION: O3 CONTRACTOR SHALL HAVE THE SEWER/STORM • PER C.O.B. STD. SW -6. LINE STUB LOCATION AND INVERT SURVEYED SECTWN LETTER PRIOR TO PLUGGING AND BACKnWNG TRENCH. CONSTRUCT STORM DRAIN PER CIN STANDARDS �- 32 ---� 0 CONSTRUCT STORM DRAIN MANHOLE "A" Know below. TYPE PER C.O.B. STD. SW -4 & SW -5. SNEET WHERE SEC1NXI IS SHOWN Whars CONSTRUCT CATCH BASIN Call before you dig. 4 TYPE "A" PER A.O.B. STD. D-14. 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 I UNIT 5 1 ' J I N-1 II : o. da J niW 1I 1 a J 7 3 J }UN17lw 6+5 DELMERE STREET 2 M SEE SHEET 3 1 �C# O En 1 Z r� IoQ 1 TNI I 1 O 1 11 ' 10 yyl�In+ -1 I I nY Zie�� $ caid� Iuai STI 1� }IAiO ci r' + o M .- 1 a I m $ g P/L ifi° a L4 rc � II Un A 1t-� $ ~ 1 N w I N y -' ��._�-��- J __ n N 173.96' 17+OD 1 j 1 o1 1 1A I $ 1 G �__ s F r �� r S65'3223�-16+00_5 -1 P/L a _ ; _ _—,- C1 8" SEWER N71.46' E 257.48' _ c - _ _ _ 1 97.90' p - 13+� DRAIN 14++_00---1_�- N653223°E g ♦ _ _ S71'42'19" 18° DRAIN 2 D1' N 24" DRAIN E lv....JJJJ Na wo gs SEw s 11i4,D,_l_ 28� —__— _—_ - "1 a P/L PA ; 11 1 o rc yry 1 NY 11 F a; p. i 8' WATER � wpA V 12 bl ` 9�B 1 �, in 1 1 s TN 8. A a . c51 W Mls 11 1 1 M W3 1 it io'= i'i 1 m - n > ci n? atix� 1 0�' ' w � � NN' zh •�, 't- ' 12 W'g � 1 1 � 11 ' � N ' � �zLL PA$ N N �^ \ ea n 13 j.UI 11 1 y .Y+- 1 $a $ 1 d + y� '$,-' Ao.. tici 1 � 00 CO +9 ' v 1 m 14 v� 10+ I Ao 1 i-" nJLi 8i0 I N A y 3N a ' O ' d Q -1 6Q3p�pWIn Jj 'go I.N +AI r1. 1 �' ' 8 1 9 i ' � Y'��r I $ ' ^ I �-.1��-�.-��-a-�-�- •.E � '� � I I 1 1 DELAMERE STREET SEE SHEET 3 BOON WAY (PRIVATE STREET) (STA. 10+00.00 C.L. TO 17+23.45 C.L.) SCALE: 1" = 40' HORIZONTAL U N 1 7 NOT A PMT 2 a FUTURE 8" SEWER .. fUTURE z 8' WATER Vs m� n 22 23 `" SCALE: 1" = 40' 40' 20' O' 40' 80' 17+00 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 18+00 NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVA71ONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4" IN SIZE, UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SEC71W LETTER SHEET WERE SECTION IS $HOTMI 2 CURVE TABLE CURVE RADIUS LENGTH TANGENT 9+50 10+00 11+00 12+00 INSTALLLF 13+00 14+00 18" R - O 017% 85732" (STA. 9+50.00 C.L. TO 18+00.00 C.L.) L4 N 2427'37" W 17.42' IiNST SCALE: 1" = 40' HORIZONTAL 01 LF OF 1 RGJ-R O 0.11% LEGEND: SCALE: 1" = 4' VERTICAL 8' RGJ-R O 0.11% SMH SEWER MANHOLE -- w PROPOSED WATER PER SEPARATE PLANS INV. INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE T.a_M-113_22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION M.H. MANHOLE EX. EXISTING CB CATCH BASIN ELEV. ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS L.S. LANDSCAPING AREA PA PROPERTY UNE SCP STREET CONSTRUCTION PLAN T.O.M. TOP OF MANHOLE 0 CONSTRUCT SEWER MANHOLE STA. STATION T.O.C. TOP OF CLEANOUT TYPE "A" PER C.O.B. STD. SW -4 AND SW -5. TEMP. TEMPORARY RAD. RADIAN Q ® CONSTRUCTSEWER CLEANOUT - - - - •.-_ .m -r- UNIT BOUNDARY PER C.O.B.T ---------- PROPERTY UNE / RIGHT-OF-WAY ----a CONSTRUCT STORM DRAIN PER CITY STANDARDS ---------- TRACT BOUNDARY 0 CONSTRUCT STORM DRAIN MANHOLE z 0 wYI @ z. N TYPE "A" PER C.O.B. STD. SW -4 & SW -5. — CENTERUNE N W W or CONSTRUCT CATCH BASIN PROPOSED CURB 1- TYPE "A" PER C.O.B. STD. D-14. APPROXIMATE FINISHED I ___-- _ •_ 'w —, ti zz3 z zvii I I r W INV. 18" DRAININV 18' GRAIN J 1f.!— r SEWER w J , a W , , i 1 1— p Z. .- Z . — — x . W Q i < ZZ i 2ZZ K S�mNN .?Z Q W @ zzz i : _ --. __---Z a 'l lrpj n - --- - --_-_ -_ A Z k M M S J K M K MM --- , o+ a — ' rn - W W APPIOXIMATE R IISHED N > W W > . J • >�> > APPROI6MA FINISHED ORA E O CEN LUNE W WJ ,VO -- ' - -- - -- - -- - __ _ -- ---1--- I I � i : — --.•. �' INV. a WATER • INV. 18" AIN ` V. 18 DRAT INj}'. 18" DRAIN INV 8°MtR „ W N FU1)RE Sm N . 8" SEWTR v p p .00 oo w •za e SEWER w r p Z N 2 IN . O Z. J > : • ZZ N N x Q . ao ao IV NY' e I W Z I Z M S ._�._._ 1� .._._____- -__— -._+sa MM » C3>ii JU_Z Z_Z_ z� Q N WW Qj > WW — �WMMM I I WaJ�J 1.L., INS rALL 296.6 LF OF 8" VC SEWER 10 0.53% LF OF el PVC 00.53% INST 173.96 aF 8" PV SEWER O .53% 17+00 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 18+00 NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVA71ONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4" IN SIZE, UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SEC71W LETTER SHEET WERE SECTION IS $HOTMI 2 CURVE TABLE CURVE RADIUS LENGTH TANGENT 9+50 10+00 11+00 12+00 C1 13+00 14+00 78.18' 15+00 16+00 85732" (STA. 9+50.00 C.L. TO 18+00.00 C.L.) L4 N 2427'37" W 17.42' I5 SCALE: 1" = 40' HORIZONTAL 7.42'. L6 N 16'4199" W LEGEND: SCALE: 1" = 4' VERTICAL C.L. ABBREVIATIONS CENTERUNE SMH SEWER MANHOLE -- w PROPOSED WATER PER SEPARATE PLANS INV. INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE T.a_M-113_22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION M.H. MANHOLE EX. EXISTING CB CATCH BASIN ELEV. ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS L.S. LANDSCAPING AREA PA PROPERTY UNE SCP STREET CONSTRUCTION PLAN T.O.M. TOP OF MANHOLE 0 CONSTRUCT SEWER MANHOLE STA. STATION T.O.C. TOP OF CLEANOUT TYPE "A" PER C.O.B. STD. SW -4 AND SW -5. TEMP. TEMPORARY RAD. RADIAN Q ® CONSTRUCTSEWER CLEANOUT - - - - •.-_ .m -r- UNIT BOUNDARY PER C.O.B.T ---------- PROPERTY UNE / RIGHT-OF-WAY ----a CONSTRUCT STORM DRAIN PER CITY STANDARDS ---------- TRACT BOUNDARY 0 CONSTRUCT STORM DRAIN MANHOLE z 0 wYI @ z. N TYPE "A" PER C.O.B. STD. SW -4 & SW -5. — CENTERUNE N W W or CONSTRUCT CATCH BASIN PROPOSED CURB TYPE "A" PER C.O.B. STD. D-14. 17+00 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 18+00 NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVA71ONS UNLESS OTHERWISE NOTED. 3) ALL SEWER LATERALS SHALL BE 4" IN SIZE, UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SEC71W LETTER SHEET WERE SECTION IS $HOTMI 2 CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA C1 500.00' 78.18' 39.17 85732" UNE TABLE UNE BEARING DISTANCE L1 N 65'32'23" E 291.66' L2 N 74'29'55' E 101.47 L3 N 6532'23" E 347.71' L4 N 2427'37" W 17.42' I5 N 242837° W 7.42'. L6 N 16'4199" W 42.39' 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 SECTION 5 SCALE: 1' = 40' HORIZONTAL 1" = 4' VERTICAL 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 • O Know what's below. Call before you dig. OF 18' GJ -RCP OF 18" -RCP .t17: O it% m L>,OW yM1 Q z 0 wYI @ z. N W N W W APPROXIMATE FINISHED I ___-- _ •_ GRADE O CENTERUNE —, I r INV. 18" DRAININV 18' GRAIN INW. r SEWER SECTION 5 SCALE: 1' = 40' HORIZONTAL 1" = 4' VERTICAL 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 • O Know what's below. Call before you dig.