Loading...
HomeMy WebLinkAbout8624 CALIFORNIA AVENUE (2)SWRCB, January 2002 Page of Secondary Containment Testing Report Form This form is intendedfor use by contractors performingperiodic testing ofUST secondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested The completedform, written test procedures, and printouts from tests (fapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: DEL TACO Date of Testing: 5/8/12 Facility Address: 8624 CALIFORNIA AVENUE, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified ofTesting: Name of Local Agency Inspector (fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: RICH ENVIRONMENTAL Pass Technician Conducting Test: JAMES RICH Not Tested Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61 / D40 FailI License Number: 809850 Manufacturer Manufacturer Training Component(s) Date Training Expires X 0 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass FailI Not Tested Repairs Made UNL87 — FROM STP TO DISP #7/8 & X 0 0 9/10 SECONDARY 0 0 0 PREM91 — FROM STP TO DISP #7/8 X 0 0 9/10 SECONDARY 0 0 0 1 1 0 If hydrostatic testing was performed, describe what was done with the water after completion oftests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 5/8/12 SWRCB, January 2002 5. SFCONDARY PIPE TESTING 4b%v Page —1/ of 2/ Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: X Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run # 87 Piping Material: PLASTIC Piping Run #91 Piping Run # Piping Run # PLASTIC Piping Manufacturer: APT APT Piping Diameter: 1.5" 1.5" Length of Piping Run: 50' 50' Product Stored: UNL87 PREM91 Method and location of piping-run isolation: TEST BOOT STP SUMP TEST BOOT STP SUMP Wait time between applying pressure /vacuum/water and starting test: 1 -HOUR 1 -HOUR Test Start Time: 2:00 2:00 Initial Reading (RI): 5.2PSI 5.2PSI Test End Time: 3:00 3:00 Final Reading (RF): 5.2PSI 5.2PS1 Test Duration: I -HOUR l -HOUR Change in Reading (RF -Ri): 0 0 Pass/Fail Threshold or Criteria: 0 0 Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail COmments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SB989 TESTING FAILURE REPORT SITE NAME: DEL TACO DATE 518/12 THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO' COMPLETE TESTING. REPAIRS: HAD TO REPLACE PRODUCT LINE LABOR: 87- REPLACED PRODUCT LINE FROM STP TO DISP #7/8 9/10 91- REPLACED PRODUCT LINE FROM DISP #7/8 TO #9/10 PARTS INSTALLED: 6- REPAIR PENETRATION, 6 TEST BOOTS & 6 BARB FITTINGS NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR CONVIENENCE.