Loading...
HomeMy WebLinkAbout4901 UNION AVENUE (8)SWRCB, January 2002 s -P rzl Ig l ?Aalo -r co'.4g Page of Secondary Containment Testing Report Form This form is intendedfor use by contractors performing periodic testing of USTsecondary containment systems. Use the appropriate pages ofthis form to report resultsfor all components tested. The completedform, written test procedures, and printouts from tests (fapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Chevron #775 1 Date ofTesting: 3/2/11 Facility Address: 4901 South Union Ave. Bakersfield, CA Facility Contact: Jamieson Hill Phone: 1- 661- 393 -7000 Date Local Agency Was Notified of Testing: February 23, 2011 Name of Local Agency Inspector (fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Fail Technician Conduct Test: Scott Olinger Component Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester Not Tested License Type: C -36 C -10 License Number: 589517 Manufacturer Manufacturer Training Component(s) Date Training Expires Incon TS -STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 FILL 44 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made UDC 1 &2 FILL #3 UDC 3 & 4 FILL 44 UDC 5 & 6 ANN SPACE #1 UDC 7 & 8 ANN SPACE #2 TRANS #1 U1, ANN SPACE #3 TRANS #2 ANN SPACE #4 STP #1 PIPE RUN #1 STP #2 PIPE RUN #2 STP #3 PIPE RUN #3 STP #4 J PIPE RUN #4 E91 FILL #1 PIPE RUN #5 FILL #2 PIPE RUN #6 1 1 If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated in this document are accurate and Infull compliance with legal requirements 3Technician's Signature: Date: 4/19/11 SWRCB, January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure VVacuum Hydrostatic Other (Specie) Test Equipment Used: 4" GEL FILLED GAUGE W /CERTS Equipment Resolution: 0 -30 a Tank # 1 Tank # 2 Tank # 3 Tank #4 Is Tank Exempt From Testing ?' Yes o Yes No Yes o Yes Ao Tank Capacity: 12,000 12,000 12,000 12,000 Tank Material: FIBERGLASS / STEEL FIBERGLASS / STEEL FIBERGLASS / STEEL FIBERGLASS / STEEL Tank Manufacturer: MODERN MODERN MODERN MODERN Product Stored: PREM UNL UNL DIESEL Wait time between applying pressure /vacuum/water and starting test: 10 MIN 10 MIN 10 MIN 10 MIN Test Start Time: 1:30 1:30 1:30 1:30 Initial Reading (111): 8 HG 8 HG 8 HG 8 HG Test End Time: 2:30 2:30 2:30 2:30 Final Reading (RF): 8 HG 8 HG 8 HG 8 HG Test Duration: 1 HR 1 HR 1 HR 1 HR Change in Reading (RF-R,): 0 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 0 Test Result: E/ Pass Fail M"Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA VYes No NA Yes No NA Y No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA WYes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 Page of F. a[K I 17:\ `iil a1111x.`711 1 Ce± Test Method Developed By: 7Piping Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum YHydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH Piping Diameter: 3" 3" 3" 3" & 4" Length of Piping Run: 90' 100' 110' 120' Product Stored: PREM UNL UNL DIESEL Method and location of i in -run isolation: TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT STP Wait time between applying pressure /vacuum/water and starting test: 10 MIN 10 MIN 10 MIN 10 MIN Test Start Time: 1:38 1:38 1:38 1:38 Initial Reading (R,): 4.1471 6.3057 3.8381 6.3693 Test End Time: 1:53 1:53 1:53 1:53 Final Reading (RF): 4.1468 6.3049 3.8378 6.3684 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading (RF -R,): 0003 0008 0003 0009 Pass/Fail Threshold or Criteria: 002 002 002 002 Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforfailed tests) SWRCB, January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: UPiping Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Shressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: 4" GEL FILLED GAUGE W/ CERT Equipment Resolution: 0 -15 Piping Run # 5 Piping Run # 6 Piping Run # Piping Run # Piping Material: FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH Piping Diameter: 3" 3" Length of Piping Run: 15' 15' Product Stored: DIESEL DIESEL Method and location of piping-run isolation: TEST BOOT AT TRANS 1 & UDC TEST BOOT AT TRANS 1 & UDC Wait time between applying pressure /vacuum /water and starting test: 10 MIN 10 MIN Test Start Time: 1:30 1:30 Initial Reading (Rj): 5.0 5.2 Test End Time: 2:30 2:30 Final Reading (RF): 5.0 5.2 Test Duration: I HR I HR Change in Reading (RF-R,): 0 0 Pass /Fail Threshold or Criteria: 0 0 Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) SWRCB, January 2002 Page of V. l ii L \\T UV1V11 1L' Ulil\li Test Method Developed By: - Sump Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum ydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid (both product and water)?* Turbine shutdown response time Is system programmed for fail -safe shutdown ?* Was fail -safe verified to be operational?* Wait time between applying pressure /vacuum/water and starting test: Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -Ri): Pass /Fail Threshold or Criteria: Test Result: Was sensor removed for testing? Was sensor properly replaced and verified functional after testing? TRANSI 3'X 2' 30" FIBERGLASS 10" 8" DRY 12" es No NA 20 SEC Yes No NA TRANS 2 3'X 2' 30" FIBERGLASS 10" 8" DRY 12" 20 es No NA I Yes No NA I Yes No NA es No NA I Yes No NA 1 Yes No NA Yes No NA 1 I1 Yes No NA I Yes []No NA I Yes No NA 10 MIN 2:00 5.4525 2:15 5.4525 15 MIN 0000 002 Of Pass Fail es No NA Yes No NA 10 MIN 2:00 3.8728 2:15 3.8729 15 MIN 0001 002 Pass Fail No NA es No NA Pass Fail Yes No NA Yes No NA Pass Fail Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) If the entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to 4ay of the questions indicated with an asterisk(*) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 6. PIPING SUMP TESTING Page of Test Method Developed By: 7 Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 SUMP #1 SUMP #2 SUMP #3 SUMP #4 Sump Diameter: 48' 48" 48" 48" Sump Depth: 58" 58" 58" 58" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of Highest Piping Penetration: 16" 16" 16" 16' Height from Tank Top to Lowest Electrical Penetration: 24" 24" 24" 24" Condition of sump prior to testing: DRY DRY DRY DRY Portion of Sump Tested' 18" 18" 18" 18" Does turbine shut down when sump sensor detects liquid (both product and water)? * JYes No NA 9 / Yes No NA 4/Yes No NA 6 Yes No NA Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail -safe shutdown?* Yes No NA Yes No NA Yes No NA gNes No NA Was fail -safe verified to be operational?* Yes No NA Yes No NA Yes No NA es No NA Wait time between applying pressure /vacuum/water and starting test: 10 MIN 10 MIN 10 MIN 10 MIN Test Start Time: 2:00 2:27 2:27 2:27 Initial Reading (RI): 2.4843 7.2004 5.9931 7.0695 Test End Time: 2:15 2:42 2:42 2:42 Final Reading (RF): 2.4845 7.2001 5.9929 7.0694 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading (RF -Ri): 0002 0003 0002 0001 Pass /Fail Threshold or Criteria: 002 002/ 002 002 Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? es No NA EfXes No NA es No NA Xyes No NA Was sensor properly replaced and verified functional after testing? Yes No F1 NA Yes No NA Yes No NA Y No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) STP 4 REPLACED (1) 2" X 3" BOOT If the entire depth of the sump is not tested, specify how much was tested. If the answer to a_y of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 UNVk;K -V1SVE SE'K Uk)N'1'AINMEN'1' (UDU)'1'ES'I'tNG Page of Test Method Developed By: E(UDC Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum dHydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 UDC # 1 -2 UDC # 34 UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top ofHighest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested Does turbine shut down when UDC sensor detects liquid (both product and water)?* Turbine shutdown response time Is system programmed for fail - safe shutdown ?* Was fail -safe verified to be operational?* Wait time between applying pressure /vacuum/water and starting test Test Start Time: Initial Reading (111): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -Rj): Pass /Fail Threshold or Criteria: Test Result: Was sensor removed for testing? Was sensor properly replaced and verified functional after testin ? AM CON AM CON FIBERGLASS FIBERGLASS 30" 30" 12" 12" 10" 12" DRY DRY 14" 14" UDC # 5-6 AM CON FIBERGLASS 30" 12" 12" DRY 14" Yes No NA Yes No NA 5 4es No NA 20 SEC 20 SEC 20 SEC dyes No NA Yes No NA es No NA Yes No NA 10 MIN 1:38 4.1471 1:53 4.1468 15 MIN 0003 002 JY Pass Fail Yes No NA Yes No NA Yes No NA 10 MIN 1:38 6.3057 1:53 6.3049 15 MIN 0008 002 Pass _ Fail Yes No NA Yes No NA Yes No NA 10 MIN 1:38 3.8381 1:53 3.8378 15 MIN 0003 002 Pass Fail es 0N DNA es No NA UDC # 7 -8 AM CON FIBERGLASS 30" 14" 10" DRY 16" Ves No NA 20 SEC Yes No NA Wyes No NA 10 MIN 1:38 6.3693 1:53 6.3684 15 MIN 0009 002 Pass Fail es 0N 0N Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) If the entire depth of the UDC is not tested, specify how much was tested. If the answer to gay of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 FILL RISER CONTAINMENT SUMP TESTING Page of Facility is Not Equipped With Fill Riser Containment Sums Fill Riser Containment Sumps are Prese , but were Not Tested Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum WHydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Fill Sump # 1 Fill Sump # 2 Fill Sump # 3 Fill Sump # 4 Sump Diameter: 42" 42" 42" 42" Sump Depth: 52" 52" 52" 49" Height from Tank Top to Top of Highest Piping Penetration: 0 0 0 0 Height from Tank Top to Lowest Electrical Penetration: 0 0 0 0 Condition ofsump prior to testing: DRY DRY DRY DRY Portion of Sump Tested 12" 12" 12" 12" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying pressure /vacuum/water and starting test: 10 MIN 10 MIN 10 MIN 10 MIN Test Start Time: 2:00 2:27 2:54 2:54 Initial Reading (R,): 4.6621 5.3786 4.2330 6.0560 Test End Time: 2:15 2:42 3:09 3:09 Final Reading (RF): 4.6622 5.3784 4.2331 6.0561 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading (RF -R,): 0001 0002 0001 0001 Pass/Fail Threshold or Criteria: 002 002 002 002 Test Result: Pass Fail V Pass Fail Pass F it Pass it Is there a sensor in the sump? Yes Ao Yes 4No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No V NA Yes No 9/NA El Yes No 17NA Yes No WkA Was sensor removed for testing? Yes No 4NA Yes No ED Yes No A Yes No SYN Was sensor properly replaced and verified functional after testin ? yes No NA Yes No 11A Yes No NA Yes No 2A Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) SWRCB, January 2002 9. SPILL/OVERFILL CONTAMMENT BOXES Page of Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Over611 Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Sped) Test Method Used: Pressure Vacuum Hydrostatic Other (Sped) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # Bucket Diameter: Bucket Depth: Wait time between applying pressure /vacuum/water and starting test: Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -Rj): Pass /Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)