HomeMy WebLinkAbout4901 LISA MARIE COURT (7)11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 03/02/2012
Order Number: 3190332
Dear Regulator,
Date Printed and Mailed: 04/03/2012
Enclosed are the results of recent testing performed at the following facility:
YRC 822
4901 LISA MARIE COURT
BAKERSFIELD, CA. 93313
Testing performed:
Leak detector tests
Monitor Certification
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
IPURPOSE: COMPLIANCE
TEST DATE: 03/02/12
TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
TEST RESULT SUMMARY REPORT
WORK ORDER NUMBER: 3190332
CUSTOMER PO:
CLIENT: YRC INC. SITE: YRC 822
YRC NORTH AMERICAN TRANSPORTATION 4901 LISA MARIE COURT
10990 ROE AVE. BAKERSFIELD, CA 93313
OVERLAND PARK, KS 66211
JOYCE LOREDO RYAN SUTTERFIELD
913)344 -5622 (661)833 -1895
TEST TYPE: TLD -1
Prnrlurt Pina Tinhtnaca Tact Raciiltc
ILINE, 4LINE
1
s
d,
DIESEL
rv" to-,, +LINE
T,_._a IYPE,#aAr 8
DW FIBERG
Ave
DELIVERY,
PRESSURE
rt t,a _,
TEST'RESULT
0v- 'l
CAD
y _t &y" t tH ." v
YFINAL1EALC;RATE ` h'`
a,, A 4 r zl9p) A r'CW.D
IMPACT',
yALVE.. ".
FIJNCTIO,
Y
2 ' ;
FYictinn I Ina I aak Ilatar tnr Tact
LINE.
ram M 5,pEXIST NGiLEAK ETECTOR; 1` s' ,,:M. t!EXISTIN- JL A ;DETECTOR 2 ' ;
Y reMANUFACTURER IMMMODEL"# SERIAL # RESULTS MANUFACTURER J' MODEL # a SERIAL # yRESUL'TIDr _ iy rrr
40504 P1REDJACKETFX1 —DV
New RanlarPmant I Ina I aak Platartnr Tact
1' "•t', "'K _. 2- i i Y" h
MANUFACTURER SERIAL ftESUT 6MANUFACTURER MODEL #; SERIA# RESUL , aMODEL
I-Ui UWI101 UOtai iGU IVPUIL IIIIUI II IaUUn, Vlsll WWW.CanKI IUIUgy.L;om anu suicut Vn -Line reports -wKHr, or contact your iocal I anKnology om(x.
Tester Name: EDWIN PINEDA Technician Certification Number: 8026748
Printed 04/03/2012 06:59 MTUTTLE
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
Mop Mmknokogy
TEST DATE:03/02/12 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBERS190332
CLIENT:YRC INC. AUSTIN, TEXAS 78759 (512) 451-6334 SITE:YRC 822
4Z%". :,"'A a IN 'VW, i" TANK INFORMATION 4,1
Tank ID: i Tank manifolded: NO Bottom to top fill in inches: 155.0
Product: DIESEL Vent manifolded: NO Bottom to grade in inches: 161.0
Capacity in gallons: 12,036 Vapor recovery manifolded: No Fill pipe length in inches: 65.0
Diameter in inches: 90.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 389 Overspill protection: YES Stage I vapor recovery: NONE
Material: DW STIP3 Installed: ATG Stage 11 vapor recovery: NONE
CP installed on:
COMMENTS
T riiga*Kl ECT, it etwT
Start (in) End (in)
Dipped Water Level: New/passed Failed/replaced Now/passed Failed/replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: RED JACKET
Ingress Detected: Water Bubble Ullage Model: FX1-DV
Test time: S/N: 40504
Open time in sec: 3.00
Inclinometer reading: Holding psi: 18
VacuTect Test Type: NOT
Resiliency cc: 75 NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml/m: 189.0 TESTED
Pressure Set Point: Metering psi-. 10
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TEST IMLtS INSIWRIP" A B t 5CB
Material: DW FIBERG DW FIBERG
Diameter (in): 2.0 2.0
Length (ft): 25.0 10.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE PRESSURE
Pump make: RED JACKET RED JACKET
COMMENTS Impact Valves Operational: YES
Printed 04/03/2012 06:59
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is Installed at the facility, a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: YRC 822
Site Address: 4901 LISA MARIE COURT
Facility Contact Person: RYAN SUTTERFIELD
Make /Model of Monitoring System:USD -LA -04
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
City: BAKERSFIELD CA Zip: 93313
Contact Phone No: 833 -1895
Date of Testing /Service: 03/02/2012
Work Order Number: 3190332
Tank ID: DIESEL Tank ID:
71 In -Tank Gauging Probe. Model: MAG In -Tank Gauging Probe. Model:
X Annular Space or Vault Sensor. Model: USD- LALS -1 Annular Space or Vault Sensor. Model:
X Piping Sumprrrench Sensor(s). Model: BEI -406 Piping Sump/Trench Sensor(s). Model:
Fill Sump Sensor(s). Model: Fill Sump Sensogs). Model:
Mechanical Line Leak Detector. Model: FX1 -DV Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
X Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Tank ID: Tank ID:
In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model:
Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model:
Piping Sumprrrench Sensogs). Model: Piping Sump/Trench Sensor(s). Model:
FIII Sump Sensor(s). Model: Fill Sump Sensor(s). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model;
Tank Overfill /High -Level Sensor. Model: Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). 7 Other (specify equipment type and model In Section E on page 2).
Dispenser : 1 Dispenser D:
Dispenser containment Sensors) Model: BEI -406 Dispenser Containment Sensors) Model:
X Shear Valve(s), Shear Valve(s)
Dispenser Containment Float(s) and Chaln(s). Dispenser Containment Float(s) and Chain(s).
Dispenser ID: 2 SAT Dispenser ID:
QX Dispenser Containment Sensors) Model: BEI -406 Dispenser Containment Sensor(s). Model:
XD Shear Valve(s), Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chaln(s).
Dispenser ID: Dispenser lD:
Dispenser Containment Sensor(s) Model: Dispenser Containment Sensogs). Model:
Shear Valve(s), Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment Identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is Information (e.g manufacturers' checklists) necessary to verity that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): System set -up Alarm history report
Technician Name (print): EDWIN PINEDA
Certification No.: B -37453
Signature:
License. No 743160 (Class 'A' General Enginering Contractor License)
Testing Company Name: Tanknology Phone No.: (8 0) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 03/02/2012
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Site Address 4901 LISA MARIE COURT
D. Results of Testing /Servicing
Software Version Installed:
Complete the following checklist:
Monitoring System Certification
Date of Testing /Service: 03/02/2012
X Yes No • Is the audible alarm operational?
0 Yes No • Is the visual alarm operational?
0 Yes E No • Were all sensors visually Inspected, functionally tested, and confirmed operational?
Q Yes No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
Yes I M No • N/A I If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
Yes No • N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors Initiate positive
shut -down? (check all that apply) x Sump/Trench Sensors; x Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks and sensor failure /disconnection? [S] Yes No
Ex Yes No' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger? 2 a/o
Yes* X No Was any monitoring equipment replaced? If yes, Identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
Yes* QX No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
Water. If yes, describe causes in Section E, below.
Yes QX No • Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
QX Yes o No • Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 4901 LISA MARIE COURT Date of Testing /Service:
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment Is Installed.
03/02/2012
Check this box If tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment Is Installed.
This section must be completed If In -tank gauging equipment Is used to perform leak detection monitoring.
Complete the following checklist:
Yes No' Has all Input wiring been inspected for proper entry and termination, including testing for ground faults?
Yes No Were all tank gauging probes visually inspected for damage and residue buildup?
Yes No • Was accuracy of system product level readings tested?
Yes No • Was accuracy of system water level readings tested?
Ye No • Were all probes reinstalled properly?
Et]Yess No • Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe now and when these deticlencles were or will be corrected.
G. Line Leak Detectors (LLD) : Check this box If LLDs are not installed.
Complete the following checklist:
a Yes No • N /A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: x 3 h 0.1 h 0.2 h9•P• 9.p. g.p.
x Yes No Were all LLDs confirmed operational and accurate within regulatory requirements?
x Yes No • Was the testing apparatus properly calibrated?
x Yes No • N/A For mechanical LLDs, does the LLD restrict product flow If it detects a leak?
Yes No • N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
Yes No • 0 N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Yes No • x N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or falls a test?
Yes No' 0 N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
MYes No • Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, descnbe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
Work Order: 3190332
ESO) k (ESV) Ting Form - Va'sim I- 6QS=
Emergency Shut Off (ESO) &
Dispenser Emergency Shutoff Valve (ESV)
ANNUAL TEST RECORD LOCATIONS AND TEST DATA
Teattng
Company: Ct ld Date:
Location Name: K C Store #:
N
Stag: ID #:
Maintenance Log #
Address: y Q ma i L city: State:
Emergency Shut Off SO Testing Results
On o itc-LIn- in accordance with "ESO Vendor Letter (3- 21- 05).doc ", from Valero's Retail
Compliance Department, as a part of annual compliance testing, this representative tested the
Emergency Shut Off (ESO) switches indicated on this sketch. Findings listed below:
Emergency Shut Off (ESO) ifNo, Provide
Operational? N Maintenance Log #
Maintenance Log #
Date Called:
Date Called
On o zL j rL in. accordance with NFPA 30A this representative tested the automatic - closing feature
ofthe Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each
individual island type dispenser indicated on the diagram below. Each device ( Z in all,
would automatically close. Findings listed below:
Disp. Emergency Shut Off IfNo, Provide
Valve (ESA Operational? Y / N Maintenance Log # Date Called
Signature Of Rearesentative:
Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE:03 /02/12 WORK ORDER NUMBERC3190332
CLIENT:YRC INC. SITE:YRC 822
COMMENTS
Performed the annual monitor certification. All tests passed, Wilbert crisostomo performed the
spill bucket testing with int INCON system.
PARTS REPLACED
HELIUM PINPOINT TE5T RE5ULT5 (IF APPLICABLE)
Printed 04/03/2012 06:59 MTUTTLE
SITE DIAGRAM
i Tanknoiagy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 03/02/12 WORK ORDER NUMBER3190332
CLIENT:YRC INC. SITE: YRC 822
GARAGE
LEAK ALERT LS -04 ATG
BREAKERS /
EN
VtNI
LEAK ALERT AT \
LALS -1
B E1 406
F O STP SENSORS
12K Diesel
Drop tube
flapper valve
Docks and Office
Printed 04/03/2012 06:59 MTUTTLE