Loading...
HomeMy WebLinkAbout4203 MING AVENUE (7)SWRCB, January 2002 P,95S Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and printouts from tests (f applicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: M &S Enterprises Date of Testing: 5/23/12 Facility Address: 4203 Ming Ave. Facility Contact: Augustine Phone: 661- 834 -1076 Date Local Agency Was Notified of Testing: 5/2/12 Name of Local Agency Inspector (ifpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Pass Fail Technician Conducting Test: Frank J Landa Repairs Made Component Credentials: x CSLB Licensed Contractor SWRCB Licensed Tank Tester Not Tested License Type: CSLB 87 N. Secondary License Number:804904 Manufacturer Manufacturer Trainin:? Component(s) Date Training Expires Franklin Fueling TS -STS 9/20/12 UST Service technician ICC 2/2/13 Star. Smith. Fibercast Fiber Glass Systems N.A. 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made 87 N. Secondary X 87 South Syphon Secondary X El El El If hydrostatic testing was performed, describe what was done with the water after completion oftests: Water was out back into test trailer and waste drum CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To Ilse best ofmy knowledge, thefacts stated in this.,46cument are accurate and infull compliance with legal requirements Technician's SienatureJ Date: 5/23/12 SWRCB, January 2002 5. SECONDARY PIPE TESTING Page of Test Method Developed By: Piping Manufacturer x Industry Standard Professional Engineer Other (Sped) Test Method Used: x Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run #87 north Piping Run #87 S.Syphon Piping Run# Piping Run # Piping Material: Fiberglass Fiberglass Piping Manufacturer: Smith Smith Piping Diameter: 3" 3" Length of Piping Run: 200' 5' Product Stored: None Regular Method and location of piping-run isolation: Boot in stp Boot in stp Wait time between applying pressure /vacuum/water and starting test: 5 Min. 5 Min. Test Start Time: Exempt from testing 10:00 am Initial Reading (R,): See notes 5 Psi Test End Time: 11:00 am Final Reading (RF): 5 Psi Test Duration: I hr Change in Reading (RF -R,): 0.00 Pass /Fail Threshold or Criteria: 0.00" 0.00" Test Result: Pass Fail X Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforjailed tests) 87 North Sec. is exempt from testing. Line not connected to turbin 87 South siphon line passed, installed (1) 3.5x2.4 split boot, and (1) 3.5x2.6 split boot