Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages ofthis form to report resultsfor all components tested. The completedform, written test procedures, and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: PANAMA BUENA VISTA SCHOOL DISTRICT Date ofTesting: 10/14/11
Facility Address: 4200 ASHE ROAD, BAKERSFIELD
Facility Contact: I Phone:
Date Local Agency Was Notified of Testing: 8/26/11
Name of Local Agency Inspector (ifpresent during testing): CRAIG
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Pass
Technician Conducting Test: RICH PHILLIPS
Not
Tested
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: C6 UD40 A HAZ
Manufacturer
License Number: 809850
Manufacturer Training
Component(s) Date Training Expires
INCON TS -STS 6/11/2012
L NL87 ANNULAR X WASTE OIL ANNULAR
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
L NL87 ANNULAR X WASTE OIL ANNULAR X
DIESEL ANNULAR X 11 WASTE OIL SEC PIPE 0 X
UNL87 SEC PIPE X WASTE OIL SEC SUMP X
DIESEL SEC PIPE X WASTE OIL FILL SUMP X
UNL87 STP X 0 0 D
DIESEL STP X
UDC #1/2 X 0
UDC #3/4 X 0 0 0
UNL87 FILL SUMP 0 X 0 0 0 0
DIESEL FILL SUMP X
UNL87 VAPOR BUCKET X 0 0 0 D 0
0 0 0 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts stated i document are accurate and infull compliance whit legal requirements
Technician's Signature: Date: 10 /14 /11
SWRCB, January 2002
4. TANK ANNULAR TESTING
Li5`1U
n/
I
n
Page iof ' C
Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure X Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution:
Tank # 87 Tank # DIESEL Tank #WASTE OIL Tank #
Is Tank Exempt From Testing ?' Yes X No Yes X No Yes X No Yes No
Tank Capacity: 12000 12000 500
Tank Material: STEEL STEEL STEEL
Tank Manufacturer. UNKNOWN UNKNOWN UNKNOWN
Product Stored: UNL87 DIESEL WASTE OIL
Wait time between applying
pressure /vacuum /water and
starting test:
30MIN 30MIN 30MIN
Test Start Time: 9:00 9:00 11:30
Initial Reading (R,): 10HG IOHG I OHG
Test End Time: 10:00 10:00 12:30
Final Reading (RF): l OHG 1014G 1014G
Test Duration: 60 MIN 60 MIN 60 MIN
Change in Reading (RF -R,): 0 0 0
Pass/Fail Threshold or Criteria: 0 0 0
TesCResult: ;: X Pass :Fail X, Pass Fail X _P ss: Fail ass.: Fail
Was sensor removed for testing? X Yes No NA X Yes No 0 NA X Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testin ? X yes No NA X Yes No NA X Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code ofRegulations, Title 23, Section 2637(ax6)}
SWRCB, January 2002
5. SECONDARY PIPE TESTING
I-IM / -1/
Page — of Y
f
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: X Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run # 87 Piping Run # DIESEL Piping Run # Piping Run # WASTE OIL
Piping Material: FIBERGLASS FIBERGLASS
Piping Manufacturer: SMITH SMITH
Piping Diameter: 3" 3"
Length ofPiping Run: 50' 60'
Product Stored: UNL87 DIESEL
Method and location of
i -run isolation: in BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure/vacuum /water and
starting test:
30 MIN 30 MIN NOT TESTED
Test Start Time: 9:30 9:30 SINGLE
Initial Reading (R,): 7PSI 8PSI WALL
Test End Time: 10:30 10:30 LINE
Final Reading (RF): 7PSI 8PSI
Test Duration: 60 MIN 60 MIN
Change in Reading (RF -R,): 0 0
PasslFail Threshold or
Criteria: 0 PSI 0 PSI 0 0
7iest Result: _ X :`Pass l7 Fail XPass =. Fall 3 Pass;.: Fail' p Pass: QFal .
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
SWRCB, January 2002
6. PIPING SUMP TESTING
1" D`I U f
I
Page ___ of
Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Sump # 87 Sump # DIESEL Sump #WASTE
OIL Sump #
Sump Diameter:
Sump Depth:
Sump Material: FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to testing: CLEAN CLEAN
Portion of Sump Tested'
Does turbine shut down when
sump sensor detects liquid (both
roduct and water)?*
S Yes No NA S Yes No NA Yes 0 No NA Yes 0No NA
Turbine shutdown response time 5SEC 5SEC
Is system programmed for fail-safe
shutdown ?" X Yes No DNA X Yes No NA Yes No NA Yes 0 No NA
Was fail -safe verified to be
operational?* X Yes No NA X Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure /vacuum/water and starting
test:
30 MIN 30 MIN NOT TESTED
Test Start Time: 9:47 10:22 9:47 10:22 NO
Initial Reading (R,): 2.275 2.287 3.852 3856 SUMP
Test End Time: 10:02 10:37 10:02 10:37
Final Reading (RF): 2.277 2.283 3.853 3.858
Test Duration: 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -Ri): 002 002 001 000
Pass /Fail Threshold or Criteria: 002 002 002 002
TesfResult X bass quail X Pass „ O Fall . i. 0 Pass _ p F;il 0 Pass t7F i
Was sensor removed for testing? X Yes No NA X Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes D No DNA X Yes No NA Yes No DNA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING
Page of
Test Method Developed By: UDC Manufacturer X Industry Standard 0 Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
0 Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC # 1/2 UDC # % UDC # UDC # 1UUD cturer: UNKNOWN UNKNOWN
DC Material: FIBERGLASS FIBERGLASS
UDC Depth: 29" 29"
Height from UDC Bottom to Top
of Highest Piping Penetration:
9" 9"
Height from UDC Bottom to
Lowest Electrical Penetration:
5" 5"
Condition of UDC prior to
testing:
CLEAN CLEAN
Portion of UDC Tested 12" 12"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
X Yes 0 No 0 NA X Yes 0 No 0NA Yes 0 No NA Yes No 0NA
Turbine shutdown response time 5SEC 5SEC
Is system programmed for fail-
safe shutdown ?* X Yes No NA X Yes No NA Yes No NA Yes No NA
Was fail -safe verified to be
operational?* X Yes No NA X Yes No DNA 0 Yes 0N 0N Yes No DNA
Wait time between applying
pressure/vacuum /water and
starting test
30MIN 30MIN
Test Start Time: 11:30 11:47 11:30 11:47
Initial Reading (Ri): 2.197 2.197 3.855 3.856
Test End Time: 11:45 12:01 11:45 12:02
Final Reading (Rr): 2.197 2.197 3.856 3.856
Test Duration: 15MIN 15MFN 15MIN 15MIN
Change in Reading (RF -Rj): 000 000 000 000
Pass/Fail Threshold or Criteria: 002 002 002 002
Test Result3`. X Pass ;Fail X Pass 0`Feil Passe . Fail Pass Fail.
Was sensor removed for testing? X Yes 0 No NA X Yes 0 No NA Yes 0 No NA 0 Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes No NA X Yes No NA Yes No NA Yes No NA
COMMentS — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests)
1 Ifthe entire depth of the UDC is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
8. FILL RISER CONTAINMENT SUMP TESTING
3`10' 1
Page -— of -2
Facility is Not Equipped With Fill Riser Containment Sumps 0
Fill Riser Containment Sumps are Present, but were Not Tested
Test Method Developed By: 0 Sump Manufacturer X Industry Standard 0 Professional Engineer
D Other (Specie)
Test Method Used: Pressure 0 Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS
Fill Sump Fill Sump #
Equipment Resolution:
Fill Sump # Fill Sump # rSumDiameter:
SumpSump the
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing: NOT TESTED
Portion ofSump Tested
Sump Material:
Wait time between applying
pressure /vacuum /water and
starling test:
30MIN 30MIN 30MIN 30MIN
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration: 15MTN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R,):
Pass/Fail Threshold or Criteria:
Test.Resnit : Pass . `FaII, .; Pass , .. ;'Fad , .'<, Pass. : O Fad . -. Pass . =Fad .'
Is there a sensor in the sump? Yes 0 No Yes No Yes No Yes D No
Does the sensor alarm when
either product or water is
detected?
Yes No 0 NA Yes No NA 0 Yes No 0 NA 0 Yes No NA
Was sensor removed for testing? 0 Yes No NA Yes No NA Yes 0 No NA 0 Yes No NA
Was sensor properly replaced and
verified functional after testing? yes No NA Yes No NA Yes No NA Yes No NA
Comments -- (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
NO FILL SUMPS
SWRCB, January 2002
9. SPILL/OVERFILL CONTAL MENT BOXES
ti n`j of
Page '7 of !
dl
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Spill Box #87 VPR Spill Box # Spill Box # Spill Box #
Bucket Diameter: 12"
Bucket Depth: 16"
Wait time between applying
pressure /vacuum/water and
starting test:
30MIN
Test Start Time: 9:47 10:03
Initial Reading (R,): 3.323 3.322
Test End Time: 10:02 10:19
Final Reading (RF): 3.322 3.322
Test Duration: 15MIN 15MIN
Change in Reading (Rr-R,): 002 000
Pass/Fail Threshold or
Criteria: 002 002
Test Result:; Pass Fail -. 11 )QasS >: Fad.: D Pass. , 0 trail 0 Pass O.Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
PANAMA USD
4200 ASHE RD
BAKERSFIELD CA
10/14/2011 10 :03 AM
SUMP LEAK TEST REPORT
87VPR
TEST STARTED 9:47 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 3.3234 IN
END TIME 10:02 AM
END DATE 10/14/2011
END LEVEL ?•. 3.3228 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
87STP
TEST STARTED 9:47 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 2.2750 IN
END TIME 10:02 AM
END DATE 10/14/2011
END LEVEL 2.2774 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT I%mll.
DSLSTP
TEST STARTED 9:47 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 3.8521 IN
END TIME 10:02 AM
END DATE 10/14/2011
END LEVEL 3.8535 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
PAN+MA U RD
4200 FIFID CA
OAR''' 10:19 AN
10/
1412x11
TEST
REPORT
VIA?
gTUPR
18:03 AN
T 4/20"
TES T •
a TARTER 13229 f,MTESZNEEN
ND
TiLPE1E
Ve-
DATE
101/
013:4
2
1 901II1
N
EVEL 0.002 NDL
E5
a PA55ED
87STP
10:22 AM
1
6201h1
TEST STARTED
TEST STARTED
10:22 AM
10/14/2011
BF_GIN LEVEL 2.2540 IN
10:37 AM _ END TIME
END DATE 14/2011108NI2.2538 NENDLEVELLEAKTHRESHOLD0.0@,j
ASSIN
TEST RESULT
DSLSTP
TEST STARTED 10:22 AM
1
6201h1TESTSTARTED
BEGIN LEVEL
END TIME 10:37 AM
10/14/2011ENDDATE
END 3.8562 IN
0.002 INTHRESHOLDPASSED
TEST RESULT
PANAMA USD 1
4200 ASHE RD
BAKERSFIELD CA
10/14/2011 11:45 AM
SUMP LEAK TEST REPORT
DISP1 -2
TEST STARTED 11:30 AM
TEST STARTED 110/14/2011
BEGIN LEVEL 2.1976 IN
END TIME 11:45 AM
END DATE 10/14/2011
END LEVEL 2.1971 IN
LEAK THRESHOLD 10.002 IN
TEST RESULT PASSED
DISP3 -4
TEST STARTED
TEST STARTED
BEGIN LEVEL
END TIME
END DATE
END LEVEL
LEAK THRESHOI
TEST RESULT
11:30 AM
10/14/2011
3.8557 IN
11:45 AM
10/14/2011
3.8563 IN
D 0.002 IN
PASSED
PANAMA USD
4200 ASHE RD
BAKERSFIELD CA
10/14/2011 12:02 PM
SUMP LEAK TEST REPORT
DISP1 -2
TEST STARTED 11:47 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 2.1972 IN
END TIME 12 :02 PM
END DATE 10/14/2011
END LEVEL 2.1974 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DISP3 -4
TEST STARTED 11:47 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 3.8563 IN
END TIME 12:02 PM
END DATE 1011412011
END LEVEL 3.8564 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
SB989 TESTING FAILURE REPORT
SITE NAME: PANAMA BUENA VISTA USD DATE: 10/14/11
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: /Lo
LABOR: 1-61"C
PARTS INSTALLED: Al_*'L/
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.