Loading...
HomeMy WebLinkAbout4200 ASHE ROAD (7)SWRCB, January 2002 Page-L of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performingperiodic resting ofUSTsecondary containment systems. Usa the appropriate pages ofthisform to report resultsfor all components tested The completedform, written testprocedures, andprintoutsfromtests (1fapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. i 1FAt1YT.TTV 1NW('jRMATION Facilit Name: 4 t"4 FN.y _ U i571f - - G L - 1947VA4 Date ofTestin : Facility Address: y)eo i C9- Facility Contact: Phone: Date Local Agency Was Notified ofTesting: Name of Local Agency Inspector (Ifpresent during testing): 2 TESTING CONTRACTOR INFORMATION Company Name: RICH ENVIRONMENTAL I Pass Technician Conducting Test: ty,.,; on-5 Not Tested Credentials: 3CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type. C611D40 ManLfacturer Manufacturer License Number: 809850 Training C m onen s Date Traininp. Expires INCON INCON TS -STS tiL, 7 ig 1 L vt.K 3. SUMMARY OF TEST RESULTS Component I Pass Fail Not Tested Repairs Made Component Pass Fall Not Tested Repairs Made tiL, 7 ig 1 L vt.K L64,WE ot_ SE for g U t. 7 Sir(. C7 OIL PffE 1&-te i0 bsls1 Ste. 9 0 0 ort. ILL J,--ijf 0 R1 0 0 D CJ 0 0 vi0 c, i -J fA U uD 3- y o r1 D,FS6 %G Scy- 0 0 0 0 El 1j Ifhydrostatic testing was performed, describe what was done with the water after completion oftests: RECYCLE AND REUSFD CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts .crated in this document are accurate and In, full compliance will: legal requirements Technician's Signature: Date: SWRCB, January 2002 d. TANK ANNULAR TESTING Lebo Page Of Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer 0 Other (Spect&) Test Method Used: Pressure IM Vacuum Hydrostatic d Other (Specify) Test Equipment Used: 41n. DIAL GAUGE Equipment Resolution: . 5% t 4; ' / fi r V Tank Tank# Tank# Tank# PXSEL. Is Tank Exempt From Testing ?' Cl Yes 9 No El Yes Sd No Yes No 0 Yes [,No* rank Capacity: 000 iapOp O Tank Material: 5MEL Sri S7 Tank Manufacturer: v v vew"O V K o.. Product Stored: vtit_ ') Q16S£t, w 014- Wait time between applying pressure/vacuum /water and starting test: 30 ' 3d..• -v 3010-1 Test Start Time: AO Initial Reading (Rj): Test End Time: j , Al y Fiiial Reading (R[:): Test Duration: Change in Reading (RF -&): J 046 d Pass /Fail Threshold or Criteria: 0/14 046 Test Result; R Pass Fail OZPass D Fail e Pass Fail Pass r] Fail Was sensor removed for testing? Yes 0 No NA KYes No NA Yes No NA 0 Yes 0 No C NA Was sensor properly replaced and verified functional after testing? yes D No NA XYes 0 No NA b Yes No DNA Yes No 0 NA Comments— (include 4Vormation on repairs mode prior to testing and recomniendedfollow -u forfailed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. (Californ ia Code ofRegulations. Title 23, Section 2637(a)(6)1 S WRCB, January 2002 5. SECONDARY PIPE TESTING a. \b8o Page —L of 7 Test Method Developed By: 0 Piping Manufacturer id Industry Standard 0 Professional Engineer 0 Other (Specj&) Test Method Used: 11 Pressure 0 Vacuum Ei Hydrostatic 0 Other (Specify) Test Equipment Used: 4 in. DIAL GAUGE Piping Run # Piping Run # 05 L Equipment Resolution: . 5% Piping Run Na Piping Run # Piping Material: Fj 6A26 LA j Ft Piping Manufacturer: Piping Diameter: Length ofPiping Run: Product Stored: Method and location of i in -run isolation: 04271 , S iv Wait time between applying pressure/vacuum /water and starting test: 36 ..,1 • %.j UT Test Start 'time: 10.Q— Initial Reading (111): S) Test End Time: Q Je Final Reading (Rr): L / Test Duration: v 7 Change in Reading (RF-R,): Q S 1 0 p5 / Pass/Fail Threshold or Criteria: GP5 / lJ 1 Test Result: Pass 0 Fall Pass 0 Fall O Pass 0 Fail 0 Pass 0 Fall Comments — (include information on repairs madeprior to testing, andrecommendedfollow -upforfailedtests) SWRCB, January 2002 6. PIPING SUMP TESTING a.M107A: Page l_I of Test Method Developed By: Sump Manufacturer ® Industry Standard Professional Engineer D Other (Spec(fy) Test Method Used: Pressure 'Vacuum A] Hydrostatic 0 Other (Specie) Test Equipment Used: INCON TS—STSTS—STS Sump Sump # DS L Equipment Resolution: , Ooo in . Sump #.W /p Sump # Sump Diameter: Sump Depth: Suinp Material: 1 I Height from Tank Top to Top of Highest Pieing Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition ofsump prior to testing: Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid (both product and water ?. R4Yes D No NA JXYes DNo DNA D Yes 0No DNA D Yes 0140 DNA Turbine shutdown response time Is system programmed for fail -safe shutdown?* Yes 0 No NA 9 Yes DNo DNA 0 Yes ONO ONA O Yes No DNA Was fail -safe verified to. be operational? . JC Yes D No DNA JOYes DNo NA Yes No DNA 1 Yes DNo NA Wait time between applying pressure/vacuum /water and starting test: J ) M , n J 36) ,-1 • v N- n r Tcst Start Time: 07oey... 10. 14— U / 1214^ Initial Reading (R,): 61171"&„• w • v Test End Tinte: l : 0i— s1l Final Reading (RF): Q,.> y Test Duration: v t .ti GA-1 Change in Reading (Rr -R,): pap, , Do at`; doo....0 , u Pass/Fail Threshold or Criteria: p,, v ,, y • N Test Result: Z Pass Fail Pass D Fall Pass Fait D Pass Fall Was sensor removed for testing? Yes DNo DNA Yes DNo DNA OYes DNo 0 N Yes DNo DNA Was sensor properly replaced and verified functional after testing? Yes 0 No NA JWYes DNo DNA Yes No NA Yes DNo DNA Comments — (include information on repairs made prior to testing andrecommendedfollow -upforfailed Tests) If the entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated with anasterisk (•) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 7. UNDER - DISPENSER CONTAINMENT (UDQ TESTING aye )0 Page of? Test Method Developed By: UDC Manufacturer Id Industry Standard Professional Engineer Other (Spec) Test Method Used: 0 Pressure D Vacuum 5 Hydrostatic Other (S ec) Test Equipment Used: INCON TS —STS UDC # /—,A UDC # Equipment Resolution: .000in. UDC H UDC # UDCManufacturer. w"-' UDC Material' 514 01 L4 LK S UDC Depth-, ol 7, Height from UDC Bottom to Top of Highest Piping Penetration: a p Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: L ^t i) ' t LJg: +-V Portion ofUDC Tested v Does turbine shut down when UDC sensor detects liquid (both product and water )f IdYes No NA Wes No NA Yes No Cl NA 0 Yes 0 No NA Turbine shutdown response time L G Is system programmed for fail- safe shutdown?* 9Yes ONo NA TdYes ONo DNA Yes ONo DNA Yes ONo DNA Was fail -safe verified to be operational?* W Yes No 0 NA XYes No NA Yes 0No D NA Yes 0 No 0 NA Wait time between applying pressure /vacuunVwater and starting test Test Start Time: Initial Reading ( N .v 7•Yyi ° i 1.1) •+ Test End Time: Final Reading F): 7, y Test Duration: j ti Change in Reading RF -RI); 00,v ew,•J Pass/Fail Threshold or Criteria: 00 .,, a. od .,t d0 •v Teat Result: 19 Pass 0 Fail A Pass Fail Pass Fait Pass 0 Fail Was sensor removed for testing? Yes 0 No 0 NA Z Yes 0N NA 0 Yes No DNA 0 Yes 0N E) NA Was sensor properly replaced and verifiedfied functional after testi T Yes No 0 NA VYes 0 No 0 NA Cl Yes ONo DNA_ D Yes ONo NA Comments — (include infOrmation on repairs made prior to testing and recommendedjollow -up forjailed tests) Ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an asterisk (*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 A vyur. RiCF.R r0NTATNMFNT SUMP TESTING Page (S of 1 Facility is Not Equipped With Fill Riser Containment Sums 0 Fill Riser Containment Sum s are Present, but were Not Tested 0 Test Method Developed By: Sump Manufacturer 31ndustry Standard 0 Professional Engineer D Other (Specify) Test Method Used: Pressure D Vacuum 9 Hydrostatic Other (Spec) Test Equipment Used: INCON TS —STS Fill Sum # Fill Sump# l7$l__. Equipment Resolution: .000in. Fill Sump #tJ Fill Sump # Sump Diameter: Sump Depth; Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure /vacuum /water and starting test: rte J Test Start Time: Initial Reading Fr): Test End Time: Final Reading RF ): Test Duration: Change in Readin R,): Pass/Fail Threshold or Criteria: Test Result: Pass 0 Fail Pass Fail 0 Pass 0 Fail D Pass 0 Fall Is there a sensor in the sump? Yes No 0 Yes DNo 0 Yes DNo Yes 0 No Does the sensor alarm when either product or water is detected? D Yes No DNA O Yes 0 No NA Yes No DNA 0 Yes 0 No n NA Was sensor removed for testin ? 0 Yes No DNA D Yes DNo NA yes DNo NA Yes No NA Was sensor properly replaced and verified functional after testing? Dyes No 0 NA DYes DNo DNA Yes DNo DNA 0 Yes DNo I?NA Comments — (include information on repairs made prior to Jesting, andrecommended follow -upfor ailed tests) VD FILL Sjej SWRCB, January 2002 o SPILUOVERFILL CONTAINMENT BOXES Page -7 of Facility is Not EAuipped With S ilUOverfi1I Containment Boxes 0 Spill /Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: 0 Spill Bucket Manufacturer 0 Other (Speci 2 Industry Standard Professional Engineer Test Method Used: 0 Pressure Other (Specify) Vacuum 99 Hydrostatic Test Equipment Used, INCON TS -STS Spill BOX #Vff Spill Box # Bucket Diameter: ,ti Equipment Resolution: • 000in . Spill Box # Spill Box # Bucket Depth: Wait time between applying pressure/vacuum /water and startin test: Test Stan Time: Initial Reading (Ra): 7. >iaj.v 7•,•+ Test End Time: Final Reading (R}): 7.Ytd.v 7.300, Test Duration: J I Is--% n^) Change in Reading (RF-Rt): pp),v v Pass/Fail Threshold or Criteria: moo), , Cdol •' Test Result: A Pass 0 Fail Pass Fall 0 Pass 0 Fail 0 Pass p Fail Comments - (include informatlon on repairs mode prior to testing and recommendedfollow -upforjailed tests) DSLSTP TEST STARTED 10:15 AM TEST STARTED 04/09/2007 BEGIN LEVEL 5.3680 IN END TIME 10:31 AM END DATE 04/09/2007 END LEVEL 5.3687 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED DSLSTP TEST STARTED 10:31 AMTESTSTARTED04/09/2007BEGINLEVEL5.3686 INENDTIME10:47 AMENDDATE04/09/2007ENDLEVEL5.3696 INLEAKTHRESHOLD0.002 INTESTRESULTPASSED 87STP TEST STARTED 10:00 AM TEST STARTED 04/09/2007 REGTN i_EVEL 6.7662 IN END TIME 10:15 AM FND DATE 04/09/2007 END LEVEL 6.7664 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 87STP TEST STARTED 10:31 AMTESTSTARTED04/09/2007BEGINLEVEL5,7684 INENDTIME10:47 AMENDDATE04/09/2007ENDLEVEL6.7703 INLEAKTHRESHOLD0.002 INTESTRESULTPASSED DANAMA BUENA VISTA 4200 ASHE RD 3AKERSFIELD 04/09/2007 10:31 AM SUMP LEAK TEST REPORT 87VAP TEST STARTED 10:15 AM TEST STARTED 04/09/2007 BEGIN LEVEL 7.2137 IN END TIME 10:31 AM END DATE 04/09/2007 END LEVEL 7.2185 IN LEAK, THRESHOLD 0.002 IN TEST RESULT PASSED NAM RUENA VISTA4200ASHERD6AKERSFIELD 04/09/2007 11:11 AM U'1? '_EAK TEST REPORT 37VAP TEST STARTED 10 :56 AMTESTSTARTED04/09/20037BEGINLEVEL7.2003 INENDTIME11:11 ANENDDATE04/09/2007ENDLEVEL7.2002 INLEAKTHRESHOLD0.002 INTESTRESULTPASSED i r ANAMA 9UENA VISTA 4200 ASHE RD 3AKERSFIELD 04:09/200? 11:55 AM SIJMP i_EAK TEST REPORT TEST STARTED 11:40 AM TEST STARTED 04/09/2007. BEGIN LEVEL 7.4469 IN END TIME 11:55 AM END DATE 04/09/2007 END LEVEL 7.4479 IN LEAK THRESHOLD 0.002 IN TEST RESULT. PASSED 3 -4 TEST STARTED 11:40 AM TEST STARTED 04/09/2007 BEGIN LEVEL 2.7723 IN END TIME 11:55 AM END DATE 04/09/2007 ND LEVEL 2.7726 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED ANAMA BUENA VISTA 4200 ASHE RD 3AKERSFIELD 84/09'2007 12:13 PM SUMP _EAK TEST REPORT 1 -2 TEST STARTED 1158 AM TEST STARTED 04/09/2007 BEGIN LEVEL 7.4478 IN END TIME 12:13 PM END DATE 04/09/2007 END LEVEL 7.4481 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 3 -4 TEST STARTED 11 :58 AM TEST STARTED 04/09/2007 BEGIN LEVEL 2.7727 IN END TIME 12:13 PM END DATE 04/09/2007 END LEVEL 2.7724 IN LEAK THRESHOLD 0.002 IN T73T RESULT PASSED P(2-1 v7'- S)6/L/ SB989 TESTING FAILURE REPORT SITE NAME: 14A &n4 608+4 VIS" TL/VWI- dlJMt;j DATE: 4f- ADDRESS: y)yV &MC 40 TECHNICIAN: /QY4'U a 1 sa v CITY: SITE CONTACT: THE FOLLOWING COMPONENTS WERE REPLACED /REPAIRED TO COMPLETE THE SB989 TESTING• LIST OF PARTS REPLACED / REPAIRED: REPAIR$: LABOR: 14-,O t"C PARTS INSTALLED: votIJ5 WE a\,ee(D