Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performingperiodic testing ofUST secondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: MEMORIAL HOSPITAL Date ofTesting: 5/7/12
Facility Address: 42034.. STREET, BAKERSFIELD
Facility Contact: Phone:
Date Local Agency Was Notified of Testing; 3/28/12
Name ofLocal Agency Inspector (fpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: RICH ENVIRONMENTAL
Pass
Technician Conducting Test: RICH PHILLIPS
Not
Tested
Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester
License Type: C61/D40 A HAZ License Number: 809850
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON TS -STS 6/11/2012
X
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
GEN DSL ANNULAR X
BOILER DSL ANNULAR 0 0 X 0 0
GEN DSL SUPPLY SEC PIPE 1 X 0 0 0 0
BOILER DSL SUPPLY SEC PIPE X 0 0 0 0 0 0
GEN DSL RETURN SEC PIPE X 0 0 0 0 0 0
BOILER DSL RETURN SEC PIPE X 0 0 0 0 0
GEN DSL STP X 0 0
BOILER DSL STP X
GEN DSL FILL SUMP X D 0 0
BOILER DSL FILL SUMP X
0 0 1 1 0 0 0 0
0 I 1 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECH IAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, the facts st to this document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 5/7112
SWRCB, January 2002
4. TANK ANNULAR TESTING
4 36Ir
Page _;_z of
Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure X Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution:
Is Tank Exempt From Testing ?'
Tank # ;EN Tank #BOILER Tank # Tank #
Yes No Yes No 0 Yes No 0 Yes No
Tank Capacity :
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
NOT TESTED
Test Start Time:
Initial Reading (Rr):
Test End Time:
Final Reading (RF):
Test Duration: 60 MIN 60 MIN 60 MIN 60MIN
Change in Reading (RrR,):
Pass/Fail Threshold or Criteria:
Test Result:.. 0 Pass Fail Pass 0 Fail 0 Pass 0 Fail 0 Pass Fail
Was sensor removed for testing? Yes No NA 0 Yes 0 No NA Yes No 0 NA 0 Yes No NA
Was sensor properly replaced and
verified functional after testing'? Yes 0 No NA Yes 0No NA Yes No NA 0 Yes No 0 NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
WET ANNULARS
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6))
SWRCB, January 2002
S. SECONDARY PIPE TESTING
y(f 3 G
Page 3 of
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: X Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run #GEN
SUPPLY
Piping Material: FIBERGLASS
Piping Run #BOILER
SUPPLY
Piping Run #GEN
RETURN
Piping Run #BOILER
RETURN
FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: SMITH SMITH SMITH SMITH
Piping Diameter: 3" 3" 3" 3"
Length of Piping Run: 50' 100' 50' 100'
Product Stored: DSL DSL DSL DSL
Method and location of
piping-run isolation• BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure/vacuum/water and
starting test:
30 MIN 30 MIN 30 MIN 30 MIN
Test Start Time: 10:30 9:15 10:30 9:15
Initial Reading (R,): 5 6.5 5 6.5
Test End Time: 11:30 10:15 11:30 10:15
Final Reading (RF): 0 6.5 0 6.5
Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN
Change in Reading (RF -R,): 5 0 5 0
Pass/Fail Threshold or
Criteria 0 PSI 0 PSI 0 PSI 0 PSI
Test Result: Pass X Fail X Pass Fail Pass X Fail X Pass Fail
Comments — (include information on repairs made prior to testing and recommendedfollow -upforfailed tests)
EMERGENCY GENERATOR RETURN AND SUPPLY FAILED
SWRCB, January 2002
6. PIPING SUMP TESTING
y 3G,7
Page y of -7—f,
Test Method Developed By: Sump Manufacturer X Industry Standard D Professional Engineer
0 Other (Specify)
Test Method Used: 0 Pressure D Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Sump #GEN Sump #BOILER Sump # Sump #
Sump Diameter: 42" 42"
Sump Depth: 36" 36"
Sump Material: FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration: 6" 6"
Height from Tank Top to Lowest
Electrical Penetration: 12" 12"
Condition ofsump prior to testing: GOOD GOOD
Portion ofSump Tested' 8" 8"
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
Yes D No X NA D Yes No X NA Yes No NA Yes D No 0 NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?* Dyes No X NA Yes DNo X NA Yes No NA Yes No NA
Was fail -safe verified to be
operational?'
D Yes No X NA Yes No X NA Yes No DNA 0 Yes D No 0 NA
Wait time between applying
pressure/vacuum /water and starting
test:
30 MIN 30 MIN
Test Start Time: 10:44 11:21 9:38 9:54
Initial Reading (R,): 2.312 2.306 1 3.413 3.412
Test End Time: 10:59 11:36 9:53 10:10
Final Reading (RF): 2.310 2.304 3.412 3.412
Test Duration: 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R,): 002 002 001 000
Pass/Fail Threshold or Criteria: 002 1 -.002 002 002
Test Result: X Pass Fail X Pass Fail Pass 0 Fail Pass Fail
Was sensor removed for testing? X Yes No NA X Yes No DNA Yes D No DNA 0 Yes No NA
Was sensor property replaced and
verified functional after testing? X Yes No NA X Yes No NA D Yes No NA 0 Yes No 0NA
Comments — (include information on repairs made prior to testing and recommendedfollow -upforfailedtests)
ifthe entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated with an
asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -l60)
SWRCB, January 2002
7. UNDER - DISPENSER CONTAINMENT (UDC) TESTING
x%347 fPageof
Test Method Developed By: 0 UDC Manufacturer X Industry Standard 0 Professional Engineer
Other (Specify)
Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC Manufacturer:
UDC # UDC # UDC # UDC #
UDC Material:
UDC Depth:
Height from UDC Bottom to Top
of Highest Piping Penetration:
Height from UDC Bottom to
Lowest Electrical Penetration:
Condition ofUDC prior to
testing:
Portion ofUDC Tested
Does turbine shut down when
UDC sensor detects liquid (both
product and water )?
0 Yes No NA 0 Yes ONO NA 0 Yes 0 No 0NA Yes No 0 NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?* 0 Yes No NA 0 Yes 0 No DNA 0 Yes No 0 NA Yes No NA
Was fail -safe verified to be
operational?* Oyes No NA Yes No NA 0 Yes 0 No 0 NA 0 Yes 0 No NA
Wart time between applying
pressure/vacuum/water and
starting test
NO UDCS
Test Start Time:
Initial Reading :
Test End Time:
Final Reading F):
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -&):
Pass/Fail Threshold or Criteria:
Test Result: 0 Pass 0 Fail Pass 0 Fail Pass Fail 0 Pass Fail
Was sensor removed for testin ? 0 Yes No DNA 0 Yes 0 No NA Yes No 0 NA Yes 0 No DNA
Was sensor properly replaced and
verified functional after testing? 0 Yes 0 No NA 0 Yes No DNA 0 Yes 0No 0 NA Yes 0 No NA
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforfailedtests)
NO UDCS
Ifthe entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to - of the questions indicated with an
asterisk ( *) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
8. FILL RISER CONTAINMENT SUMP TESTING
4M1WPage -17— of
Facility is Not Equipped With Fill Riser Containment Sums 0
Fill Riser Containment Sumps are Present, but were Not Tested
Test Method Developed By: 0 Sump Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
0 Other (Specify)
Test Equipment Used: INCON TS -STS
Fill Sump # Fill Sump #
Equipment Resolution:
Fill Sump # Fill Sump #
Sum Diameter:
Sump De the
Height from Tank Top to Top of7n
Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition ofsump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressure/vacuum/water and
starting test:
NOT TESTED
Test Start Time:
Initial Reading (R,):
Test End Time:
Final Reading
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN I5MIN 15MIN
Change in Reading R, :
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail 0 Pass Fail 0 Pass Fait 0 Pass Fail
Is there a sensor in the sump? 0 Yes No Yes No 0 Yes 0 No 0 Yes No
Does the sensor alarm when
either product or water is
detected?
Yes No NA Yes 0No NA Yes No NA Yes No NA
Was sensor removed for testing? 0Y s No NA Yes No NA 0Yes 0 No 0 NA Yes 0 No DNA
Was sensor properly replaced and
verified functional after testing? Yes 0 No NA Yes No NA Yes No NA Yes No NA
Comments —(include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
NO FILL SUMPS
SWRCB, January 2002
9. SPILL/OVERFILL CONTAINMENT BOXES
yG3 7 fPage ;7
of ;Z
Facility is Not Equipped With SpilUOverfill Containment Boxes
Spill/Overfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Spill Box #
Bucket Diameter:
Spill Box # Spill Box # Spill Box #
Bucket Depth:
Wait time between applying
pressure/vacuum/water and
starting test:
NOT TESTED
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -RO:
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
COMMents — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
SPILL BOXES TESTED DURING ANNUAL MONITORING CERT.
3o// /
SB989 TESTING FAILURE REPORT
SITE NAME: MEMORIAL HOSPITAL DATE: 5/7/12
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: BOTH SUPPLY AND RETURN FOR EMERGENCY GENERATOR
SECONDARY LIES FAILED. NO COMMUNICATION INSIDE BUILDING. PULLED
3/4 TEST PLUG OFF CLAM SHELL. DID NOT CHANGE GAUGES OUTSIDE.
RETURN SHOWS PRESSURE OUTSIDE AT SUMP BUT FAILS INSIDE WHEN
PRESSURED UP. SUPPLY FALLS RIGHT OFF WHEN NITROGEN FLOW IS SHUT
OFF BOTH INSIDE AND OUT. THIS TANK IS GOING TO BE REMOVED
SOMETEKE THIS SUNEKER.
LABOR:
PARTS INSTALLED:
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.