HomeMy WebLinkAbout1129 UNION AVENUE (3)SWRCB, January 2002 Page of A
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriatepages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and
printoutsfrom tests (fapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: J 17-2 Date of Testing: / TZe/ o
Facility Address: t'j ,
Facility Contact: Phone:
Date Local Agency Was No feed ofTesting: / U
Name of Local Agency Inspector (ifpresent during testing):
2. JESTING CONTRACTOR INFORMATION
Company Name: (1
r
Technician Conducting Test:
Not
Tested
Credentials: CSLB_LAcensed Contractor SWRCB Licensed Tank Tester
License Type: License Number: —
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
e x
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Rcpairs
Made
e x
x
vP
57-r
7
If hydrostatic testing was perfo7ed, desAribe what was done with the water after completion of tests:
U,
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts state in this document are accurate and infull compliance with legs requirements
Technician's Signature: Date: ) V
SWRCB, January 2002
4. TANK ANNULAR TE
L
Page of
Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuu Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution: 12
A Tank # Tank # Tank Tank 67
Is Tank Exempt From Testing?' Yes Yes o Yes Q'_L Yes
Tank Capacity:
Tank Material:
Tank Manufacturer: S A^1 S
Product Stored: a 7
Wait time between applying
pressure /vacuum/water and
starting test: S '
Test Start Time: 2 0 7 1 L 5 C
Initial Reading (R,): 0a
Test .End Time: v a— 71C
Final Reading (RF): gyp. S
Test Duration:
Change in Reading (RF -R,): L1217
Pass/Fail Threshold or Criteria:
Test Result: ass Fail Pass Fail Pas Fail Fail
Was sensor removed for testing? No NA es No NA es • No NA Y No NA
Was sensor properly replaced and
verified functional after testing?
Yes NA Yes NA Yes NA Yes Q NA
Comments — (include information on repairs madeprior to testing, and recommendedfollow -up forfailed tests)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)1
SWRCB, January 2002
6. PIPING SUMP TE I
Page 7 of
Test Method Developed By: Sump Manufacturer ustry Standa Professional Engineer
Other (Specie)
Test Method Used: Pressure Vacuum Hydros tic
Other (Specify)
Used: —f - I f Z —S Equipment Resolution: oTestEquipment
eter:
Sump # "6 7 5, Sump* 9 46L Sump # 57 ., Sump #
y
f
Sump Material: L
Height from Tank Top to Top of
Highest Piping Penetration:
LA LL
7 Z
Height from Tank Top to Lowest
Electrical Penetration: Z' Z
Condition of sump prior to testing:
Portion of Sump Tested 11Z
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?*
Yes No NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?*
Yes No NA Yes No NA Yes No NA Yes No NA
Was fail -safe verified to be
o erational ?*
Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure /vacuum/water and starting
test:
D, M I V ' I iM J/1 J i1l
r }
C I/ V40
Test Start Time:
Initial Reading (Rj): yW_06 t?j 0, `?q3
Test End Time: St(a L ; " Z/ f
Final Reading (RF): p 0, 0,51Z- c? 9U
Test Duration: t f ih n , %t 7
Change in Reading (RF -Rj): p too vcJ I ' oZ rry) S
Pass/Fail Threshold or Criteria: of, L) cx7 Z
Test Result: Pass Fail Pass Fa' Pas Fail Pass Fa
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
If the entire "depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
6. PIPING SUMP TESTING
Page _R_ of
Test Method Developed By: Sump Manufacturer . Industr .tandard—' Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum dro lahc
Other (Specify)
Test Equipment Used: — S' Equipment Resolution:
Sump Diameter:
Sump # C Sump # k Sump # Sump #
A
Sump Depth: 1_ t
Sump Material:
Height from Tank Top to Top of
Hi h6 Piping Penetration: Z
Might from Tank Top to Lowest
Electrical Penetration: 7i 7i
Condition of sump prior to testing:
Portion of Sump Tested'
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?"
Yes No NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?'
Yes No NA Yes No NA Yes No NA Yes No NA
Was fail -safe verified to be
operational?*
Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure /vacuum/water and starting
test:
Test Start Time: T Z./ S Qfc 3 jZ
Initial Reading (R,): Q 5-61-6
Test End Time: t 2 ; O t-
Final Reading (RF): j
Test Duration: 6n r"
niP rM,ll Sa,,%i
Change in Reading (RF -R,):
Pass/Fail Threshold or Criteria:
Test Result: ass Fail Fail Pass Fail Pass Fail
Was sensor removed for testing? Ye No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor.failed tests)
If the entire depth ofthe sump is not tested, specify how much was tested. If the answer to May of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)