Secondary Containment Testing Report Form
This form is intendedfor use by contractorsperformingperiodic testing of USTsecondary containment systems. Use the
appropriate pages ofthis form to report resultsfor all components tested The completedform, written testprocedures, and
printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Grand Island Chevron Date ofTesting: 10/14/11
Facility Address: 11400 Ming Ave.
Facility Contact: Sharon Trent Sullivan Petroleum Phone: 661- 327 -5008
Date Local Agency Was Notified ofTesting: /0-/0-11
Name of Local Agency Inspector (rfpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Co pany Name: Sunset Mechanical
Fail
Tec ician Conduct' g Test: Scott Olinger
Repairs
Made
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
Fail
License Type: C -36 C -10 License Number. 589517
Manufacturer
Manufacturer Trainine
Component(s) Date Training Expires
Incon TS -STS Inspection Equipment 1/18/13
Veeder Root Monitoring System 1/15/12
ICC Cal UST Service Tech 1/18/13
FILL #3 W,
3. SUMMARY OF TEST RESULTS
Component pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
UDC 1&2 FILL #2
UDC 3 &4 FILL #3 W,
UDC 5 &6 SPILL #1
UDC 7 &8 V SPILL #1
UDC 9 &10 SPILL #2
UDC 11&12 V SPILL #2
UDC 13 &14 SPILL #3 It
UDC 15 &16
STP #1
ST? #2
STP #3
FILL #1 1 2-j
Ifhydrostatic testing was performed, describe what was done with the water after completion oftests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, stated In this document are accurate and infull compliance with legal requirements
Technician's Signa Date:_10 -14 -11
SWRCB, January 2002 Page of
O.IFJx lull V aluLUX IraALLI%J
Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum Nf Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000
Sump # STP 1 Sump # STP 2 Sump # STP 3 Sump #
Sump Diameter, . 48" 48" 48"
10:48
Sump Depth: 63" 64" 6219
Change in Reading (RF-R ):.
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Hip-hest Pinine Penetration: 16" 18" 16"
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to testing:
Portion of Sump Tested'
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
Turbine shutdown response time
Is system programmed for fail -safe
shutdown?*
Was fail -safe verified to be
i?li
DRY
18"
Yes No NA
20 SEC
IYes; No NA
24"
DRY
20"
19 Yes No NA
20"
DRY
18"
d Yes No NA
20 SEC 120 SEC
Yes No NA Yes No NA
Yes No NA
Yes No NA
M Yes No NA I N Yes No NA I FA Yes No NA I Yes No NAorational.
Wait time between applying
pressure/vacuum/water and starting
test:
15 MIN
Test Start Time: 10:33
Initial Reading (Rj): 5.0378
Test End Time: 10:48
Final Reading (RF): 5.0377
Test Duration: 15 MIN
Change in Reading (RF-R ):. 0001
Pass(Fail Threshold or Criteria: 002
Test Result: Pass Fail
Was sensor removed for testing? Yes No NA
Was sensor properly replaced and yes No NAverifiedfunctionalaftertesting?
15 MIN
10:33
5.8478
10:48
5.8494
15 MIN
0016
002
Pass Fail
es No NA
Yes No NA
15 MIN
2:00
4.2482
2:16
4.2486
15 MIN
0004
002
Pass Fail
es No NA
C/Yes No NA
Pass . Fail
Yes No NA
Yes No NA
Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk ( *) is "NO" or "NA', the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
UNDE #(- DISPENSEK CONTA.iNN1ENT (UDC) TESTING
Page of
Test Method Developed By: 0 UDC Manufacturer Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure
Other (Specify)
Vacuum Hydrostatic
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
xa ... "'C+` 'v ;, 7_ =.x. . 50:7. rtFr - .7P'. n fie;'' .'°tPA. -w T iC N3`c; i Y'. '.v+.oti.u . ^:•,._,.
UDC # 1 -2 UDC # 3-4 UDC # 5-6 UDC # 7-8
UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 30" 30" 30" 30"
Height from UDC Bottom to Top 11" 11" lilt 11"
of Highest Piping Penetration:
Height from UDC Bottom to 0 0 0 0
Lowest Electrical Penetration:
Condition ofUDC prior to DRY DRY DRY DRY
Portion of UDC Tested' 13" 13" 13" 13"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?"
Yes No NA dyes No NA 17 Yes No NA Yes No NA
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail -
safe shutdown ?"
Yes No NA d Yes No NA es El No NA Yes No NA
Was fail -safe verified to be
operational?"
g1 Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure/vacuum/water and
starting test
15 MIN 15 MIN 15 MIN 15 MIN
Test Start Time: 2:00 9:12 9:12 2:00
Initial Reading (R,): 5.9333 6.3780 2.6555 5.0950
Test End Time: 2:16 9:27 9:27 2:16
Final Reading (RF ): 5.9336 6.3781 2.6554 5.0943
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading RF-R' : 0003 0001 0001 0007
Pass/Fail Threshold or Criteria: 002 002 002 002
Test Result: Pass Fail Pass Fail Pass Fail Pass Fall
Was sensor removed for testing? Yes No NA Yes No NA SlYes No NA MYes No NA
Was sensor properly replaced and
verified functional after testis ? f Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
1 If the entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to finny ofthe questions indicated with an
asterisk (*)is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002 Page of
7. UNDER-DISPENSER CONTAINWNT (UDC) TESTING
Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum 9 Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
Y:{la.i v 5.:. +•hi 3G.':: «1 UDC # 9 -10 UDC # 11 -12 UDC # 13-14 UDC # 15-16
UDC Manufacturer: WESTERN WESTERN WESTERN WESTERN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 30" 30" 30" 30"
Height from UDC Bottom to Top
of Highest Piping Penetration:
l 1" 11" 11" 11"
Height from UDC Bottom to
Lowest Electrical Penetration:
0 0 0 0
Condition ofUDC prior to
testing-
DRY DRY DRY DRY
Portion ofUDC Tested 13" 13" 13" 13"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
C>! Yes No NA 6 / Yes No NA iYes No NA 9 / Yes No NA
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail -
safe shutdown ? Yes No NA 4 Yes No NA Yes 11 No NA Yes No NA
Was fail-safe verified to be
o rational ?" Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure/vacuum/water and
starting test
15 MIN 15 MIN 15 MIN 15 MIN
Test Start Time: 9:43 9:43 9:43 9:43
Initial Reading (R,): 4.8721 5.1547 5.8749 7.5371
Test End Time: 9:58 9:58 9:58 9:58
Final Reading 4.8705 5.1549 5.8761 7.5389
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading RF-Rj: 0016 0002 0012 0018
Pass/Fail Threshold or Criteria 002 002 002 002
Test Result: T4 Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? 14 Yes No NA Yes No NA Yes No NA EJYes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA 1IYes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
1 If the entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to gay ofthe questions indicated with an
asterisk ( *) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002 Page of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sums
Fill Riser Containment Sumps are Pres nt, but were Not Tested
Test Method Developed By: I Sump Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum ydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000
Y' t } 3. " j• e`Kc_ - AI': asr t.` .Y„'Yit6'nM•lP..u• '>-T.o: It S. -' .F{/4. +'' iReit_. -n'A a . MSS : '. a'M'l. i.= •!e.+'Y C: .'9h•.
Fill Sump #1 Fill Sump #2 Fill Sump #3 Fill Sump #
Sump Diameter. 42" 42" 42"
Sump Depth: 65" 63" 62"
Height from Tank Top to Top of
Highest Piping Penetration:
0 0 0
Height from Tank Top to Lowest
Electrical Penetration:
25" 25" 25"
Condition of sump prior to
testing:
DRY DRY DRY
Portion ofSump Tested 12" 12" 12"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Wait time between applying
pressure /vacuum/water and
starting test:
15 MIN 15 MIN 15 MIN
Test Start Time: 11:03 11:03 2:00
Initial Reading (R): 4.3750 3.0746 3.8973
Test End Time: 11:18 11:19 2:16
Final Reading (Rr ): 4.3750 3.0746 3.8971
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading (RF-Rj): 0000 0000 0002
Pass/Fail Threshold or Criteria: 002 002 002
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Is there a sensor in the sump? Yes No Yes No Yes No Yes No
Does the sensor alarm when
either product or water is
detected?
Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testin ? Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests)
SWRCB, January 2002
9. SPILL/OVERFH L CONTAINMENT BOXES
Page of
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are Pr ent, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum 5fHydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000
y iY r Cr: ?;kp° Xtr. iRi "g°.`?'`- :..+w:'4"'o i'ur. 7`'iii":.''?,+'":sr,:7*: :v' •.irR :.`.°' Wit''':', ..cn,s`aL'7' -',' -5? •d' _ Y'' Cd:.•fZ"'? %'t'
Spill Box #1 Spill Box #2 Spill Box #3 Spill Box #
Bucket Diameter. 12" 12" 12"
Bucket Depth: 12" 12" 12"
Wait time between applying
pressure/vacuum/water and
starting test:
15 MIN 15 MIN 15 M1N
Test Start Time: 1:33 11:55 1:33
Initial Reading (R,): 4.5019 2.0991 3.3189
Test End Time: 1:48 12:10 1:48
Final Reading (RF): 4.5020 2.0995 3.3190
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading (RF -R,): 0001 0004 0001
Pass/Fail Threshold or
Criteria: 002 002 002
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailedtests)
SWRCB, January 2002 Page of
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are sent, but were Not Tested
Test Method Developed By: V Spill Bucket Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
T rAwVSpill Boa #1 V Spill Bog #2 Spill Bog # Spill Box
Bucket Diameter: 12" 12"
Bucket Depth: 12" 12"
Wait time between applying
pressure/vacuum/water and
starting test:
15 MIN 15 MIN
Test Start Time: 1:33 11:55
Initial Reading (R: 3.7736 4.2083
Test End Time: 1:48 12:10
Final Reading (RF): 3.7737 4.2080
Test Duration: 15 MIN 15 MIN
Change in Reading (RF -R,): 0001 0003
Pass/Fail Threshold or
Criteria: 002 002
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
RAND ISLi7ND CHEVRON
1400 MINI_ AVE.
dAKERSFIELD 93311
SUNSET CONST
1-809-984 -6266
10/14/2011 12 41 PN
SUMP !._EAK TEST REPORT
TP3
FOT STARTED 12:26 PM
TEST START --D 10 / ?.a %2011
EGT',,J ! -_VEI_ 5.382? IN
END TIME 2: 4: PM
D DATE_ 10/14/2011
END LEVEL 5.3845 IN
I -EAK THRESHOLD 0.002 IN
TEST R•ECULT PASSED
1I -L3
TEST STARTED !2:26 PN
TEST STARTED 109/14/2011
BEGIN LEVEL 2.9282 Iii
i _ -ND TIME I. ': 41 PM
END DATE 10/14/20111
ND LEIJEL 2.9251 IN
LEAK THRESHOLD 0.002 IN
7--ST RESULT ! =AT'•_ED
SP I LL:.
E ^T STARTED 12:25 PM
TEST STARTED 10 }14!2011
BEGIN LEVEL 1.9954 IN
END TIME 12:41 PM
END DATE 10/14/2011
END LEVEL 1.9949 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
US,PILL2
TEST STARTF*, 12:26 Phi
TEST STARTEb 10/14/2011
BEGIN; LEVEL 4.2136 IN
ND TIME 12:41 PM
END DATE 19/14/2011
ND LEVEL 4.2121 IN
LEAK THRESHOLD 9.0902) IN
TEST RESULT PASSED
1 ' 441L1- M P-, i !' lj ,
J,it..r_cLL 9'311
r ;RPt -* ISLAND CHEVRON f G0- 4vc}'-6I66
14010 MINI`. AVP—'-
f1KERSFIELD 93311 41/ 4.i2G1? I, 7h. tSUNSETCONS'
i- 809 - 984 -6266 Vi'i" -:-AK T =` =' REPORT
1 I /i4/2,1i 12:10 PPi 1-1G'C_-
P ! EAK TEST REF '± IRTM y- TARTED 2• 00 PM
STARTED 1 0/14/ 0" _
TEST =TARTER AM11.55 ENE? T7'rE
i lJ : ?A . "E
i6
10/14 /2011
TEST STARTEC. 10/14/'2'o il
5 1615 IN I END LEVEL 9 ,:,n ; r,:
OEOIN I_EIIEL 10 Pr1`°'
EA C THRESHOLD 0.002 iN
END 7 T p1E < 10/14/2011
TEST RESI I r r „ PAoL cD)
t:ND DATE
END LEVEL 5.1643 IN
A ", T14RF-SHOLD L NJ02 IN DC7
TEST RESULT INCREASED
TEST STARTED
ST
2 :00 ON
LL3
STARTED
FELT LC1.I._
1,,1/14/20 11
J. F1950 1r
rTESTSTARTED 1 55 AM1° NI) TINE
END to
2:16 PM
Ik-1 /1i 4:'2k11
TEST ::TARTER 1/14/29111
j•nrf'° Iti5 D LEUEL 5.1943 IN
BEGIN LEVEE
2; PM LEAK. THRESHOLD 0.002 !N
rjD 1 THE
END GATE i0!14/2011 4ST ?ES ff." i
END LE111EL 3. 6635 IN
LEAK THRESHOLD 0_+.002 IN
ASSED FI'_:
TEST RESULT
TARTER 00 PM
SPILL2
TES` STARTED 10 /4/201
3FGIN !-EQE(- 3.89 ?3 IN
TEST STARTED 11:55 AM
J j/J4/2011
END I IMC
4) DATE
2 :16 PXi
10/14./2011
T STARTEDTE,
EI.iEL 2.05"?1 IN C-h;t) LEI.I}L
aFr t t.1 12 :10 PM AF. HRESHOLD 0.002 IN
END TIME 1i/14/29II TwS- RESULT PASSE G
END DATE 2.0Q95 i! END LEVEL.
THRESHOLD 0.002 IN S o, STP7EAK
TEST RESULT PASSED
TEST STARTED 2:00 Pr.
1,1EPIL?_2 TEST STARTED 10/'_4/2011
FJEGIr' LEIJEL, 4.2=82 IN
TEST STARTED
ND ! THEENDC?ATE 10/14!
2: 16 PM
201
TEST STARTED 4/2 1110/14/2011
4.2083 IN I vG LEVEL 4.2486 INN,
TN LEVELBEr,.. 12:10 PM +I
LEAK THRESHOLD 0.! 02 IN
END TIME 01/14/29111_ TEST RESULT
GRAND ISLAND CHEVRON
11400 MIMG AVE. GRriND ISLAND
B8KERSFlELD 93311 400 MlNG HVE^ / SUNSET CONS7 3HKERSFIEL
1-880-984-6266 S HSE COHSr
800-984-6266
10/14/2011 9:28 HH
SUMP LEAK TEST REPORT 10//2@z 20 Hp Ro D lSL D C EVRO |
UDCI-2 S[p '-EHK EST qEPORT HKERS L 9331z
ST STARTED 9:12 AM P 4 ZI
SUNS COKS-
t2 b /
TEST STARTED 18/14/2011
BEGIN LEVEL 5`9984 IN T ST STARTED :03 HM
oi
40 0» Al »' `
q^^ z // 0 2g z:38 pr
N0 TIME TES STHRTED 0/+/20 1
5.0+05 IN
HK SF E o
S HSE78o `
0/
9:270HM
Eno on/E 10/14/2011 E8IN EVB
Hn - z-S@w- --"` S MP -HK TEST REPORT
N0 LEVEL 6.0004 IN
LEAK THRESHOLD 0.002 IN
18NDTIME0/z4/20117NDDAn.
5 l
TEST RESULT INCREASED ND L VEL ` @ 05
THRESHOLo 0`082 IN
10//2@ !
3EpORT rSr
RESULT p SSED S MP EHK `EST ' 9TARTED
S
5 PM
TEST ST RTED 10/1^/20'
UDC3-4 Sp-3 S!» VEL 3.3z9 '
TP2 PM END IwE
TEST STARTED 9:12 AM ED 33
ED
0/
0Pp
TEST STARTED 10/14/2011 TEST STARTED z/03 r z0/ TEST 5 H ENn LE.E
NBEGINL 6 IN
9:27
z 11
SEGI /
3.3 89 p ) K T=- 0
S DENDTIMEAMIEL5.O526 I v
1:48
END TI TESr R^`^ c" no -
END DATE \0/14/2011 u y \m 9FN* D. 10- KTE 0/ z4/201 I END LEVEL 6 3781 IN MD VEL J. E) 3.19@
ExD LEV - INLEAKTHRESHOLD8^002 IN LEAK THRESHOLD 0`002 lH 0.002
pHSSFD
TEST RESULT PASSED r` pUL OHSSE0 Ay
TEST PFcUL 7E.017 START_D 5 P
71DT STARTED 1-8/14/2011
U005-6 U- LEVEL 4.5006 'r. /
T ME
TEST STARTED. 9:12 AM 7ES7 STARTED 11 .03 HM
LTESTSTARTED10/14/2011 TEST STHRTED z0/14/201 18/4/20
n '
K ,ESHOLD
4.5017j
BEGIN LEVEL 2.6555 IN 3EGIN [VEL 4.3750 IN BE*
l=,^ +`
50 9
T '^^ULT Ac._ "' | END TIME 9:27 AM
10/14/2011 END TIME 1l 18 HH l`8 n
END DATE
END LEVEL 2^6554 IN END DATE 0/1/2@11
END LEVEL .375@ IN
10/1+/zm
4 i
LEAK THRESHOLD 0.002 IN EHK THRESHOLD 0,002 IN' LEAK n`"~'-- PHs*EuTESTRESULTPASSEDTESTRESULTPHSSED
ZST STARTED 1 ?M '
TEST STARTED 10/,+/20 \ UDC7-8 FILL2 VSPI L 8EGIN VEL 3.7736 IN /
TEST STARTED M \ ( TEST STARTED :03 Hn | 33 M END 71 E
E@D 0HrE
30 Pp
10/14/2011 | 1/
9:z
u,' S'n«/E» 14" TrST STARTED 10/l*/zw11 10/4/20 E ^ IM TEST `n n"- -3^7736 ND LEVEL 3 7736 l BEGIN LEVEL 6^1937 /n
TIME 9:27 AM / BEOI EVEL 3,0746 lK p 8[GlwI-, 1 4S0 z !
AV 7HRESHOLD 002 lN
pHSSEDN0
END DATE 10/14/2011 | END TIME 1:9 HM
DATE 10/1/2811 | END ,: 1@/1/z TEST RESUL`
END LEVEL 6^2029 IN |
IN
END
H0 LEVEL 3,0746 INND
IpNDDATE3^773? INLv-SHOLDLEAKTHRESHOLD0^002 /
RESULT INCREASED i THRESHOLD 0 002 IN
LEST ^?HSSED
END 0^002 ED PASSEDKnHRELT ` TtST RESULT T[S x SU
GRAND !BLAND CHEQRON
11400 MING AOF-
AKERSFIELD 93311
SEUN S7SUNSECIIN•7 !
800 - 984 -5266
1.0/14/2011 10:4 Ap':
IMP LEAK TEST :?E PT
7 S T STARTED ' - 33 AM
TEST STARTED 10/14/2011
EG'cN LEVEL 5.0378 IN
C>,tn Trhir- tQ :dp OM
r•..J,, ticrc tai ±dr J.l
L' T'1t',rn Ulll n ,l !-o? TF,I
Try- . -; r r
rr_+T CT4C,?T -n '
rryiT'' ' CLICK' 't; Q479 TFi
u,n TT•nr 'i,' dP AM
cF.ln r7 ?r• ip /tar ^[1.^
oAPd 7N
76V TLl0C'0Ul-)j n P pp-:, Thi
TEST RESULT, PASSED
1L -..
ST STARTED 10:33 AM
TEST STARTED 1k1/14/20::.
3EGIN LEVEL 4.3,745 IN
END TIME' 10:48 AM
END DATE 10/!4/2011
END LEVEL 4.3749 IN
EAK THRESHOLD 0.002 IN
TEST RESULT _ PASSED
TEST STARTED 10:3, AM
TEST STARTED 10/14/2011
BEGIN LEVEL 3.0701 IN
END TIME 10:48 AM
END DATE 16/14/2011
END LEbiEL 3.0700 IN
LEAK THRESHOLD 0.002 IN
TF!;T QrSlIt T PASSED
GRAND ISLAND CHEVRON
11400 MING AVE.
BAKERSFIELD 93311
SUNSET CiINST
1 -800 -984 -6266
10/14/2011 9:58 AN
SUMP LEAK TEST REPORT
UDC9 -10
TEST STARTED 9143 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 4.8721 IN
END TIME 9:58 AM
END DATE 10/14/2011
END LEVEL 4.8705 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC1112
TEST STARTED 9:43 AM
I TEST STARTED 10/14/2011
BEGIN LEVEL 5.1547 IN
END TIME 9:58 AM
END DATE 10/14/2011
END LEVEL 5.1549 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC1314
TEST STARTED 9 :43 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 5.8749 IN
END TIME 9:58 AM
END DATE 10/14/2011
END LEVEL 5.8761 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC1516
TEST STARTED 9:43 AM
TEST STARTED 10/14/2011
BEGIN LEVEL 7.5371 IN
END TIME 9:58 AM
END DATE 10/14/2011
END LEVEL 7.5389 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
0
10kJlj rr,r awn !'! -'F'I lf; r_11J 'I
ld0(7! h,Twn a'1. GRAND ISLAND CHEVRON
Q -, 11400 MING AVE.
BAKERSFIELD 93311
C + +- ao J._ ? ! SUNSET CONSTI1 - 3000 -984 -6266
t4jf7 ; 7(d t ;
10/14/2,011 ' ..,« AM
SUMP LEAK TEST REPORT
1n' 1171 UDC! -2
TrCT nTn.4 Trn YJ- {•fi( Tr ^.T q- opT rn TEST STARTED 8:36 AM
E ; T;J -1;
t `'I "' t TEST STARTED 10/14/2011
rlln TT,y a ?70? TW BEGIN LEVEL 5.9943 IN
END TIME 8:53 AM
END DATE 10/14/2011
INr ^,lac' Tf! F T JPFSHO! r.) a r r ? Try
END .FUEL 5,9Q47
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
I
UDC3 -4
r c- QTar TCr, 1 k,; TEST STARTED 8:35' AM
ccr c iac' qTC!7Ttf) tar "t +!,,, TEST STARTED 10/14/2011
crTF 1rr5yS rh, Z
BEGIN LEVEL 6.3724 IN
TTMF AM END TIME 8:53 AM
Fh!D Harr 1r1 4,'Zt; ; END DATE 10/14/2011
END LcUEL F, 1555 IN END LEVEL 6.3723 IN
TEST TL pFSyOL D 0. 0q;. Ih LEAK THRESHOLD C.002' IN
T E{I II T p nASSED TFS7 PF" 'l (I .T PASSED
i
UnG l . -. ,_ 4 i UDC5 -6
T7 ^T .zTPRTR,D It.0:0F AM TEST STARTED 3:38 AM
Tcc TEST STARTED 10/14/2011
9EGiN I_EVEI_ 5 3750 BEGIN LEVEL 2.9762 IN
INENDTTMF10.1 END TIME 8.53 AM
FND "ATP AM
x/14/2011 END DATE 10/14/2011
Fmn LFIX- 5- $7A4 END LEVEL 2.9757 IN
hAKT"P`- QHO! 1a. qc,? LEAK THRESHOLD 0.002 IN
rTcGrPFR!ji_T N TEST RESULT PASSED
PAr 1ED
Uf)C 16 UDC7 -8
TCST OTAPTED TEST STARTED 8:38 AM
r^ kart A , TEST TpRTF..D TEST STARTED 10/14/2011
tG.r +d /2011REG ?h' L RV I BEGIN LEVEL 6.1947 IN
7.5333 INF.Jn TTME END TIME 8:53 AM
un ngTF 1.8:15 AM END DATE 10/14/2011
10'14/2-0.11. yin ! Er1EL END I -EVEL 6.1947 IN
5389 INLFA!! THRE_HOLD LEAK; THRESHOLD 0.002 IN
0.1002 INrrc-r 0 ^III T I
TEST RESULT PASSED
a$SEn I