HomeMy WebLinkAbout11400 MING AVENUE (2)P15-3 f SWRCB, Ja-nuary 2002 Page of Secondary Containment Testing Report Form This form is intendedfor use by contractorsperformingperiodic testing of USTsecondary containment systems. Use the appropriate pages ofthis form to report resultsfor all components tested The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Grand Island Chevron Date ofTesting: 10/14/11 Facility Address: 11400 Ming Ave. Facility Contact: Sharon Trent Sullivan Petroleum Phone: 661- 327 -5008 Date Local Agency Was Notified ofTesting: /0-/0-11 Name of Local Agency Inspector (rfpresent during testing): 2. TESTING CONTRACTOR INFORMATION Co pany Name: Sunset Mechanical Fail Tec ician Conduct' g Test: Scott Olinger Repairs Made Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester Fail License Type: C -36 C -10 License Number. 589517 Manufacturer Manufacturer Trainine Component(s) Date Training Expires Incon TS -STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 FILL #3 W, 3. SUMMARY OF TEST RESULTS Component pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made UDC 1&2 FILL #2 UDC 3 &4 FILL #3 W, UDC 5 &6 SPILL #1 UDC 7 &8 V SPILL #1 UDC 9 &10 SPILL #2 UDC 11&12 V SPILL #2 UDC 13 &14 SPILL #3 It UDC 15 &16 STP #1 ST? #2 STP #3 FILL #1 1 2-j Ifhydrostatic testing was performed, describe what was done with the water after completion oftests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, stated In this document are accurate and infull compliance with legal requirements Technician's Signa Date:_10 -14 -11 SWRCB, January 2002 Page of O.IFJx lull V aluLUX IraALLI%J Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Nf Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Sump # STP 1 Sump # STP 2 Sump # STP 3 Sump # Sump Diameter, . 48" 48" 48" 10:48 Sump Depth: 63" 64" 6219 Change in Reading (RF-R ):. Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of Hip-hest Pinine Penetration: 16" 18" 16" Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid (both product and water)?* Turbine shutdown response time Is system programmed for fail -safe shutdown?* Was fail -safe verified to be i?li DRY 18" Yes No NA 20 SEC IYes; No NA 24" DRY 20" 19 Yes No NA 20" DRY 18" d Yes No NA 20 SEC 120 SEC Yes No NA Yes No NA Yes No NA Yes No NA M Yes No NA I N Yes No NA I FA Yes No NA I Yes No NAorational. Wait time between applying pressure/vacuum/water and starting test: 15 MIN Test Start Time: 10:33 Initial Reading (Rj): 5.0378 Test End Time: 10:48 Final Reading (RF): 5.0377 Test Duration: 15 MIN Change in Reading (RF-R ):. 0001 Pass(Fail Threshold or Criteria: 002 Test Result: Pass Fail Was sensor removed for testing? Yes No NA Was sensor properly replaced and yes No NAverifiedfunctionalaftertesting? 15 MIN 10:33 5.8478 10:48 5.8494 15 MIN 0016 002 Pass Fail es No NA Yes No NA 15 MIN 2:00 4.2482 2:16 4.2486 15 MIN 0004 002 Pass Fail es No NA C/Yes No NA Pass . Fail Yes No NA Yes No NA Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests) Ifthe entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an asterisk ( *) is "NO" or "NA', the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 UNDE #(- DISPENSEK CONTA.iNN1ENT (UDC) TESTING Page of Test Method Developed By: 0 UDC Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Other (Specify) Vacuum Hydrostatic Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 xa ... "'C+` 'v ;, 7_ =.x. . 50:7. rtFr - .7P'. n fie;'' .'°tPA. -w T iC N3`c; i Y'. '.v+.oti.u . ^:•,._,. UDC # 1 -2 UDC # 3-4 UDC # 5-6 UDC # 7-8 UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 30" 30" 30" 30" Height from UDC Bottom to Top 11" 11" lilt 11" of Highest Piping Penetration: Height from UDC Bottom to 0 0 0 0 Lowest Electrical Penetration: Condition ofUDC prior to DRY DRY DRY DRY Portion of UDC Tested' 13" 13" 13" 13" Does turbine shut down when UDC sensor detects liquid (both product and water)?" Yes No NA dyes No NA 17 Yes No NA Yes No NA Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail - safe shutdown ?" Yes No NA d Yes No NA es El No NA Yes No NA Was fail -safe verified to be operational?" g1 Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test 15 MIN 15 MIN 15 MIN 15 MIN Test Start Time: 2:00 9:12 9:12 2:00 Initial Reading (R,): 5.9333 6.3780 2.6555 5.0950 Test End Time: 2:16 9:27 9:27 2:16 Final Reading (RF ): 5.9336 6.3781 2.6554 5.0943 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading RF-R' : 0003 0001 0001 0007 Pass/Fail Threshold or Criteria: 002 002 002 002 Test Result: Pass Fail Pass Fail Pass Fail Pass Fall Was sensor removed for testing? Yes No NA Yes No NA SlYes No NA MYes No NA Was sensor properly replaced and verified functional after testis ? f Yes No NA Yes No NA Yes No NA Yes No NA Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests) 1 If the entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to finny ofthe questions indicated with an asterisk (*)is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 Page of 7. UNDER-DISPENSER CONTAINWNT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum 9 Hydrostatic Other (Specify) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 Y:{la.i v 5.:. +•hi 3G.':: «1 UDC # 9 -10 UDC # 11 -12 UDC # 13-14 UDC # 15-16 UDC Manufacturer: WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 30" 30" 30" 30" Height from UDC Bottom to Top of Highest Piping Penetration: l 1" 11" 11" 11" Height from UDC Bottom to Lowest Electrical Penetration: 0 0 0 0 Condition ofUDC prior to testing- DRY DRY DRY DRY Portion ofUDC Tested 13" 13" 13" 13" Does turbine shut down when UDC sensor detects liquid (both product and water)?* C>! Yes No NA 6 / Yes No NA iYes No NA 9 / Yes No NA Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail - safe shutdown ? Yes No NA 4 Yes No NA Yes 11 No NA Yes No NA Was fail-safe verified to be o rational ?" Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test 15 MIN 15 MIN 15 MIN 15 MIN Test Start Time: 9:43 9:43 9:43 9:43 Initial Reading (R,): 4.8721 5.1547 5.8749 7.5371 Test End Time: 9:58 9:58 9:58 9:58 Final Reading 4.8705 5.1549 5.8761 7.5389 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading RF-Rj: 0016 0002 0012 0018 Pass/Fail Threshold or Criteria 002 002 002 002 Test Result: T4 Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? 14 Yes No NA Yes No NA Yes No NA EJYes No NA Was sensor properly replaced and verified functional after testing? Yes No NA 1IYes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) 1 If the entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to gay ofthe questions indicated with an asterisk ( *) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 Page of 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sums Fill Riser Containment Sumps are Pres nt, but were Not Tested Test Method Developed By: I Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum ydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Y' t } 3. " j• e`Kc_ - AI': asr t.` .Y„'Yit6'nM•lP..u• '>-T.o: It S. -' .F{/4. +'' iReit_. -n'A a . MSS : '. a'M'l. i.= •!e.+'Y C: .'9h•. Fill Sump #1 Fill Sump #2 Fill Sump #3 Fill Sump # Sump Diameter. 42" 42" 42" Sump Depth: 65" 63" 62" Height from Tank Top to Top of Highest Piping Penetration: 0 0 0 Height from Tank Top to Lowest Electrical Penetration: 25" 25" 25" Condition of sump prior to testing: DRY DRY DRY Portion ofSump Tested 12" 12" 12" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying pressure /vacuum/water and starting test: 15 MIN 15 MIN 15 MIN Test Start Time: 11:03 11:03 2:00 Initial Reading (R): 4.3750 3.0746 3.8973 Test End Time: 11:18 11:19 2:16 Final Reading (Rr ): 4.3750 3.0746 3.8971 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading (RF-Rj): 0000 0000 0002 Pass/Fail Threshold or Criteria: 002 002 002 Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Is there a sensor in the sump? Yes No Yes No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin ? Yes No NA Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) SWRCB, January 2002 9. SPILL/OVERFH L CONTAINMENT BOXES Page of Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Pr ent, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum 5fHydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 y iY r Cr: ?;kp° Xtr. iRi "g°.`?'`- :..+w:'4"'o i'ur. 7`'iii":.''?,+'":sr,:7*: :v' •.irR :.`.°' Wit''':', ..cn,s`aL'7' -',' -5? •d' _ Y'' Cd:.•fZ"'? %'t' Spill Box #1 Spill Box #2 Spill Box #3 Spill Box # Bucket Diameter. 12" 12" 12" Bucket Depth: 12" 12" 12" Wait time between applying pressure/vacuum/water and starting test: 15 MIN 15 MIN 15 M1N Test Start Time: 1:33 11:55 1:33 Initial Reading (R,): 4.5019 2.0991 3.3189 Test End Time: 1:48 12:10 1:48 Final Reading (RF): 4.5020 2.0995 3.3190 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading (RF -R,): 0001 0004 0001 Pass/Fail Threshold or Criteria: 002 002 002 Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailedtests) SWRCB, January 2002 Page of 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are sent, but were Not Tested Test Method Developed By: V Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 T rAwVSpill Boa #1 V Spill Bog #2 Spill Bog # Spill Box Bucket Diameter: 12" 12" Bucket Depth: 12" 12" Wait time between applying pressure/vacuum/water and starting test: 15 MIN 15 MIN Test Start Time: 1:33 11:55 Initial Reading (R: 3.7736 4.2083 Test End Time: 1:48 12:10 Final Reading (RF): 3.7737 4.2080 Test Duration: 15 MIN 15 MIN Change in Reading (RF -R,): 0001 0003 Pass/Fail Threshold or Criteria: 002 002 Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) RAND ISLi7ND CHEVRON 1400 MINI_ AVE. dAKERSFIELD 93311 SUNSET CONST 1-809-984 -6266 10/14/2011 12 41 PN SUMP !._EAK TEST REPORT TP3 FOT STARTED 12:26 PM TEST START --D 10 / ?.a %2011 EGT',,J ! -_VEI_ 5.382? IN END TIME 2: 4: PM D DATE_ 10/14/2011 END LEVEL 5.3845 IN I -EAK THRESHOLD 0.002 IN TEST R•ECULT PASSED 1I -L3 TEST STARTED !2:26 PN TEST STARTED 109/14/2011 BEGIN LEVEL 2.9282 Iii i _ -ND TIME I. ': 41 PM END DATE 10/14/20111 ND LEIJEL 2.9251 IN LEAK THRESHOLD 0.002 IN 7--ST RESULT ! =AT'•_ED SP I LL:. E ^T STARTED 12:25 PM TEST STARTED 10 }14!2011 BEGIN LEVEL 1.9954 IN END TIME 12:41 PM END DATE 10/14/2011 END LEVEL 1.9949 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED US,PILL2 TEST STARTF*, 12:26 Phi TEST STARTEb 10/14/2011 BEGIN; LEVEL 4.2136 IN ND TIME 12:41 PM END DATE 19/14/2011 ND LEVEL 4.2121 IN LEAK THRESHOLD 9.0902) IN TEST RESULT PASSED 1 ' 441L1- M P-, i !' lj , J,it..r_cLL 9'311 r ;RPt -* ISLAND CHEVRON f G0- 4vc}'-6I66 14010 MINI`. AVP—'- f1KERSFIELD 93311 41/ 4.i2G1? I, 7h. tSUNSETCONS' i- 809 - 984 -6266 Vi'i" -:-AK T =` =' REPORT 1 I /i4/2,1i 12:10 PPi 1-1G'C_- P ! EAK TEST REF '± IRTM y- TARTED 2• 00 PM STARTED 1 0/14/ 0" _ TEST =TARTER AM11.55 ENE? T7'rE i lJ : ?A . "E i6 10/14 /2011 TEST STARTEC. 10/14/'2'o il 5 1615 IN I END LEVEL 9 ,:,n ; r,: OEOIN I_EIIEL 10 Pr1`°' EA C THRESHOLD 0.002 iN END 7 T p1E < 10/14/2011 TEST RESI I r r „ PAoL cD) t:ND DATE END LEVEL 5.1643 IN A ", T14RF-SHOLD L NJ02 IN DC7 TEST RESULT INCREASED TEST STARTED ST 2 :00 ON LL3 STARTED FELT LC1.I._ 1,,1/14/20 11 J. F1950 1r rTESTSTARTED 1 55 AM1° NI) TINE END to 2:16 PM Ik-1 /1i 4:'2k11 TEST ::TARTER 1/14/29111 j•nrf'° Iti5 D LEUEL 5.1943 IN BEGIN LEVEE 2; PM LEAK. THRESHOLD 0.002 !N rjD 1 THE END GATE i0!14/2011 4ST ?ES ff." i END LE111EL 3. 6635 IN LEAK THRESHOLD 0_+.002 IN ASSED FI'_: TEST RESULT TARTER 00 PM SPILL2 TES` STARTED 10 /4/201 3FGIN !-EQE(- 3.89 ?3 IN TEST STARTED 11:55 AM J j/J4/2011 END I IMC 4) DATE 2 :16 PXi 10/14./2011 T STARTEDTE, EI.iEL 2.05"?1 IN C-h;t) LEI.I}L aFr t t.1 12 :10 PM AF. HRESHOLD 0.002 IN END TIME 1i/14/29II TwS- RESULT PASSE G END DATE 2.0Q95 i! END LEVEL. THRESHOLD 0.002 IN S o, STP7EAK TEST RESULT PASSED TEST STARTED 2:00 Pr. 1,1EPIL?_2 TEST STARTED 10/'_4/2011 FJEGIr' LEIJEL, 4.2=82 IN TEST STARTED ND ! THEENDC?ATE 10/14! 2: 16 PM 201 TEST STARTED 4/2 1110/14/2011 4.2083 IN I vG LEVEL 4.2486 INN, TN LEVELBEr,.. 12:10 PM +I LEAK THRESHOLD 0.! 02 IN END TIME 01/14/29111_ TEST RESULT GRAND ISLAND CHEVRON 11400 MIMG AVE. GRriND ISLAND B8KERSFlELD 93311 400 MlNG HVE^ / SUNSET CONS7 3HKERSFIEL 1-880-984-6266 S HSE COHSr 800-984-6266 10/14/2011 9:28 HH SUMP LEAK TEST REPORT 10//2@z 20 Hp Ro D lSL D C EVRO | UDCI-2 S[p '-EHK EST qEPORT HKERS L 9331z ST STARTED 9:12 AM P 4 ZI SUNS COKS- t2 b / TEST STARTED 18/14/2011 BEGIN LEVEL 5`9984 IN T ST STARTED :03 HM oi 40 0» Al »' ` q^^ z // 0 2g z:38 pr N0 TIME TES STHRTED 0/+/20 1 5.0+05 IN HK SF E o S HSE78o ` 0/ 9:270HM Eno on/E 10/14/2011 E8IN EVB Hn - z-S@w- --"` S MP -HK TEST REPORT N0 LEVEL 6.0004 IN LEAK THRESHOLD 0.002 IN 18NDTIME0/z4/20117NDDAn. 5 l TEST RESULT INCREASED ND L VEL ` @ 05 THRESHOLo 0`082 IN 10//2@ ! 3EpORT rSr RESULT p SSED S MP EHK `EST ' 9TARTED S 5 PM TEST ST RTED 10/1^/20' UDC3-4 Sp-3 S!» VEL 3.3z9 ' TP2 PM END IwE TEST STARTED 9:12 AM ED 33 ED 0/ 0Pp TEST STARTED 10/14/2011 TEST STARTED z/03 r z0/ TEST 5 H ENn LE.E NBEGINL 6 IN 9:27 z 11 SEGI / 3.3 89 p ) K T=- 0 S DENDTIMEAMIEL5.O526 I v 1:48 END TI TESr R^`^ c" no - END DATE \0/14/2011 u y \m 9FN* D. 10- KTE 0/ z4/201 I END LEVEL 6 3781 IN MD VEL J. E) 3.19@ ExD LEV - INLEAKTHRESHOLD8^002 IN LEAK THRESHOLD 0`002 lH 0.002 pHSSFD TEST RESULT PASSED r` pUL OHSSE0 Ay TEST PFcUL 7E.017 START_D 5 P 71DT STARTED 1-8/14/2011 U005-6 U- LEVEL 4.5006 'r. / T ME TEST STARTED. 9:12 AM 7ES7 STARTED 11 .03 HM LTESTSTARTED10/14/2011 TEST STHRTED z0/14/201 18/4/20 n ' K ,ESHOLD 4.5017j BEGIN LEVEL 2.6555 IN 3EGIN [VEL 4.3750 IN BE* l=,^ +` 50 9 T '^^ULT Ac._ "' | END TIME 9:27 AM 10/14/2011 END TIME 1l 18 HH l`8 n END DATE END LEVEL 2^6554 IN END DATE 0/1/2@11 END LEVEL .375@ IN 10/1+/zm 4 i LEAK THRESHOLD 0.002 IN EHK THRESHOLD 0,002 IN' LEAK n`"~'-- PHs*EuTESTRESULTPASSEDTESTRESULTPHSSED ZST STARTED 1 ?M ' TEST STARTED 10/,+/20 \ UDC7-8 FILL2 VSPI L 8EGIN VEL 3.7736 IN / TEST STARTED M \ ( TEST STARTED :03 Hn | 33 M END 71 E E@D 0HrE 30 Pp 10/14/2011 | 1/ 9:z u,' S'n«/E» 14" TrST STARTED 10/l*/zw11 10/4/20 E ^ IM TEST `n n"- -3^7736 ND LEVEL 3 7736 l BEGIN LEVEL 6^1937 /n TIME 9:27 AM / BEOI EVEL 3,0746 lK p 8[GlwI-, 1 4S0 z ! AV 7HRESHOLD 002 lN pHSSEDN0 END DATE 10/14/2011 | END TIME 1:9 HM DATE 10/1/2811 | END ,: 1@/1/z TEST RESUL` END LEVEL 6^2029 IN | IN END H0 LEVEL 3,0746 INND IpNDDATE3^773? INLv-SHOLDLEAKTHRESHOLD0^002 / RESULT INCREASED i THRESHOLD 0 002 IN LEST ^?HSSED END 0^002 ED PASSEDKnHRELT ` TtST RESULT T[S x SU GRAND !BLAND CHEQRON 11400 MING AOF- AKERSFIELD 93311 SEUN S7SUNSECIIN•7 ! 800 - 984 -5266 1.0/14/2011 10:4 Ap': IMP LEAK TEST :?E PT 7 S T STARTED ' - 33 AM TEST STARTED 10/14/2011 EG'cN LEVEL 5.0378 IN C>,tn Trhir- tQ :dp OM r•..J,, ticrc tai ±dr J.l L' T'1t',rn Ulll n ,l !-o? TF,I Try- . -; r r rr_+T CT4C,?T -n ' rryiT'' ' CLICK' 't; Q479 TFi u,n TT•nr 'i,' dP AM cF.ln r7 ?r• ip /tar ^[1.^ oAPd 7N 76V TLl0C'0Ul-)j n P pp-:, Thi TEST RESULT, PASSED 1L -.. ST STARTED 10:33 AM TEST STARTED 1k1/14/20::. 3EGIN LEVEL 4.3,745 IN END TIME' 10:48 AM END DATE 10/!4/2011 END LEVEL 4.3749 IN EAK THRESHOLD 0.002 IN TEST RESULT _ PASSED TEST STARTED 10:3, AM TEST STARTED 10/14/2011 BEGIN LEVEL 3.0701 IN END TIME 10:48 AM END DATE 16/14/2011 END LEbiEL 3.0700 IN LEAK THRESHOLD 0.002 IN TF!;T QrSlIt T PASSED GRAND ISLAND CHEVRON 11400 MING AVE. BAKERSFIELD 93311 SUNSET CiINST 1 -800 -984 -6266 10/14/2011 9:58 AN SUMP LEAK TEST REPORT UDC9 -10 TEST STARTED 9143 AM TEST STARTED 10/14/2011 BEGIN LEVEL 4.8721 IN END TIME 9:58 AM END DATE 10/14/2011 END LEVEL 4.8705 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC1112 TEST STARTED 9:43 AM I TEST STARTED 10/14/2011 BEGIN LEVEL 5.1547 IN END TIME 9:58 AM END DATE 10/14/2011 END LEVEL 5.1549 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC1314 TEST STARTED 9 :43 AM TEST STARTED 10/14/2011 BEGIN LEVEL 5.8749 IN END TIME 9:58 AM END DATE 10/14/2011 END LEVEL 5.8761 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC1516 TEST STARTED 9:43 AM TEST STARTED 10/14/2011 BEGIN LEVEL 7.5371 IN END TIME 9:58 AM END DATE 10/14/2011 END LEVEL 7.5389 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 0 10kJlj rr,r awn !'! -'F'I lf; r_11J 'I ld0(7! h,Twn a'1. GRAND ISLAND CHEVRON Q -, 11400 MING AVE. BAKERSFIELD 93311 C + +- ao J._ ? ! SUNSET CONSTI1 - 3000 -984 -6266 t4jf7 ; 7(d t ; 10/14/2,011 ' ..,« AM SUMP LEAK TEST REPORT 1n' 1171 UDC! -2 TrCT nTn.4 Trn YJ- {•fi( Tr ^.T q- opT rn TEST STARTED 8:36 AM E ; T;J -1; t `'I "' t TEST STARTED 10/14/2011 rlln TT,y a ?70? TW BEGIN LEVEL 5.9943 IN END TIME 8:53 AM END DATE 10/14/2011 INr ^,lac' Tf! F T JPFSHO! r.) a r r ? Try END .FUEL 5,9Q47 LEAK THRESHOLD 0.002 IN TEST RESULT PASSED I UDC3 -4 r c- QTar TCr, 1 k,; TEST STARTED 8:35' AM ccr c iac' qTC!7Ttf) tar "t +!,,, TEST STARTED 10/14/2011 crTF 1rr5yS rh, Z BEGIN LEVEL 6.3724 IN TTMF AM END TIME 8:53 AM Fh!D Harr 1r1 4,'Zt; ; END DATE 10/14/2011 END LcUEL F, 1555 IN END LEVEL 6.3723 IN TEST TL pFSyOL D 0. 0q;. Ih LEAK THRESHOLD C.002' IN T E{I II T p nASSED TFS7 PF" 'l (I .T PASSED i UnG l . -. ,_ 4 i UDC5 -6 T7 ^T .zTPRTR,D It.0:0F AM TEST STARTED 3:38 AM Tcc TEST STARTED 10/14/2011 9EGiN I_EVEI_ 5 3750 BEGIN LEVEL 2.9762 IN INENDTTMF10.1 END TIME 8.53 AM FND "ATP AM x/14/2011 END DATE 10/14/2011 Fmn LFIX- 5- $7A4 END LEVEL 2.9757 IN hAKT"P`- QHO! 1a. qc,? LEAK THRESHOLD 0.002 IN rTcGrPFR!ji_T N TEST RESULT PASSED PAr 1ED Uf)C 16 UDC7 -8 TCST OTAPTED TEST STARTED 8:38 AM r^ kart A , TEST TpRTF..D TEST STARTED 10/14/2011 tG.r +d /2011REG ?h' L RV I BEGIN LEVEL 6.1947 IN 7.5333 INF.Jn TTME END TIME 8:53 AM un ngTF 1.8:15 AM END DATE 10/14/2011 10'14/2-0.11. yin ! Er1EL END I -EVEL 6.1947 IN 5389 INLFA!! THRE_HOLD LEAK; THRESHOLD 0.002 IN 0.1002 INrrc-r 0 ^III T I TEST RESULT PASSED a$SEn I