HomeMy WebLinkAbout11400 MING AVENUEHOODS ALARMS SpRNKL ER SYSTEMS
Permit No. Permit No. Permit No.
File Number: , ?5--5zcn-
Date Received: S— /D -- /Q
Address:
Permit No
AST
Permit No.
Bakersfield, CA 933
Business Name: r. 'iA ZsC a
Other:
Comments: 1-3 -- /,,4Kj ( S
9.
a.
3.
4.
UST
Permit No.
ilk
NSPECTMN LOG
Date Time
9/7-1 2A.11,- SE
SYSTEM: BUILDING SQUARE FEET:
New Mod.
c,ri.;v.vE„rr
O Commercial Hood System Building Sq. Feet:
Fire Alarm System Calculation Bldg. Sq. Ft:
Fire Sprinkler System
Aboveground Storage Tank
C1V Underground Storage Tank
minor
modification Underground Storage Tank
removal Underground Storage Tank
Other:
Comments: 1-3 -- /,,4Kj ( S
9.
a.
3.
4.
UST
Permit No.
ilk
NSPECTMN LOG
Date Time
9/7-1 2A.11,- SE
c,ri.;v.vE„rr
0/19/'/ C— hre& $Fs 5 s
to/.2/h, Ew- ii L 4 sr-
11 12 1t C.A-7 ; •
Signature
Signature
wsPFCfi. v
14P ~r%ALF1 I
UNDERGROUND STORAGE TANK
PERMIT APPLICATION
TO CONSTRUCT- INSTALL NEW TANK (NEW FACILITY) /NEW
TANK INSTALL (EXISTING FACILITY) /MOD -MINOR MOD
Permit #
TYPE OF APPLICATION:
CHECK ONE ONLY)
BAKERSFIELD FIRE DEPARTMENT
Prevention Services
1600 Truxtun Ave., Suite 401
Bakersfield, CA 93301
E/BI
R 1 Phone: 661 - 326 -3979 • Fax: 661- 852 -2171Aflr
Page 1 of 1
X NEW TANK INSTALL /NEW FACILITY NEW TANK INSTALL/EXISTING FACILITY
MODIFTCATTnN CIF FA('TI TTY M MTnInD MnMTCW/ ATrr%Al r C CA/ Tl -
STARTING DATE/
vN o
I—I v1 i nl.aLai r
PROPOSED COMPLETION DATE
FACILITY NAME EXISTING FACILITY PERMIT #
FACILITY ADDRESS
FOAAiA V
CITY ZIP CODE
TYPE OF BUSINESS
C -STORE AND 6/4.s srATio u
APN
TANK OWNER PHONE #
ADDRESS
f SUITE .# a :z
CITY
AK015FI>=LO ZIg33o1
CONTRACTOR CA LICENSE # ICC *
ADDRESS CITY ZIP CODE
PHONE i
61 _ BAKERSFIELD CITY BUSINESS LICENSE #
0
WORKMANS COMP t INSURER
BRIEFLY DESCRIBE THE WORK TO BE DONE:
S
WATER TO FACILITY PROVIDED BY
CAL. WATEIE?
DEPTH TO GROUND WATER `
O
I + SOIL TYPE EXPECTED AT SITE
OF TANKS TO BE INSTALLED ARE THEY FOR MOTOR FUEL?
YES NO
SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN ON FILE?
YES Cl_ NO
THIS SECTION IS FOR MOTOR FUEL STORAGE TANKS
TANK # VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION
to K
THIS SECTION IS FOR NON -MOTOR FUEL STORAGE TANKS
TANKS VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION
FOR OFFICIAL USE ONLY
APPLICATION DATE FACILITY # _7TANKSTANKS FEES $
THE APPLICANT HAS RECEIVED, UNDERSTANDS, AND WILL COMPLY WITH THE ATTACHED CONDITIONS OF THIS PERMIT AND ANY OTHER STATE, LOCAL, AND FEDERAL REGULATIONS. IS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE ISANDCORRECT.
APPRO D BY APPLICANT NAME (PRINT)
DC 0#
APPLI T RE
Lk
THIS APPLICATION BECOMES A PERMIT WHEN APPROVED
FD2086 (Rev 06/07)
BILLING & PERMIT STATEMENT t3AKEK5FIELD F1KE DEPAKIMENT
B E R F, D Prevention Services
PERMIT # FIRE 1501 Truxtun Avenue, 1st FloorIAJNFTMrBakersfield, CA 93301
Phone: 661-326-3979 • Fax: 661- 852 -2171
All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK.
Alarm - New & Modification (minimum charge) 280
Over 10,000 sq ft 0 .028 x sq ft
SITE INFORMATION
LOCATION OF PROJECT
V 1c,,
PROPERTY OWNER
P linc- n l f--
STARTING DATE COMPLETION DATE NAME
jUA1jF 9,010
PROJECT NAME
5 /a
ADDRESS PHONE #
PROJECT ADDRESS
470
CITY A k'-ER SFI EI_D STATE CA ZIP CODE
Aboveground Storage Tank (1 inspection per installation) AST
CONTRACTOR INFORMATION
82
CONTRACTOR NAM C LICENSE # TYPE OF LICENSE EXPIRATION DATE PHONE #
J`L'n v C 3
Underground Storage Tank (Installation /Inspection) NI
a P
CONTRACTOR COMNY NAME
82
Underground Storage Tank (Modification) MOD
FAX #
J JA- M ec i
Underground Storage Tank (Minor Modification) MTM
y7S7
ADDRES
82
CITY
573 /tank
CODE
84
Mandated Leak Detection (test) /Fuel Mont Cert/SB989
NOTE: $96 /hr for each type of test /per site even if
scheduled at the same time TT
96 /hr (2 hrs minimum) =$192 82
All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK.
Alarm - New & Modification (minimum charge) 280
Over 10,000 sq ft 0 .028 x sq ft
Sprinkler - New & Modification (minimum charge) 280
Over 10,000 sq ft 0 .028 x sq ft
Minor Sprinkler Modification ( <10 heads) 96 (inspection only) 84
Commercial Hood (New & Modification) 470
Additional hood 58
Spray Booth (New & Modification) 470
98
Aboveground Storage Tank (1 inspection per installation) AST 180 /tank 82
Additional Tank ATI 96 /tank 82
Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR 109 /tank 82
Underground Storage Tank (Installation /Inspection) NI 878 /tank CK 12 34 82
Underground Storage Tank (Modification) MOD 878 /site 82
Underground Storage Tank (Minor Modification) MTM 167 /site 82
Underground Storage Tank (Removal) TR 573 /tank 84
Mandated Leak Detection (test) /Fuel Mont Cert/SB989
NOTE: $96 /hr for each type of test /per site even if
scheduled at the same time TT
96 /hr (2 hrs minimum) =$192 82
Oil well (Installation, Inspection, or re- inspection) X 96 /hr 82
Tent # 96 /tent 84
After -hours inspection fee 121 /hr (2 hrs minimum) =$242
Pyrotechnic (1 permit per event, plus an inspection fee of
96 /hr during business hours) PY
NOTE: After hours Pyrotechnic event inspection is @ $121 /hr
96 /hr + (5 hrs min standby fee /insp) =$576
5 hrs min standby fee ins = 605
84
Re- inspection /Follow -up Inspection 96 /hr 84
Portable LPG (Propane): # of Cages? 96 /hr 84
Explosive Storage 266 84
Copying & File Research (File Research fee $50 /hr) 0.25 /page 84
Miscellaneous 84
FD2021(Rev 04/08)
4
Jul 02 10 07:48a Sessions
JUL -01 -2010 08:29
661- 396 -0569 p.2
modern welding company
Rtiotn of california; inc.
Metal Products Coast to Coast .
4141 N Brawley Ave. Fresno, CA. 93722
559 )2759353 • Fax (559)'2754381
tune 24, 2010
Northwest Ptunp & Equipment
Attu. Mike Shed
Gentlemen.
We have received a sample of the sand removed from the. site at the northwest corner of Mu 8 and BuenaVista, in Bakersfield. That material is suitable for use as backfill materiai with our tanks.
Sincerely,
Reb .Bartlett
Assistant Manager
TOTAL P.01
4
Jul 02 10 07:48a Sessions
Sessions
9521 Fritz St.
Bakersfield, CA 933D7
661-833-9501
661-396-0569 p.1
To: Ernie Medina
Fax number: 852-2171
From: Juliana Sessions
Fax number: 396-0569
Date: 7/2/2010
Regarding:
Letter from Modern Welding
Phone number for follow-up:
661-978-5059
Comments: Here is the letter from Modern stating that we can use
natural backfill. Ross will see you at 9.
Pages, including cover 2
is
CONSTRUCTION PERMIT
Application Number . . . . .
Property Address . . . . . .
ATN (11 Digits):
Application type description
Subdivision Name . . . . . .
Property Use . . . . . . . .
Application valuation . . . .
Owner
BOLTHOUSE PROP LLC
2000 OAR ST # 250
BAKERSFIELD CA 93301
BAKERSFIELD FIRE DEPARTMENT
PREVENTION SERVICES
3 R S P I D 1501 TRUXTUN AVENUE, 1ST FLR
FIRE BAKERSFIELD, CA 93313
6 T Office Phone: (661) 326 -3979
10- 10000148 Date 5/24/10
11400 MING AVE
522- 610- 07 -00 -3
FIRE DEPT
0
Contractor
OWNER
Permit . . . . . UNDGRND STR TANK INSTALL /INSP
Additional desc .
Phone Access Code 1003862
Permit Fee . . . 439.00 Plan Check Fee 439.00
Issue Date . . . 5/24/10 Valuation 0
Expiration Date . 11/20/10
Fee summary Charged Paid Credited Due
Permit Fee Total 439.00 439.00 00 00
Plan Check Total 439.00 439.00 00 00
Grand Total 878.00 878.00 00 00
CALL FOR INSPECTION
661) 326 -3979
Please state the Permit Number, the Job address, and
the Type of Inspection. Requests for inspections
should be made at least 48 hours in advance.
DECLARATIONS
Permit is issued in accordance with all applicable
Federal, State and Local Ordinances. The permittee
has properly signed and dated the reverse side of this
form. This Permit expires afterl.80 days of inactivity.
I have reviewed the above application, and find it to
be correct/complete.
Permittee: Date:
HAZARDOUS MATERIALS STATEMENT
Yes—No Will the applicant or future occupant handle hazardous material or a mixture containing a hazardous material equal to or greater
than the amounts specified on the list of extremely hazardous substances? See checklist for guidelines.
Yes _ No Will the proposed building or modified facility be within 1000 feet of the outer boundary of a school?
Yes—No Will the intended use of the building by the applicant or future building occupant require a permit for construction or modification
from the Kern County Air Pollution Control District (KCAPCD) or from the Bakersfield Fire Dept? See checklist for guidelines.
Yes _ No I have read the Hazardous Material Guide and KCAPCD Permitting Checklist. I understand my requirements under the Calif.
Health and Safety Code Sec. 6.95 and Calif. Govt. Sec. 65850 and the requirements of the City of Bakersfield Fire Dept. regardinghazardousmaterials.
en _ Owner or Authorized A '
F Y ' g hone No. Date
DECLARATIONS: The declarations below are mandated by the State of California under Section 19825 of the Health and Safety Code.
LICENSED CONTRACTORS DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of the Division 3 of the
Business and Professions Code and my license is in full fierce and effect.
Lic. Class Lic. No. Gxp. Date Contractors Signature Date
OWNER - BUILDER DECLARATION
I hereby affirm that under penalty of perjury that 1 am exempt from the Contractors License Law for the following reason (Sec. 7031.5 Business
and Professions Code: Any city or county which requires a permit to construct, alter, improve, demolish, or repair any structure prior to its
issuance also requires the applicant for such permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors
License Law (Chapter 9 commencing with Section 7000 of Division 3 or the Business and Professions Code) or that he or she is exempt there from
and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of
not more than five hundred dollars ($500)):
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044 Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or herself through his or her own employees, provided that such improvements are not
intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner- builder will have the
burden of proving that he or she did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044 Business and Professions
Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon and who contracts for such
project with a contractor(s) licensed pursuant to the Contractor License Law).
I am exempt under Sec. B. & 1'. C. for the reason
Owner Signature {— _'" Date
WORKERS COMPENSATION DECLARATION
I hereby affirm that under penalty of perjury one of the following declarations:
Carrier
I have and will maintain a certificate of consent to self - insure for workers' compensation, as provided for by Section 3700 of the Labor Code,
for the performance of the work for which this permit is issued.
I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work
for which this permit is issued. My workers' compensation insurance carrier and policy number are:
Policy No.
I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions
of Section 3700 of the Labor Code. I shall forthwith comply with those provisions.
Applicant: Date
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN
EMLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000) IN ADDITION TO
COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE,
INTEREST AND ATTORNEY'S FEES
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097 Civ. C.)
Lenders Name Lenders Address
I certify that I have read this application and state that the information contained herein Is correct. 1 agree to comply with all city ordinances and state
laws relating to building constriction and hereby authorize representatives of the city to enter the above mentioned - property for inspection purposes.
Signature of Applicant or Agent' -j Date
FY Praxair Services, Inc.
3755 N. Business Center Drive
Praxair Services Inc. Tucson, AZ 86706
Tel: (800) 394 -9929
Fax: (520) 293 -1306
NEW CONSTRUCTION ENHANCED LEAK DETECTION (NCELD)
FINAL TEST RESULTS
Client Date: 9/20/2011 Site Info: SWO: ?
Sunset Mechanical
P.O. Box 60527
Bakersfield CA 93386
Grand Island Chevron
Ming & Buena Vista Road
Bakersfield CA 93312
SYSTEM STATUS - Pass/ Fail
Product / System Size Tank
PRODUCT PIPING
Prima
VENT PIPING
Primary)
87 20,000 PASS PASS PASS
91 12,000 PASS PASS PASS
DSL 10,000 PASS PASS PASS
Va o Recovery PASS
Under Dispenser
Containment (UDC) 8 PASS
I declare under penalty of perjury that the Information contained In this report Is true and correct to the best of
my knowledge
Tester: Brian Cloninger State LIc. #: 09 -1746
Signature: j` ,, Date: 9/20/2011
t of BskEri fi e Id
GMER RECEIPT
1 Type; OC Drawer: I
e 0! Receipt no: 10-M
Descripti_,r Quantity Aeount
2 10 .10N. 148
PG-11-01W PERMITS
1. $2634. N
fe,i,je• deli.;'_
CK 0it CK 12560 $2KA. 00
I o,:.al *t End?red $6314. N
Ik'r.,31 j)avir(-.lr $2634.00
ate; `- J24/10 fime: 14: @4: 2
R.GL THE PF: T POPULAT ION
15PW OR N113TER,
NCELD Field Log - Bakersfield, CA Summary
JOB LOG SUMMARY
TYPE OF TEST (Pretest, Final, Leak locate, Retest] = Final iProbe Install ?_(Yes /No) N/A
Job Number.
PASS
swo# 7
Client: Sunset Mechanical Client Contact:. officesunset@aol.com.
Site Name: Grand Island Chevron Phone: (661) 322 -0880
Site Address: Ming & Buena Vista Road Site Contact: 0
City, State: Bakersfield CA Site Phone: Scott Olinger
Crew: CA Cart:
Chemist:
Crew:
Brian Cloninger LIC # 09 -1746
Brian Clonin er Truck # 41 Trailer # 2523 GC# 16
Brian Cloninger, Alan Harris
Total a e Hrs Initial Approver
Start Date: 08/19111 Start Time: 8:00 AM End Time: 6:15 PM
Day 2 09/20111 Start Time: 8:30 AM End Time: 3:00 PM
Day 3 09/21111 Start Time: End Time:
Day 4 09/22/11 Start Time: End Time:
Day 5 09/23/11 Start Time: End Time:
Totals
10.25 9.5
6.5 6.5
16.75 16
MAKE NOTES IF Yf)tl 14AVF Amv I Im-nii I A121 c unl roc
Total Billable Hours 16 Total Detected Leaks 17
TEST RESULTS (PASS /FAIL) PASS If fall -Describe In summary - Failed Components
COMMENTS: (Leaks, un- billable hours, alto specific Info)
LOG Completed BY: Brian Clonin er Date:
712100K
Hours Approve . d B Print Name : Signature: Date:
Company of Approver:
Page 1
State Water Resources Control Board M
Linda S. Adams Division of Water Quality Arnold Schwarzenegger
Secretaryfor 1001 1 Street, Sacramento, California 95814 (916) 341 -5775 Governor
Environmental Protection Mailing Address: P.O. Box 2231, Sacramento, California 95812
FAX (916) 341 -5808 Internet Address: http: / /www.waterboards.ca.gov
March 25, 2008
LG 162 -3
INSTALLATION AND MONITORING REQUIREMENTS FOR
UNDERGROUND STORAGE TANKS INSTALLED
ON OR AFTER JULY 1, 2003
Available electronically at http : / /www.waterboards.ca.gov /ust)
To: Local Agencies and Other Interested Persons
The Purpose of this letter is to answer some common questions that have arisen to
date about the new installation and monitoring requirements for underground storage
tanks (USTs)2 installed (1) on or after July 1, 2003 and prior to July 1, 2004 and (2) on
or after July 1, 2004. Discussion of these new installation and monitoring requirements
is divided into two parts, as follows:
Part I explains requirements for USTs installed on or after July 1, 2003 and
prior to July 1, 2004. These USTs must comply with the requirements outlined
in Section 25290.2 of the H &S Code3. The requirements are presented in
question and answer format, listed numerically as Questions 1 -10.
Part II explains requirements for USTs installed on or after July 1, 2004 in
addition to the applicable requirements of Part I. These USTs must comply with
requirements outlined in Section 25290.1 of the H &S Code4. The additional
requirements are presented in question and answer format, listed alphabetically
as Questions A -D.
This letter is intended as a working document and may be periodically updated as new information
becomes available and new questions arise.
2 The term "underground storage tank" means tank and piping used for the storage of a hazardous
substance. [H &S Code, §25281(x)(1).] The term "underground tank system" or "tank system" means an
underground storage tank, connected piping, ancillary equipment, and containment systems. [H &S Code,
25281(y)•]
These requirements became effective on July 7, 2003 with the enactment of Assembly Bill 1702 (Stats.
2003, Ch. 42), an urgency measure.
These requirements became effective on January 1, 2003 with the enactment of Assembly Bill 2481
Stats. 2002, Ch. 999).
California Environmental Protection Agency
Recycled Paper
LG 162 -2 2-
PART I: USTs INSTALLED ON OR AFTER JULY 1, 2003 AND PRIOR
TO JULY 1, 2004.
1. What does "product tight" mean?
For UST systems installed before July 1, 2003, "product tight' is defined to mean
impervious to the (liquid) substance that is contained, so as to prevent seepage
of the substance stored. [H &S Code §25281(0)] However, for UST systems
installed on or after July 1, 2003, statute defines the term "product tight' to mean
impervious to the liquid and vapor of the substance that is contained, or is to be
contained, so as to prevent seepage of the substance from the containment."
H &S Code §25290.2(a).] UST owners and operators may install UST systems
approved in accordance with Sections 2631 (b) and (d), Title 23, California Code
of Regulations (CCR), as applicable. If at any point in time the State Water
Resources Control Board (State Water Board) staff determine that an existing
component or testing standard is deficient, the manufacturer of the equipment or
testing organization will be informed and asked to resolve any concerns or
deficiencies.
2. How can sumps and under - dispenser containment (UDC) connected to
USTs installed on or after July 1, 2003 meet the product tight requirement?
UST systems installed on or after July 1, 2003 must be designed and installed
such that there are no pathways for liquids or vapors to enter the backfill. For
sumps, the "product tight' requirement may be satisfied by installing and
maintaining sumps which have barriers that extend to grade level or covers, such
that there is a product tight barrier between the sump containment and the
backfill. For UDCs, the "product tight' requirement may be satisfied through the
use of containment structures that extend to grade level such that there is a
product tight barrier between the UDC and the backfill. Sump and UDC
penetration (entry) fittings must also be product tight. Furthermore, sumps and
UDCs must be properly installed, operated, and maintained to provide protection
against the entry of liquids and vapors into the backfill.
3. For USTs installed on or after July 1, 2003, can secondary containment be
open to rainfall or water intrusion?
No. All secondary containment components must be installed to prevent water
intrusion into the system by precipitation, infiltration, or surface runoff. [H &S
Code, §25290.2(c)(3).] The primary function of this requirement is to keep water
out of the containment areas (e.g., tanks, piping, sumps, UDC) so that, in the
event of a release, the stored substance can be detected and contained until it is
cleaned up. In response to the detection of water into these containment areas,
the owner or operator must remove and properly dispose of such water, identify
the source(s), and correct the problem to prevent further water intrusion. The
owner or operator should not make any modifications to the UST system that
would nullify or void manufacturer warranties or independent testing organization
approvals.
California Environmental Protection Agency
MRecycled Paper
15c"
co
0n
LG 162 -2
4.
3-
lied-on-o
Yes. Vent piping, vapor recovery piping, and fill pipes that are beneath the
surface of the ground and installed in conjunction with a UST system on or after
July 1, 2003 are regulated "pipe" and are subject to secondary containment
requirements. [H &S Code, §25290.20).]
5. Are the piping exemptions provided in H &S Code, Section 25281.5(a)(4) and
b)(1), and the secondary containment exemptions in Section 2636(a), Title
23, CCR applicable to USTs installed on or after July 1, 2003?
No. The piping exemptions provided in H &S Code, Section 25281.5(a)(4) and
b)(1), are not applicable for UST systems installed on or after July 1, 2003.
H &S Code, §25290.20).] Additionally, the secondary containment exemptions
for vent and tank riser piping, vapor recovery piping, and safe suction piping) in
Section 2636(a), Title 23, CCR are not applicable for USTs installed on or after
July 1, 2003. here are no exemptionsfrom - the - secondary - containment
requirement for USTs installed-on-or-after--July 1, 2003.
6. What type of post - installation testing is required for USTs installed on or
after July 1, 2003, and when should the testing be completed?
The UST must be tested after installation, and before it is placed into use, using
one of the following three test methods: (1) enhanced leak detection (ELD), (2)
an inert gas pressure test certified by a third -party and approved by the State
Water Board, or (3) a test method deemed equivalent to ELD and approved by
the State Water Board in regulation. [H &S Code, §25290.2(i).]
As of the date of this letter, three tests have been determined to meet the ELD
performance criteria and are allowable for post - installation testing:
Vendor Test Method
Praxair Services, Inc. Enhanced Tracer Tight®
CGRS, Inc. iota® VaporTite - V005 and
Enhanced Tracer Tight®
Leak Detection Technologies, Inc MD Leak
The three ELD test methods can be used when there is no fuel in the system.
The Enhanced Tracer Tight® test and the MD Leak test may also be conducted
with fuel in the UST. To conduct either test with fuel, the owner or operator
should first obtain approval from the local agency to have fuel delivered to the
UST. Prior to approving a fuel delivery, the local agency may need to verify that
all pertinent installation requirements have been met. A UST system should not
be put into service until the facility has been issued a valid operating permit by
the local agency.
California Environmental Protection Agency
Recycled Paper
LG 162 -2 4-
If the results of post - installation testing indicate that the UST system is leaking
liquid or vapor, the owner or operator must take appropriate actions to correct the
leakage, and retest the system using the same approved test method until the
system is no longer leaking liquid or vapor.
7. What requirements apply to a UST installation if installation started prior to
July 1, 2003, but is not completed until after July 1, 2003?
If the tank and associated piping are not placed in the ground prior to July 1,
2003, the UST is subject to the new installation and monitoring requirements of
H &S Code, Section 25290.2. [H &S Code, §25290.2.] As always, the local
agency must have approved the installation plan prior to placement of the tank
and associated piping in the ground.
Please note the following for a UST placed in the ground prior to July 1, 2003,
following approval of the installation plan by the local agency. Such a UST is not
subject to the new installation and monitoring requirements of H &S Code,
Section 25290.2. However, the owner /operator of that UST system is required to
perform a one -time ELD test on or before January 1, 2005, if the UST system is
located within 1,000 feet of a public drinking water well. [H &S Code,
25290.2(1)(3); H &S Code, §25292.5(a) and (b).]
8. Does a repair or modification to a UST, NOT installed in accordance with
H&S Code, Section 25290.2, subject the UST to the requirements of this
section?
No, not unless the tank is replaced. USTs only become subject to H &S Code,
Section 25290.2 when the tank is replaced. Therefore, for USTs installed prior to
July 1, 2003, replacement of spill containment, sumps, product piping, vapor
recovery piping, or vent piping would not subject the component or the UST
system to the new installation and monitoring requirements of H &S Code,
Section 25290.2.
9. What components of USTs installed on or after July 1, 2003 and prior to
July 1, 2004 are required to be monitored in accordance with H&S Code,
Section 25290.2(d)?
As for all USTs installed since January 1, 1984, USTs installed on or after July 1,
2003 and prior to July 1, 2004 must also be equipped with a continuous
monitoring system "capable of detecting the entry of the hazardous substance
stored in the primary containment into the secondary containment." [H &S Code,
25290.2(d); CCR, §2630(d).] All sumps, UDCs, and the interstitial spaces of
tanks and piping (including product, vent, vapor recovery, and fill pipe) must have
sensors that are capable of detecting liquid releases from the primary
containment. Components subject to the monitoring requirement of Section
California Environmental Protection Agency
Recycled Paper
LG 162 -2 5-
25290.2(d) include, but are not limited to, riser piping and access points on top of
the tank, which provide access to the primary containment of the tank and may
be in contact with vapors of the stored product.
10. For USTs installed on or after July 1, 2003 and prior to July 1, 2004, is an
annual line tightness test on pressurized piping required?
Yes. As for all USTs installed since January 1, 1984, the requirement for
underground pressurized piping ... (to) be tightness tested annually" also applies
to USTs installed on or after July 1, 2003 and prior to July 1, 2004. [H &S Code,
25290.2(8); H &S Code, §25291(f).] The annual line tightness testing requirement
may be met by satisfying the criteria specified in CCR, Title 23, Section 2636(g)(1-
5).
PART II: USTs INSTALLED ON OR AFTER JULY 1, 2004.
In addition to the requirements discussed below (Questions A -D of Part II), USTs
installed on or after July 1, 2004 are subject to all of the installation and monitoring
requirements presented in the responses to Questions 1 -8 of Part I. For USTs installed
on or after July 1, 2004, references to the "July 1, 2003" date in Part I should be
substituted with "July 1, 2004." The H &S Code citations relevant to USTs installed on or
after July 1, 2003 and July 1, 2004 are provided in the table below. Note that Questions
9 and 10 of Part I do not apply to USTs installed on or after July 1, 2004.
Question
Number
H&S Code Citation for USTs
Installed On or After July 1, 2003 and
Prior to July 1, 2004
Part I
H&S Code Citation
for USTs Installed
On or After July 1, 2004
Part II
1 H &S Code §25290.2(a) H &S Code 25290.1 a
2
3 H &S Code §25290.2(c)(3) H &S Code 25290.1 (c)(3)
4 H &S Code §25290.20) H &S Code 25290.1 k
5 H &S Code §25290.2(i) H &S Code 25290.1 k
6 H &S Code §25290.2(i) H &S Code §25290.10)
7 H &S Code 25290.2 H &S Code 25290.1
8 H &S Code 25290.2 H &S Code 25290.1
A. In accordance with H&S Code, Section 25290.1(e), which components of
USTs installed on or after July 1, 2004 must be continuously monitored
using vacuum, pressure, or interstitial liquid level measurement methods?
The interstitial space of the tank and product piping (including fill, vent, and vapor
recovery piping), that are beneath the surface of the ground must be maintained
under constant vacuum or pressure. Statute also requires that a breach in the
primary or secondary containment be detected before the liquid or vapor of the
stored substance is released to the environment. Continuous vacuum, pressure,
or interstitial liquid level measurement methods can be used to satisfy these
California Environmental Protection Agency
0 Recycled Paper
LG 162 -2
requirements. As with all leak detection equipment used to monitor the UST
system, these methods must be third -party certified and should be listed in Local
Guidance (LG) Letter 113. LG 113 can be found on our website at:
http: / /www.waterboards.ca.gov /ust/leak prevention /Ig113 /index.html
It is important to note that regulated piping begins where piping exits /enters the
tank and continues to the point where piping extends above the surface of the
ground (e.g., at a shear valve). Statute does not provide an exemption for single -
walled piping transitions contained in sumps, or single - walled piping transitions in
UDCs, or fill piping contained in sumps. The following options may be used to
satisfy the requirements for single - walled piping transitions contained in sumps;
single - walled piping transitions contained in UDCs; and fill piping contained in
sumps:
L The entire piping length, including piping within sumps or UDCs, must be
double - walled and continuously monitored using vacuum, pressure, or
interstitial liquid level measurement methods; or
ii. The interstitial space between the primary (i.e., single - walled transition
pipe or fill piping) and secondary containment (i.e., sump, UDC) must be
continuously monitored using vacuum or pressure. (Note: Interstitial liquid
level measurement would not be appropriate for this option.); or
M. The single - walled transition pipe or fill piping must be contained within a
double - walled sump and /or double - walled UDC that either: (1) extends to
the surface or (2) has a double - walled product tight lid that is continuously
monitored using vacuum, pressure, or interstitial liquid level measurement
methods. The secondary containment (of the sump or UDC, including
penetration fittings) must be continuously monitored using vacuum,
pressure, or interstitial liquid level measurement methods.
Pursuant to Section 2637(a)(6) of Title 23, CCR, portions of the?UST system
which are continuously monitored using vacuum, pressure, or interstitial liquid
level measurement methods are exempt from periodic secondary containment
testing. Therefore, periodic secondary containment testing is not required for
secondary containment of tank and piping that are continuously monitored using
vacuum, pressure, or interstitial liquid level measurement methods. Please note
that annual certification of the leak detection equipment is still required.
B. What components of USTs installed on or after July 1, 2004 are required to
be monitored in accordance with H &S Code, Section 25290.1(d)?
Section 25290.1 requires that the "underground storage tank system" be
designed and constructed with a continuous monitoring system. Tank and
product piping monitored using constant vacuum, pressure, or interstitial liquid
level measurement methods satisfy this requirement through Section 25290.1(e).
However, other parts of the UST system not subject to Section 25290.1(e) must
California Environmental Protection Agency
Recycled Paper
LG 162 -2 7-
satisfy the monitoring requirement in Section 25290.1(d). These components
include, but are not limited to, riser piping and access points on top of the tank,
which provide access to the primary containment of the tank and may be in
contact with vapors of the stored product.
The requirement for sumps and UDCs to have sensors is as follows. Sumps and
UDCs installed and monitored in accordance with paragraph A.i, above, must
have sensors that are capable of detecting liquid and vapor releases from the
primary containment. No sensors are required for sumps and UDCs installed
and monitored in accordance with paragraph A.ii, above. Sumps and UDCs
installed and monitored in accordance with paragraph A.iii, above, are only
required to have sensors that are capable of detecting liquid releases.
C. For UST components monitored continuously using vacuum, pressure, or
interstitial liquid level measurement methods, is additional testing or
evaluation necessary?
If the component's current listing includes approval for its use with continuous
monitoring using vacuum, pressure, or interstitial liquid level measurement
methods, no further testing or evaluation is necessary. However, if the
component's current listing does not include approval of its use with continuous
monitoring using vacuum, pressure, or interstitial liquid level measurements,
additional testing or evaluation may be necessary. Owners and operators should
ensure that UST components are approved for use with a continuous monitoring
system using pressure, vacuum, or interstitial liquid level measurement methods
consistent with the requirements outlined in Sections 2631 (b) and (d), Title 23,
CCR, as applicable.
D. For USTs installed on or after July 1, 2004, is the annual line tightness test
on pressurized piping required?
No. For USTs installed on or after July 1, 2004, an annual line tightness test on
the primary piping is not required.
If you have questions regarding this document, please contact the UST Program at
916) 341 -5775 or via e-mail at ustawaterboards.ca.gov.
Sincerely,
Original signed by
Kevin Graves, P.E., Manager
Underground Storage Tank Program
California Environmental Protection Agency
Recycled Paper
A.
df
VA
WN
jo
is
lJ
u
44
lop,
Awl
a
W,
CORRECTION NOTICE
BAKERSFIELD FIRE DEPARTMENT 2453
PREVENTION SERVICES DIVISION
2101 H STREET
661) 326 -3979
Location: lit/ f
Oa/,es 12i C14 9-?-?13
ZYo are hereby required to take the following action at the above location: "r
CORRECT & CALL FOR REINSPECTIO.N CORRECT & PROCEED
t1EA17' L INC. ZA >N s- -,1i0.v IS ivaT a Ceo.e,5?1, k
JQGlJ;ScG I2i 5 Gi2T /W67T(/`iS fo c 25L9o• J
Completion Date for Corrections:
Received by:
Inspector:
Desk Phone:
Initial E Date: to
from 8:00am to 8:30am)
KBF -9229
4
L
Completion Date for Corrections:
Received by:
Inspector:
Desk Phone:
Initial E Date: to
from 8:00am to 8:30am)
KBF -9229
CORRECTION NOTICE
BAKERSFIELD FIRE DEPARTMENT 2453 ! i
PREVENTION SERVICES DIVISION
2101 H STREET
661) 326 -3979
Location: l bD irt/r v
x'14 933 1 3 f
R
Yo are hereby required to take the following action at the above location:
CORRECT & CALL FOR REINSPECTION D CORRECT & PROCEED
l VENT L r C- 7, 7A/ V; O/V / S Al6T COre,--
acv I JCCI -1 >4
s, IPcv.'SGG / ?w5 '%rG 2T /+- ET(j`r- Cn z 290• %
Y
n
Completion Date for Corrections:
Received by: /
Inspector: Initial ,U% Date:
Desk Phone from 8:00am to 8:30am)
KBF -9229