Loading...
HomeMy WebLinkAbout11400 MING AVENUEHOODS ALARMS SpRNKL ER SYSTEMS Permit No. Permit No. Permit No. File Number: , ?5--5zcn- Date Received: S— /D -- /Q Address: Permit No AST Permit No. Bakersfield, CA 933 Business Name: r. 'iA ZsC a Other: Comments: 1-3 -- /,,4Kj ( S 9. a. 3. 4. UST Permit No. ilk NSPECTMN LOG Date Time 9/7-1 2A.11,- SE SYSTEM: BUILDING SQUARE FEET: New Mod. c,ri.;v.vE„rr O Commercial Hood System Building Sq. Feet: Fire Alarm System Calculation Bldg. Sq. Ft: Fire Sprinkler System Aboveground Storage Tank C1V Underground Storage Tank minor modification Underground Storage Tank removal Underground Storage Tank Other: Comments: 1-3 -- /,,4Kj ( S 9. a. 3. 4. UST Permit No. ilk NSPECTMN LOG Date Time 9/7-1 2A.11,- SE c,ri.;v.vE„rr 0/19/'/ C— hre& $Fs 5 s to/.2/h, Ew- ii L 4 sr- 11 12 1t C.A-7 ; • Signature Signature wsPFCfi. v 14P ~r%ALF1 I UNDERGROUND STORAGE TANK PERMIT APPLICATION TO CONSTRUCT- INSTALL NEW TANK (NEW FACILITY) /NEW TANK INSTALL (EXISTING FACILITY) /MOD -MINOR MOD Permit # TYPE OF APPLICATION: CHECK ONE ONLY) BAKERSFIELD FIRE DEPARTMENT Prevention Services 1600 Truxtun Ave., Suite 401 Bakersfield, CA 93301 E/BI R 1 Phone: 661 - 326 -3979 • Fax: 661- 852 -2171Aflr Page 1 of 1 X NEW TANK INSTALL /NEW FACILITY NEW TANK INSTALL/EXISTING FACILITY MODIFTCATTnN CIF FA('TI TTY M MTnInD MnMTCW/ ATrr%Al r C CA/ Tl - STARTING DATE/ vN o I—I v1 i nl.aLai r PROPOSED COMPLETION DATE FACILITY NAME EXISTING FACILITY PERMIT # FACILITY ADDRESS FOAAiA V CITY ZIP CODE TYPE OF BUSINESS C -STORE AND 6/4.s srATio u APN TANK OWNER PHONE # ADDRESS f SUITE .# a :z CITY AK015FI>=LO ZIg33o1 CONTRACTOR CA LICENSE # ICC * ADDRESS CITY ZIP CODE PHONE i 61 _ BAKERSFIELD CITY BUSINESS LICENSE # 0 WORKMANS COMP t INSURER BRIEFLY DESCRIBE THE WORK TO BE DONE: S WATER TO FACILITY PROVIDED BY CAL. WATEIE? DEPTH TO GROUND WATER ` O I + SOIL TYPE EXPECTED AT SITE OF TANKS TO BE INSTALLED ARE THEY FOR MOTOR FUEL? YES NO SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN ON FILE? YES Cl_ NO THIS SECTION IS FOR MOTOR FUEL STORAGE TANKS TANK # VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION to K THIS SECTION IS FOR NON -MOTOR FUEL STORAGE TANKS TANKS VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION FOR OFFICIAL USE ONLY APPLICATION DATE FACILITY # _7TANKSTANKS FEES $ THE APPLICANT HAS RECEIVED, UNDERSTANDS, AND WILL COMPLY WITH THE ATTACHED CONDITIONS OF THIS PERMIT AND ANY OTHER STATE, LOCAL, AND FEDERAL REGULATIONS. IS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE ISANDCORRECT. APPRO D BY APPLICANT NAME (PRINT) DC 0# APPLI T RE Lk THIS APPLICATION BECOMES A PERMIT WHEN APPROVED FD2086 (Rev 06/07) BILLING & PERMIT STATEMENT t3AKEK5FIELD F1KE DEPAKIMENT B E R F, D Prevention Services PERMIT # FIRE 1501 Truxtun Avenue, 1st FloorIAJNFTMrBakersfield, CA 93301 Phone: 661-326-3979 • Fax: 661- 852 -2171 All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK. Alarm - New & Modification (minimum charge) 280 Over 10,000 sq ft 0 .028 x sq ft SITE INFORMATION LOCATION OF PROJECT V 1c,, PROPERTY OWNER P linc- n l f-- STARTING DATE COMPLETION DATE NAME jUA1jF 9,010 PROJECT NAME 5 /a ADDRESS PHONE # PROJECT ADDRESS 470 CITY A k'-ER SFI EI_D STATE CA ZIP CODE Aboveground Storage Tank (1 inspection per installation) AST CONTRACTOR INFORMATION 82 CONTRACTOR NAM C LICENSE # TYPE OF LICENSE EXPIRATION DATE PHONE # J`L'n v C 3 Underground Storage Tank (Installation /Inspection) NI a P CONTRACTOR COMNY NAME 82 Underground Storage Tank (Modification) MOD FAX # J JA- M ec i Underground Storage Tank (Minor Modification) MTM y7S7 ADDRES 82 CITY 573 /tank CODE 84 Mandated Leak Detection (test) /Fuel Mont Cert/SB989 NOTE: $96 /hr for each type of test /per site even if scheduled at the same time TT 96 /hr (2 hrs minimum) =$192 82 All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK. Alarm - New & Modification (minimum charge) 280 Over 10,000 sq ft 0 .028 x sq ft Sprinkler - New & Modification (minimum charge) 280 Over 10,000 sq ft 0 .028 x sq ft Minor Sprinkler Modification ( <10 heads) 96 (inspection only) 84 Commercial Hood (New & Modification) 470 Additional hood 58 Spray Booth (New & Modification) 470 98 Aboveground Storage Tank (1 inspection per installation) AST 180 /tank 82 Additional Tank ATI 96 /tank 82 Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR 109 /tank 82 Underground Storage Tank (Installation /Inspection) NI 878 /tank CK 12 34 82 Underground Storage Tank (Modification) MOD 878 /site 82 Underground Storage Tank (Minor Modification) MTM 167 /site 82 Underground Storage Tank (Removal) TR 573 /tank 84 Mandated Leak Detection (test) /Fuel Mont Cert/SB989 NOTE: $96 /hr for each type of test /per site even if scheduled at the same time TT 96 /hr (2 hrs minimum) =$192 82 Oil well (Installation, Inspection, or re- inspection) X 96 /hr 82 Tent # 96 /tent 84 After -hours inspection fee 121 /hr (2 hrs minimum) =$242 Pyrotechnic (1 permit per event, plus an inspection fee of 96 /hr during business hours) PY NOTE: After hours Pyrotechnic event inspection is @ $121 /hr 96 /hr + (5 hrs min standby fee /insp) =$576 5 hrs min standby fee ins = 605 84 Re- inspection /Follow -up Inspection 96 /hr 84 Portable LPG (Propane): # of Cages? 96 /hr 84 Explosive Storage 266 84 Copying & File Research (File Research fee $50 /hr) 0.25 /page 84 Miscellaneous 84 FD2021(Rev 04/08) 4 Jul 02 10 07:48a Sessions JUL -01 -2010 08:29 661- 396 -0569 p.2 modern welding company Rtiotn of california; inc. Metal Products Coast to Coast . 4141 N Brawley Ave. Fresno, CA. 93722 559 )2759353 • Fax (559)'2754381 tune 24, 2010 Northwest Ptunp & Equipment Attu. Mike Shed Gentlemen. We have received a sample of the sand removed from the. site at the northwest corner of Mu 8 and BuenaVista, in Bakersfield. That material is suitable for use as backfill materiai with our tanks. Sincerely, Reb .Bartlett Assistant Manager TOTAL P.01 4 Jul 02 10 07:48a Sessions Sessions 9521 Fritz St. Bakersfield, CA 933D7 661-833-9501 661-396-0569 p.1 To: Ernie Medina Fax number: 852-2171 From: Juliana Sessions Fax number: 396-0569 Date: 7/2/2010 Regarding: Letter from Modern Welding Phone number for follow-up: 661-978-5059 Comments: Here is the letter from Modern stating that we can use natural backfill. Ross will see you at 9. Pages, including cover 2 is CONSTRUCTION PERMIT Application Number . . . . . Property Address . . . . . . ATN (11 Digits): Application type description Subdivision Name . . . . . . Property Use . . . . . . . . Application valuation . . . . Owner BOLTHOUSE PROP LLC 2000 OAR ST # 250 BAKERSFIELD CA 93301 BAKERSFIELD FIRE DEPARTMENT PREVENTION SERVICES 3 R S P I D 1501 TRUXTUN AVENUE, 1ST FLR FIRE BAKERSFIELD, CA 93313 6 T Office Phone: (661) 326 -3979 10- 10000148 Date 5/24/10 11400 MING AVE 522- 610- 07 -00 -3 FIRE DEPT 0 Contractor OWNER Permit . . . . . UNDGRND STR TANK INSTALL /INSP Additional desc . Phone Access Code 1003862 Permit Fee . . . 439.00 Plan Check Fee 439.00 Issue Date . . . 5/24/10 Valuation 0 Expiration Date . 11/20/10 Fee summary Charged Paid Credited Due Permit Fee Total 439.00 439.00 00 00 Plan Check Total 439.00 439.00 00 00 Grand Total 878.00 878.00 00 00 CALL FOR INSPECTION 661) 326 -3979 Please state the Permit Number, the Job address, and the Type of Inspection. Requests for inspections should be made at least 48 hours in advance. DECLARATIONS Permit is issued in accordance with all applicable Federal, State and Local Ordinances. The permittee has properly signed and dated the reverse side of this form. This Permit expires afterl.80 days of inactivity. I have reviewed the above application, and find it to be correct/complete. Permittee: Date: HAZARDOUS MATERIALS STATEMENT Yes—No Will the applicant or future occupant handle hazardous material or a mixture containing a hazardous material equal to or greater than the amounts specified on the list of extremely hazardous substances? See checklist for guidelines. Yes _ No Will the proposed building or modified facility be within 1000 feet of the outer boundary of a school? Yes—No Will the intended use of the building by the applicant or future building occupant require a permit for construction or modification from the Kern County Air Pollution Control District (KCAPCD) or from the Bakersfield Fire Dept? See checklist for guidelines. Yes _ No I have read the Hazardous Material Guide and KCAPCD Permitting Checklist. I understand my requirements under the Calif. Health and Safety Code Sec. 6.95 and Calif. Govt. Sec. 65850 and the requirements of the City of Bakersfield Fire Dept. regardinghazardousmaterials. en _ Owner or Authorized A ' F Y ' g hone No. Date DECLARATIONS: The declarations below are mandated by the State of California under Section 19825 of the Health and Safety Code. LICENSED CONTRACTORS DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of the Division 3 of the Business and Professions Code and my license is in full fierce and effect. Lic. Class Lic. No. Gxp. Date Contractors Signature Date OWNER - BUILDER DECLARATION I hereby affirm that under penalty of perjury that 1 am exempt from the Contractors License Law for the following reason (Sec. 7031.5 Business and Professions Code: Any city or county which requires a permit to construct, alter, improve, demolish, or repair any structure prior to its issuance also requires the applicant for such permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors License Law (Chapter 9 commencing with Section 7000 of Division 3 or the Business and Professions Code) or that he or she is exempt there from and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)): I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044 Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or herself through his or her own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner- builder will have the burden of proving that he or she did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044 Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon and who contracts for such project with a contractor(s) licensed pursuant to the Contractor License Law). I am exempt under Sec. B. & 1'. C. for the reason Owner Signature {— _'" Date WORKERS COMPENSATION DECLARATION I hereby affirm that under penalty of perjury one of the following declarations: Carrier I have and will maintain a certificate of consent to self - insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Policy No. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code. I shall forthwith comply with those provisions. Applicant: Date WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000) IN ADDITION TO COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST AND ATTORNEY'S FEES CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097 Civ. C.) Lenders Name Lenders Address I certify that I have read this application and state that the information contained herein Is correct. 1 agree to comply with all city ordinances and state laws relating to building constriction and hereby authorize representatives of the city to enter the above mentioned - property for inspection purposes. Signature of Applicant or Agent' -j Date FY Praxair Services, Inc. 3755 N. Business Center Drive Praxair Services Inc. Tucson, AZ 86706 Tel: (800) 394 -9929 Fax: (520) 293 -1306 NEW CONSTRUCTION ENHANCED LEAK DETECTION (NCELD) FINAL TEST RESULTS Client Date: 9/20/2011 Site Info: SWO: ? Sunset Mechanical P.O. Box 60527 Bakersfield CA 93386 Grand Island Chevron Ming & Buena Vista Road Bakersfield CA 93312 SYSTEM STATUS - Pass/ Fail Product / System Size Tank PRODUCT PIPING Prima VENT PIPING Primary) 87 20,000 PASS PASS PASS 91 12,000 PASS PASS PASS DSL 10,000 PASS PASS PASS Va o Recovery PASS Under Dispenser Containment (UDC) 8 PASS I declare under penalty of perjury that the Information contained In this report Is true and correct to the best of my knowledge Tester: Brian Cloninger State LIc. #: 09 -1746 Signature: j` ,, Date: 9/20/2011 t of BskEri fi e Id GMER RECEIPT 1 Type; OC Drawer: I e 0! Receipt no: 10-M Descripti_,r Quantity Aeount 2 10 .10N. 148 PG-11-01W PERMITS 1. $2634. N fe,i,je• deli.;'_ CK 0it CK 12560 $2KA. 00 I o,:.al *t End?red $6314. N Ik'r.,31 j)avir(-.lr $2634.00 ate; `- J24/10 fime: 14: @4: 2 R.GL THE PF: T POPULAT ION 15PW OR N113TER, NCELD Field Log - Bakersfield, CA Summary JOB LOG SUMMARY TYPE OF TEST (Pretest, Final, Leak locate, Retest] = Final iProbe Install ?_(Yes /No) N/A Job Number. PASS swo# 7 Client: Sunset Mechanical Client Contact:. officesunset@aol.com. Site Name: Grand Island Chevron Phone: (661) 322 -0880 Site Address: Ming & Buena Vista Road Site Contact: 0 City, State: Bakersfield CA Site Phone: Scott Olinger Crew: CA Cart: Chemist: Crew: Brian Cloninger LIC # 09 -1746 Brian Clonin er Truck # 41 Trailer # 2523 GC# 16 Brian Cloninger, Alan Harris Total a e Hrs Initial Approver Start Date: 08/19111 Start Time: 8:00 AM End Time: 6:15 PM Day 2 09/20111 Start Time: 8:30 AM End Time: 3:00 PM Day 3 09/21111 Start Time: End Time: Day 4 09/22/11 Start Time: End Time: Day 5 09/23/11 Start Time: End Time: Totals 10.25 9.5 6.5 6.5 16.75 16 MAKE NOTES IF Yf)tl 14AVF Amv I Im-nii I A121 c unl roc Total Billable Hours 16 Total Detected Leaks 17 TEST RESULTS (PASS /FAIL) PASS If fall -Describe In summary - Failed Components COMMENTS: (Leaks, un- billable hours, alto specific Info) LOG Completed BY: Brian Clonin er Date: 712100K Hours Approve . d B Print Name : Signature: Date: Company of Approver: Page 1 State Water Resources Control Board M Linda S. Adams Division of Water Quality Arnold Schwarzenegger Secretaryfor 1001 1 Street, Sacramento, California 95814 (916) 341 -5775 Governor Environmental Protection Mailing Address: P.O. Box 2231, Sacramento, California 95812 FAX (916) 341 -5808 Internet Address: http: / /www.waterboards.ca.gov March 25, 2008 LG 162 -3 INSTALLATION AND MONITORING REQUIREMENTS FOR UNDERGROUND STORAGE TANKS INSTALLED ON OR AFTER JULY 1, 2003 Available electronically at http : / /www.waterboards.ca.gov /ust) To: Local Agencies and Other Interested Persons The Purpose of this letter is to answer some common questions that have arisen to date about the new installation and monitoring requirements for underground storage tanks (USTs)2 installed (1) on or after July 1, 2003 and prior to July 1, 2004 and (2) on or after July 1, 2004. Discussion of these new installation and monitoring requirements is divided into two parts, as follows: Part I explains requirements for USTs installed on or after July 1, 2003 and prior to July 1, 2004. These USTs must comply with the requirements outlined in Section 25290.2 of the H &S Code3. The requirements are presented in question and answer format, listed numerically as Questions 1 -10. Part II explains requirements for USTs installed on or after July 1, 2004 in addition to the applicable requirements of Part I. These USTs must comply with requirements outlined in Section 25290.1 of the H &S Code4. The additional requirements are presented in question and answer format, listed alphabetically as Questions A -D. This letter is intended as a working document and may be periodically updated as new information becomes available and new questions arise. 2 The term "underground storage tank" means tank and piping used for the storage of a hazardous substance. [H &S Code, §25281(x)(1).] The term "underground tank system" or "tank system" means an underground storage tank, connected piping, ancillary equipment, and containment systems. [H &S Code, 25281(y)•] These requirements became effective on July 7, 2003 with the enactment of Assembly Bill 1702 (Stats. 2003, Ch. 42), an urgency measure. These requirements became effective on January 1, 2003 with the enactment of Assembly Bill 2481 Stats. 2002, Ch. 999). California Environmental Protection Agency Recycled Paper LG 162 -2 2- PART I: USTs INSTALLED ON OR AFTER JULY 1, 2003 AND PRIOR TO JULY 1, 2004. 1. What does "product tight" mean? For UST systems installed before July 1, 2003, "product tight' is defined to mean impervious to the (liquid) substance that is contained, so as to prevent seepage of the substance stored. [H &S Code §25281(0)] However, for UST systems installed on or after July 1, 2003, statute defines the term "product tight' to mean impervious to the liquid and vapor of the substance that is contained, or is to be contained, so as to prevent seepage of the substance from the containment." H &S Code §25290.2(a).] UST owners and operators may install UST systems approved in accordance with Sections 2631 (b) and (d), Title 23, California Code of Regulations (CCR), as applicable. If at any point in time the State Water Resources Control Board (State Water Board) staff determine that an existing component or testing standard is deficient, the manufacturer of the equipment or testing organization will be informed and asked to resolve any concerns or deficiencies. 2. How can sumps and under - dispenser containment (UDC) connected to USTs installed on or after July 1, 2003 meet the product tight requirement? UST systems installed on or after July 1, 2003 must be designed and installed such that there are no pathways for liquids or vapors to enter the backfill. For sumps, the "product tight' requirement may be satisfied by installing and maintaining sumps which have barriers that extend to grade level or covers, such that there is a product tight barrier between the sump containment and the backfill. For UDCs, the "product tight' requirement may be satisfied through the use of containment structures that extend to grade level such that there is a product tight barrier between the UDC and the backfill. Sump and UDC penetration (entry) fittings must also be product tight. Furthermore, sumps and UDCs must be properly installed, operated, and maintained to provide protection against the entry of liquids and vapors into the backfill. 3. For USTs installed on or after July 1, 2003, can secondary containment be open to rainfall or water intrusion? No. All secondary containment components must be installed to prevent water intrusion into the system by precipitation, infiltration, or surface runoff. [H &S Code, §25290.2(c)(3).] The primary function of this requirement is to keep water out of the containment areas (e.g., tanks, piping, sumps, UDC) so that, in the event of a release, the stored substance can be detected and contained until it is cleaned up. In response to the detection of water into these containment areas, the owner or operator must remove and properly dispose of such water, identify the source(s), and correct the problem to prevent further water intrusion. The owner or operator should not make any modifications to the UST system that would nullify or void manufacturer warranties or independent testing organization approvals. California Environmental Protection Agency MRecycled Paper 15c" co 0n LG 162 -2 4. 3- lied-on-o Yes. Vent piping, vapor recovery piping, and fill pipes that are beneath the surface of the ground and installed in conjunction with a UST system on or after July 1, 2003 are regulated "pipe" and are subject to secondary containment requirements. [H &S Code, §25290.20).] 5. Are the piping exemptions provided in H &S Code, Section 25281.5(a)(4) and b)(1), and the secondary containment exemptions in Section 2636(a), Title 23, CCR applicable to USTs installed on or after July 1, 2003? No. The piping exemptions provided in H &S Code, Section 25281.5(a)(4) and b)(1), are not applicable for UST systems installed on or after July 1, 2003. H &S Code, §25290.20).] Additionally, the secondary containment exemptions for vent and tank riser piping, vapor recovery piping, and safe suction piping) in Section 2636(a), Title 23, CCR are not applicable for USTs installed on or after July 1, 2003. here are no exemptionsfrom - the - secondary - containment requirement for USTs installed-on-or-after--July 1, 2003. 6. What type of post - installation testing is required for USTs installed on or after July 1, 2003, and when should the testing be completed? The UST must be tested after installation, and before it is placed into use, using one of the following three test methods: (1) enhanced leak detection (ELD), (2) an inert gas pressure test certified by a third -party and approved by the State Water Board, or (3) a test method deemed equivalent to ELD and approved by the State Water Board in regulation. [H &S Code, §25290.2(i).] As of the date of this letter, three tests have been determined to meet the ELD performance criteria and are allowable for post - installation testing: Vendor Test Method Praxair Services, Inc. Enhanced Tracer Tight® CGRS, Inc. iota® VaporTite - V005 and Enhanced Tracer Tight® Leak Detection Technologies, Inc MD Leak The three ELD test methods can be used when there is no fuel in the system. The Enhanced Tracer Tight® test and the MD Leak test may also be conducted with fuel in the UST. To conduct either test with fuel, the owner or operator should first obtain approval from the local agency to have fuel delivered to the UST. Prior to approving a fuel delivery, the local agency may need to verify that all pertinent installation requirements have been met. A UST system should not be put into service until the facility has been issued a valid operating permit by the local agency. California Environmental Protection Agency Recycled Paper LG 162 -2 4- If the results of post - installation testing indicate that the UST system is leaking liquid or vapor, the owner or operator must take appropriate actions to correct the leakage, and retest the system using the same approved test method until the system is no longer leaking liquid or vapor. 7. What requirements apply to a UST installation if installation started prior to July 1, 2003, but is not completed until after July 1, 2003? If the tank and associated piping are not placed in the ground prior to July 1, 2003, the UST is subject to the new installation and monitoring requirements of H &S Code, Section 25290.2. [H &S Code, §25290.2.] As always, the local agency must have approved the installation plan prior to placement of the tank and associated piping in the ground. Please note the following for a UST placed in the ground prior to July 1, 2003, following approval of the installation plan by the local agency. Such a UST is not subject to the new installation and monitoring requirements of H &S Code, Section 25290.2. However, the owner /operator of that UST system is required to perform a one -time ELD test on or before January 1, 2005, if the UST system is located within 1,000 feet of a public drinking water well. [H &S Code, 25290.2(1)(3); H &S Code, §25292.5(a) and (b).] 8. Does a repair or modification to a UST, NOT installed in accordance with H&S Code, Section 25290.2, subject the UST to the requirements of this section? No, not unless the tank is replaced. USTs only become subject to H &S Code, Section 25290.2 when the tank is replaced. Therefore, for USTs installed prior to July 1, 2003, replacement of spill containment, sumps, product piping, vapor recovery piping, or vent piping would not subject the component or the UST system to the new installation and monitoring requirements of H &S Code, Section 25290.2. 9. What components of USTs installed on or after July 1, 2003 and prior to July 1, 2004 are required to be monitored in accordance with H&S Code, Section 25290.2(d)? As for all USTs installed since January 1, 1984, USTs installed on or after July 1, 2003 and prior to July 1, 2004 must also be equipped with a continuous monitoring system "capable of detecting the entry of the hazardous substance stored in the primary containment into the secondary containment." [H &S Code, 25290.2(d); CCR, §2630(d).] All sumps, UDCs, and the interstitial spaces of tanks and piping (including product, vent, vapor recovery, and fill pipe) must have sensors that are capable of detecting liquid releases from the primary containment. Components subject to the monitoring requirement of Section California Environmental Protection Agency Recycled Paper LG 162 -2 5- 25290.2(d) include, but are not limited to, riser piping and access points on top of the tank, which provide access to the primary containment of the tank and may be in contact with vapors of the stored product. 10. For USTs installed on or after July 1, 2003 and prior to July 1, 2004, is an annual line tightness test on pressurized piping required? Yes. As for all USTs installed since January 1, 1984, the requirement for underground pressurized piping ... (to) be tightness tested annually" also applies to USTs installed on or after July 1, 2003 and prior to July 1, 2004. [H &S Code, 25290.2(8); H &S Code, §25291(f).] The annual line tightness testing requirement may be met by satisfying the criteria specified in CCR, Title 23, Section 2636(g)(1- 5). PART II: USTs INSTALLED ON OR AFTER JULY 1, 2004. In addition to the requirements discussed below (Questions A -D of Part II), USTs installed on or after July 1, 2004 are subject to all of the installation and monitoring requirements presented in the responses to Questions 1 -8 of Part I. For USTs installed on or after July 1, 2004, references to the "July 1, 2003" date in Part I should be substituted with "July 1, 2004." The H &S Code citations relevant to USTs installed on or after July 1, 2003 and July 1, 2004 are provided in the table below. Note that Questions 9 and 10 of Part I do not apply to USTs installed on or after July 1, 2004. Question Number H&S Code Citation for USTs Installed On or After July 1, 2003 and Prior to July 1, 2004 Part I H&S Code Citation for USTs Installed On or After July 1, 2004 Part II 1 H &S Code §25290.2(a) H &S Code 25290.1 a 2 3 H &S Code §25290.2(c)(3) H &S Code 25290.1 (c)(3) 4 H &S Code §25290.20) H &S Code 25290.1 k 5 H &S Code §25290.2(i) H &S Code 25290.1 k 6 H &S Code §25290.2(i) H &S Code §25290.10) 7 H &S Code 25290.2 H &S Code 25290.1 8 H &S Code 25290.2 H &S Code 25290.1 A. In accordance with H&S Code, Section 25290.1(e), which components of USTs installed on or after July 1, 2004 must be continuously monitored using vacuum, pressure, or interstitial liquid level measurement methods? The interstitial space of the tank and product piping (including fill, vent, and vapor recovery piping), that are beneath the surface of the ground must be maintained under constant vacuum or pressure. Statute also requires that a breach in the primary or secondary containment be detected before the liquid or vapor of the stored substance is released to the environment. Continuous vacuum, pressure, or interstitial liquid level measurement methods can be used to satisfy these California Environmental Protection Agency 0 Recycled Paper LG 162 -2 requirements. As with all leak detection equipment used to monitor the UST system, these methods must be third -party certified and should be listed in Local Guidance (LG) Letter 113. LG 113 can be found on our website at: http: / /www.waterboards.ca.gov /ust/leak prevention /Ig113 /index.html It is important to note that regulated piping begins where piping exits /enters the tank and continues to the point where piping extends above the surface of the ground (e.g., at a shear valve). Statute does not provide an exemption for single - walled piping transitions contained in sumps, or single - walled piping transitions in UDCs, or fill piping contained in sumps. The following options may be used to satisfy the requirements for single - walled piping transitions contained in sumps; single - walled piping transitions contained in UDCs; and fill piping contained in sumps: L The entire piping length, including piping within sumps or UDCs, must be double - walled and continuously monitored using vacuum, pressure, or interstitial liquid level measurement methods; or ii. The interstitial space between the primary (i.e., single - walled transition pipe or fill piping) and secondary containment (i.e., sump, UDC) must be continuously monitored using vacuum or pressure. (Note: Interstitial liquid level measurement would not be appropriate for this option.); or M. The single - walled transition pipe or fill piping must be contained within a double - walled sump and /or double - walled UDC that either: (1) extends to the surface or (2) has a double - walled product tight lid that is continuously monitored using vacuum, pressure, or interstitial liquid level measurement methods. The secondary containment (of the sump or UDC, including penetration fittings) must be continuously monitored using vacuum, pressure, or interstitial liquid level measurement methods. Pursuant to Section 2637(a)(6) of Title 23, CCR, portions of the?UST system which are continuously monitored using vacuum, pressure, or interstitial liquid level measurement methods are exempt from periodic secondary containment testing. Therefore, periodic secondary containment testing is not required for secondary containment of tank and piping that are continuously monitored using vacuum, pressure, or interstitial liquid level measurement methods. Please note that annual certification of the leak detection equipment is still required. B. What components of USTs installed on or after July 1, 2004 are required to be monitored in accordance with H &S Code, Section 25290.1(d)? Section 25290.1 requires that the "underground storage tank system" be designed and constructed with a continuous monitoring system. Tank and product piping monitored using constant vacuum, pressure, or interstitial liquid level measurement methods satisfy this requirement through Section 25290.1(e). However, other parts of the UST system not subject to Section 25290.1(e) must California Environmental Protection Agency Recycled Paper LG 162 -2 7- satisfy the monitoring requirement in Section 25290.1(d). These components include, but are not limited to, riser piping and access points on top of the tank, which provide access to the primary containment of the tank and may be in contact with vapors of the stored product. The requirement for sumps and UDCs to have sensors is as follows. Sumps and UDCs installed and monitored in accordance with paragraph A.i, above, must have sensors that are capable of detecting liquid and vapor releases from the primary containment. No sensors are required for sumps and UDCs installed and monitored in accordance with paragraph A.ii, above. Sumps and UDCs installed and monitored in accordance with paragraph A.iii, above, are only required to have sensors that are capable of detecting liquid releases. C. For UST components monitored continuously using vacuum, pressure, or interstitial liquid level measurement methods, is additional testing or evaluation necessary? If the component's current listing includes approval for its use with continuous monitoring using vacuum, pressure, or interstitial liquid level measurement methods, no further testing or evaluation is necessary. However, if the component's current listing does not include approval of its use with continuous monitoring using vacuum, pressure, or interstitial liquid level measurements, additional testing or evaluation may be necessary. Owners and operators should ensure that UST components are approved for use with a continuous monitoring system using pressure, vacuum, or interstitial liquid level measurement methods consistent with the requirements outlined in Sections 2631 (b) and (d), Title 23, CCR, as applicable. D. For USTs installed on or after July 1, 2004, is the annual line tightness test on pressurized piping required? No. For USTs installed on or after July 1, 2004, an annual line tightness test on the primary piping is not required. If you have questions regarding this document, please contact the UST Program at 916) 341 -5775 or via e-mail at ustawaterboards.ca.gov. Sincerely, Original signed by Kevin Graves, P.E., Manager Underground Storage Tank Program California Environmental Protection Agency Recycled Paper A. df VA WN jo is lJ u 44 lop, Awl a W, CORRECTION NOTICE BAKERSFIELD FIRE DEPARTMENT 2453 PREVENTION SERVICES DIVISION 2101 H STREET 661) 326 -3979 Location: lit/ f Oa/,es 12i C14 9-?-?13 ZYo are hereby required to take the following action at the above location: "r CORRECT & CALL FOR REINSPECTIO.N CORRECT & PROCEED t1EA17' L INC. ZA >N s- -,1i0.v IS ivaT a Ceo.e,5?1, k JQGlJ;ScG I2i 5 Gi2T /W67T(/`iS fo c 25L9o• J Completion Date for Corrections: Received by: Inspector: Desk Phone: Initial E Date: to from 8:00am to 8:30am) KBF -9229 4 L Completion Date for Corrections: Received by: Inspector: Desk Phone: Initial E Date: to from 8:00am to 8:30am) KBF -9229 CORRECTION NOTICE BAKERSFIELD FIRE DEPARTMENT 2453 ! i PREVENTION SERVICES DIVISION 2101 H STREET 661) 326 -3979 Location: l bD irt/r v x'14 933 1 3 f R Yo are hereby required to take the following action at the above location: CORRECT & CALL FOR REINSPECTION D CORRECT & PROCEED l VENT L r C- 7, 7A/ V; O/V / S Al6T COre,-- acv I JCCI -1 >4 s, IPcv.'SGG / ?w5 '%rG 2T /+- ET(j`r- Cn z 290• % Y n Completion Date for Corrections: Received by: / Inspector: Initial ,U% Date: Desk Phone from 8:00am to 8:30am) KBF -9229