Loading...
HomeMy WebLinkAbout13004 STOCKDALE HWY (6)SWRCB, January 2002 Page I of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriatepages ofthis form to report resultsfor all components tested. The completedform, written test procedures, and printoutsfrom tests (tfapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: CHEVRON Date of Testing: 45 -12 Facility Address: 13004 STOCKDALE HWY, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified ofTesting: Name ofLocal Agency Inspector (rfpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Pass Technician Conducting Test: RYAN MASON Not Tested Credcndals: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61/1340 A HAZ License Number: 809850 Manufacturer Manufacturer Training Component(s) Date Trainin , Expires INCON TS -STS 10 -5 -13 11 i i 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made DIESEL SEC. PIPE X 11 i i UDC 1 -2 X C:I UDC 9 -10 X Ll 1.1 L E U CI l L Li r1 n n CI 11 rl n CI LI I r 1-i o r -I r 1 1-1 I Ll n i:j r:1 L I 1 Ll i_1 I 111 f 1. If hydrostatic testing was performed, describe what was done with the water after completion oftests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacis stated in this document are accurate and in full compliance with legal requirentents Technician's SiOnature: Date: ____ SWRCB, January 2002 5. SECONDARY PIPE TESTING k Z.s ' v Page Z of 3 Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer Other (Specify) Test Method Used: X Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: Equipment Resolution: Piping Run # DSL Piping Material: PLASTIC Piping Run # Piping Run # Oo Piping Run # Test Result: Piping Manufacturer: TCI 0 Pass Fail Pass Fail Piping Diameter: 2" Length of Piping Run: 200' Product Stored: DIESEL Method and location of piping-run isolation: TEST BOOT IN DSL STP Wait time between applying pressure/vacuum/water and starting test: 60MIN Test Start Time: 1:00 Initial Reading (RJ: 5PSI Test End Time: 2 :00 Final Reading (RF): 5PSI Test Duration: 60MIN Change in Reading (Rf Rl): 0 Pass/Fail Threshold or Criteria: 0 Test Result: X Pass Fail Pass Fail 0 Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailedtests) SWRCB. January 2002 7. UNDER- DISPENSER CONTAINMENT (UDQ TESTING TDy N k Page _ 3 _ of ,3 Pest Method Developed By: D UDC Manufacturer D Industry Standard Ll Professional Engineer Other (Specify) Test Method Used: Pressure 1:1 Vacuum n Hydrostatic D Other (Specify) Test Equipment Used: Equipment Resolution: UDC #1 -2 UDC 9-10 UDC# UDC# UDC Manufacturer: TCI TCI L)DC Material: PLASTIC PLASTIC UDC Depth: 24" 40" Hei-lit from UDC Bottom to Top 14" 14" Of Highest Piping Penetration: Height from UDC Bottom to 6" 6" Lowest Electrical Penetration: Condition of UDC prior to CLEAN CLEAN testing: Portion of UDC Tested 16" 16" Does turbine shut down when UDC sensor detects liquid (both X Yes No D NA X Yes n No DNA D Yes 1.7 No I-I NA f) Yes ['No !. NA and water) ?* product Turbine shutdown response time N/A N/A Is system programmed for fail - X Yes L] No NA X Yes 11 No 0 NA Yes DNo l] NA I_l Yes f ! No ;I NA safe shutdown ?* Was fail -safe verified to be X Yes No DNA X Yes D No DNA D Yes L l No NA C1 Yes No i ! NA operational?* 1 Wait time between applying pressure /vacuum /water and 30MIN 30MIN 30MIN 30MIN starting lest Test Start Time: 3:54PM 4: l 1 PM 7:11 PM 7:26PM Initial Reading (R,): 3.7441N 3.7451N 5.9541N 5.954IN Test End Time: 4:09PM 4:26PM 7:26PM 7:41 PM final Reading (RI-): 3.7441N 3.7451N 5.954IN 5.5941N Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RI.R,): OOOIN OOOIN 000IN 0001N Pass /Fail Threshold or Criteria: 0021N 0021N 0021N I .0021N 0021N 0021N OQ21N 0021N Test Result: X Pass Fail X Pass Fail D Pass Fail Pass Fail Was sensor removed for testing? X Yes No DNA X Yes No i'I NA D Yes No DNA I l Yes 1 No NA Was sensor properly replaced and verified functional after testing? X Yes 17J No DNA X Yes No U NA Yes No [I NA L i Yes I iNo :NA Comments — (include information on repairs made prior to testing, andrecommended fbllow -up for.failed t(,-sts) If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) uR7R:l -2 4IK Es7 K kD 3: ja rp. 04/a3i2011INLEVEL3.7446 ND DATk 4:09 pm YU cVt y4/03/20;2 3.7447 int-EAK TH ES_HSLD 6.002 1r: ES, RESU L I PASSED QDCl -2 TEc- STARTED 4:_1 ?n• EST KjV M 04ie3/2012 BEGIN LEVEL 3.7451 :r ND TIME 4:26 A4 END DATE 0a 03 20ai ND LEUFL 3.7452 Ery rEflK THP- "%lQLD 0.002 -,,N TEST RESU -T PASSEL) Lklt v-% 26 N„ gl!Ma '_` AK T .ST R EaORT UDC9-1 6 T'aT S7MRTED 7:1 P, TEST STARTED 04/05/201HH- T EL 5.9534 PC END TIME 7:26 1 1.40 DATE 5 9542 I END LEUELOAKT}{RESHO D TEST RESULT BUMP _EAK TEST REPORT UDC9 -10 S' cTARTED TEST STARTED 26 PTT, 04/05/20" 6EGIN • EUEL 5.5-55447;41 P.`: END TIME ND DATE 95518. I END LEUELrLEAKTHREaHOLD PAbS TEST RESULT