Loading...
HomeMy WebLinkAbout1415 TRUXTUN AVENUE (6)0 0 I x SWRCB, January 2002 Page 1 ofL. Secondary Containment Testing Report Form Thisform is intendedfor use by contractorsperforming periodic testing ofUSTsecondary containment systems. Use the appropriatepages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), shouldbe providedto thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: pate ofTestin Facility Address: / 5Q5, dye- Facility Contact: Phone: Date Local Agency Was Notified of Testing: Name of Local Aaencv Insnector tilnresent during testintyk 2. TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: 4CSLB Licensed Contractor U SWRCB Licensed Tank Tester License Type: G a 3 License Number. e Manufacturer Training Manufacturer Component(s) Date Training_ Expires 3. SUMMARY OF TEST RFS1J1.TS Component Pass Fail Not Tested Repairs Made Component pis Fail Not Tested Repairs Made u u. u U U u C 4— «s m U u u u u u i .5 ty U U u 2- U U U u U u U U U 0- S t. U U U J4 U U U s & 04 u u u d u U u 04 u u U U u u a tt s U U U U U U U U U U U U U u U U u u u U U c KI U U U U U u u U U u U U U u If hydrostatic testing was performed, describe what was done with the water after completion oftests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated in this document are accurate and In fug compliance with legalrequirements Technician's Signature: Date: /1L— 5;—,n% C SWRCB, January 2002 i Test Method Developed By: 9 Page 4. TANK ANNULAR TESTING U Tank Manufacturer ' .Industry Standard U Professional Engineer U other (Specify) I 2 ofLc Test Method Used: U Pressure U Vacuum U Other (Spec' ) J Hydrostatic Test Equipment Used: Is Tank Exempt From Testing ? Tank # Tank # U Yes U No U Yes U No Equipment Resolution: Tank # Tank # U Yes U No U Yes U No Tank Capacity: Tank Material: Tank Manufacturer. Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (111): iTest End Time: Final Reading (RP): Test Duration: Change in Reading (RF-RO: Pass/Fail Threshold or Criteria: G t: U Pass U.Fall' U. Pm. U wl U Pass U ball !1 P;.Ma p t Was sensor removed for testing? U Yes U No U NA UYes U No U NA U Yes U No U NA U Yes UNo U NA Was sensor properly replaced and verified functional after testing? U Yes U No U NA U Yes U No U NA U Yes U No U NA U Yes U No U NA Comments — include in onwdon on (' f repairs made prior to lesfittg, and recommendedfollow -upforjaded lesaj I Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. (California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 Test Method Developed By: f Test Method Used: I Test Equipment Used Q,, U Piping Manufacturer Kjndustry Standard U Other (Specify) Kpressurc U Vacuum U Other (Spedfv) Piping Page S oKG U Professional Engineer U Hydrostatic Resolution: 7 Pining un aka_ Piping Material: r Piping Manufacturer. Piping Diameter: 2 '• 2" Length of Piping Run: ` r Product Stored: NLe \I Method and location of i in -run isolation: Wait time between applying pres=Wvacuurn/water and starting test: Test Start Time: rqjQ A,, 'fQ 14 Initial Reading (Rr): r Test End Time: Final Reading (RF): Test Duration: 64 1 Ale Igg Change in Reading (RF -Rr): 0- Pass/Fail Threshold or Criteria 2 Test Result:. Bess Lhiran i6a U Fart Pass U11*WL x Pass U »atl Comments — (indude informadon on repairs made prior to testing, andrecommendedfollow-up forfailedtests) Page '-( . of Test Method Developed By. U Piping Manufacturer )(Industry Standard U Professional Engineer U Other (Specs%' p) Test Method Used: KPressme U Vacuum U Hydrostatic U Other ) Test Equipment Used Piping Material Pipin an *s Pipin an a Resolution: Pipin Piping Og PipPiping Manufacturer: r Piping Diameter y t f c Length ofPiping Run Product Stored Method and location of i i isolation Wait time between applying pressure/vacuum/water and starting test f la IhfA Test Start Time 1924W f f Initial Reading (RI). Teat End Timm: z , f z , Final Reading (Rp): lyll Test Dumflon: Change in Reading (RP -RO: Pass/Fail Threshold or Criteria: hest Resgl 9 : i6= U IM YL, i s U FkU Pass :Ei± Comments -- (Include IirJormaor" on repairs mode priorto fisting: andreoammertdedfollm+ uPlorlailedtests) Test Method Developed By: UPiping Manufacturer }Q Industry Standard U Professional Engineer U Other ) Test Method Used p(Pressure UVacuum U Hydrostatic U Other ('Specify) Test Equipment Used 4t, Piping . IGIS 07AIg Piping Yn # r 7a Piping Material: (( Equipment Resolution: tug AW Wp Piping ue # rT it r Q Piping Manufacturer:- rn j r Piping Diaameta- Length ofPiping stun: Product Stored: Method and location of in run isolation: Wait time between applying pressure/vacuum/water and starting test: I'M 14 Test Stmt Time: UAA Initial Reading (R&. Test End Time: Final Reading (RO: Test Duration: RL INK Change in (Rf-R1): Pass/Fail T bmshold or Criteria: 2 OXI est$esel. U Ball IL! s U Fa11 Pass Lt $fail Pax , U Fail Comments — lwrdude hfformatlon on r,epatrs madepriorto te&Ing, andn!EM ended: follow-erpforjailed testa) 6. PIPING SUMP TESTING Test Method Developed By: U Sump Manufacturer Pndustry Standard U Professional Engineer U Other (Specify) Test Method Used: — — Test Equipment Used co '`S Page of ( Pressure Ot:.cr 15 U Vacuum Hydrostatic Equipment Resolution: 2 Sump # 't Sump # 3 ' Sump # Sump # rSumpMatcrial: " 77 S I Is system programmed for fail -safe shutdown?* Yes U No U NA14yes r Yes U No U NA Height from Tank Top to Top of Hi st Piping-Penetration: l " " U No U NA Height from Tank Top to Lowest Electrical Penetration Yes U No U NA Condition of sump prior to testing: 4 41 i Portion of Sump Tested' o Does turbine shut down when sump sensor detects liquid (both nroduct and water) ?* Xyes U No U NA X1'es U No U NA WYes U No U NA XYes U No U NA Turbine shutdown response time S 3 Lrc- Is system programmed for fail -safe shutdown?* Yes U No U NA14yes Yes UNo U NA Yes U No U NA is U No U NA Was fail -safe verified to be operational?* U No U NA Yes U No U NA lS,j'es UNo U NA Yes U No U NA Wait time between applying pressure/vacuum/water and starting test: Test Start Time: 4 41 Z z, Initial Reading (Rj): o Test End Time: go f Final Reading (RF): 9 Test Duration: 3 Change in Reading (RF -RO: t 11, 1242 i Pass/Fail Threshold or Criteria: Test Result: 1k, Pass, U Roil1. i.1*utw upoll R`aa E l' Iteil j Ps aa U Fall Was sensor removed for testing? g Yes U No U NA Yes U No U NA b(Yes , U No U NA Yes U No U NA Was sensor properly replaced and verified functional after testing? Yes U No U NA I.Yes UNo U NA gJ1Yes UNo U NA 49 Yes U No U NA Comments — (include information on repairs made prior to testinz, and recommended follow -up for fartedtests) Ifthe entire depth of the sump is not tested, specify how much was tested. If the answer to gtr y of the questions indicated with an asterisk (') is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 6. PiPYNC CIiMP TFCTtNf_ Page 'I of Test Method Developed By: U Sump Manufacturer )(Industry Standard U Professional Engineer U Other (Sped) Test Method Used: U Pressure U Vacuum )(Hydrostatic U Ot:,er (Spec' ) Test Equipment Used: = TS —.57'S Sump # Jt q Sump # tkiz Sump Diameter: LYE' Equipment Resolution: Sump # Sump # Sump Depth: Sump Material: r4 P Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition ofsump prior to testing: Portion ofSump Tested' oto c° Does turbine shut down when sump sensor detects liquid (both roduct and water)?* p9,Yes U No U NA Yes UNo VNA UYes U No U NA U Yes U No U NA Turbine shutdown response time Is system programmed for fail -safe shutdown ?* KYes U No U NA UYes U No )QNA. U Yes UNo U NA U Yes U No UNA Was fail -safe verified to be KYes U No U NA UYes U No NA U Yes UNo U NA U Yes U No UNA operational?' Wait time between applying pressure/vacuum/water and starting test: 10 1104 6 A14 Test Start Time: Initial Reading (Ri): U Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-Rj: Pass/Fail Threshold or Criteria: T st:Resultc: Pass U Evil .` Psis -., W Fall, U'.:F!as9 :. U`Irall U Pasa U Fail.:, Was sensor removed for testing? Yes U No U NA A,Yes U No U NA U Yes U No U NA UYes UNo U NA Was sensor properly replaced and verified ftinctional after testin ? 9,Yes U No U NA Ryes UNo U NA U Yes U No UNA U Yes U No U NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) l v,st tr,n S;j *,-5- 11 aay ",j4 UU S - Ans n. S4M_ 4 aA d- , #$at s:1azj talc _ t Ifthe entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an asterisk (') is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG =160) Test Method Developed By: e e t- DISPENSER CONT U UDC Manufacturer U Other (Specify) Page 9 OfP U Industry Standard U Professional Engineer Test Method Used: U Pressure U Vacuum U Other (Specg.) U Hydrostatic Test Equipment Used: UDC # UDC # Equipment Resolution: UDC # UDC # UDC Manufacturer. UDC Material: UDC Depth: Height from UDC Bottom to Top ofHighest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested Does turbine shut down whenf. UDC sensor detects liquid (both U Yes U No U NA U Yes U No UNA prod and water)?* U Yes U No U NA UYes U No U NA Turbine shutdown response time is system programmed for fail- U Yes U No U NA safe shutdown ?. U Yes U No U NA UYes U No U NA U Yes U No U NA Was fail -safe verified to be U Yes U No U NA operational ?' U Yes U No U NA i UYes UNo U NA UYes U No U NA Wait time between applying presswe/vacuum/water and starting test Test Start Time: Initial Reading Ri : Test End Time: Final ReadingRF Test Duration: Change in Reading Pass/Fail Threshold or Criteria: I Test Result; U ft t1' U Paas U Fars: U Iil U Van Up* Was sensor removed for testing? U Yes U No U NA U Yes U No U NA U Yes UNo U NA U Yes UNo U NA Was sensor properly replaced and U Yes U No U NA U Yes U No U NAverifiedfunctionalaftertesting? U Yes U No U NA U Yes U No UNA Comments — (include information on repairs made prior to testing, and recommendedfollow- upforjalledtests) i I egrl 04 6A ' t yAC's Ifthe entire depth ofthe UDC is not tested, specify how much was tested. If the answer to rM of the questions indicated with an asterisk M is "NO" or "NA ", the entire UDC must be tested (See SWRCB LG -160) i iI` SWRCB, January 2002 Page ofo S. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested U Test Method Developed By. U Sump Manufacturer U Industry Standard U Professional Engineer U Other (Specify) Test Method Used: U Pressure U Vacuum U Hydrostatic Specify) U Other ' Test Equipment Used: Equipment Resolution: FM Sump# Fill Sum # Fill Sump # Fill Sump # Sivnn Diameter um D the eight from Tank Top to Top of i est Pi in Penetration: Electrical eight from Tank Top to Lowest Penetration- Condition of sump prior to testing: Portionof Sump Tested Sump Material: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Readin Test End Time: Final Read' Rf : Test Duration: Change in Reading Pass/Fail Threshold or Criteria: Test Result: U. s. U. __ - U go" U.Ba t U Lisa U Fall U .. Li F-01 Is there a sensor in the sump? U Yes U No U Yes U No U Yes U No U Yes U No Does the sensor alarm when either product or water is detected? U Yes U No U NA U Yes U No U NA UYes U No U NA U Yes UNo U NA Was sensor removed for testing? U Yes U No U NA U Yes UNo U NA U Yes U No U NA U Yes U No U NA Was sensor properly replaced and verified functional after testing? U Yes U No U NA UYes U No U NA U Yes U No U NA U Yes U No U NA Comments —(include information on repairs made prior to testing, and recommendedfo!!ow -upforfailedtests) SWRCB, January 2002 9. SPILLOVERFILL CONTA Facili is Not Equipped With Spill/Overfill Containment Boxes U i S i1VOverfill Containment Boxes are Present, but were Not Tested U Test Method Developed By- U Spill Bucket Manufacturer j U Other (Spec) Test Method Used: U Pressure U Other (S ec)s ) Test Equipment Used f U Vacuum l Sp Ill Box # Sp Ill Box # Bucket Diameter: •+ Bucket Depth: +` Wait time between applying Page ( 0 ofit Standard U Professional Engineer KHydrostatic quipment Resolution: SvIli Box # spW Box # starting test: Test Start Time: Initial Reading (R,): Test End Time: 9; Final Reading (RF): 8 Test Duration: Change in Reading (RF-RJ: Pass/Fail Threshold or Criteria: Y dgf'$esulle Pass U hail U R*ss U hall U Pass U Frail U 'mss U b'ai1 Comments — (Oclude information on repairs made prior to testing, and recommendedfollow- upforfailed tests)