Loading...
HomeMy WebLinkAboutSB-989 2008Page / of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performingperiodic testing of USTsecondary containment systems. Use the appropriatepages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATMN 2. TF.gTYNG C ONTRAC'TC)R YNFORN4ATFnN Company Name. Facility Name: (41 Date of Testing: _ Technician Conducting Test: Facility Address: Credentials: Q'CSLB Licensed Contractor Facility Contact: 4, Ci Phone: License Number. Manufactyrer Trainine Component(s) Date Training Expires Date Local Agency Was Notified of Testing: Name ofLocal Agency Inspector (fpresent during testing): 2. TF.gTYNG C ONTRAC'TC)R YNFORN4ATFnN Company Name. Technician Conducting Test: Credentials: Q'CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type: WWWONAM Manufacturer License Number. Manufactyrer Trainine Component(s) Date Training Expires 3. SUMMARY OF TEST RF.WT.TS If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts st I in this document are accurate and in full compliance witlt legal requirements Technician's Signature: Date: /Z 2 %— 02 a Component 070 t70 J 1 aino or r.o oor o nc r.. nor o r.noo ana o r r. o ninaoo onoo n000 o000 If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts st I in this document are accurate and in full compliance witlt legal requirements Technician's Signature: Date: /Z 2 %— 02 a 4. TANK ANNULAR TR.RTtN(: Page —Z— of Test Method Developed By: 0 Tank Manufacturer ndustry Standard Professional Engineer Other (Specie) Test Method Used: Pressure 2"Vacuum 0 Hydrostatic Other (Specie) Test Equipment Used: Equipment Resolution: Tank # g1,2 L Tank # Tank # Tank # Is Tank Exempt From Testing ?' 0 Yes &<O Yes No 0 Yes No 0 Yes 0 No Tank Capacity: Tank Material: rzte Tank Manufacturer: v Product Stored: Wait time between applying pressure/vacuum/water and starting test Test Start Time: q Initial Reading (Rj): Test End Time: IQ 40 Final Reading (RP); Test Duration: Change in Reading (RF -EQ: Pass/Fail Threshold or Criteria: esr tesulk:; PTass 0 Fail'. Pttiss: Q-Ti l 0 Pass D Bail Pass Fall Was sensor removed for testing? des 0 No NA Yes No DNA, Yes No 0NA 0 Yes 0No NA Was sensor properly replaced and verified functional after testing? es No 0 NA 0 Yes No 0 NA 0Yes No NA Yes 0 No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. (California Code ofRegulations, Title 23, Section 2637(a)(V SWRCB, January 2002 S_ CvroNT)Anv PTPF TR_CTINr' Page ? of 7 Test Method Developed By: 0 Piping Manufacturer &ndustry Standard 0 Professional Engineer 0 Other (Spec) Test Method Used: Erfrr-essure 0 Vacuum 0 Hydrostatic 0 Other (Spec) Test Equipment Used: ,'y co, Agsigg, Equipment Resolution: Piping Run # Piping Run # Piping Run # Piping Run # Piping Material: ra Piping Manufacturer: Piping Diameter: Length of Piping Run: Product Stored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum /water and starting test: Test Start Time: Initial Reading (RI): Test End Time; Final Reading (RF): Test Duration: Change in Reading (RF -ice: Pass/Fail Threshold or Criteria: p, z Tes ResultV ss O T+aii R °Pass Fall,. G Pass ftfl 0 Pass O Rail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Test Method Developed By: 0 Sump Manufacturer ndustry Standard 0 Professional Engineer 0 Other (Spec) Test Method Used: 0 Pressure 0 Vacuum RA ydrostatic 0 Other (Specie) Test Equipment Used: s Equipment Resolution: Sump # Sump # Sump # Sump # Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion ofSump Tested' Does turbine shut down when sump sensor detects liquid (both induct and water)? . O'Yes 0 No DNA D Yes No DNA 0 Yes No DNA 0 Yes No 0 NA Turbine shutdown response time 1 S Is system programmed for fail -safe shutdown ?* 917'e-s No 0 NA D Yes D No DNA 0 Yes []No DNA D Yes No 0 NA Was fail -safe verified to be o erationalf 0,1e-s 0 No 0 NA 0 Yes DNo DNA Yes No DNA 0 Yes 0 No 0 NA Wait time between applying pressure /vacuum/water and starting test: Test Start Time: Initial Reading (Ri): Test End Time: Final Reading (RF): q Test Duration: Change in Reading (RF -R{): Pass/Fail Threshold or Criteria: Test.Results: Pass Faal, .. D Pass %'ail TZ. Piss:. O D Pass: D Fail Was sensor removed for testing? eTes 0 No NA 0 Yes 0No 0 NA 0 Yes 0 No NA 0 Yes 0 No 0NA Was sensor properly replaced and verified functional after tesdn ? pes D No 0 NA 0 Yes 0No 0 NA 0 Yes D No NA 0 Yes 0 No 0 NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upfbrfailed tests) r. t If the entire depth of the sump is not tested, specify how much was tested. If the answer to _My of the questions indicated with`an asterisk ( *) is "NO" or `NA ", the entire sump must be tested. (See SWRCB LG -160) I • J I SWRCB, January 2002 7. iTN F.R_17TfiPF.NCFR rnNTe rnrna nrr rrrnr, -r errivr_ Page - ofd Test Method Developed By: UDC Manufacturer &Wdustry Standard 0 Professional Engineer 0 Other (Spec) Test Method Used: Pressure 0 Vacuum drostatic 0 Other (Spect&) Test Equipment Used: 7-5—s Equipment Resolution: UDC # UDC # _ UDC # UDC # UDC Manufacturer. UDC Material: UDC Depth: 26 " Height from UDC Bottom to Top ofHighest Piping Penetration: 9' Height from UDC Bottom to Lowest Electrical Penetration: Et-& 'r-s C n ss Condition of UDC prior to testing: Portion ofUDC Tested Does turbine shut down when UDC sensor detects liquid (both induct and water)?* No .NA No NA 0 Yes D No 0 NA Dyes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown ?* s 0 No C NA Yes 0 No 0NA Yes D No 0 NA Yes No NA Was fail -safe verified to be operational?* D No 0 NA 0 No DNA 0 Yes 0No NA 11 Yes 0 No NA Wait time between applying pressure/vacuum/water and startin test Test Start Time: Initial Reading Test End Time: Final Reading F : Test Duration: Change in Reading Ri Pass/Fail Threshold or Criteria: est;Resulf: mss ;Fitil :..:.: L9`as O:Tall Or Pass:. r:T+AII ,: f7'ss: [J;Fail Was. sensor removed for testing? LOYes 0 No 0 NA P-Ye -s 0No 0 NA Yes D No 0 NA 0 Yes No D NA Nas sensor properly replaced and verified, functional after testin ? es No Q NA 0 No 0 NA 11 Yes No NA 0 Yes No 0 NAr}' QrY Comments - (include information on repairs made prior to testing, and recommendedfollow -upforjailed tests) If the entire depth ofthe UDC is not tested, specify how much was tested Ifthe answer to My ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire. UDC must be tested. (See SWRCB LG -160) Facility is Not Equipped With Fill Riser Containment Sums 81, Fill Riser Containment Sumps are Present, but were Not Tested 0 Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer 0 Other (Spec) Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic Other (Spec) Test Equipment Used: Equipment Resolution: Fill Sump Fill Sum # Fill Sump # Fill Sump # Sump Diameter: Sump Depth: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial ReadingR Test End Time: Final Reading RF ): Test Duration: Change in Reading R Rt : Pass/Fail Threshold or Criteria: Test Result: 0 Pass O Fail Pass Fail Pass Faih D Pass Fail Is there a sensor in the sump? Yes 0 No 0 Yes 0 No 0 Yes 0 No Yes 0 No Does the sensor alarm when either product or water is detected? D Yes 0 No 0 NA Yes No NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA Was sensor removed for testing? Yes 0 No DNA D Yes No NA 0Yes 0 No 0NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes D No DNA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: 0 Spill Bucket Manufacturer &Hndustry Standard Professional Engineer Other (Spec) Test Method Used: 0 Pressure Vacuum oHly—drostatic Other (Specify) Test Equipment Used: e., m pTs Equipment Resolution: 2j Spill Box # $ 7 Spin Box # Spill Box # Spill Box # Bucket Diameter: Z " Bucket Depth: Wait time between applying pressure /vacuum/water and starting test: Test Start Time: 91 ff9 Initial Reading (111): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: less 0 Fall Pass Fail 0 Pass 1±a1G Pass 0 Fair Comments — (include information on repairs madeprior to testing, and recommendedfollow upforfailedtests) Permit to Operate To Be Posted Hazardous Material/ Hazardous Waste Unified Permit CONDITIONS OF PERMIT ON REVERSE SIDE PERMIT ID #015 - 021- 002768 This permit is issued for the following: BAKERSFIELD POLICE DEPARTMENT 1601 TRUXTUN AVENUE BAKERSFIELD CA 93301 Hazardous Materials Plan Hazardous Waste Generator and /or Treatment Underground Storage of Hazardous Materials TANK HAZARDOUS CAPACITY UNITS YEAR TANK TYPE TANK MATERIAL TANK MONITOR PIPING METHOD PIPING MONITOR SUBSTANCE INSTALLED 0001 REGULAR 15000 GAL 1995 DOUBLE FIBERGLASS INTERSTITIAL PRESSURE AUTOMATIC LEAK ALL MONITORING DETECTION Issued by: B E R S F I D FIRE ARIA/ r Bakersfield Fire Department PREVENTION SERVICES DIVISION 2101 H Street Bakersfield, CA 93301 Phone 661- 326 -3979 FAX 661 - 852 -2171 Approved by: Howard H. Wines, III, Director Prevention Services Division Issue Date: July 1, 2009 Expiration Date: June 30, 2012