Test Date: 06/14/2011
Order Number: 3184338
Dear Regulator,
P ?55
Date Printed and Mailed: 06/23/2011
Enclosed are the results of recent testing performed at the following facility:
PEPSI COLA #3040
215 EAST 21 ST STREET
BAKERSFIELD, CA. 93305
Testing performed:
Leak detector tests
Line tests
Monitor Certification
Secondary Containment -Spill Container
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
II. ianro*obgy
PURPOSE: COMPLIANCE
TEST DATE: 06/14/11
CLIENT: PEPSI COLA
NEW BERN TRANS - PBG
6261 CABALLERO BLVD.
BUENA PARK, CA 90620
BELEN LEWIS
714)522 -9739
TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
TEST RESULT SUMMARY REPORT
WORK ORDER NUMBER: 3184338
CUSTOMER PO:
SITE: PEPSI COLA #3040
215 EAST 21ST STREET
BAKERSFIELD, CA 93305
CASEY BLAIR
661)201 -6963
TEST TYPE: TLD -1
PrnAnrf Pinn Tinh+nnee Tne4 Rnciil+a
LINE
ID
LINE
PRODUCT
LINE
MATERIAL
DELIVERY
TYPE
TEST RESULT
A B C D
FINAL LEAK RATE (gph)
A B C D
IMPACT
VALVE
FUNCTION
1 DIESEL DW FIBERG PRESSURE P 0.000 Y
FYictinn Linn Laak natartnr TA-qt
LINE
ID
EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR #2
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
1 RED JACKET FX1 -DV 308082873 P
Naw Ranlarmmpnt Linn I_aak nptnrtnr Tact
LINE
ID MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
Por owner aetaile0 report mtormation, visa wWw.tanKnology.com anO select Un -Line Keports -w KAY, or contact your local i anKnoiogy office.
Tester Name: PATRICK M PFRANG
m
Technician Certification Number: 1590
Printed 06/23/2011 07:27 MTUTTLE
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
I Tanknofogy
TEST DATE:06 /14/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3184338
CLIENT:PEPSI COLA AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:PEPSI COLA #3040
Printed 06/23/201107:27
TANK INFORMATION
Tank ID: 1 Tank manifolded: NO Bottom to top fill in inches: 119.0
Product: DIESEL Vent manifolded: NO Bottom to grade in inches:
Capacity in gallons: 15,102 Vapor recovery manifolded: No Fill pipe length in inches:
Diameter in inches: 119.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 317 Overspill protection: YES Stage I vapor recovery: NONE
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: NONE
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: LDT -5000
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: RED JACKET
Ingress Detected: Water Bubble Ullage Model: FK1 -Dv
Test time: S /N: 3080e2e73
Open time in sec: 2.00
Inclinometer reading: Holding psi: 11
VacuTect Test Type: NOT
Resiliency cc: 52 NOT
V2CUT8Ct Probe Entry Point: TESTED
Test leak rate ml /m: 189. o TESTED
Pressure Set Point: Metering psi: 9
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 15.0
Test psi: so
Bleedback cc: 3
Test time (min): 30 NOT NOT NOT
Start time: 08: 41 TESTED TESTED TESTED
End time: 09:41
Final gph: 0.000
Result: PASS
Pump type: PRESSURE
Pump make: RED JACKET
COMMENTS Impact Valves Operational: YES
Printed 06/23/201107:27
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is Installed at the facility, a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: PEPSI COLA #3040
Site Address: 215 EAST 21ST STREET
Facility Contact Person: CASEY BLAIR
Make /Model of Monitoring System:TLS -350
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
City: BAKERSFIELD
Contact Phone No: 201 -6963
Date of Testing /Service: 06/14/2011
Work Order Number: 3184338
CA Zip: 93305
Tank ID: T1- DIESEL Tank ID:
7 In -Tank Gauging Probe. Model: VR MAG In -Tank Gauging Probe. Model:
X Annular Space or Vault Sensor. Model: VR 302 Annular Space or Vault Sensor. Model:
X Piping Sump/Trench Sensor(s). Model: VR 352 Piping Sump/Trench Sensor(s). Model:
Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model:
X Mechanical Line Leak Detector. Model: FXIDV Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
X Tank Overfill /High -Level Sensor. Model: FLAPPER Tank Overflll /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Tank ID: Tank ID:
In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model:
Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model:
Piping Sump/Trench Sensor(s). Model: Piping Sump/Trench Sensor(s). Model:
Fill Sump Sensor(s). Model: 7 Fill Sump Sensor(s). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
Tank Overfill /High -Level Sensor. Model: Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Dispenser : 1 Dispenser ID:
Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s) Model:
XD Shear Valve(s). Shear Valves)
X Dispenser Containment Roat(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
Dispenser ID: Dispenser ID:
Dispenser Containment Sensor(s) Model: Q Dispenser Containment Sensor(s). Model:
F] Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Floats) and Chain(s).
Dispenser lD: Dispenser ID:
Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): X System set -up X Alarm history report
Technician Name (print): PATRICK M PFRANG Signature: _$
Certification No.: A29052 License. No.: 743160 (Class 'A' General Enginering Contractor License)
Testing Company Name:Tanknology Phone No.: (800) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 06/14/2011
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address 215 EAST 21 ST STREET Date of Testing /Service:
D. Results of Testing /Servicing
Software Version Installed: 119.05
Complete the following checklist:
06/14/2011
X Yes 11 No • Is the audible alarm operational?
X Yes No • Is the visual alarm operational?
0 Yes No Were all sensors visually inspected, functionally tested, and confirmed operational?
Yes No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
X Yes No N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
X Yes No N/A
For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive
shut -down? (check all that apply) X Sump/Trench Sensors; Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks and sensor failure /disconnection? X Yes No
Yes No X N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger?
Yes' j No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
X Yes' No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
X Water. If yes, describe causes in Section E, below.
X Yes No ` Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
X Yes No' Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
t [ e] / iZ 7 I C_1 I[ eL'[ i7dri %Zi 7 Zi])r 117 I I 11,i1`
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 215 EAST 21ST STREET
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment is installed.
Date of Testing /Service: 06/14/2011
X Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed if in -tank gauging equipment Is used to perform leak detection monitoring.
Complete the following checklist:
X Yes No' Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
X Yes No Were all tank gauging probes visually inspected for damage and residue buildup?
X Yes No • Was accuracy of system product level readings tested?
Yes No • Was accuracy of system water level readings tested?
F;q Yes F-1 No • Were all probes reinstalled properly?
X Yes No • Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed.
Complete the following checklist:
X Yes 1:1 No • N /A
For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: Q 3 g.p.h 0.1 g.p.h 0.2 g.p.h
X Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements?
X Yes No' Was the testing apparatus properly calibrated?
x Yes No • N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
Yes No' X N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
Yes No' X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Yes No • X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
Yes No • X N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
LJ Yes No' Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
SWRCB, January 2002 Page 1.
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing of USTsecondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and
printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: PEPSI COLA #3040 Date of Testing: 06/14/2011
Facility Address: 215 EAST 21ST STREET , BAKERSFIELD, CA, 93305
Facility Contact: CASEY BLAIR Phone: (661) 201 -6963
Date Local Agency Was Notified of Testing: 05/31/2011
Name of Local Agency Inspector (ifpresent during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY , INC.
Technician Conducting Test: PATRICK M PFRANG
Credentials: CSLB Licensed Contractor x SWRCB Licensed Tank Tester
Spill Box 1 DIE FILL
License Type: VACUTECH/ A/ UT License Number: 051590/743160/5259475
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
OPW FILL BUCKET 09/29/2012
000
3. SUMMARY OF TEST RESULTS
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 06/14/2011
Spill Box 1 DIE FILL
000 00
000 00
0000 0000
0000 0000
0000 0000
0000 0000
0000 0000
0000 0000
0000 0000
0000 0000
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 06/14/2011
SWRCB, January 2006
9. Spill Bucket Testing Report Form
Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: PEPSI COLA #3040 Date of Testing: 06/14/2011
Facility Address: 215 EAST 21ST STREET , BAKERSFIELD, CA, 93305
Facility Contact: CASEY BLAIR Phone: (6 61) 201-6963
Date Local Agency Was Notified ofTesting: 05/31/2011
Name of Local Agency Inspector (if present during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: PATRICK M PFRANG
Credentials): x CSLB Contractor E ICC Service Tech. E SWRCB Tank Tester Other (Spec) VACUTECH/ A/ UT
License Number: 051590/743160/5259475
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: El Hydrostatic Vacuum Other
Test Equipment Used: TAPE MEASURE Equipment Resolution: VISUAL
Identify Spill Bucket(By Tank
Number, Stored Product, etc)
I I DIE FILL 2 3 4
Bucket Installation Type:
X Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Bucket Diameter: 12
Bucket Depth: 13
Wait time between applying
vacuum/water and starting test:
0
Test Start Time (TI ): 0 S : 3 3
Initial Reading (RI ): 5.75
Test End Time (TF ): 09 : 3 3
Final Reading (R F ): 5.75
Test Duration. 1 HOUR
Change in Reading (R F - RI ): 0
Pass/Fail Threshold or
Criteria:
PASS
Test Result: K] Pass Fail Pass Fail Pass Fail Pass Fail
Comments - (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements.
Technician's Signature: Date: 06/14/2011
1
State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements
0p Ta17knology
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE:06 /14/11 WORK ORDER NUMBER3184338
CLIENT:PEPSI COLA SITE:PEPSI COLA #3040
COMMENTS
Conduct MC, Linea, LD, and Spill Bucket Testing. WITNESS Ernie Medina with San Bernardino Fire
will be onsite, confirmed 5/31/11. Left voicemail for Casey on 6/9/11.
MONITOR CERT PASSED. LINE, LD, AND BUCKET TEST PASSED.
PARTS REPLACED
QUANTITY DESCRIPTION
HELIUM PINPOINT TEST RESULTS (IF APPLICABLE)
ITEMS TESTED
HELIUM PINPOINT LEAK TEST RESULTS
Printed 06/23/2011 07:27 MTUTTLE
SITE DIAGRAM
i Tanknokogy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 06/14/11 WORK ORDER NUMBER3184338
CLIENT:PEPSI COLA SITE: PEPSI COLA #3040
DSL
TLS K
F
VENTCOLl0 LO
o
aa)
i coc)
Bravo
m L2 FloatAn d N
a i a) m w
w 12
ESO Y
N fBED
ENTRANCE
Printed 06/23/2011 07:27 MTUTTLE
ATG Information Work Order# 3184338
150301
JUN 14, 2011 10:25 AM
1:108889 PEPSI SITE 9
150302
JUN 14, 2011 10:25 AM
2:215 EAST 21 ST STREET
150303
JUN 14, 2011 10:25 AM
3:BAKERSFIELD,CA 93305
150304
JUN 14, 2011 10:25AM
4:81152324905001
3184338
151700
JUN 14, 2011 10:25 AM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATE/TIME FORMAT
MON DO YYYY HH:MM:SS xM
150F00
JUN 14, 2011 10:25 AM
MON DD YYYY HH:MM:SS xM
110200
JUN 14, 2011 10:25AM
108889 PEPSI SITE 9
215 EAST 21ST STREET
BAKERSFIELD,CA 93305
81152324905001
SYSTEM CONFIGURATION
SLOT BOARD TYPE POWER ON RESET CURRENT
1 4 PROBE / G.T. 162447 162292
2 INTERSTITIAL BD 201209 200781
3 UNUSED 15000000 15000000
4 UNUSED 15000000 15000000
5 UNUSED 15000000 15000000
6 UNUSED 15000000 15000000
7 UNUSED 15000000 15000000
8 UNUSED 15000000 15000000
9 RELAY BOARD 14995 14974
10 MECH DISP INT. 68471 68315
11 UNUSED 15000000 15000000
12 UNUSED 15000000 15000000
13 UNUSED 15000000 15000000
14 UNUSED 15000000 15000000
15 UNUSED 15000000 15000000
16 UNUSED 15000000 15000000
COMM 1 RS232 SERIAL BD 15000000 15015
3184338
ATG•Information Work Order# 3184338
COMM 2 FAXMODEM BOARD 40251 40256
COMM 3 UNUSED 15000000 15000000
COMM 4 UNUSED 15000000 15000000
COMM 5 UNUSED 15000000 15000000
COMM 6 UNUSED 15000000 15000000
0
160100
JUN 14, 2011 10:25 AM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 DIESEL FUEL ON
2 OFF
3 OFF
4 OFF
160200
JUN 14, 2011 10:25 AM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1 DIESEL FUEL
2
3
4
160300
JUN 14, 2011 10:25 AM
TANK PRODUCT CODE
TANK PRODUCT LABEL
1 DIESEL FUEL 1
2 1
3 3
4 4
0
0
160400
JUN 14, 2011 10:25AM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS
1 DIESEL FUEL 15102
2 15102
3 0
4 15102
0
0
160700
JUN 14, 2011 10:25 AM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 DIESELFUEL 119.50
2 119.50
3 0.00
4 119.50
0
0
160900
JUN 14, 2011 10:25 AM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL
1 DIESEL FUEL 0.000450
2 0.000450
3 0.000000
4 0.000450
3184338
ATIG Information Work Order# 3184338
161200
JUN 14, 2011 10:25 AM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL MANIFOLDED TANKS
1 DIESEL FUEL NONE
2 NONE
3 NONE
4 NONE
162100
JUN 14, 2011 10:26 AM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 DIESEL FUEL 1000
2 1000
3 0
4 1000
162200
JUN 14, 2011 10:26 AM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 DIESEL FUEL 14043
2 14347
3 0
4 14347
162300
JUN 14, 2011 10:26 AM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS
1 DIESEL FUEL 13304
2 13591
3 0
4 13591
162400
JUN 14, 2011 10:26 AM
TANK HIGH WATER LEVEL LIMIT
TANK PRODUCT LABEL INCHES
1 DIESEL FUEL 2.0
162800
JUN 14, 2011 10:26 AM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 DIESEL FUEL 15102
2 15102
3 0
4 15102
162900
JUN 14, 2011 10:26 AM
TANK DELIVERY REQUIRED LIMIT
3184338
ATG Inform8tion Work Order# 3184338
TANK PRODUCT LABEL GALLONS
1 DIESEL FUEL 3020
2 0
3 0
4 3020
170300
JUN 14, 2011 10:26 AM
LIQUID TYPE
SENSOR LOCATION TYPE
1 ANNULAR SPACE DUAL FLOAT HYDROSTATIC
2 TURBINE SUMP DUAL FLT. HIGH VAPOR
3 TRI -STATE (SINGLE FLOAT)
4 TRI -STATE (SINGLE FLOAT)
5 TRISTATE (SINGLE FLOAT)
6 TRI -STATE (SINGLE FLOAT)
7 TRI -STATE (SINGLE FLOAT)
8 TRI -STATE (SINGLE FLOAT)
9999FFlB
9999FFlB
9999FFlB
9999FF1B
161500
JUN 14, 2011 10:26 AM
TANK PRODUCT LABEL METER DATA
1 DIESEL FUEL YES
2 NO
3 NO
4 NO
190200
JUN 14, 2011 10:26 AM
SOFTWARE REVISION LEVEL
VERSION 119.05
SOFTWARE# 346119 -100 -F
CREATED - 00.02.25.12.15
S- MODULE# 330160 -105 -A
SYSTEM FEATURES:
PERIODIC IN -TANK TESTS
ANNUAL IN -TANK TESTS
CSLD
BIR
FUEL MANAGER
120600
JUN 14, 2011 10:26 AM
108889 PEPSI SITE 9
215 EAST 21 ST STREET
BAKERSFIELD,CA 93305
81152324905001
TANK ALARM HISTORY
TANK 1 DIESEL FUEL
HIGH WATER ALARM JUN 14, 2011 9:34 AM
JUN 30, 2010 8:36 AM
JUL 17, 2009 9:35 AM
OVERFILL ALARM JUN 14, 2011 9:44 AM
JUN 30, 2010 9:21 AM
JUL 17, 2009 9:27 AM
LOW PRODUCT ALARM JUN 14, 2011 9:30 AM
JUN 30, 2010 8:31 AM
JUL 17, 2009 9:22 AM
3184338
ATGInformbtion Work Order# 3184338
HIGH PRODUCT ALARM JUN 14, 2011 9:46 AM
JUN 30, 2010 9:22 AM
JUL 17, 2009 9:26 AM
INVALID FUEL LEVEL JUN 14, 2011 9:30 AM
JUN 30, 2010 8:32 AM
JUN 30, 2010 8:31 AM
PROBE OUT JUN 14, 2011 9:47 AM
JUN 14, 2011 9:29 AM
JUN 30, 2010 9:22 AM
HIGH WATER WARNING JUN 14, 2011 9:34 AM
JUN 30, 2010 8:36 AM
JUL 17, 2009 9:35 AM
DELIVERY NEEDED JUN 14, 2011 9:29 AM
NOV 18, 2010 3:14 AM
OCT 22, 2010 5:11 AM
MAX PRODUCT ALARM JUN 14, 2011 9:46 AM
JUN 30, 2010 9:22 AM
ACCU_CHART CAL WARN JUL 30, 2001 11:30 AM
RECONWARNING JAN 27, 2003 9:30 AM
JAN 20, 2003 2:30 PM
JAN 13, 2003 2:30 PM
RECON ALARM JAN 27, 2003 1:30 PM
JAN 20, 2003 3:30 PM
JAN 13, 2003 2:30 PM
LOW TEMP WARNING JUL 17, 2009 9:38 AM
AUG 4, 2008 11:47 AM
MAY 19, 2005 1:33 PM
3184338