Loading...
HomeMy WebLinkAbout215 21ST STREET (7)Sf a„bolo9,. 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451 -6334 Fax: (512) 459 -1459 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR - 15e4liFMi59f14 1501 TRUXTUN AVE. BAKERSFIELD, CA. 93301 Test Date: 06/14/2011 Order Number: 3184338 Dear Regulator, P ?55 Date Printed and Mailed: 06/23/2011 Enclosed are the results of recent testing performed at the following facility: PEPSI COLA #3040 215 EAST 21 ST STREET BAKERSFIELD, CA. 93305 Testing performed: Leak detector tests Line tests Monitor Certification Secondary Containment -Spill Container Sincerely, Dawn Kohlmeyer Manager, Field Reporting II. ianro*obgy PURPOSE: COMPLIANCE TEST DATE: 06/14/11 CLIENT: PEPSI COLA NEW BERN TRANS - PBG 6261 CABALLERO BLVD. BUENA PARK, CA 90620 BELEN LEWIS 714)522 -9739 TANKNOLOGY CERTIFICATE OF TESTING 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 TELEPHONE (512) 451 -6334 FAX (512) 459 -1459 TEST RESULT SUMMARY REPORT WORK ORDER NUMBER: 3184338 CUSTOMER PO: SITE: PEPSI COLA #3040 215 EAST 21ST STREET BAKERSFIELD, CA 93305 CASEY BLAIR 661)201 -6963 TEST TYPE: TLD -1 PrnAnrf Pinn Tinh+nnee Tne4 Rnciil+a LINE ID LINE PRODUCT LINE MATERIAL DELIVERY TYPE TEST RESULT A B C D FINAL LEAK RATE (gph) A B C D IMPACT VALVE FUNCTION 1 DIESEL DW FIBERG PRESSURE P 0.000 Y FYictinn Linn Laak natartnr TA-qt LINE ID EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR #2 MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT 1 RED JACKET FX1 -DV 308082873 P Naw Ranlarmmpnt Linn I_aak nptnrtnr Tact LINE ID MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT Por owner aetaile0 report mtormation, visa wWw.tanKnology.com anO select Un -Line Keports -w KAY, or contact your local i anKnoiogy office. Tester Name: PATRICK M PFRANG m Technician Certification Number: 1590 Printed 06/23/2011 07:27 MTUTTLE INDIVIDUAL TANK INFORMATION AND TEST RESULTS I Tanknofogy TEST DATE:06 /14/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3184338 CLIENT:PEPSI COLA AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:PEPSI COLA #3040 Printed 06/23/201107:27 TANK INFORMATION Tank ID: 1 Tank manifolded: NO Bottom to top fill in inches: 119.0 Product: DIESEL Vent manifolded: NO Bottom to grade in inches: Capacity in gallons: 15,102 Vapor recovery manifolded: No Fill pipe length in inches: Diameter in inches: 119.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 Length in inches: 317 Overspill protection: YES Stage I vapor recovery: NONE Material: Dw FIBERG Installed: ATG Stage II vapor recovery: NONE CP installed on: COMMENTS TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: LDT -5000 Start (in) End (in) Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced L.D. #1 L.D. #1 L.D. #2 L.D. #2 Dipped Product Level: Probe Water Level: Make: RED JACKET Ingress Detected: Water Bubble Ullage Model: FK1 -Dv Test time: S /N: 3080e2e73 Open time in sec: 2.00 Inclinometer reading: Holding psi: 11 VacuTect Test Type: NOT Resiliency cc: 52 NOT V2CUT8Ct Probe Entry Point: TESTED Test leak rate ml /m: 189. o TESTED Pressure Set Point: Metering psi: 9 Tank water level in inches: Calib. leak in gph: 3.00 Water table depth in inches: Results: PASS Determined by (method): Result: COMMENTS COMMENTS LINE TEST RESULTS Test type: TLD -1 LINE A B C D Material: Dw FIBERG Diameter (in): 2.0 Length (ft): 15.0 Test psi: so Bleedback cc: 3 Test time (min): 30 NOT NOT NOT Start time: 08: 41 TESTED TESTED TESTED End time: 09:41 Final gph: 0.000 Result: PASS Pump type: PRESSURE Pump make: RED JACKET COMMENTS Impact Valves Operational: YES Printed 06/23/201107:27 MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is Installed at the facility, a separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name: PEPSI COLA #3040 Site Address: 215 EAST 21ST STREET Facility Contact Person: CASEY BLAIR Make /Model of Monitoring System:TLS -350 B. Inventory of Equipment Tested /Certified Check the appropriate boxes to indicate specific equipment inspected /serviced City: BAKERSFIELD Contact Phone No: 201 -6963 Date of Testing /Service: 06/14/2011 Work Order Number: 3184338 CA Zip: 93305 Tank ID: T1- DIESEL Tank ID: 7 In -Tank Gauging Probe. Model: VR MAG In -Tank Gauging Probe. Model: X Annular Space or Vault Sensor. Model: VR 302 Annular Space or Vault Sensor. Model: X Piping Sump/Trench Sensor(s). Model: VR 352 Piping Sump/Trench Sensor(s). Model: Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model: X Mechanical Line Leak Detector. Model: FXIDV Mechanical Line Leak Detector. Model: Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: X Tank Overfill /High -Level Sensor. Model: FLAPPER Tank Overflll /High -Level Sensor. Model: Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2). Tank ID: Tank ID: In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model: Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model: Piping Sump/Trench Sensor(s). Model: Piping Sump/Trench Sensor(s). Model: Fill Sump Sensor(s). Model: 7 Fill Sump Sensor(s). Model: Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model: Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: Tank Overfill /High -Level Sensor. Model: Tank Overfill /High -Level Sensor. Model: Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2). Dispenser : 1 Dispenser ID: Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s) Model: XD Shear Valve(s). Shear Valves) X Dispenser Containment Roat(s) and Chain(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser ID: Dispenser Containment Sensor(s) Model: Q Dispenser Containment Sensor(s). Model: F] Shear Valve(s). Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser Containment Floats) and Chain(s). Dispenser lD: Dispenser ID: Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s). Model: Shear Valve(s). Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s). If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines. Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct. and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the (Check all that apply): X System set -up X Alarm history report Technician Name (print): PATRICK M PFRANG Signature: _$ Certification No.: A29052 License. No.: 743160 (Class 'A' General Enginering Contractor License) Testing Company Name:Tanknology Phone No.: (800) 800 -4633 Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 06/14/2011 Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08 Monitoring System Certification Site Address 215 EAST 21 ST STREET Date of Testing /Service: D. Results of Testing /Servicing Software Version Installed: 119.05 Complete the following checklist: 06/14/2011 X Yes 11 No • Is the audible alarm operational? X Yes No • Is the visual alarm operational? 0 Yes No Were all sensors visually inspected, functionally tested, and confirmed operational? Yes No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? X Yes No N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? X Yes No N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (check all that apply) X Sump/Trench Sensors; Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor failure /disconnection? X Yes No Yes No X N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? Yes' j No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. X Yes' No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product; X Water. If yes, describe causes in Section E, below. X Yes No ` Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable. X Yes No' Is all monitoring equipment operational per manufacturers' specifications? In Section E below, describe how and when these deficiences were or will be corrected. E. Comments: t [ e] / iZ 7 I C_1 I[ eL'[ i7dri %Zi 7 Zi])r 117 I I 11,i1` Page 2 of 3 Based on CA form dated 03/08 Monitoring System Certification Site Address: 215 EAST 21ST STREET F. In -Tank Gauging / SIR Equipment Check this box if no tank gauging or SIR equipment is installed. Date of Testing /Service: 06/14/2011 X Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed if in -tank gauging equipment Is used to perform leak detection monitoring. Complete the following checklist: X Yes No' Has all input wiring been inspected for proper entry and termination, including testing for ground faults? X Yes No Were all tank gauging probes visually inspected for damage and residue buildup? X Yes No • Was accuracy of system product level readings tested? Yes No • Was accuracy of system water level readings tested? F;q Yes F-1 No • Were all probes reinstalled properly? X Yes No • Were all items on the equipment manufacturers' maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed. Complete the following checklist: X Yes 1:1 No • N /A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? Check all that apply) Simulated leak rate: Q 3 g.p.h 0.1 g.p.h 0.2 g.p.h X Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? X Yes No' Was the testing apparatus properly calibrated? x Yes No • N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No' X N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No' X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes No • X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No • X N/A For electronic LLDs, have all accessible wiring connections been visually inspected? LJ Yes No' Were all items on the equipment manufacturers' maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. H. Comments: Page 3 of 3 Based on CA form dated 03/08 SWRCB, January 2002 Page 1. Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of USTsecondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: PEPSI COLA #3040 Date of Testing: 06/14/2011 Facility Address: 215 EAST 21ST STREET , BAKERSFIELD, CA, 93305 Facility Contact: CASEY BLAIR Phone: (661) 201 -6963 Date Local Agency Was Notified of Testing: 05/31/2011 Name of Local Agency Inspector (ifpresent during testing): ERNIE MEDINA 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY , INC. Technician Conducting Test: PATRICK M PFRANG Credentials: CSLB Licensed Contractor x SWRCB Licensed Tank Tester Spill Box 1 DIE FILL License Type: VACUTECH/ A/ UT License Number: 051590/743160/5259475 Manufacturer Manufacturer Training Component(s) Date Training Expires OPW FILL BUCKET 09/29/2012 000 3. SUMMARY OF TEST RESULTS If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 06/14/2011 Spill Box 1 DIE FILL 000 00 000 00 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 06/14/2011 SWRCB, January 2006 9. Spill Bucket Testing Report Form Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: PEPSI COLA #3040 Date of Testing: 06/14/2011 Facility Address: 215 EAST 21ST STREET , BAKERSFIELD, CA, 93305 Facility Contact: CASEY BLAIR Phone: (6 61) 201-6963 Date Local Agency Was Notified ofTesting: 05/31/2011 Name of Local Agency Inspector (if present during testing): ERNIE MEDINA 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY, INC. Technician Conducting Test: PATRICK M PFRANG Credentials): x CSLB Contractor E ICC Service Tech. E SWRCB Tank Tester Other (Spec) VACUTECH/ A/ UT License Number: 051590/743160/5259475 3. SPILL BUCKET TESTING INFORMATION Test Method Used: El Hydrostatic Vacuum Other Test Equipment Used: TAPE MEASURE Equipment Resolution: VISUAL Identify Spill Bucket(By Tank Number, Stored Product, etc) I I DIE FILL 2 3 4 Bucket Installation Type: X Direct Bury Contained in Sump Direct Bury Contained in Sump Direct Bury Contained in Sump Direct Bury Contained in Sump Bucket Diameter: 12 Bucket Depth: 13 Wait time between applying vacuum/water and starting test: 0 Test Start Time (TI ): 0 S : 3 3 Initial Reading (RI ): 5.75 Test End Time (TF ): 09 : 3 3 Final Reading (R F ): 5.75 Test Duration. 1 HOUR Change in Reading (R F - RI ): 0 Pass/Fail Threshold or Criteria: PASS Test Result: K] Pass Fail Pass Fail Pass Fail Pass Fail Comments - (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements. Technician's Signature: Date: 06/14/2011 1 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements 0p Ta17knology 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 512) 451 -6334 FAX (512) 459 -1459 TEST DATE:06 /14/11 WORK ORDER NUMBER3184338 CLIENT:PEPSI COLA SITE:PEPSI COLA #3040 COMMENTS Conduct MC, Linea, LD, and Spill Bucket Testing. WITNESS Ernie Medina with San Bernardino Fire will be onsite, confirmed 5/31/11. Left voicemail for Casey on 6/9/11. MONITOR CERT PASSED. LINE, LD, AND BUCKET TEST PASSED. PARTS REPLACED QUANTITY DESCRIPTION HELIUM PINPOINT TEST RESULTS (IF APPLICABLE) ITEMS TESTED HELIUM PINPOINT LEAK TEST RESULTS Printed 06/23/2011 07:27 MTUTTLE SITE DIAGRAM i Tanknokogy 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 512) 451 -6334 FAX (512) 459 -1459 TEST DATE: 06/14/11 WORK ORDER NUMBER3184338 CLIENT:PEPSI COLA SITE: PEPSI COLA #3040 DSL TLS K F VENTCOLl0 LO o aa) i coc) Bravo m L2 FloatAn d N a i a) m w w 12 ESO Y N fBED ENTRANCE Printed 06/23/2011 07:27 MTUTTLE ATG Information Work Order# 3184338 150301 JUN 14, 2011 10:25 AM 1:108889 PEPSI SITE 9 150302 JUN 14, 2011 10:25 AM 2:215 EAST 21 ST STREET 150303 JUN 14, 2011 10:25 AM 3:BAKERSFIELD,CA 93305 150304 JUN 14, 2011 10:25AM 4:81152324905001 3184338 151700 JUN 14, 2011 10:25 AM SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE/TIME FORMAT MON DO YYYY HH:MM:SS xM 150F00 JUN 14, 2011 10:25 AM MON DD YYYY HH:MM:SS xM 110200 JUN 14, 2011 10:25AM 108889 PEPSI SITE 9 215 EAST 21ST STREET BAKERSFIELD,CA 93305 81152324905001 SYSTEM CONFIGURATION SLOT BOARD TYPE POWER ON RESET CURRENT 1 4 PROBE / G.T. 162447 162292 2 INTERSTITIAL BD 201209 200781 3 UNUSED 15000000 15000000 4 UNUSED 15000000 15000000 5 UNUSED 15000000 15000000 6 UNUSED 15000000 15000000 7 UNUSED 15000000 15000000 8 UNUSED 15000000 15000000 9 RELAY BOARD 14995 14974 10 MECH DISP INT. 68471 68315 11 UNUSED 15000000 15000000 12 UNUSED 15000000 15000000 13 UNUSED 15000000 15000000 14 UNUSED 15000000 15000000 15 UNUSED 15000000 15000000 16 UNUSED 15000000 15000000 COMM 1 RS232 SERIAL BD 15000000 15015 3184338 ATG•Information Work Order# 3184338 COMM 2 FAXMODEM BOARD 40251 40256 COMM 3 UNUSED 15000000 15000000 COMM 4 UNUSED 15000000 15000000 COMM 5 UNUSED 15000000 15000000 COMM 6 UNUSED 15000000 15000000 0 160100 JUN 14, 2011 10:25 AM TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 DIESEL FUEL ON 2 OFF 3 OFF 4 OFF 160200 JUN 14, 2011 10:25 AM TANK PRODUCT LABEL TANK PRODUCT LABEL 1 DIESEL FUEL 2 3 4 160300 JUN 14, 2011 10:25 AM TANK PRODUCT CODE TANK PRODUCT LABEL 1 DIESEL FUEL 1 2 1 3 3 4 4 0 0 160400 JUN 14, 2011 10:25AM TANK FULL VOLUME TANK PRODUCT LABEL GALLONS 1 DIESEL FUEL 15102 2 15102 3 0 4 15102 0 0 160700 JUN 14, 2011 10:25 AM TANK DIAMETER TANK PRODUCT LABEL INCHES 1 DIESELFUEL 119.50 2 119.50 3 0.00 4 119.50 0 0 160900 JUN 14, 2011 10:25 AM TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 DIESEL FUEL 0.000450 2 0.000450 3 0.000000 4 0.000450 3184338 ATIG Information Work Order# 3184338 161200 JUN 14, 2011 10:25 AM TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL MANIFOLDED TANKS 1 DIESEL FUEL NONE 2 NONE 3 NONE 4 NONE 162100 JUN 14, 2011 10:26 AM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 DIESEL FUEL 1000 2 1000 3 0 4 1000 162200 JUN 14, 2011 10:26 AM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 DIESEL FUEL 14043 2 14347 3 0 4 14347 162300 JUN 14, 2011 10:26 AM TANK OVERFILL LEVEL LIMIT TANK PRODUCT LABEL GALLONS 1 DIESEL FUEL 13304 2 13591 3 0 4 13591 162400 JUN 14, 2011 10:26 AM TANK HIGH WATER LEVEL LIMIT TANK PRODUCT LABEL INCHES 1 DIESEL FUEL 2.0 162800 JUN 14, 2011 10:26 AM TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 DIESEL FUEL 15102 2 15102 3 0 4 15102 162900 JUN 14, 2011 10:26 AM TANK DELIVERY REQUIRED LIMIT 3184338 ATG Inform8tion Work Order# 3184338 TANK PRODUCT LABEL GALLONS 1 DIESEL FUEL 3020 2 0 3 0 4 3020 170300 JUN 14, 2011 10:26 AM LIQUID TYPE SENSOR LOCATION TYPE 1 ANNULAR SPACE DUAL FLOAT HYDROSTATIC 2 TURBINE SUMP DUAL FLT. HIGH VAPOR 3 TRI -STATE (SINGLE FLOAT) 4 TRI -STATE (SINGLE FLOAT) 5 TRISTATE (SINGLE FLOAT) 6 TRI -STATE (SINGLE FLOAT) 7 TRI -STATE (SINGLE FLOAT) 8 TRI -STATE (SINGLE FLOAT) 9999FFlB 9999FFlB 9999FFlB 9999FF1B 161500 JUN 14, 2011 10:26 AM TANK PRODUCT LABEL METER DATA 1 DIESEL FUEL YES 2 NO 3 NO 4 NO 190200 JUN 14, 2011 10:26 AM SOFTWARE REVISION LEVEL VERSION 119.05 SOFTWARE# 346119 -100 -F CREATED - 00.02.25.12.15 S- MODULE# 330160 -105 -A SYSTEM FEATURES: PERIODIC IN -TANK TESTS ANNUAL IN -TANK TESTS CSLD BIR FUEL MANAGER 120600 JUN 14, 2011 10:26 AM 108889 PEPSI SITE 9 215 EAST 21 ST STREET BAKERSFIELD,CA 93305 81152324905001 TANK ALARM HISTORY TANK 1 DIESEL FUEL HIGH WATER ALARM JUN 14, 2011 9:34 AM JUN 30, 2010 8:36 AM JUL 17, 2009 9:35 AM OVERFILL ALARM JUN 14, 2011 9:44 AM JUN 30, 2010 9:21 AM JUL 17, 2009 9:27 AM LOW PRODUCT ALARM JUN 14, 2011 9:30 AM JUN 30, 2010 8:31 AM JUL 17, 2009 9:22 AM 3184338 ATGInformbtion Work Order# 3184338 HIGH PRODUCT ALARM JUN 14, 2011 9:46 AM JUN 30, 2010 9:22 AM JUL 17, 2009 9:26 AM INVALID FUEL LEVEL JUN 14, 2011 9:30 AM JUN 30, 2010 8:32 AM JUN 30, 2010 8:31 AM PROBE OUT JUN 14, 2011 9:47 AM JUN 14, 2011 9:29 AM JUN 30, 2010 9:22 AM HIGH WATER WARNING JUN 14, 2011 9:34 AM JUN 30, 2010 8:36 AM JUL 17, 2009 9:35 AM DELIVERY NEEDED JUN 14, 2011 9:29 AM NOV 18, 2010 3:14 AM OCT 22, 2010 5:11 AM MAX PRODUCT ALARM JUN 14, 2011 9:46 AM JUN 30, 2010 9:22 AM ACCU_CHART CAL WARN JUL 30, 2001 11:30 AM RECONWARNING JAN 27, 2003 9:30 AM JAN 20, 2003 2:30 PM JAN 13, 2003 2:30 PM RECON ALARM JAN 27, 2003 1:30 PM JAN 20, 2003 3:30 PM JAN 13, 2003 2:30 PM LOW TEMP WARNING JUL 17, 2009 9:38 AM AUG 4, 2008 11:47 AM MAY 19, 2005 1:33 PM 3184338