HomeMy WebLinkAbout2317 L STREET (9)SWRCB, January 2002 Page of
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing ofUSTsecondary containment systems. Use the
appropriate pages ofthis form to report resultsfor all components tested The completedform, written testprocedures, and
printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Fail
Technician Conducting Test: Scott Olinger
Repairs
Made
Credentials: WCSLB Licensed Contractor SWRCB Licensed Tank Tester
Fail
License Type. C -36 C -10 License Number: 589517
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
Incon TS -STS Inspection Equipment 1/18/13
Veeder Root Monitoring System 1/15/12
ICC Cal UST Service Tech 1/18/13
PIPING RUN #2
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
UDC 1 &2 V PIPING RUN #1
UDC 3 & 4 PIPING RUN #2
UDC 5 & 6 PIPING RUN #3
UDC 7 & 8 SPILL #1 V
UDC 9 & 10 SPILL #2
UDC 11 & 12 SPILL #3
STP #1
STP #2 W,
STP #3 W, I
ANN SPACE #1 Rf
ANN SPACE #2
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To lite best ofmy knowled , thefacts stated in this document are accurate and in full compliance with legal requirements
Technician's Signatwe: Date:_6 -21 -11
SWRCB, January 2002
4 TANK ANNULAR TESTING
Page of
Test Method Developed By: 9 Tank Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure 51 Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: 4" GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-30
Is Tank Exempt From Testing?' Yes DNo Yes No Yes DNo Yes No
Tank Capacity: 12,000 10,000 / 8,000
Tank Material: GLASS/STEEL GLASS/STEEL
Tank Manufacturer: JOOR DOOR
Product Stored: UNL PREM / PLUS
Wait time between applying
pressure/vacuum/water and
starting test:
10 MIN 10 MIN
Test Start Time: 3:00 3:00
Initial Reading (Rj): 10 HG 10 HG
Test End Time: 4:00 4:00
Final Reading (RF): 10 HG 10 HG
Test Duration: 1H I HR
Change in Reading (RF-Rj): 0 0
Pass/Fail Threshold or Criteria: 0 0
Test Result: dPass Fail 5( Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? N(Yes No NA E(Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? 5(yes No NA 9f'Yes No NA Yes No NA Yes No NAI
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. (California Code of Regulations, Title 23, Section 2637(a)(6)}
SWRCB, January 2002
5. SECONDARY PIPE TESTING
Page of
Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specie)
Test Equipment Used: Equipment Resolution:
tiYy " r *
10'. +}gPPwt0 . Th w'
3
Piping Run # Piping Run # Piping Run # Piping Run #
Piping Material:
Piping Manufacturer:
Piping Diameter:
Length of Piping Run:
Product Stored:
Method and location of
piping-run isolation:
Wait time between applying
pressure /vacuum/water and
starting test:
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-Rj):
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
SWRCB, January 2002 Page _ of
6. PIPING SUMP TESTING
Test Method Developed By: 4 Sump Manufacturer Industry Standard Professional Engineer
Other (Spec) 4
Test Method Used: Pressure Vacuum 4Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS - STS Equipment Resolution: 0.0000
Sump # STP I Sump It STP 2 Sump # STP 3 Sump #
Sump Diameter: 48" 48" 48"
Sump Depth: 4611 4711 5011
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration:
1211 1211 81'
Height from Tank Top to Lowest
Electrical Penetration:
1011 911 1011
Condition of sump prior to testing: DRY DRY DRY
Portion of Sump Tested' 1411 14" 14"
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
l Yes DNo DNA Yes No NA N/Yes No NA Yes No NA
Turbine shutdown response time 20 SEC 20 SEC 20 SEC
Is system programmed for fail-safe
shutdown?*
WYes No NA dYes No NA Yes No NA Yes No NA
Was fail-safe verified to be
operational?*
dyes No NA dYes No NA iYes ONo DNA Yes No NA
Wait time between applying
pressure/vacuum/water and starting
test:
15 MIN 15 MIN 15 MIN
Test Start Time: 3:40 4:09 4:31
Initial Reading (111): 5.5551 5.8583 5.8959
Test End Time: 3:55 4:25 4:46
Final Reading (RF): 5.5549 5.8566 5.8969
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading (RF-R): 0002 0017 0010
Pass/Fail Threshold or Criteria: 002 002 0
Test Result: M;rPass Fail dPass Fail Sf Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA @(Yes No NA WYes No NA Yes No NA
erified functional after testing?
anvWassensorproperlyreplacedd jVyes ONo DNA Yes No NAI — I Yes 11 No NA 11 Yes No NAI I
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
I If the entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated with an
asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page of
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
74W.
UDC # UDC # UDC #
UDC Manufacturer:
UDC Material:
UDC Depth:
Height from UDC Bottom to Top
of Highest Piping Penetration:
Height from UDC Bottom to
Lowest Electrical Penetration:
Condition ofUDC prior to
testing:
Portion of UDC TestedT
Does turbine shut down when
UDC sensor detects, liquid (both
product and water)?*
OYes DNo DNA OYes DNo DNA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown?*
E]Yes ONo DNA Yes DNo DNA 0 Yes No NA 0 Yes No NA
Was fail-safe verified to be
operational?*
DYes DNo DNA DYes ONo DNA DYes E]No DNA Yes No NA
Wait time between applying
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (Ri):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-Rj):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? DYes ONo DNA D Yes 0No DNA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? DYes ONo DNA OYes DNo DNA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
1 If the entire depth ofthe UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an
asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SVrRCB LG- 160)
SWRCB, January 2002 Page of
8. FH L RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps
Fill Riser Containment Sumps are Present, but were Not Tested
Test Method Developed By: Sump Manufacturer industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: NCON TS -STS Equipment Resolution:0.0000
l4l•. _ _
ti ref
nC. i'}Vr -..1 .++ :'•AsaTYii1 -s.A •M 1r7A1x15 ..1: Y.l.rv'b. .]W. u.•i ::'ivl^.'.iT3:J'n - ,tQ,;?1G?:.'RfF. z. S. It(415= %'^`:
Fill Sump # Fill Sump Fill Sump # Fill Sump #
Sump Diameter:
Sump Depth:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition ofsump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressure /vacuum /water and
starting test:
Test Start Time:
Initial Reading (R,):
Test End Time:
Final Reading (RF ):
Test Duration:
Change in Reading (RF-R,):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Is there a sensor in the sump? Yes No Yes No Yes No Yes No
Does the sensor alarm when
either product or water is
detected?
Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
SWRCB, January 2002 Page of
9. SPILUOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes
SpiH/Over6ll Containment Boxes are Pr sent, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer
Other (Spec) le
Test Method Used: Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000
Spill Box #1 Spill Box #2 Spill Box #3 Spill Box #
Bucket Diameter: 12" 12" 12"
Bucket Depth: 14" 14" 14"
Wait time between applying
pressure /vacuum/water and
starting test:
10 MIN 10 MIN 10 MIN
Test Start Time: 3:04 3:04 3:40
Initial Reading (111): 3.0435 4.5098 2.7401
Test End Time: 3:19 3:19 3:55
Final Reading (RF): 3.0439 4.5097 2.7403
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading (RF -RO: 0004 0001 0002
Pass/Fail Threshold or
Criteria: 002 002 002
Test Result: A icPass Fail. Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
DOWNTOWN CHEVRON S.
2317 L ST.
3AKERSFIELD CA 93301
SUNSET CONS!
1 -800- 984 -6266
PM06/21/2011 3 :1.a :
SUMP LEAK TEST REPORT
9PILL1
TEST STARTED 3:04 ;PM
06121/201= TEST STARTED
BEGIN LEVEL 3.0415 INENDTIME
3.0440 IN
END DATE 06/21/2011
3.0439 IN. END LEVELLEAKTHRESHOLD 0.002 IN
TEST RESULT PASSED
USPILLI
TEST STARTED 3:04 PM
TEST STARTED 06/21/2011
BEGIN! LEVEL 4.6319 IN
END TIME 3:19 PM
06/ 21/2011ENGDATE4.6327 INENpLEUEL
LEAK. THRESHOLD 0.002 IN
TEST RESULT PASSED
SPILL2
TEST STARTED 3:04 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.5098 IN
END TIME 3:19 PM
END DATE 06/21/2011
END LEVEL 4.5097 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
OSPILL2
TEST STARTED 3:04 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 2.6242 IN
END TIME 3:19 PM
END DATE 06/21/2011
END LEVEL 2.6250 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DOWNTOWN CHEVRON S.
2317 L ST.
SAKERSFIELD CA 93301
SUNSET CONST
1 -800- 984 -6266
06/21/2011 3:03 PM
SUS Iff
USPILLI
TEST STARTED 2:47 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.6312 IN
END TIME 3:03 PM
END DATE 06/2i/2011011
END LEVEL 4.6315 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
SPILL2
TEST STARTED 2:47 PM
TEST STARTED 06 /21/2011
BEGIN LEVEL 4.5105 IN
END TIME 3:03 Phi
END DATE 06/21/2011
END LEVEL 4.5099 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
VSPILL2
TEST STARTED 2:47 PM
TEST STARTED 06/21/2011
BEGIN; LEVEL 2.6252 IN
END TIME 3:03 PM
END DATE: 06/21/2011
END LEVEL 2.6245 IN
LEAK THRESHOLD 0.002 IN
TE$T RESULT PASSED
DOWNTOWN CHEVRON S.
2317 L ST.
BAKERSFIELD CA 93301
SUNSET CONST
1-800-934-6266
06/21/201 4:25 P(',,
lJ iP LEAK TEST /REPORT
I
STPi
TEST 'STARTED 4:
TEST STARTED 06/21/201! ?
M
BEGIN LEVEL 5.5547 IN
END TIME 4:25 Phi
END DATE 06/21 /2011
END LEVEL 5.5514 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT FAILED
STP 2
TEST STARTED 4 :09 pp-i
EST STARTED 06 /21/2011
BEGIN LEVEL 5.8583 IN
END TIME 4:25 PM
END DATE 06/21/2011
END LEVEL 5.8566 IN
LEAK THRESHOLD & 002 IN
TEST RESULT PASSED
SPIT LJ
TEST STARTED 4:09 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 2.7402 IN
END TIME 4:25 PM
END DATE 06/21/2011
END LEVEL 2.7399 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
USPILL3
TEST STARTED 4:09 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.5971 IN,
END TIME 4:25 PM
END DATE 06/2i/2011
END LEVEL 4.5971 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
06/2A011
BEGIN LEVEL 3.0440 IN
END TIME 3:03 Phi
END DATE 06/21/2011
END LEVEL 3.0437 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
USPILLI
TEST STARTED 2:47 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.6312 IN
END TIME 3:03 PM
END DATE 06/2i/2011011
END LEVEL 4.6315 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
SPILL2
TEST STARTED 2:47 PM
TEST STARTED 06 /21/2011
BEGIN LEVEL 4.5105 IN
END TIME 3:03 Phi
END DATE 06/21/2011
END LEVEL 4.5099 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
VSPILL2
TEST STARTED 2:47 PM
TEST STARTED 06/21/2011
BEGIN; LEVEL 2.6252 IN
END TIME 3:03 PM
END DATE: 06/21/2011
END LEVEL 2.6245 IN
LEAK THRESHOLD 0.002 IN
TE$T RESULT PASSED
DOWNTOWN CHEVRON S.
2317 L ST.
BAKERSFIELD CA 93301
SUNSET CONST
1-800-934-6266
06/21/201 4:25 P(',,
lJ iP LEAK TEST /REPORT
I
STPi
TEST 'STARTED 4:
TEST STARTED 06/21/201! ?
M
BEGIN LEVEL 5.5547 IN
END TIME 4:25 Phi
END DATE 06/21 /2011
END LEVEL 5.5514 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT FAILED
STP 2
TEST STARTED 4 :09 pp-i
EST STARTED 06 /21/2011
BEGIN LEVEL 5.8583 IN
END TIME 4:25 PM
END DATE 06/21/2011
END LEVEL 5.8566 IN
LEAK THRESHOLD & 002 IN
TEST RESULT PASSED
SPIT LJ
TEST STARTED 4:09 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 2.7402 IN
END TIME 4:25 PM
END DATE 06/21/2011
END LEVEL 2.7399 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
USPILL3
TEST STARTED 4:09 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.5971 IN,
END TIME 4:25 PM
END DATE 06/2i/2011
END LEVEL 4.5971 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
OWNTOWN CHEVRON S.
5.8959
77 L C- i . DOWNTOWN CHEVRON S. 2_17
3AKERSFIELD CA 93301 23 Tt111L
SUNSET CONST SAKERSFIEL'D CA 93301
1 -800 -984 -6266 SUNSET CONST
5.3965
1 -800 -984 -6266
06/21 /2011 4:47 PM
0.002 IN
06/21/2011 3:55 Phi
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
STP-i
TP
TEST STARTED 4:31 PM
TEST STARTED 06/2i/20ii TEST STARTED 3 :40 PM
BEGIN LEVEL 4.5263 IN TEST STARTED 06/21/2011
END TIME 4:46 Ph; BEGIN LEVEL 5.5551 IN
END DATE 06/21 /2011 END TIME 3 :55 PM
END LEVEL 4.5264 IN END 'DATE 06/21/2011
LEAK THRESHOLD 0.002 IN END LEVEL 5.5549 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
TP 3
TEST STARTED 4:31 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 5.8959 IN
END TIME 4:46 PM
END DATE 06/21/2011
END LEVEL 5.3965 IN
LEAK. THRESHOLD 0.002 IN
TEST RESULT PASSED
DOWNTOWN CHEVRON S.
2317 L 3T.
AKERSFI'ELD GA 93301
SUNSET CONST
1 -800 -984 -6266
06/21/2011 5:02 PP+
SUMP LEAK TEST REPORT
STP£
TEST STARTED 447 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.5261 IN
END TIME 5 :02 PM
END DATE 06/21/2011
END LEVEL 4.5254 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
STP 3
TEST STARTED 4:47 Phi
TEST STARTED 06/21/2011
BEGIN LEVEL 5.8969 IN
END TIME 5:02 PM
END DATE 06/21/2011
END LEVEL 5.8973 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED_
STP2
TEST STARTED 3:40 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 6.0046 IN
END TIME 3:55 PM
END DATE 06/21/2011
END LEVEL 6.0055 IN
LEAP; THRESHOLD 0.002 IN
TEST RESULT = PASSED
SPILLS
TEST STARTED 3:40 PM
TEST STARTED 06/21/2011
BEGIN LEVEL 2.7401 IN
END TIME 3:55 PM
END ''DATE 06/21/2011
END LEVEL 2.7403 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
VSPILL3
TEST STARTED 3 :40 Pfn
TEST STARTED 06/21/2011
BEGIN LEVEL 4.5969 IN
END TIME 3:55 PM
END DATE 06/21/2011
END LEVEL 4.5972 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DOWNTOWN CHEVRON
2311 L
8AKERSFIELD CA. OtdNTOWN CHEVRON
SUNSET CONSTRUCTION 2317 L ST. i WNTOWN CHEVRON
i- 800 - 984 -6266 AKERSFIELD CA. 2317 L ST
SUNSET CONS7RUC7ION AKERSFIELD CA.
clh!21f2011 9:53 AM 1_800- 984 -6266 SUNSET CONSTRUCTION
1- ''v00- 984— F,2ni,
SUMP LEAK TEST REPORT 06/2-1/2011 1:05 Pht 06/2l-2011 10:10 Rh"i
VSPILL1 SUMP LEAK TEST REPORT SUMP LEAK TE: =;-; EPOP,T
TEST STARTED 9:38 AM STP 2
TEST STARTED 06/21/2011 VSPILLI
BEGIN LEVEL 4.5029 IN TEST STARTED 2:49 PM
END TIME 9:53 AM TEST STARTED 06/21•/201! TEST STARTED 55 AM
END DATE 06/21/2011 BEGIN LEVEL 3.7343 IN TEST STARTED 06/21/2011
END LEVEL 4.5032 IN END TIME 1:05 Pt9 BEGIN LEVEL 4.5032 IN
LEAK THRESHOLD 0.002 IN END DATE 06/21/2011 END TIME 10:10 AM
TEST RESULT PASSED END LEVEL 3.7344 IN END DATE 06/21/2011
LEAK THRESHOLD 0.002 IN END LEVEL 4.5032 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
SPILLI TEST RESULT PASSED
TEST STARTED 9:38 AM STP 3
TEST STARTED 06/21/2011 PILL1
BEGIN LEVEL 6.3069 IN TEST STARTED 12:49 PM
END TIME 9:53 AM TEST STARTED 06/21/2011 TEST STARTED 9:55 AM
END DATE 06/21/2011 BEGIN LEVEL 3. 9654 IN TEST STARTED 06/21/2011
END LEVEL 6.306£: IN END TIME 1:05 PM BEGIN LEVEL 6.3066 IN
LEAK THRESHOLD 0.002 IN END DATE 06/21/2011 END TINE 10:10 AM
TEST RESULT PASSED END !FUEL 3.9657 IN END DATE 06/21/2011
LEAK: THRESHOLD 0.002 IN END LEVEL 6.3065 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
VSPILL2 TEST RESULT PASSED
TEST STARTED 9:32 AM STP
TEST STARTED 06/21/2011 VSPILL2
BEGIN LEVEL 4.4281 IN TEST STARTED 12:49 PM
END TIME 9:53 AM TEST STARTED 06/21/2011 TEST STARTED 9:55 AM
END DATE 06/21/2011 BBEGIN LEVEL 5.0323 IN TEST STARTED 06/21/2011
END LEVEL 4.4279 IN END TIME 1:05 PM BEGIN LEVEL 4.4279 IN
LE'AK THRESHOLD 0.002 IN DATE 206/21/_4911 END TIME 10:10 AM
TEST RESULT PASSED END LEVELM 5.0323 IN END DATE 06/21/2011
AK THRESHOLDLEAK 0.002 IN LEVEL 4.4278 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
STP1 TEST RESULT PASSED
TEST STARTED 9:38 AM
TEST STARTED 06 /21/2011
BEGIN LEVEL 5.0234 IN
END TIME 9:53 AM
END DATE 06/21/2011
END LEVEL 4.6534 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT FAILED
DOWNTOWN CHEVRON DOWNTOWN CHEVRON
2317 L ST. 2317 L S' ' DOWNTOWN CHEVRON
BAKERSFID CA. EL BAKERSFIELD CA. 2317 L ST:
SUNSET CONSTRUCTION SUNSET CONSTRUCTION BAKERSFIELD CA.
1- 890 -484 -6266 1- 800 -984 -6266 SUNSET CONSTRUCTION'
06/21/2011 8:59 AM 06/21/2011 3:16 AM
0n121/1b- 1:2'1 PM06/21/2011-
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
VSPILL3 USPILL
STP
TEST STARTED 5:44 AM TEST STARTED 9:00 AM
TEST STARTED 06/21/2011 TEST STARTED 06/21/2011 TEST STARTED 1:06 Pty
BEGIN LEVEL 4.3200 IN BEGIN LEVEL 4.3143 IN TEST STARTED 06/21/2011
END TIME 5:59 AM END TIME 9:15 AM BEGIN LEVEL 3.7344 IN
ND DATE 06/21/2011 END DATE 06/21/2011 END TIME 1:21 PM
END LEVEL 4.3200 IN END LEVEL 4.3198 IN ENp DATE 06/21x2011
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN END LEVEL ,1,.734' IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
SPILL3 SPILL3
STPP Z
TEST STARTED 8:44 AM TEST STARTED 4:00 AN
TEST 'STARTED 06/21/2011 TEST STARTED 06/21/2011 TEST STARTED 1:06 PM
BEGIN LEVEL 3.2621 IN BEGIN LEVEL 3.2621 IN TEST STARTED 06/21/2011
END TIME 8:59 AM END TIME 9:15 AM BEGIN LEVEL 3.9656 IN
END DATE 06/21/2011 END DATE 06/21/2011 END TIME 1:21 PM
END LEVEL 3.2621 IN END LEVEL 3.2618 IN END DATE 06/21/2011
LEAK THRESHOLD 0.002 IN LEA THRESHOLD 0.002 INK END LEVEL 3.9658 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK. THRESHOLD 0.002 IN
TEST RESULT PASSED
SPILL4 SPILL4
STP 4
TEST STARTED 8:44 AM TEST STARTED 9:00 AM
TEST STARTED 06/21/2011 TEST STARTED 06/21/2011 TEST STARTED 1:06 PM
BEGIN LEVEL 3.2741 IN BEGIN LEVEL 3.2736 IN TEST STARTED 06/21/2011
END TIME 5: 5:+ AM END TIME 3:15 AM BEGIN LEVEL 5.0323 IN
END DATE 06/21/2011 END DATE 06/21/2011 END TIME 1:21 PM
END LEVEL 3.2735 IN END LEVEL 3.2727 IN END DATE 06/21/2011
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN END LEVEL 5.0323 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
SPILL2 SPILL2
TEST 'STARTED 8:44 AM TEST STARTED 9:00 AM
TEST STARTED 06/21/2011 TEST STARTED 06/21/2011
BEGIN LEVEL 3.2753 IN BEGIN LEVEL 3.275: IN
END TIME 8:59 AM END TIME 9:15 AM
END DATE 06/21/2011 END DATE 06/21/2011
END LEVEL 3.2754 IN END LEVEL 3.2754 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED TEST RESULT PASSED
DOWNTOWN CHEVRON
2317 =T.
SAKERSFIELD CA.
SUNSET CONSTRUCTION'
1 -800 -984 -6266
06/21 /201 J. l i : 09 AN
SUMP LEAK TEST REPORT
17 1
TEST STARTED 10:54 AM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.0611 IN
END TIME 11:09 AM
END DATE 06/21/2011
END LEVEL 4.9611 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DOWNTOWN CHEVRON
2317 L
BAKERSFIELD CA.
SUNSET CONSTRUCTION
1- 800- 984 -6266
66/21/2011 11:25 AM
SUMP LEAK TEST REPORT
STP
TEST STARTED 11:09 AM
TEST STARTED 06/21/2011
BEGIN LEVEL 4.0612 IN
END TIME 11:24 AM
END DATE 06/21/2011
END LEVEL 4.0610 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED