Loading...
HomeMy WebLinkAbout2317 L STREET (9)SWRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing ofUSTsecondary containment systems. Use the appropriate pages ofthis form to report resultsfor all components tested The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Fail Technician Conducting Test: Scott Olinger Repairs Made Credentials: WCSLB Licensed Contractor SWRCB Licensed Tank Tester Fail License Type. C -36 C -10 License Number: 589517 Manufacturer Manufacturer Training Component(s) Date Training Expires Incon TS -STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 PIPING RUN #2 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made UDC 1 &2 V PIPING RUN #1 UDC 3 & 4 PIPING RUN #2 UDC 5 & 6 PIPING RUN #3 UDC 7 & 8 SPILL #1 V UDC 9 & 10 SPILL #2 UDC 11 & 12 SPILL #3 STP #1 STP #2 W, STP #3 W, I ANN SPACE #1 Rf ANN SPACE #2 If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To lite best ofmy knowled , thefacts stated in this document are accurate and in full compliance with legal requirements Technician's Signatwe: Date:_6 -21 -11 SWRCB, January 2002 4 TANK ANNULAR TESTING Page of Test Method Developed By: 9 Tank Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure 51 Vacuum Hydrostatic Other (Specify) Test Equipment Used: 4" GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-30 Is Tank Exempt From Testing?' Yes DNo Yes No Yes DNo Yes No Tank Capacity: 12,000 10,000 / 8,000 Tank Material: GLASS/STEEL GLASS/STEEL Tank Manufacturer: JOOR DOOR Product Stored: UNL PREM / PLUS Wait time between applying pressure/vacuum/water and starting test: 10 MIN 10 MIN Test Start Time: 3:00 3:00 Initial Reading (Rj): 10 HG 10 HG Test End Time: 4:00 4:00 Final Reading (RF): 10 HG 10 HG Test Duration: 1H I HR Change in Reading (RF-Rj): 0 0 Pass/Fail Threshold or Criteria: 0 0 Test Result: dPass Fail 5( Pass Fail Pass Fail Pass Fail Was sensor removed for testing? N(Yes No NA E(Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? 5(yes No NA 9f'Yes No NA Yes No NA Yes No NAI Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. (California Code of Regulations, Title 23, Section 2637(a)(6)} SWRCB, January 2002 5. SECONDARY PIPE TESTING Page of Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Hydrostatic Other (Specie) Test Equipment Used: Equipment Resolution: tiYy " r * 10'. +}gPPwt0 . Th w' 3 Piping Run # Piping Run # Piping Run # Piping Run # Piping Material: Piping Manufacturer: Piping Diameter: Length of Piping Run: Product Stored: Method and location of piping-run isolation: Wait time between applying pressure /vacuum/water and starting test: Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-Rj): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SWRCB, January 2002 Page _ of 6. PIPING SUMP TESTING Test Method Developed By: 4 Sump Manufacturer Industry Standard Professional Engineer Other (Spec) 4 Test Method Used: Pressure Vacuum 4Hydrostatic Other (Spec) Test Equipment Used: INCON TS - STS Equipment Resolution: 0.0000 Sump # STP I Sump It STP 2 Sump # STP 3 Sump # Sump Diameter: 48" 48" 48" Sump Depth: 4611 4711 5011 Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of Highest Piping Penetration: 1211 1211 81' Height from Tank Top to Lowest Electrical Penetration: 1011 911 1011 Condition of sump prior to testing: DRY DRY DRY Portion of Sump Tested' 1411 14" 14" Does turbine shut down when sump sensor detects liquid (both product and water)?* l Yes DNo DNA Yes No NA N/Yes No NA Yes No NA Turbine shutdown response time 20 SEC 20 SEC 20 SEC Is system programmed for fail-safe shutdown?* WYes No NA dYes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* dyes No NA dYes No NA iYes ONo DNA Yes No NA Wait time between applying pressure/vacuum/water and starting test: 15 MIN 15 MIN 15 MIN Test Start Time: 3:40 4:09 4:31 Initial Reading (111): 5.5551 5.8583 5.8959 Test End Time: 3:55 4:25 4:46 Final Reading (RF): 5.5549 5.8566 5.8969 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading (RF-R): 0002 0017 0010 Pass/Fail Threshold or Criteria: 002 002 0 Test Result: M;rPass Fail dPass Fail Sf Pass Fail Pass Fail Was sensor removed for testing? Yes No NA @(Yes No NA WYes No NA Yes No NA erified functional after testing? anvWassensorproperlyreplacedd jVyes ONo DNA Yes No NAI — I Yes 11 No NA 11 Yes No NAI I Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) I If the entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated with an asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page of 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: 74W. UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition ofUDC prior to testing: Portion of UDC TestedT Does turbine shut down when UDC sensor detects, liquid (both product and water)?* OYes DNo DNA OYes DNo DNA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* E]Yes ONo DNA Yes DNo DNA 0 Yes No NA 0 Yes No NA Was fail-safe verified to be operational?* DYes DNo DNA DYes ONo DNA DYes E]No DNA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (Ri): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-Rj): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? DYes ONo DNA D Yes 0No DNA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? DYes ONo DNA OYes DNo DNA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) 1 If the entire depth ofthe UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SVrRCB LG- 160) SWRCB, January 2002 Page of 8. FH L RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: Sump Manufacturer industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: NCON TS -STS Equipment Resolution:0.0000 l4l•. _ _ ti ref nC. i'}Vr -..1 .++ :'•AsaTYii1 -s.A •M 1r7A1x15 ..1: Y.l.rv'b. .]W. u.•i ::'ivl^.'.iT3:J'n - ,tQ,;?1G?:.'RfF. z. S. It(415= %'^`: Fill Sump # Fill Sump Fill Sump # Fill Sump # Sump Diameter: Sump Depth: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition ofsump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure /vacuum /water and starting test: Test Start Time: Initial Reading (R,): Test End Time: Final Reading (RF ): Test Duration: Change in Reading (RF-R,): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Is there a sensor in the sump? Yes No Yes No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? yes No NA Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SWRCB, January 2002 Page of 9. SPILUOVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes SpiH/Over6ll Containment Boxes are Pr sent, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Spec) le Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Spill Box #1 Spill Box #2 Spill Box #3 Spill Box # Bucket Diameter: 12" 12" 12" Bucket Depth: 14" 14" 14" Wait time between applying pressure /vacuum/water and starting test: 10 MIN 10 MIN 10 MIN Test Start Time: 3:04 3:04 3:40 Initial Reading (111): 3.0435 4.5098 2.7401 Test End Time: 3:19 3:19 3:55 Final Reading (RF): 3.0439 4.5097 2.7403 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading (RF -RO: 0004 0001 0002 Pass/Fail Threshold or Criteria: 002 002 002 Test Result: A icPass Fail. Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) DOWNTOWN CHEVRON S. 2317 L ST. 3AKERSFIELD CA 93301 SUNSET CONS! 1 -800- 984 -6266 PM06/21/2011 3 :1.a : SUMP LEAK TEST REPORT 9PILL1 TEST STARTED 3:04 ;PM 06121/201= TEST STARTED BEGIN LEVEL 3.0415 INENDTIME 3.0440 IN END DATE 06/21/2011 3.0439 IN. END LEVELLEAKTHRESHOLD 0.002 IN TEST RESULT PASSED USPILLI TEST STARTED 3:04 PM TEST STARTED 06/21/2011 BEGIN! LEVEL 4.6319 IN END TIME 3:19 PM 06/ 21/2011ENGDATE4.6327 INENpLEUEL LEAK. THRESHOLD 0.002 IN TEST RESULT PASSED SPILL2 TEST STARTED 3:04 PM TEST STARTED 06/21/2011 BEGIN LEVEL 4.5098 IN END TIME 3:19 PM END DATE 06/21/2011 END LEVEL 4.5097 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED OSPILL2 TEST STARTED 3:04 PM TEST STARTED 06/21/2011 BEGIN LEVEL 2.6242 IN END TIME 3:19 PM END DATE 06/21/2011 END LEVEL 2.6250 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED DOWNTOWN CHEVRON S. 2317 L ST. SAKERSFIELD CA 93301 SUNSET CONST 1 -800- 984 -6266 06/21/2011 3:03 PM SUS Iff USPILLI TEST STARTED 2:47 PM TEST STARTED 06/21/2011 BEGIN LEVEL 4.6312 IN END TIME 3:03 PM END DATE 06/2i/2011011 END LEVEL 4.6315 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SPILL2 TEST STARTED 2:47 PM TEST STARTED 06 /21/2011 BEGIN LEVEL 4.5105 IN END TIME 3:03 Phi END DATE 06/21/2011 END LEVEL 4.5099 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED VSPILL2 TEST STARTED 2:47 PM TEST STARTED 06/21/2011 BEGIN; LEVEL 2.6252 IN END TIME 3:03 PM END DATE: 06/21/2011 END LEVEL 2.6245 IN LEAK THRESHOLD 0.002 IN TE$T RESULT PASSED DOWNTOWN CHEVRON S. 2317 L ST. BAKERSFIELD CA 93301 SUNSET CONST 1-800-934-6266 06/21/201 4:25 P(',, lJ iP LEAK TEST /REPORT I STPi TEST 'STARTED 4: TEST STARTED 06/21/201! ? M BEGIN LEVEL 5.5547 IN END TIME 4:25 Phi END DATE 06/21 /2011 END LEVEL 5.5514 IN LEAK THRESHOLD 0.002 IN TEST RESULT FAILED STP 2 TEST STARTED 4 :09 pp-i EST STARTED 06 /21/2011 BEGIN LEVEL 5.8583 IN END TIME 4:25 PM END DATE 06/21/2011 END LEVEL 5.8566 IN LEAK THRESHOLD & 002 IN TEST RESULT PASSED SPIT LJ TEST STARTED 4:09 PM TEST STARTED 06/21/2011 BEGIN LEVEL 2.7402 IN END TIME 4:25 PM END DATE 06/21/2011 END LEVEL 2.7399 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED USPILL3 TEST STARTED 4:09 PM TEST STARTED 06/21/2011 BEGIN LEVEL 4.5971 IN, END TIME 4:25 PM END DATE 06/2i/2011 END LEVEL 4.5971 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 06/2A011 BEGIN LEVEL 3.0440 IN END TIME 3:03 Phi END DATE 06/21/2011 END LEVEL 3.0437 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED USPILLI TEST STARTED 2:47 PM TEST STARTED 06/21/2011 BEGIN LEVEL 4.6312 IN END TIME 3:03 PM END DATE 06/2i/2011011 END LEVEL 4.6315 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SPILL2 TEST STARTED 2:47 PM TEST STARTED 06 /21/2011 BEGIN LEVEL 4.5105 IN END TIME 3:03 Phi END DATE 06/21/2011 END LEVEL 4.5099 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED VSPILL2 TEST STARTED 2:47 PM TEST STARTED 06/21/2011 BEGIN; LEVEL 2.6252 IN END TIME 3:03 PM END DATE: 06/21/2011 END LEVEL 2.6245 IN LEAK THRESHOLD 0.002 IN TE$T RESULT PASSED DOWNTOWN CHEVRON S. 2317 L ST. BAKERSFIELD CA 93301 SUNSET CONST 1-800-934-6266 06/21/201 4:25 P(',, lJ iP LEAK TEST /REPORT I STPi TEST 'STARTED 4: TEST STARTED 06/21/201! ? M BEGIN LEVEL 5.5547 IN END TIME 4:25 Phi END DATE 06/21 /2011 END LEVEL 5.5514 IN LEAK THRESHOLD 0.002 IN TEST RESULT FAILED STP 2 TEST STARTED 4 :09 pp-i EST STARTED 06 /21/2011 BEGIN LEVEL 5.8583 IN END TIME 4:25 PM END DATE 06/21/2011 END LEVEL 5.8566 IN LEAK THRESHOLD & 002 IN TEST RESULT PASSED SPIT LJ TEST STARTED 4:09 PM TEST STARTED 06/21/2011 BEGIN LEVEL 2.7402 IN END TIME 4:25 PM END DATE 06/21/2011 END LEVEL 2.7399 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED USPILL3 TEST STARTED 4:09 PM TEST STARTED 06/21/2011 BEGIN LEVEL 4.5971 IN, END TIME 4:25 PM END DATE 06/2i/2011 END LEVEL 4.5971 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED OWNTOWN CHEVRON S. 5.8959 77 L C- i . DOWNTOWN CHEVRON S. 2_17 3AKERSFIELD CA 93301 23 Tt111L SUNSET CONST SAKERSFIEL'D CA 93301 1 -800 -984 -6266 SUNSET CONST 5.3965 1 -800 -984 -6266 06/21 /2011 4:47 PM 0.002 IN 06/21/2011 3:55 Phi SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT STP-i TP TEST STARTED 4:31 PM TEST STARTED 06/2i/20ii TEST STARTED 3 :40 PM BEGIN LEVEL 4.5263 IN TEST STARTED 06/21/2011 END TIME 4:46 Ph; BEGIN LEVEL 5.5551 IN END DATE 06/21 /2011 END TIME 3 :55 PM END LEVEL 4.5264 IN END 'DATE 06/21/2011 LEAK THRESHOLD 0.002 IN END LEVEL 5.5549 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TP 3 TEST STARTED 4:31 PM TEST STARTED 06/21/2011 BEGIN LEVEL 5.8959 IN END TIME 4:46 PM END DATE 06/21/2011 END LEVEL 5.3965 IN LEAK. THRESHOLD 0.002 IN TEST RESULT PASSED DOWNTOWN CHEVRON S. 2317 L 3T. AKERSFI'ELD GA 93301 SUNSET CONST 1 -800 -984 -6266 06/21/2011 5:02 PP+ SUMP LEAK TEST REPORT STP£ TEST STARTED 447 PM TEST STARTED 06/21/2011 BEGIN LEVEL 4.5261 IN END TIME 5 :02 PM END DATE 06/21/2011 END LEVEL 4.5254 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED STP 3 TEST STARTED 4:47 Phi TEST STARTED 06/21/2011 BEGIN LEVEL 5.8969 IN END TIME 5:02 PM END DATE 06/21/2011 END LEVEL 5.8973 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED_ STP2 TEST STARTED 3:40 PM TEST STARTED 06/21/2011 BEGIN LEVEL 6.0046 IN END TIME 3:55 PM END DATE 06/21/2011 END LEVEL 6.0055 IN LEAP; THRESHOLD 0.002 IN TEST RESULT = PASSED SPILLS TEST STARTED 3:40 PM TEST STARTED 06/21/2011 BEGIN LEVEL 2.7401 IN END TIME 3:55 PM END ''DATE 06/21/2011 END LEVEL 2.7403 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED VSPILL3 TEST STARTED 3 :40 Pfn TEST STARTED 06/21/2011 BEGIN LEVEL 4.5969 IN END TIME 3:55 PM END DATE 06/21/2011 END LEVEL 4.5972 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED DOWNTOWN CHEVRON 2311 L 8AKERSFIELD CA. OtdNTOWN CHEVRON SUNSET CONSTRUCTION 2317 L ST. i WNTOWN CHEVRON i- 800 - 984 -6266 AKERSFIELD CA. 2317 L ST SUNSET CONS7RUC7ION AKERSFIELD CA. clh!21f2011 9:53 AM 1_800- 984 -6266 SUNSET CONSTRUCTION 1- ''v00- 984— F,2ni, SUMP LEAK TEST REPORT 06/2-1/2011 1:05 Pht 06/2l-2011 10:10 Rh"i VSPILL1 SUMP LEAK TEST REPORT SUMP LEAK TE: =;-; EPOP,T TEST STARTED 9:38 AM STP 2 TEST STARTED 06/21/2011 VSPILLI BEGIN LEVEL 4.5029 IN TEST STARTED 2:49 PM END TIME 9:53 AM TEST STARTED 06/21•/201! TEST STARTED 55 AM END DATE 06/21/2011 BEGIN LEVEL 3.7343 IN TEST STARTED 06/21/2011 END LEVEL 4.5032 IN END TIME 1:05 Pt9 BEGIN LEVEL 4.5032 IN LEAK THRESHOLD 0.002 IN END DATE 06/21/2011 END TIME 10:10 AM TEST RESULT PASSED END LEVEL 3.7344 IN END DATE 06/21/2011 LEAK THRESHOLD 0.002 IN END LEVEL 4.5032 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN SPILLI TEST RESULT PASSED TEST STARTED 9:38 AM STP 3 TEST STARTED 06/21/2011 PILL1 BEGIN LEVEL 6.3069 IN TEST STARTED 12:49 PM END TIME 9:53 AM TEST STARTED 06/21/2011 TEST STARTED 9:55 AM END DATE 06/21/2011 BEGIN LEVEL 3. 9654 IN TEST STARTED 06/21/2011 END LEVEL 6.306£: IN END TIME 1:05 PM BEGIN LEVEL 6.3066 IN LEAK THRESHOLD 0.002 IN END DATE 06/21/2011 END TINE 10:10 AM TEST RESULT PASSED END !FUEL 3.9657 IN END DATE 06/21/2011 LEAK: THRESHOLD 0.002 IN END LEVEL 6.3065 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN VSPILL2 TEST RESULT PASSED TEST STARTED 9:32 AM STP TEST STARTED 06/21/2011 VSPILL2 BEGIN LEVEL 4.4281 IN TEST STARTED 12:49 PM END TIME 9:53 AM TEST STARTED 06/21/2011 TEST STARTED 9:55 AM END DATE 06/21/2011 BBEGIN LEVEL 5.0323 IN TEST STARTED 06/21/2011 END LEVEL 4.4279 IN END TIME 1:05 PM BEGIN LEVEL 4.4279 IN LE'AK THRESHOLD 0.002 IN DATE 206/21/_4911 END TIME 10:10 AM TEST RESULT PASSED END LEVELM 5.0323 IN END DATE 06/21/2011 AK THRESHOLDLEAK 0.002 IN LEVEL 4.4278 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN STP1 TEST RESULT PASSED TEST STARTED 9:38 AM TEST STARTED 06 /21/2011 BEGIN LEVEL 5.0234 IN END TIME 9:53 AM END DATE 06/21/2011 END LEVEL 4.6534 IN LEAK THRESHOLD 0.002 IN TEST RESULT FAILED DOWNTOWN CHEVRON DOWNTOWN CHEVRON 2317 L ST. 2317 L S' ' DOWNTOWN CHEVRON BAKERSFID CA. EL BAKERSFIELD CA. 2317 L ST: SUNSET CONSTRUCTION SUNSET CONSTRUCTION BAKERSFIELD CA. 1- 890 -484 -6266 1- 800 -984 -6266 SUNSET CONSTRUCTION' 06/21/2011 8:59 AM 06/21/2011 3:16 AM 0n121/1b- 1:2'1 PM06/21/2011- SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT VSPILL3 USPILL STP TEST STARTED 5:44 AM TEST STARTED 9:00 AM TEST STARTED 06/21/2011 TEST STARTED 06/21/2011 TEST STARTED 1:06 Pty BEGIN LEVEL 4.3200 IN BEGIN LEVEL 4.3143 IN TEST STARTED 06/21/2011 END TIME 5:59 AM END TIME 9:15 AM BEGIN LEVEL 3.7344 IN ND DATE 06/21/2011 END DATE 06/21/2011 END TIME 1:21 PM END LEVEL 4.3200 IN END LEVEL 4.3198 IN ENp DATE 06/21x2011 LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN END LEVEL ,1,.734' IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SPILL3 SPILL3 STPP Z TEST STARTED 8:44 AM TEST STARTED 4:00 AN TEST 'STARTED 06/21/2011 TEST STARTED 06/21/2011 TEST STARTED 1:06 PM BEGIN LEVEL 3.2621 IN BEGIN LEVEL 3.2621 IN TEST STARTED 06/21/2011 END TIME 8:59 AM END TIME 9:15 AM BEGIN LEVEL 3.9656 IN END DATE 06/21/2011 END DATE 06/21/2011 END TIME 1:21 PM END LEVEL 3.2621 IN END LEVEL 3.2618 IN END DATE 06/21/2011 LEAK THRESHOLD 0.002 IN LEA THRESHOLD 0.002 INK END LEVEL 3.9658 IN TEST RESULT PASSED TEST RESULT PASSED LEAK. THRESHOLD 0.002 IN TEST RESULT PASSED SPILL4 SPILL4 STP 4 TEST STARTED 8:44 AM TEST STARTED 9:00 AM TEST STARTED 06/21/2011 TEST STARTED 06/21/2011 TEST STARTED 1:06 PM BEGIN LEVEL 3.2741 IN BEGIN LEVEL 3.2736 IN TEST STARTED 06/21/2011 END TIME 5: 5:+ AM END TIME 3:15 AM BEGIN LEVEL 5.0323 IN END DATE 06/21/2011 END DATE 06/21/2011 END TIME 1:21 PM END LEVEL 3.2735 IN END LEVEL 3.2727 IN END DATE 06/21/2011 LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN END LEVEL 5.0323 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SPILL2 SPILL2 TEST 'STARTED 8:44 AM TEST STARTED 9:00 AM TEST STARTED 06/21/2011 TEST STARTED 06/21/2011 BEGIN LEVEL 3.2753 IN BEGIN LEVEL 3.275: IN END TIME 8:59 AM END TIME 9:15 AM END DATE 06/21/2011 END DATE 06/21/2011 END LEVEL 3.2754 IN END LEVEL 3.2754 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED DOWNTOWN CHEVRON 2317 =T. SAKERSFIELD CA. SUNSET CONSTRUCTION' 1 -800 -984 -6266 06/21 /201 J. l i : 09 AN SUMP LEAK TEST REPORT 17 1 TEST STARTED 10:54 AM TEST STARTED 06/21/2011 BEGIN LEVEL 4.0611 IN END TIME 11:09 AM END DATE 06/21/2011 END LEVEL 4.9611 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED DOWNTOWN CHEVRON 2317 L BAKERSFIELD CA. SUNSET CONSTRUCTION 1- 800- 984 -6266 66/21/2011 11:25 AM SUMP LEAK TEST REPORT STP TEST STARTED 11:09 AM TEST STARTED 06/21/2011 BEGIN LEVEL 4.0612 IN END TIME 11:24 AM END DATE 06/21/2011 END LEVEL 4.0610 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED