Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing ofUSTsecondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested The completedform, written test procedures, and
printouts from tests (fapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: WESTCHESTER MOBIL Date of Testing: 12/7/11
Facility Address: 3200 "F" STREET, BAKERSFIELD
Facility Contact: Phone:
Date Local Agency Was Notified ofTesting: 10/31/11
Name of Local Agency Inspector (fpresent during testing): ERNIE
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Pass
Technician Conducting Test: RICH PHILLIPS
Not
Tested
Credentials: X CSLB Licensed Contractor D SWRCB Licensed Tank Tester
License Type: C61/1340 A HAZ License Number: 809850
Manufacturer
Manufacturer Training
Component(s) ) Date Training Expires
INCON TS -STS 6/11/2012
X UDC #11/12 X
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
LNL87 ANNULAR X UDC #11/12 X
PREM91 ANNULAR X UNL87 FILL SUMP X
UNL87 SECONDARY PIPE X 0 0 PREM91 FILL SUMP 1 X
PREM91 SEC PIPE X UNL87 VAPOR BUCKET X 0
TRANSITION SUMP X PREM91 VAPOR BKT X
UNL87 STP 0 X 0 0 0
PREM91 STP X 1
UDC #1/2 X
UDC #3/4 X 0
UDC #5/6 x 0 0 0 0 Q
UDC #718 X 0 0 0 F Q 0
UDC #9 /10 X 0 0 0 0 1 0 1 0
Ifhydrostatic testing was performed, describe what was done with the water after completion oftests:
RECYCLE AND REUSE
CERTIFICATION OF TECHNIC RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts stated is document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 12/7111
SWRCB, January 2002
4. TANK ANNULAR TESTING
tAtkblq
Page _ of S
Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure X Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution:
Tank # UNL87 Tank # PREM91 Tank # Tank #
Is Tank Exempt From Testing?' Yes No 11 Yes No Yes No Yes No
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
NOT TESTED NOT TESTED
Test Start Time:
Initial Reading (114):
Test End Time:
Final Reading (RF):
Test Duration: 60 MIN 60 MIN
Change in Reading (RF -Rj):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass 0 Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
TANK ANNULAR TEST NOT PERFORMED. SITE HAS SINGLE WALL TANKS.
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)1
SWRCB, January 2002
5. SECONDARY PIPE TESTING
umb-M
Page 3 of /
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: X Pressure Vacuum 0 Hydrostatic
D Other (Specify)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run # UNL87 Piping Run # PREM91 Piping Run # Piping Run # rPipingManufacturer
l: FIBERGLASS FIBERGLASS
UNKNOWN UNKNOWN
Piping Diameter: 3" 3"
Length ofPiping Run: 50' 50'
Product Stored: UNL87 PREM91
Method and location of
i in -run isolation: BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure/vacuum/water and
starting test:
30 MIN 30 MIN
Test Start Time: 9:30 9:30
Initial Reading (RD: 5 5
Test End Time: I0:30 10:30
Final Reading (RF): 5 5
Test Duration: 60 MIN 60 MIN
Change in Reading (RP -Rj): 0 0
Pass/Fail Threshold or
Criteria: 0 0
Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail
COMMentS — (include information on repairs made prior to testing, and recommendedfollow -upforfailedtests)
SECTION OF SECONDARY PIPE TESTED IS FROM TRANSITION SUMP
TO UDC #9110 AND UDC #11/12 ONLY ALL OTHER PIPING IS SINGLE
WALL.
Ci q
fSWRCB, January 2002 Page "t of t
6. PIPING SUMP TESTING
Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Sump # TRANS
Sump Diameter. 37"
Sump # Sump # Sump #
Sump Depth: 26"
Sump Material: FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration: 16"
Height from Tanis Top to Lowest
Electrical Penetration: 16"
Condition ofsump prior to testing: GOOD
Portion of Sump Tested' 18"
Does turbine shut down when
sump sensor detects liquid (both
product and water)?'
Yes No X NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?*
yes C No X NA Yes No NA 0 Yes No 0 NA Yes No NA
Was fail -safe verified to be
operational?' Yes No X NA Yes D No NA Yes No NA Yes No NA
Wait time between applying
pressure /vacuum/water and starting
test:
30 MIN
Test Start Time: 11:53 12:09
Initial Reading (R4): 3.242 3.242
Test End Time: 12:09 12:24
Final Reading (RF): 3.242 3.242
Test Duration: 15MIN 15MIN
Change in Reading (RF -R,): 000 000
Pass/Fail Threshold or Criteria: 002 002
Test Result. X Pass Fail Pass 11 Fail Pass Fail Pass Fail
Was sensor removed for testing? X Yes No NA Yes No NA Yes No NA Yes 0 No NA
Was sensor properly replaced and
verified functional after testin ? X Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
87 AND 91 STP SUMPS NOT TESTED DUE TO NO SUMPS SINGLE
WALL LINES.
If the entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk ( *) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. MINDER- DISPENSER CONTAINMENT (UDC) TESTING
Page !! of
Test Method Developed By: UDC Manufacturer X Industry Standard 0 Professional Engineer
Other (Specify)
Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic
0 Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC Manufacturer:
UDC 41/2 UDC #5/6 UDC #7/8UDC #3/4
UNKNOWN UNKNOWN UNKNOWN UNKNOWN
UDC Material: PLASTIC PLASTIC PLASTIC PLASTIC
UDC Depth: 22" 22" 22" 22"
Height from UDC Bottom to Top
of Highest Piping Penetration:
6" 6" 6" 6"
Height from UDC Bottom to
Lowest Electrical Penetration:
10" 10" 10" 10"
Condition of UDC prior to
testing:
GOOD GOOD GOOD GOOD
Portion ofUDC Tested 8" 8" 8" 8"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Yes 0 No X NA 0 Yes 0 No XNA 0 Yes 0 No X NA 11 Yes 0 No X NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?' 0 Yes No X NA 0 Yes 0No XNA Yes No XNA 0 Yes No XNA
Was fail -safe verified to be
operational?* D Yes 0 No XNA D Yes No X NA Yes No XNA D Yes No XNA
Wait time between applying
pressure /vacuum/water and
starting test
30MIN 30MIN 30MIN 30MIN
Test Start Time: 11.08 11:29 10:26 10:42 11:08 11:29 11:53 12:09
Initial Readin (Rj): 4.263 4.263 2.562 2.559 2.817 2.516 4.971 4.970
Test End Time: 12:23 11:44 10:41 10:53 11:23 1 11:44 12:09 12:24
Final Reading (RF): 4.263 4.263 2.560 2.558 2.816 2.815 4.970 4.970
Test Duration: 15MIN 15MrN 15M1N 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Readin ( R,): 000 000 002 001 001 001 001 -.0001Pass/Fail Threshold or Criteria: 002 002 002 002 002 002 002 .002
Test Result: X Pass 0 Fail X Pass Fail X Pass 0 Fail X Pass 0 Fail
Was sensor removed for testing? X Yes 0 No NA X Yes No 0NA X Yes No 0 NA X Yes No 0NA
Was sensor properly replaced and
verified functional after testing? X Yes No NA X Yes No 0 NA X Yes 0No NA X Yes No 0 NA
Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
If the entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to any of the questions indicated with an
asterisk ( *) is "NO" or "NA', the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING
Page __ of
Test Method Developed By: UDC Manufacturer X Industry Standard 0 Professional Engineer
Other (Spec)
Test Method Used: 0 Pressure Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC #9/10 UDC #11/12 UDC # UDC #
UDC Manufacturer. UNKNOWN UNKNOWN
UDC Material: FIBERGLASS FIBERGLASS
UDC De the 25" 25"
Height from UDC Bottom to Top
of Highest PiRing Penetration:
9" 9"
Height from UDC Bottom to
Lowest Electrical Penetration:
6" 6"
Condition of UDC prior to
testing:
GOOD GOOD
Portion ofUDC Tested
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?
Yes No X NA Yes No X NA 0 Yes No NA 0 Yes 0 No 0 NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ? Yes 0 No X NA Yes No X NA Yes No 0 NA Yes 0 No 0 NA
Was fail -safe verified to be
operational?* 0 Yes No X NA 0 Yes No XNA 0 Yes No DNA Yes 0 No NA
Wait time between applying
pressure/vacuum/water and
starting test
30MIN 30MIN
Test Start Time: 1:05 1:20 1:05 1:20
Initial Reading Ri): 962 962 3.676 3.378
Test End Time: 1 :20 1:36 1:20 1:36
Final Reading (RF): 962 962 3.678 3.378
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading RF -R,): 000 000 002 000
Pass/Fail Threshold or Criteria: 002 002 002 002
Test Result: X Pass Fail X Pass 0 Fail Pass 0 Fail 0 Pass Fail
Was sensor removed for testing? X Yes No 0 NA X Yes 0 No 0 NA Yes No 0NA Yes 0 No NA
Was sensorproperly replaced and
verified functional after testin ? X Yes 0 No 0 NA X Yes 0 No NA 0 Yes No 0 NA Yes 0 No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an
asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
8. FILL RISER CONTAINMENT SUMP TESTING
L4 4 (0-I
Page I of /
Facility is Not Equipped With Fill Riser Containment Sums
Fill Riser Containment Sumps are Present, but were Not Tested 0
Test Method Developed By: 0 Sump Manufacturer X Industry Standard Professional Engineer
0 Other (Specify)
Test Method Used: Pressure 0 Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Fill Sump #UNL87 Fill Sump #PR w Fill Sump # Fill Sum #
Sump Diameter:
Sump Depth:
Height from Tank Top to Top of
Hi hest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing:
Portion ofSump Tested
Sump Material:
Wait time between applying
pressure/vacuum/water and
starting test:
NOT TESTED NOT TESTED
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading F-Rj):
Pass/Fail Threshold or Criteria:
Test Result: Pass 0 Fail Pass Fail Pass 0 Fail Pass Fail
Is there a sensor in the sump? 0 Yes No Yes No Yes 0 No Yes D No
Does the sensor alarm when
either product or water is
detected?
0 Yes No DNA Yes No 0NA 0 Yes No 0 NA Yes No 0 NA
Was sensor removed for testing? Yes No 0 NA Yes 0 No DNA D Yes No 0 NA Yes D No NA
Was sensor properly replaced and
verified functional after testin ? 0 Yes 0 No 0 NA Yes No DNA Yes No DNA Yes 0 No DNA
Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests)
NO SEALED SUNT
SWRCB, January 2002
9. SPILL/OVERFILL CONTAINMENT BOXES
L4 g1014
Page _L_ of
Facility is Not Equipped With Spill/Overfill Containment Boxes
SpilVOverfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS FEquipment Resolution:
Spill Box #87 VPR
q
Spill Box #91 VPR Spill Box # Spill Box #
Bucket Diameter: 12" 12"
Bucket Depth: 16" 16"
Wait time between applying
pressure/vacuum /water and
starting test:
30MIN VISUAL FAIL
Test Start Time: 10:42 11:29
Initial Reading (RO: 1.560 I.557
Test End Time: 10:57 11:44
Final Reading (RF): 1.559 1.559
Test Duration: 15MIN 15MIN
Change in Reading (RF -R,): 001 000
Pass/Fail Threshold or
Criteria: 002 002
Test Result: X Pass Fail Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailedtests)
LARGE HOLE IN SIDE OF PREM91 VAPOR BUCKET
WESTCHESTER MOBIL
3200 F STREET
BAKERSFIELD CA
12/07/2011 10:58 AM
SUMP LEAK TEST REPORT
87UPR
TEST STARTED 10:42 AM
TEST STARTED 12/07/2011
BEGIN LEVEL 1.5604 IN
END TIME 10:57 AM
END DATE 12/07/2011
END LEVEL 1.5597 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC1 -2
TEST STARTED 10 :42 AM
TEST STARTED 12/07/2011
BEGIN LEVEL 4.1033 IN
A..EHD TIME 10:57 AM
zvFEND DATE 12/07/2011
END LEVEL. 4.1010 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT
e - -- 5. d
TEST STARTED 11:08 AN
TEST STARTED 12/07/2011
BEGIN LEVEL 2.8i75 IN
END TIME i1:23 AM
END DATE 12/07/2011
END LEVEL 2.8167 IN
LERK THRESHOLD 0.002 IN
TEST RESULT PASSED
WESTCHESTER MOBIL
3200 F STREET
BAKERSF1ELD CH
12/07/206 11:44 API
SUMP LEAK TEST REPORT
87UPR
TEST-STARTED 11:29 AM
TEST STARTED 12/07/2011
BEGIN LEVEL 1.5575 IN
END TIME 11:44 AM
EHD.DATE 12/07/2011
END LEVEL 1.5576 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC3 --+ UDC1 -2
TEST STARTED
TEST STARTED
10:42 AM
12/07/2011 TEST STARTED 11 :29 AM
BEGIN LEVEL 2.5598 IN STARTED 12/07/2611
END TIME 10:57 AM BEGIN LEVEL 4.2639 IN
END MATE 12/67/2011 END TIME 11:44 AM
END LEVEL 2.5583 IN END DATE 12/07/2011
N]LDLEAKTHRESHOLD 0.b02 IN END LEVEL 4.26.38 IN
SULTESTRESULT PASSED LEAK THRESHOLD 0.002 IN
SULT PASSED
UX5-6 WESTCHESTER MOBIL
3200 F STREET
TEST STARTED 10:42 AM BAKERSFIELD CA
TEST STARTED
BEGIN LEVEL
12/07/2011
2.8183 IN 12/87/2011- 11.24 Am
END TIME
END DATE
10-57 /
2011 112/07/ SUMP LEAK TEST REPORT
END LEVEL 2.8182 IN 87UPRLEAKTHRESHOLD0.882 IN
TEST RESULT PASSED TEST STARTED 11:08 AMTESTSTARTED12/07/2011BEGINLEVEL1.5532 INENDTIME11:23 AMENDDATE12/07/2011ENDLEVEL1.5584 IN
LEAK THRESHOLD 0.002 INTESTRESULTPASSED
UDC1 -2
TEST STARTED 11:08 AM
TEST STARTED 12/07/2011BEGINLEVEL4.2638 INENDTIME11:23 AMENDDATE12/07/2011
END LEVEL 4.2638 IN
LEAK THRESHOLD 0.002 INTESTRESULTPAID
uDC5 -6
TEST STARTED 11:25 AM
TEST STARTED 12/07/2011
BEGIN LEVEL 2.8167 IN
END TIME 11:44 AM
END DATE 12/07/2011
END LEVEL 2.8157 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
WESTOmESTER MOBIL
3200 F SiREtT
BAKERSFIELD CA
12/67/2011 12.09 Pm
SUMP LEAK TEST REPORT
UDL7 -6
TEST ST AR3tD 11:53 Are
TEST STARTED 12/67/2011
BEGIN LEVEL 4.9713 iN
END TIME 12:09 PM
END DATE 12/07/2011
END LEVEL 4.9708 IN
LEAK THRESHOLD 0.602 IN
TEST RESULT PASSED
RANSP
TEST STARTED 11:53 Am
TEST STARTED 12/07/2011
BEGIN LEVEL 3.2423 IN
END TIME 12 :09 PM
END DATE 12/07/201i
END LEVEL 3.2422 in
LEAK THRESHOLD 0.002 Iiv
TEST RESULT PASSED
UDC1112
iYt; f CHE T LR i "061 L
1:20 PM
12/'37x2011 IN
32EA P STREET
UDC3 -4 SPKtSFIELu CA
TEST STARTED 10:26 AM s2/07/291i 12:24 RN
TEST STARTED 12/07/2011
BEGIN LEV& 2.5626 IN SUMP t.EAK- TEST PEPORT
END TIME 10:41 Ali
END DATE 12/07/2011 UDC7 -8
END LEVEL 2.5682 IN
LEAK THRESHOLD 0.662 IN TEST STARTED 12:09 PM
TEST RESULT TEST STARTED 12/07/201!
BEGIN LEVEL 4.9708 IN
END TIME 12:24 Pti
END DATE 12/07/2011
END LEVEL 4.9703 IN
LEAK THRESHOLD 0.002 IN
OESTCHESTER +'1OBIL. TEST RESULT PASSED
2w10 e ST +Rtcl
6A FIELD CA
1: -t -rr
TRANSP
12/07/2011 TEST STARTED 12:09 PM
UMF LEAK TEST REQL*T ZEST STARTED 12/07/2011
BEGIN LEVEL 3.2421 iN
Dr9 -10 END TIME 12: 24 Pti
1 :20 PM END DATE 12/07/2011
7FST STARTED f12.07011 END LEUrt 3.2421 IN
1TESTSTARTED0.9622 IS LEAK THRESHOLD 0.002 IN
BEGIN LEVEL 1:36 PM TEST ZESULT PASSED
END TIME 12/07/2011ENDDATE. 0.9620 IN
END LEHf ESHO {0,002 INLEAKTPASSED
TEST RESULT uESTC1ESTER M081:.
3200 F STREET
86KERSFIEL17 CA
UDC1112
TEST STARTED
TEST STARTED
1:20 PM
12/'37x2011IN
BEGIN LEVEL 1:36 Pf936
END TIME
END DATE 12/07/2011
3.3781 IN
ENp LEVEL 0.b02^ISLEAKTHRESHOLDPASSED
TEST RESULT
LW`{"
12/07/2011 1 :20 Pm
SUMP LEAK TEST REPORT
UDC9 - ih
TEST STARTED 1:05 PM
TEST STARTED i2 /07/2011
BEGIN LEVEL 0.9623 IN
END TIME 1:20 PM
END DATE 12/07/2811
END LEVEL 0.9622 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
tA)C1112
TEST STARTED 1:05 Pri
TEST STARTED 12/67/2011
BEGIN LEVEL 3.6768 iN
cNO TIME 1:20 Pm
ND DOTE i2/07/201i
ND LEVEL 3.6732 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
4%14 f
SB989 TESTING FAILURE REPORT
SITE NAME: WESTCHESTER MOBIL DATE: 1217111
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: ' a J''/ - n"( stt l 1oe57
o />w p L,9
LABOR:
1 -m
PARTS INSTALLED: / C 1' %W7
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.