Loading...
HomeMy WebLinkAbout3200 F STREET (9)P. t SWRCB, January 2002 Page _t__ of lf Secondary Containment Testing Report Form This form is intendedfor use by contractors performingperiodic testing ofUSTsecondary containment systems. Use the appropriate pages ofthis form to report resultsfor all components tested The completedform, written test procedures, and printoutsfrom tests (fapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: WESTCHESTER MOBIL Date ofTesting: 1/27/12 Facility Address: 3200 F STREET, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified ofTesting: Name ofLocal Agency Inspector (ifpresent during testing): ERNIE 2. TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Technician Conducting Test: RICH PHILLIPS Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type: C61/1340 A HAZ M License Number. 809850 Manufacturer Manufacturer Training Component(s) Date Training Expires INCON TS -STS 6/11/2012 3. SUMMARY OF TEST RESULTS Component Component MMMMM"MiR I VAPOR BUCKET raoo nnor..; 000 a000 onoo 000 0000 n000 oo o iaaoo nor.o 0000 nnor nnoo 000 o000 0000 0000 If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNI lAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, thefacts state this document are accurate and infull compliance with legal requirements Technician's Signature: Date: 1/27/12 10 LA D %-I -, -5 SWRCB January 2006 Spill Bucket Testing Report Form Thisform is intendedfor use by contractors performing annual testing ofUSTspill containment structures. The completedform and printoutsfrom tests (tfapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: WESTCHESTER MOBIL Date ofTesting: 1/27/12 Facility Address: 3200 F STREET, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (rfpresent during testing): ERNIE 2. TESTING CONTRACTOR INFORMATION Company Name: RICH ENVIRONMENTAL Technician Conducting Test: RICH PHILLIPS Credentials': CSLB Contractor X ICC Service Tech. SWRCB Tank Tester Other (Specie) License Number(s): 1035169 -UT 3. SPILL BUCKET TESTING INFORMATION Test Method Used: X Hydrostatic Vacuum Other Test Equipment Used: Equipment Resolution: Identify Spill Bucket (By Tank Number, Stored Product, etc) 1 91 VAPOR 2 3 4 Bucket Installation Type: Direct Bury X Contained in Sump Direct Bury Contained in Sump Direct Bury Contained in Sump Direct Bury Contained in Sum Bucket Diameter. 12" Bucket Depth: 14" Wait time between applying vacuum/water and start of test: 30 MIN Test Start Time (Ti): 1:10 Initial Reading (RO: 14" Test End Time (TF): 2:10 Final Reading (RF): 14" Test Duration (TF — Tj): 1 -HOUR Change in Reading (RF -Rj): 0.00 Pass/Fail Threshold or Criteria: 0,00 Test Result: X Pass Fail Pass Fail Pass Fail Pass Fail COMMentS — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that allthe information coat fined in this report is true, accurate, and infull compliance with legal requirements. Technician's Signature: Date: 1/27/12 I State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent