Loading...
HomeMy WebLinkAbout3221 H STREET (6)Secondary Containment Testing Report Form Thisform is intendedfor use by contractors peiforniiiig periodic testing of USTsecondary containment s,vstems. Use the appropriate pages ofthis form to report resultsfor all components tested The completedform, written test procedures, and printouts from tests (ifopplicable), should beprovided to the facility owner/operatorforsubmittal to the local regulatory agency. 1. FACILITY INFORMATION Facilitv ID: SA098 Facility Name: Pacific Bell Telephone Co. dba AT &T California Date of Testing: 3/2/2012 Facility Address: 3221 S. H STREET, Bakersfield, CA 93304 Facility Contact: Grant Armstrong Phone: (661) 327 -6903 r Initial P Repair Test Date Local Agency Was Notified Of Testing: 2/24/2012 r 6 Month r Other Name of Local Agency Inspector (if present during testing): Esther Duran r Triennial 2. TESTING CONTRACTOR INFORMATION Company Name: Tait Environmental Services Technician Conducting Test: Adolfo Aguilar Credentials: F- CSLB Licensed Contractor r SW RC13 Licensed Tank Tester r-' ICC UST Service Technician License Type: A B ASB C -10 HAZ License Number: 588098 Manufacturer Training Manufacturer Component(s) Date Training Expires ICC Technician 5238610 2/7/2013 r r r r. r r r SA0980001 Return Secondary 3. SUMMARY OF TEST RESU LTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made SA0980001 Supply Secondary r r r r r. r r r SA0980001 Return Secondary Fo- r" r- r r" r r- r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r rr r r r r F- r- r r r r r r F- r r r r r r r If hydrostatic testing was performed, describe what was done with the water after completion of tests: For any equipment capable of generating a print out of test results, you must attach a copy ofthe test report to this certification r System printout attached. CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated in this documen tare accurate and infull compliance with legal requirements Technician's Signature: 1-17 ' Date: 3/2/2012 5. SECONDARY PIPE TESTING Test Method Developed By: r Piping Manufacturer 1 Industry Standard r Professional Engineer F Other(Specify) Test Method Used: r Pressure r Vacuum r Hydrostatic F Other(Specify) Test Equipment Used: 4" Dial Gauge I Equipment Resolution: .1 W Piping Run SA098000I Supply Piping Run SA098000I Reuim Piping Run Piping Run Piping Material: Poly Poly Piping Manufacturer: Western Fiberglass Western Fiberglass Piping Diameter: 1" 1 1/2" Length of Piping Run: Approx. 35' Approx. 35' Product Stored: Diesel Diesel Method and location of piping -run isolation: Test Boot In Sump Kest Boot In Sump Wait time between applying pressure/vacuum/water and starting test: 15 Minutes 15 Minutes Test Start Time: 9:15 AM 9:15 AM Initial Reading (Rt): 5 PSI 5 PSI Test End Time: 10:15 A M 10:15 A M Final Reading (R r): 5 PSI 5 PSI Test Duration: 1 I -lour 1 1 -lour Change in Reading (Rt.R,): 0 0 Pass/Fail Threshold or Criteria: 0 0 Test Result: F Pass r Fail r Pass r Fail r Pass r Fail r Pass r Fail 01nmen4S — (include injorniatron on repairs made prior to testing, and recommenaeajoltow -up jorjailect tests)