Loading...
HomeMy WebLinkAbout3300 WHITE LANE (6)SWRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performingperiodic testing of UST secondary containment systems. Use the appropriate pages ofthisform to report results for all components tested The completedform, written test procedures, and printoutsfrom tests (fapplicable), shouldbe provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Big Country Chevron Date of Testing: 6/15/11 Facility Address: 3300 White Ln. Bakersfield, CA 93304 Facility Contact: Sharon Trent Phone: 661- 327 -5008 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Com any Name: Sunset Mechanical Technician Condu g Test: Scott Olinger Component Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C -36 C -10 License Number. 589517 Manufacturer Manufacturer Training Component(s) Date Training Expires Incon TS -STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component MM Component ffFj700"W'. r r.oo orcaoo a000 1, noo 0000 o00 ono r mm If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, the ac statedin this documentare accurate and infall compliance With legal requirements Technician's Signature: Date:-6-15-11 SWRCB, January 2002 Page _ of 4.t TANK ANNULAR TESTING Test Method Developed By: 9 Tank Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: 4" GEL FILLED GUAGE W/CERTS Equipment Resolution: 0-30 Ik.17111. cXrz 7 7.47'7 , Tank # I Tank # 2 Tank # Tank # Is Tank Exempt From Testing?' Yes No Yes &"No Yes No Yes DNo Tank Capacity: 20,000 12,000 Tank Material: GLASS/STEEL GLASS/STEEL Tank Manufacturer. MODERN MODERN Product Stored-- UNL PREM Wait time between applying pressure/vacuum/water and starting test: 10 MIN 10 NUN Test Start Time: 9:30 9:30 Initial Reading R): 8 HG 10 HG Test End Time: 10:30 10:30 Final Reading (RF): 8 HG 10 HG Test Duration: I HR I HR Change in Reading (RF-RO: 0 0 Pass/Fail Threshold or Criteria: 0 0 Test Result: Pass Fall Pass Fail Pass Fail Pass Fail Was sensor removed for testing? 5(Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? 9(yes No DNA WYes No NAI Yes No NAI Yes NoI Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) I Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary Containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code ofRegulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 1 5. SECONDARY PIPE TESTING Page of Test Method Developed By: 4 Piping Manufacturer Industry Standard Professional Engineer 50ther (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec6) Test Equipment Used: 4' GELL FILLED GAUGE Equipment Resolution: 0 -15 i 2 ''Pw s ; Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer. AO SMITH AO SMITH AO SMITH Piping Diameter: 3" 3" 3 11-4" Length ofPiping Run: 200' 200' 220' Product Stored: UNL PREM VAPOR Method and location of piping-run isolation: TEST BOOT AT UDC & STP TEST BOOT AT UDC & STP TEST BOOT AT UDC & STP Wait time between applying pressure /vacuum/water and starting test: 10 MIN 10 MIN 10 MIN Test Start Time: 10:00 10:00 10:00 Initial Reading (Rj: 5.1 5.0 5.0 Test End Time: 11:00 11:00 11:00 Final Reading (RF): 5.1 5.0 5.0 Test Duration: I HR 1 HR 1 HR Change in Reading (RF -Rj): 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 Test Result: 1 6 Pass 0 Fail 6 Pass 0 Fail —+LiPass 0 Fail 0 Pass 0 Fail Comments — (wclude information onrepairs madeprior to testing, andrecommendedfollow -upforfailed tests) SWRCB, January 2002 Page of 6. PIPING SUMP TESTING Test Method Developed By: 7 Sump Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum . Hydrostatic Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 ME92STP 1 Sump # STP 2 Sump # Sump # Sump Diameter. 48" 48" Sump Depth: 62" 61" Sump Material: FIBERGLASS FIBERGLASS Height from Tank Top to Top of Highest Piping Penetration: 15" 22" Height from Tank Top to Lowest Electrical Penetration: 18" 18" Condition of sump prior to testing: DRY DRY Portion ofSump Tested' 17" 22" Does turbine shut down when sump sensor detects liquid (both product and waterf Q&es No NA 94es No NA Yes No NA Yes No NA Turbine shutdown response time 20 SEC 20 SEC Is system programmed for fail -safe shutdown? i Yes No NA VYes No NA Yes No NA Yes No NA Was fail-safe verified to be Operational ?` yes No NA VYes No NA Yes No NA Yes No NA Wait time between applying pressure /vacuum/water and starting test: 15 MIN 15 MIN Test Start Time: 3:18 9:39 Initial Reading (RD: 4.9792 6.8009 Test End Time: 3:33 9:55 Final Reading (RF): 4.9787 6.8012 Test Duration: 15 MIN 15 MIN Change in Reading (RF -&): 0004 0003 Pass/Fail Threshold or Criteria: 002 002 Test Result: VPass Fail VPass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Q,4es No NA Yes No 0 NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA es No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforfailed tests) Ifthe entire depth ofthe sump is not tested, specify how much was tested. If the answer to My of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 7. UNDER DISPENSER CONTAINMENT (UDC) TESTING Page of Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 b -u •_ - N.- "r.+1 -F" St 2y UDC # 1 -2 fwj gt?. 'i .l Fi .L7 UDC # 3-4 rCdr3f1 i Y.rl- . -wV5 }5'Xi.4°s!. - UDC # 4-6 1.:'i L miJidel".' -r .."I..`d -Aiih_ UDC # 7 -8 UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC the 30" 30" 30" 30" Height from UDC Bottom to Top ofHighest Piping Penetration: 10" 10" 10" 10" Height from UDC Bottom to Lowest Electrical Penetration: 8" 8" 8" 8" Condition ofUDC prior to testing, DRY DRY DRY DRY Portion of UDC Tested 12" 12" 12" 12" Does turbine shut down when UDC sensor detects liquid (both roduct and water)? J EJ Yes No NA i 'es No NA 6 Yes No NA 6 Yes No NA Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail- safe shutdown ?` yes No NA Yes No NA Yes No NA Yes No NA Was fail -safe verified to be o tional?' NYes No NA Wes No NA dyes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test 15 MIN 15 MIN 15 MIN 15 MIN Test Start Time: 1:57 1:57 11:57 11:57 Initial Reading RO: 2.7247- 3.7204 2.8921 3.5882 Test End Time: 2:13 2:13 12:12 12:12 Final Reading (RF): 2.7247 3.7192 2.8905 3.5879 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading (RF -R: 0 0012 0016 0003 Pass/Fail Threshold or Criteria: 002 002 002 002 Test Result: Pass Fail Pass Fail Ef Pass Fail Pass Fail Was sensor removed for testing? Ef Yes No NA es No NA Yes No NA Yes 11 No 0 NA Was sensor properly replaced and verified functional after testin ? yes No NA F1Yes No NA Yes No NA 9'//Yes No NA Comments —(include information on repairs made prior to-testing, and recommendedfollow -upforfailed tests) ifthe entire depth of the UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 1. UNDEif- DLIYENSEK C;ONTAMMEIN T (UDC:) TENTILNG Page of Test Method Developed By: ELI UDC Manufacturer D Industry Standard Professional Engineer D Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 122-, Y .. ti4`,f'- 7Tns"•.KI. iMW,STr'i.^,S'l "`fir- :x 313s .Rd'v;ro:YJ$1". T.'i UDC # 9 -10 UDC # 11 -12 UDC # UDC # UDC Manufacturer. WESTERN WESTERN Yes No Q NA D Yes D No D NA UDC Material: FIBERGLASS FIBERGLASS UDC Depth: 30" 30" Is system programmed for fail- safe shutdown ?` Height from UDC Bottom to Top of Highest Piping Penetration: 10" 10" Yes D No Height from UDC Bottom to Lowest Electrical Penetration: 8" 8" Was fail-safe verified to be operational?* y Condition ofUDC prior to DRY DRY D No NA Portion ofUDC Tested' 12" 12" Does turbine shut down when UDC sensor detects liquid (both product and water ?* Yes No D NA Yes DNo D NA Yes No Q NA D Yes D No D NA Turbine shutdown response time 20 SEC 20 SEC Is system programmed for fail- safe shutdown ?` yes D No NA Yes D No NA Yes D No D NA Yes No NA Was fail-safe verified to be operational?* y No NA Yes D No NA Yes D No NA Yes No NA Wait time between applying pressure /vacuum/water and starting test 15 MIN 15 M1N Test Start Time: 11:57 2:13 Initial Reading O: 6.4833 5.0482 Test End Time: 12:12 2:29 Final Reading Rr ): 6.4822 5.0482 Test Duration: 15 MIN 15 MIN Change in Reading RF- : 0011 0 Pass/Fail Threshold or Criteria: 002 002 Test Result: Pass Fail Pf Pass D Fail Pass Fail Pass D Fail Was sensor removed for testing? eXes D No DNA Yes No DNA D Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin ? Yes No NA 4Yes D No DN=DYes No D NA Yes D No D NA Comments — (include information on repairs made prior to testing; and recommendedfollow -upforfailed tests) 1 If the entire depth ofthe UDC is not tested, specify how much was tested. 1f the answer to M ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 1 : : t Y t lu t Y Y11ti t' Y _ y 1 Page of Facility is Not Equipped With Fill Riser Containment Sums Fill Riser Containment Sumps are nt, but were Not Tested Test Method Developed By: I Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 s. :.: -.- A.: y5..,. - tea -.: - .,.. . a., p# Fill Sump #1 Fill Sump #2 Fill Sump # Fill Sump Sump Diameter: 42" 42" Sump Depth: 60" 60" Height from Tank Top to Top of Highest Piping Penetration: N/A N/A Height from Tank Top to Lowest Electrical Penetration: 20" 20" Condition ofsump prior to testing: DRY DRY Portion of Sump Tested 22" 22" Sump Material: FIBERGLASS FIBERGLASS Wait time between applying pressure/vacuum/water and starting test: 10 MIN 10 MIN Test Start Time: 9:39 9:39 Initial Reading 6.4690 1.7446 rest End Time: 9:55 9:55 Final Reading (RF ): 6.4691 1.7443 Test Duration: 15 MIN 15 MIN Change in Reading (RF-&): 0001 0003 Pass/Fail Threshold or Criteria: 002 002 Test Result: W Pass Fail 31Pm Fail Pass Fail Pass Fail Is there a sensor in the sump? IY7es No es No Yes No Yes No Does the sensor alarm when either product or water is detected? As No C1 NA C7JYes Cl No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA 5tyes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin 7 es No NA Yes No NA Yes No NA I Yes No NA Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailedtests) SWRCB, January 2002 Page of 9. SPII.L/OVERFILL CONTAIlViV1ENT BOXES Facili is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are t, but were Not Tested Test Method Developed By: 4 Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Sped) Test Method Used: Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: 0.0000 Spill Box #1 Spill Box #2 Spill Box #3 Spill Box # Bucket Diameter: 12" 12" 12" 12" Bucket Depth: 12" 12" 12" 12" Wait time between applying pressure/vacuum/water and starting test: 10 MLN 10 MIN 10 MIN 10 M1N Test Start Time: 3:18 3:18 3:18 3:42 Initial Reading (Rj): 2.0362 6.7047 5.6518 4.4542 Test End Time: 3:33 3:33 3:33 3:57 Final Reading (RF): 2.0380 6.7040 5.6517 4.4558 Test Duration: 15 N41N 15 MIN 15 MIN 15 MIN Change in Reading (RF -R4): 0018 0007 0001 0016 Pass/Fail Threshold or Criteria: 002 002 002 002 Test Result: d Pass 0 Fail 4 Pass 0 Fail Pass 0 Pass Fail Comments — ('include information on repairs made prior to lesting, and recommendedfollow -up forfailed tests) Bl_G COUNTRY CHEVRON COUNTRY CHEVRONRlG3300WHITELk3300WHITEL BHKERSFlELD CA. 93309 ` 8HK[RSFIELD CH. 93389 3 C EVRON 661-827-8487 661-827-0487 3300 WHITE LK 1-800-984-6266 1-800-984-6266 OHKERSFIELD CH. 93309 66i-327-0487 10/29/2082 12:12 PB 10/29/2082 12:28 PM i-800-98+-6266 SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 10/29/2002 3:17 Pr, U0Cz-2 U0C-2 SxMP LEAK TEST REPORT TEST STARTED 11:57 AM TEST STARTED 12:13 PM SPILL 1 T TST 10 T 10 2 2 8EGIN LEVEL 6.3433 IN BEGIN LEVEL 6.3434 IN TEST STARTED 3;01 PM END TIME 12:12 PM END TIME 12;28 PM TEST STARTED 18/29/2002 END DATE 10/29/2002 END DATE 18/29/2002 8[GlM LEVEL 2.0362 IN END LEVEL 6.3431 IN END LEVEL 6.3314 IN! END TIME 3,16 PM LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN, END DATE 18/29/2002 TEST RESULT PASSED TEST RESULT FAILED END LEVEL 2.0361 IN K THRESHOLD 0.002 IN TEST RESULT PASSED U0C9-18 UDC9-10 TEST STARTED 1z:57 HM TEST STARTED 12:13 PM VSpILL1 TEST S--^'TED 18/29/2002 TEST STARTED 10/29/2002 BEGIN LE/:-L 6.4833 IN BEGIN LEVEL 6.4770 IN TEST STARTED 3;01 pr END TIME 12'12 pM END TIME 12:28 PM 7EST STARTED 0/29/2002 N0 DATE 10/29/2002 END DATE 10/29/2002 BEGIN LEVEL 5.6514 IN END LEVEL 6.4822 IN ND LEVEL 6.4770 IN END TIME 3:16 PM LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN END DATE 10/29/2002TESTRESULTPASSEDTESTRESULTPASSEDNDLEVEL5.6515 IN LEAK THRESHOLD 0.082 IN TEST RESULT PHSSE0 UDC 7-8 UDC 7-8 TEST STARTED 11:57 AM TEST STARTED 12:13 PM SPILL 2TESTSTARTED10/29/2082 TEST STARTED 10/29/2002BEGINLEVEL3.5882 IM BEGIN LEVEL 3,5879 IN TEST STARTED 3;01 PMNDTIME12:12 PM END TIME 12:28 PM TEST STARTED 18/29/2002 END DATE 10/29/2002 ND DATE 10/29/2002 BEGIN LEVEL 4.8205 IN END LEVEL 3.5879 IN END LEVEL 3,5875 IN END TIME 3:16 PMLEAKTHRESHOLD0.002 IN EAK THRESHOLD 0.002 IN END 0HT[ 10/29/2002 TEST RESULT PASSED TEST RESULT PASSED ND LEVEL 4.8126 lK LEAK THRESHOLD 0.002 IN TEST RESULT FAILED UDC 5-6 UDC 5-6 TEST STARTED 1:57 HM TEST STARTED 12:13 PM STP 1 TEST STARTED 10/29/2002 TEST STARTED 10/29/2002 BEGIN LEVEL 2.8921 IN BEGIN LEVEL 2.8900 IN TEST STARTED 3:01 PM END TIME 12:12 PM END TIME 12:28 PM TEST STARTED 10/29/2002ENDDATE10/29/2002 END DATE 10/29/2002 BEGIN LEVEL 4.9795 IN END LEVEL 2.8905 IN EHD LEVEL 2.8891 IN END TIME 3:16 PM LEAK THRESHOLD 0.002 IN LEAK THRESiH]L0 0.002 IN END -DATE 10/29/2002 TEST RESULT PASSED TEST RESULT PASSED END LEVEL 4.9791 IN LEAK THRESHOLD 0.002 I TEST RESULT PASSED e.IG COUNTRY CHEVRON3308WHITELNBAKERSFIELDCA BIG COUNTRY CHEVRON 3300 WHITE LN j 3113 COUNTRY CHEVRON 93,109661 - 827-0487 I iKERSFIELD CA 93309 3300 WHITE LN 1- 800 -984 -6266 661 -827 -0481 BAKERSFIEL: CA. 43309 800-98-6266 661-827-0407 06/15/2011 8:56 ACS! i. - `:k•It_i- 984- h2E•E• SUMP LEVEL 06f15,`2C11 L 9 :5` AN 10/29/2002 3 :: 7, PiaREPORT8ICOUNTRYCHEVRON 3J00 WHITE Lh, SLOP i_EAIC TEST REPORT JI(t9P i_ AK. TEST ,REPORT SUMP FILL 1 6.469 AKERSFIELD CA 93309 FILLSyJMPFINILL2661-827-048-,---' SPILL1.743 INSUMPSTP10.060 IN 1- 800 -9Sa -6266 E` STARTED 39 AN SUMP STP 0.000 IN 06/ 1.,•`2011 iC:k+C; AM TE' -,-- STARTED 06/15/201! ESTEST STARTED TTES; STARTED 31 1 2 1 10.'?'?:''1C2BEGINLEVEL6.4690 IN I N LEVEL 25EGIN SUMP L EL REPORT III END TIME END DATE 9: 55 AM 06/15/2011 END i !hJE 0362 3::33 Pr: END LEVEL 6.4691 IN END DATE 10/29/2092 SUMP c- SUMP ._ P 2 6. 799 INi LEAK THRESHOLD 0.002 IN END LEVEL LEAK THRESHOLD 2.038ij IN 0. 002 INJrTESTRESULTPASSED TEST RESULT PASSEDI F1LL 2 VSP I LL1 COUNTRY CHEVRON TEST STARTED 9:39 At'. 3300 WHITE LN TEST STARTED 06/15/2011 TEST STARTED 3:18 Pr CA 309 BEGIN LEVEL 1.744E IN TEST STARTED 10 %29/2002 661 -827 -0487 END TIME 9:55 AM BEGIN LEVEL 5.6518 IN 1-800-984-62-66 END DOTE 06/15/20112011 END TIME 3:33 Pt9 05/15/2811 4: Ah; 3"G COUNTY CHEVRON 2ND LEVEL LEAK THRESHOLD 1.7443 IN N.902 IN END DATE END LEVEL 10/29/200' 5.6517 IN34kir3 ,.1,y T TE LN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN SUMP LEAK TEST REPORT I 3AKERSFIELD Cr, 93309 TEST RESULT PASSED 661 -2 7 -040 FILL 1 i-80- 1-984-6266 STP ]. T'ST STARTED 9:18 AM 06/15/2011 5 Ar: ( 10:1 ` TEST STARTEDS 9: 9 AM SPILL 2 TkST STARTED 06/15/2811BE'G ;I LEVEL SUMP LEAK TEST REPORT TEST STARTED 06/15/2E 11 TEST STARTED TEST STARTED 9/2 02' 10/29/20026.4690 INENDTIMEx'34 C3EGIN LEVEL END TIME 2.5245 IN 9: 5., HM BEGT_N LEVEL 6.79470 IN END DATE AM 06/15 /2611ENDLEVEL S P ` END DATE 06/15 /2011 END TIME END DATE 3 :33 Phi 10/29/'20026.4691 INLEAKTHRESHOLDlD crE ' ?TriRTE' 9:59 AM END LEVEL 1.0629 IN END LEVEL 6. 7040 IF! TEST 0.002 INRESULTPASSED TEST Si`ARTED 0x/15.'2811BEGIN ' EAK THRESHOLD TTES, RESULT 0.002 IN FAILED LEAK THRESHOLD 0.002 INLE! L x.7953 IN TEST RESULT PAS'_EDENDTIME10 :1- Ah; FILL 2 END DATE 3x:15.2811ENDLEVEL TP 2 TEST oTARTED 9:18 AM 6. 79,81 It, AK. T'RESHOLD 0-0302-' TEST c TEST STARTED 3'? Ah STP 1 TEST STARTED 06/15/2011BEGINLEVEL RESLrL- - C TEST STARTED 06/15/2011 TEST , i ARTED TEST STARTED 7 • 1= PP'r 10/29/20021.7444 INENDTIh1E LBEGINLEVEL a. s El9 IN END DATE 9:33 AM END TIME 55 AM BEGIN LEVEL 4.9792 IN END LEVEL 06/1 _x/21::1 i END DATE f9 06, 15/2011 AND TIME 3 :.'.; PM 1.7445 INLEAK, THRESHOLD END LEVEL 6.8012 IN END DATE cND LEVEL 10/29/2002' 4.9787 INA. 002 IE. EST RESULT LEAK. THRESHOLD 0.002 IN AS$E1 TEST RESULT AS:SED I LEAK THRESHOLD 0.002 IN I TEST RESULT PASSED is I6 COUNTRY CHEVRON 3300 WHITE Lt AKERSFIELD CA. 93389 661 -827 -0487 03SS)Jd imS3d 1531 i -800 -984 -6266 NI ZOO'@ CIOHS38HI NV3-1 Ni Z8b0'; -13A31 ON3 10/29/2002 2:13 PM I Z00Z /6Z /8T 31YO ON3 Wd 6Z : Z 3WI1 4N3i:t =[IIi;"iic4' CHEVRONl SUMP LEAK TEST REPORT NI Z81 0'S 13Pi3 F I938 IG COUNTRY CHEVRON 33001 WHITE LN 3AKERSFIELD CA. 93309 u00Z/6 /0T i73121U1S 1,31 33001 WHITE LN 661- 827 -04,t87 UDC1 -2 I Wd 2T :7, 0iNV1S 1531 3AKERSFiELD CA. 93309 N0 -'x24 -6266 t T; 661 -827 -0487 TEST STARTED 1:57 PM a,TS (iQ 1 -800- 984 -6266 101/29/2002 t 4 PP' 4- TEST STARTED 18/29/2002 1 72 BEGIN LEVEL i.rc4. IN i0/29/'20102 3:5 Phi LIMP LEAK TEST REPORT E'N'D TIME 2:13 Phi 43SSVd 11001 1531 SE leyNDDATE. 10/cs/L002 NI 700'0 370HS38Hi AV33 SUMP LEAK TEST REPORT SPI_L 2 END LEVEL 2.7247 IN NI 90L'2 1wo -1 ON3 LEAK THRESHOLD 0.002 IN Z00Zr6z/OT 3100QN3 SF'I_! T*. - T 3 :59 TEST RESULT PASSED 3WIl 4N3261 -1303 -IINI ,1'2 N1938 T STARTED 3:2 't ^. TEST STARTED 10/29/2002 rZ00Z /6Z /0T C131du1` 131 TEST STARTED 10/29/2002 EGIN '_EVEL 5.5598 IN END TIME 5 14 IN UDC yC3 -4 I l.4d T ,.Z C31NViS iS31 3-EG IN LEVEL 5.5594 IN END TIME 3:57 Ph'' END GATE ?X7/29/20020/29/2 TEST STAR -FED 1'57 PM D--D DATE 10/29/2002 END LEVEL r2ENDTHRESHOLD .5599 IN TEST STARTED 10/29/2002 END LEVEL 5.559' IN rTESTRESULTPASSED BEGIN LEVEL 3.7204 IN 2:13 PI'1 033Iud l ilS3J 1531AKTHRESHOLD0.302 IN END TIME ITESTRESULTPASSEDiENDDATE10/29/2002 NI Z80'0 OIOHS3NH1 >IV2 -1 1.. +SPiLL2 END LEVEL 3.7192 IN 1 NI 28T'Z 3n3l 9N3 LEAK THRESHOLD 01.002 IN ' Z00Z /6Z /0T 31VO ON VSPILL2 nTEb , STARTEDARTED 3:59 P, : ST RESULT PASSEDTEST I Wd 6Z:Z 3WI1 ON3 NI 2SZZ" _13n3_1 N 193; TEST STARTED 3:42 Ph' TEST STARTED 10/29/2002 Z80Z /6Z /0T 031'lViS 1531 TEST STARTED 10/29/2002 BEGIN LEVEL 4.4500+ IN END TIME 11()1_1112 Wd 2T :Z 731 IV1S 153:_ BEGIN LEVEL 4.4542 IN 4•: 14 PM END DATE 10/29/2002 1: 57 PM n30FfENDTIME3:57 2M11 END LEVEL 4.4564 IN TEST STARTED END DATE 10/29,•':; END LEVEL 4.4559 IN LEND; THRESHOLD 0.0N12 ,T. h! c TEST STARTED 10/29/2802 ! BEGIN LEVEL 5.0482 IN I ui?Od3d 1S3_ ?I,. ?-; dWl (.; LEAK THRESHOLD 0.002 iK i TESTT , ?ESULT PASSED END TIME 2:13 PM TEST RESULT PASSED END DATE 10/29/2602 Jd 6' 6:Z Zo0Z.'6Z. /0T END LEVEL 5.0481 IN LEAK THRESHOLD 0.00+2 IN 909-086-006-T TEST RESULT PASSED 1 090 -&-18r— JZS —44 60226 'V:! 013I3S42NV 31IHM OOE2 NONA30 A81NO03 OI :