HomeMy WebLinkAbout3301 WIBLE ROAD (5)MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State ofCalifornia
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be
prepared for each monitoring system control panel by the technician who performs the work. A copy ofthis form must be provided
to the tank system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems
within 30 days of this date.
A. General Information
Facility Name: HP Go Go
Site Address: 3301 Wible Road
Facility Contact Person: Alondra Hernandez
Make /Model of Monitoring System: Veeder -Root TLS -350
B. Inventory of Equipment Tested /CertifiedChecktheappropriateborestoindicatespecificequipmentinspected /serviced:
City: Bakersfield
Bldg. No.:
Zip: 93309
Contact Phone No.: 661 - 835 -8044
Date of Testing /Servicing: 01/19/2012
Tank ID:_10000 gal. Regular #1 Tank ID: 10000 gal. Regular #2
x] In -Tank Gauging Probe. Model: 847390-107 x] In -Tank Gauging Probe. Model: 847390 -107
Lx] Annular Space or Vault Probe. Model: x] Annular Space or Vault Sensor. Model:
x] Piping Sump / Trench Sensor(s). Model: 794380-208 x] Piping Sump / Trench Sensor(s). Model: 794380 -208
Fill Sump Sensor(s) Model: Fill Sump Sensor(s). Model:
J Mechanical Line Leak Detector. Model: FX1y x] Mechanical Line Leak Detector. Model: FE Petro
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
xl Tank Overfill / High Level Sensor. Model :OPW 81SO x] Tank Overfill / High Leval Sensor. Model: OPW 61SO
Other (specify equip. type and model in Sec. E on Pg. 2) Other (specify equip. type and model in Sec. E on Pg. 2)
Tank ID: 10000 gal. Super Tank ID:
x] In -Tank Gauging Probe. Model:847390 -107 In -Tank Gauging Probe. Model:
Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model:
x] Piping Sump / Trench Sensor(s). Mode): 794380-208 Piping Sump / Trench Sensor(s). Model:
Fill Sump Sensors(s). Model: Fill Sump Sensor(s). Model:
x] Mechanical Line Leak Detector. Model:FXIV Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
X] Tank Overfill / High Level Sensor. Model:OPW 61SO Tank Overfill / High Level Sensor. Model:
Other (specify equip. type and model in Sec. E on Pg. 2) Other (specify equip. typs and model in Sec. E on Pg. 2)
Dispenser ID: 1 & 2 Dispenser ID: 3&4
n Dispenser Containment Sensor(s). Model: 794380- 208 x] Dispenser Containment Sensor(s). Model: 794380 -208
X] Shear Valve(s). x] Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s)
Dispenser ID: Dispenser ID:
Dispenser Containment Sensor(s). Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chains(s). Dispenser Containment Float(s) and Chain(s).
Dispenser ID: t Dispenser ID:
Dispenser Containment Sensor(s). Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s) Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification -1 certify that the equipment identified in this document was inspected /services in accordance with the
manufacturers' guidlines. Attached to this Certification is information (e.g. manufacturers' checklist) necessary to varify that
this information is correct and a plot plan showing the layout of monitoring equipment. F equi ment capable of generating
such reports, 1 have attached a copy of the report; (check all that apply) x Sys m S [x] Alarm history report
Technician Name (print): Douglas Young Signature:
Certification No: A32755 License No: 804904
Testing Company Name: Confidence UST Services, Inc. Phone No: 800.S4-9930
Site Address: 3301 Wible Road, Bakersfield, CA 93309 Date of Testing/Servicing: 01119/2012
D. Results of Testing /Servicing
Software Version Installed: .04
Complete the following checklist:
x] Yes No* Is the audible alarm operational?
x Yes F1 No* Is the Visual alarm operational?
x Yes No* Were all sensors visually inspected, functionally tested, and confirmed operational?
x Yes No* Were all sensors installed at the lowest point ofsecondary containment and positioned so that other
equipment will not interfere with their proper operation?
Yes No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) Hx N/A operational?
x Yes No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary
N/A containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes:
which sensors initate positive shut -down? Sump /Trench Sensors [x] Dispenser Containment Sensors
Did you confirm positive shut -down due to leaks and sensor failure /disconnected? [X] Yes; No;
Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no
rx I N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visual and audible at
the tank fill point(s) and operating properly? If so, at what percent of tank capasity does the alarm
trigger? L90 %
U Yes* No Was any monitoring equipment replaced? If Yes, identify specific sensors, probes, or other equipment
replaced and list the manufacturer name and model for all replacement parts in Section E, below.
Yes* No Was liquid found inside any secondary containment systems designed as dry systems?
Product; Water. If yes, describe causes in Section E, below.
Ex] No* I Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
LxJ Yes I Ej No* I Is all monitoring equipment operational per manufacturer's specifications?
In Section E below, discribe how and when these deficiencies were or will be corrected.
E. Comments' Replaced the Veeder -Root 208 sensor in the UDC of dispenser # 1/2 due to broken wire at the sensor.
This site is equipped with OPW 61 SO Overfill Prevention Devices (Flapper Valves)
F. In -Tank Guaging / SIR Equipment: [x] Check this box if tank guaging is used only for inventory control.
Check this box if tank guaging or SiR equipment is installed.
This section must be completed if in -tank guaging equipment is used to perform leak detection monitoring.
Complete the following checklist:
X] Yes
For equip. start-up or annual equipment certification, was a leak simulated to varify LLD performance?
No* Has all input wiring been inspected for proper enter and termination,including testing for ground faults?
x Yes
No*
No* Were all tank guaging probes visually inspected for damage and residue buildup?
x Yes
Was the testing apparatus properly calibrated?
No* Was accuracy of system product level readings tested?
x Yes No* Was accuracy of system water level readings tested?
x Yes No* Were all probes reinstalled properly?
x] Yes
I
No* Were all items on the equipment manufacturer's maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD): Check this box if LLD's are not installed.
Complete the following checklist:
x Yes No* For equip. start-up or annual equipment certification, was a leak simulated to varify LLD performance?
Check all that apply) Simulated leak rate: 3 g•p.h.: 00.1 g.p.h.; 0.2 g.p.h.;
x Yes No* Were all LLD's confirmed operational and accurate within regulatory requirments?
x Yes No* Was the testing apparatus properly calibrated?
x] Yes No* For mechanical LLD's, does the LLD restrict product flow if it detects a leak?
N/A
Yes No* For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak?
Lx] N/A
Yes No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is
x] N/A disabled or disconnected?
Yes No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system
U N/A malfunction or fails a test?
Yes No* For electronic LLD's, have all accessible wiring connections been visually inspected?
U N/A
x Yes Lj No Were all items on the equipment manufacturer's maintenance checklist completed?
In the section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
The Regular #I Leak Detector was tested while isolated from Regular #2 and PASSED
The Regular 42 Leak Detector was tested while isolated from Regular #I and PASSED
Due to the fact that Regular #I and Regular 92 product lines are manifolded, it, the normal operating configuration
both Leak Detectors failed to detect the required 3 gph @ 10 psi leak when tested. it was for this reason that Regular #2 was
removed from service until the piping configruation has been corrected.
HP GO 909
14`4 GALS T ',:1i(ILF"—DED2
ULLAGE =
3301 WIBLE PE.,
ALS OUTPUT
Jull,
90% ULLrAGE= 7909
BAK'ERSFIELL; CA 9r-7,309
IJLI AGE 9 4.6
33fil 1"31BLE RD
TC VOLUPIE = 1421
661 -397 -4
1: ', ULLt-(,E= 17- 1 ri9FII
HE I GHT =
BAKE F I EI - F1 'a: %:31_1'4
1 NC:HES' R I : P,' "S I T PI E H I IT 1- 1,0 li TC I -: 1211
TRJ
WATER =
6r.1- 39'? -s155(
GALS T,"PE:
JA I `J 19 - '201 '2' 1 1 : 17 A41
I
1;JATER = 0.00 1 NC HE- S 3TAJ'JL "IRL WATER 03L. 0 GALS
I NC-'HESTEMP = 621 . 0 DEG F j klATEP
SYSTEM STHTLIS REPORT L 2 :L !I 1 4
TEMP
TRI-2,THTE REPORT
ALL FUtJG'TIONS NORIIAL PAN
ALL :FUEL f;LhPll
sUT LHATI
I NVENTOR,l REPORT
L 3 : 87 - ITI : UNLEADED 1 TRI-21'1'iiTEVOLUME23' 3 1 t-IC' 'LS Cl'h'FEG-"-R,' 2;TP 'SUIP T I jifji,EHEIED I
ULLAGE 7540 CALS oc"ILUIE = 8;3g
90% ULLA)GE= 650 GALS IJLL6','E = 532'
TC' %)OLUME = a -3, ALS L 2-11 T PHEIGHT = O. 1'- I NC, HES, Tl-' ,iOLIJJ'JE 0
WATER VOL = 0 HE I C;HT
WATER' = 0. 00 1 NCHE" c-• JATER VOL = 0
TEPIP = 59.5 DEC F WATER = L(. oc, I (--iCHE2i
L 5 87 _'FP TEMP = DEC, F
T 2':PREIllUl-1
VOLUME 13 1 GALS
ULLAG'E = 9059 GALS kjLUME p G; L;-',
90% ULLkGE= 80'--'1 GALS HL';'3
TC VOLUME = I :30e, GALS 903"' IJLL 4(-l'C= c C
HE I GHT = 17.44 1 1+-'HES Ti_ ',,?,JLUIlE 13'' 1
WATER VOL = 0 GALS HEIGHT t_. INCHES
1.•JATER = 0. 00 1 NCHES ' 1.,IHTER %)OL Lt GAL:_
TEMP = 63.6 DEG F i, ` 'TEF-Ir Cl. 00 1 1'4CHES
TEMP F
T :3: UNLEADED2
VOLUME = 14`4 GALS T ',:1i(ILF"—DED2
ULLAGE = 8947 ALS OUTPUT90% ULLrAGE= 7909 t -, ALS IJLI AGE 9 4.6 j-i L-
TC VOLUPIE = 1421 Ci:iL'S 1: ', ULLt-(,E= 17- 1 ri9FII
HE I GHT = 18 . 47 1 NC:HES' R I : P,' "S I T PI E H I IT 1- 1,0 li TC I -: 1211
WATER = 0 GALS T,"PE: HE I (-;HT r_, I
1;JATER = 0.00 1 NC HE- S 3TAJ'JL "IRL WATER 03L. 0 GALS
I NC-'HESTEMP = 621 . 0 DEG F j klATEP c). oo
DEC FTEMP
END
ALL :FUEL f;LhPll
sUT LHATI
Fii WIBLE RE,
B,-jl::Ek2_lFl ELI, 9"'309
661 -397-4553
LEAj_. TENT' REPORT
T
SERI HAL 111111 304214b
TEE-IT
Al
TH = 2. 0 HR"
ST,R'r VOLUIE _ 2 :
TEMI = 57. F
TDIP = 518 2 F
sT-,')ERl()r,V:i; 2.-4
0 14 0.07 0.04
TEST' RE-.,ULT',l_*,
RATE = CjX:_ I-,AL,, HR
0. ;AL HR TEc'l I 1,•v'L
0.20 HI' FLtii
iFECD(F DEL P., `EP.`,`
TEMP HANGS
I
HP r v GC_". 3301 L.-JIBLE RE,
DAYER21:I ELE, 9:3.2'CII-A
E61- 3 }37-a55`3
JAN 19. 2012, J I A&-1
LEAK TE:1:7T REF""RT
T 2: PREPI 1101
PROBE 'SERIAL
TEST 12-IT"RI'll-46 Tl1 "',E:
AN ' 15 - '2012 121 : ClCl n- rl
LEf'-Jl,__lTH = 2L' .0 HREI
VOLUME = 1468.':4
START TEMP = 63. 2 F
END TDIP = 63 . 2, F
EST ER I ':) fiS 2 -40.61, _cI.I_IFI Cl. C10
LEAK MST RESULT::
RATE = 0.0o l_;r-iL HR
5.20 AL, HR TE21 I
Oi. 2i GAL HR Ff-61,:-
401,11 I-E'v'EL TF-T
s
HP Go a09
3301 WIDLE RE,
D"K FPSF I ELL C" 93:3 C19
I, El 1 -397 -- 4 5
klAt'l 1', 20 1'2, 9:21 All
LLHK TMT REP,DPT
T I :UNLD DEDI
1PR,"BE SERI 61- 1,10-1 4541
TEST TI PIE :
JAN 15 - 21012 00 11
TE I' LENGTH = .2 . cl HR
Q'TRT = 1066.1 _,illL
START TD-IF, = 6 0 F
END TDIF, = 62'.1 F
rE,--;T - PERICU" 2-:1
11. 00 CI 02-1 U. C, I
LEAK TEST RE(ULT2;
RATE = 0. 00 C,AL,, HR
Ci. -0 GAL , HR TE '-T I l'4Vl_
li.'CI GAL, HR FLh,G2_,.:
LOW LE%.,,'EL TF_!,.T ERRI.)R
END
AkP,l H I 22,70F."' F-EF,'-'RT
SEN20R iLHRM
5:87-2 STP
rP OUMP
ENSOR OUT r'_lLHRM
lN 19. 2012, y:E9 A)M
UEL ALHRM
W-1 19. 2012' 9:54
UT HL.,F.,(,l
8. 2010 .3: C.5 Pt"I
i , f END 7-. , * * k
H I ST(__)R"i REF ORT
EI-)SOR
L 6:
OTHER SE1,12joRS
x. X * END x. * *. -
x )- * * END X ;- . * *
ALr`iRrI HI'STOR"I" REP,:_>RT
HLAR11 HISTW ' REP-',,RT
HLhRPlI HISTOP"Z REPC,,RT
L 3:87-1 STP
STP SUMP
STP 'SUt"IP
DISPENER., PAN
SENSOR
L I: D ISP I
p,Fj,j:op OUT HLHPIvI HI'l DISPENSER PIA11.1
JAI'l 19. 2012 g:!S,-) SENSC)R' OUT AL Rtl
jAj-4 19, 2012 9:53 All FUEL ALARM
JAN 19. 201 ICI:46 "'M
FUEL ALARM
DEC 8- SEP4SOR OUT ALARM
4. '201'", Jw,) 1SA( °1 SENSOR OUT (iD(iRM
SP-ISOR OUT HI-HRI"I ji4i 19. 21012 10:41 AP11
DEC 8• '2010 3:05 FUEL ADARll
JAI,.i 19, '201,2 I0::,6 Wl
x )- * * END X ;- . * *
ALr`iRrI HI'STOR"I" REP,:_>RT
END
x x * * END * ;- * 3k _
HLAR11 HISTW ' REP-',,RT
L 4:91 STP
STP SUMP L ":DISP `-4
SENSOR OUT
2012 9:59 DISPENER., PAN
SENSORI'D. OUT
JAN 19, 120112, 9:51; k1l
FUEL j)LARI'l
jAj-4 19, 2012 9:53 All FUEL ALARM
JAN 19. 21F112 9:55 AM
DEC 8- SEP4SOR OUT ALARM
DEf, S. 2010 3:05 Pf")
END
x x * * END * ;- * 3k _
i-iL4211 H! 2',T RLr G+.'T
L IS : 87 -2, STP
STF, .-IIAIP
Er0R OUT AI
DEC S. 20ICl 3: C15 f 1.1
FUEL. HL-HRI-I
EjEc: 8. 2010 1 :2a PM
FUEL iLii-ARl-)
1109 2,
11.
2009 l2 :sa 2H
t
fil-H.F.111
L ILsrpEllSPEII'SER PrIHTPSUMP
SEAC)IR OUT r-IL"R11,11 DEC e, 2010DLB. Hilo 5
FfJEl- D e, . L'fj I f IDEC', 8 2010 ul-I 119
FLIEL ALRT-1 MAR 24. 20101- 23 - - - 1 -A .- 21-HY:i 9:47 AII
fil-H.F.111
END
ALA II NlSTO REP)R-r
L I
4:91 STP
Ell SPEII'SER PrIH
sUMP
DEC e, 2010 2:135 I-TI
FUEL ALHRII
HDARII
D e, . L'fj I fI
P, 20]o I
FUEL f-1
MAR 24. 2010
23- 2000 12:5i PG
END
ALA II NlSTO REP)R-r
ENE'
i-iDAPrl REPaF.
L 2:1-118P
jlS*F,Ef*-I':,-,ER PW-I
OUT HDGRPI
DECI D - -I --, : ol, F-1-12clIL
F U PI.
I i Ell': 8. 2010 2 :G7 FTI
w * .1 F'j"I[l * * * * +
L I
Ell SPEII'SER PrIH
DEC e, 2010 2:135 I-TI
FUEL ALHRII
D e, . L'fj I fI 2 :59 Ff-lj
FUEL r,-iLHR,,pq
MAR 24. 2010 a :25 P-1
ENE'
i-iDAPrl REPaF.
L 2:1-118P
jlS*F,Ef*-I':,-,ER PW-I
OUT HDGRPI
DECI D - -I --, : ol, F-1-12clIL
F U PI.
Ii Ell': 8. 2010 2 :G7 FTI
w * .1 F'j"I[l * * * * +
SWRCB, January 2006
Spill Bucket Testing Deport Form
Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and
printouts from tests (ifapplicable), should be provided to thefacility owner /operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Hp Go -Go Date of Testing: 01/19/2012
Facility Address: 3301 Wible Road, Bakersfield, CA
Facility Contact: Alondra Hernandez Phone: 661- 835 -8044
Date Local Agency Was Notified of Testing : 12/28/2011
Name of Local Agency Inspector (ifpresent during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services, Inc.
Technician Conducting Test: Doug Young
Credentials: M CSLB Contractor x ICC Service Tech. 0 SWRCB Tank Tester Other (Spec)
License Number(s): CSLB# 804904 ICC# 8043499 Tank Tester #90 -1076
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: 121 Hydrostatic Vacuum Other
Test Equipment Used: Lake Test Equipment Resolution: 0.0625"
Identify Spill Bucket (By Tank
Number, Stored Product, etc.)
1 Regular #1 2 Premium 3 Regular #2 4
Bucket Installation Type: Direct Bury
x Contained in Sump
Direct Bury
x Contained in Sump
Direct Bury
O Contained inSump
Direct Bury
Contained in Sum
Bucket Diameter: 12" 12" 12"
Bucket Depth: 13.25" 12.75" 12.75"
Wait time between applying
vacuum /water and start of test: 5 Min. 5 Min. 5 Min.
Test Start Time (Ti): 9: I Oam 9: l Oam 9: I Oam
Initial Reading (Rj): 10.50" 10.00" 10.25"
Test End Time (TF): 10: l oam 10: l Oam 10: l oam
Final Reading (RF): 10.50" 10.00" 10.25"
Test Duration (TF — Ti): 1 hour 1 hour 1 hour
Change in Reading (RF - Rj): 0.00" 0.00" 0.00"
Pass /Fail Threshold or
Criteria: 0.0625" 0.0625" 0.0625"
Test Result: x Pass Fail Pass Fail x Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -up for failed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the inLormatipn contained in this report is true, accurate, and infull compliance with legal requirements.
Technician's Signature: Date: 01/19/2012
State laws and regulations do not Vrrently reyire testing to be performed by a qualified contractor. However, local requirements
may be more stringent.