Loading...
HomeMy WebLinkAbout3333 UNION AVENUE (2)SWRCB, January 2002 Secondary Containment Testing Report, Form P255 -, CID o Page of l Thisform is intendedfor use by contractors performingperiodic testing of USTsecondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY TNFORMATTON Facility, Name: JOHNNY'S ARCO Date ofTesting: 6/9/11 Facility Address: 3333 UNION AVENUE, BAKERSFIELD Facility.` Contact: Phone: Date Local Agency Was Notified of Testing: 4/28/11 Name of Local Agency Inspector (rfpresera during testing): 2. TI.RWNG C'ONTRAC'TOR INFORMATION Company Name: Rich Environmental Pass Technician Conducting Test: RICH PHILLIPS Not Tested Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type: C61/1340 A HAZ Manufacturer License Number. 809850 Manufacturer Training Component(s) Date Training Expires INCON TS -STS 6/11/2012 89 ANNULAR X 89 FILL SUMP 3. SITMMARV OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not. Tested Repairs Made 89 ANNULAR X 89 FILL SUMP X 87 MASTER ANNULAR X 87 MASTER FILL SUMP X 87 SLAVE ANNULAR X 0 87 SLAVE FILL SUMP X 91 ANNULAR X 91 FILL SUMP X1 1 89 SECONDARY X p 89 VPR BUCKET X 87 MASTER SECONDARY X 0 87 MASTER VPR BKT X 0 87 SLAVE SECONDARY X 87 SLAVE VPR BKT X 0. 91 SECONDARY X 0 91 VPR BUCKET X DISP #1/2 X o 89 PIPING SUMP X DISP #3/4 X 87 MASTER PIPE SUMP X DISP #5/6 X 87 SLAVE PIPE SUMP X DISP #7/8 X1 191 PIPING SUMP X If hydrostatic testing was performed, describe what was done with the water after completion oftests: CERTIFICATION OF 'I To the best ofmy knowledge, thefacts OttAN RESPONSIBLE FOR CONDUCTING THIS TESTING in this document are accurate and infull compliance with legal requirements Technician's Signature: // Date: 6/9/11 SWRCB, January 2002 4. TANK ANNULAR TESTING Page —L of I Test Method Developed By:. Tank Manufacturer X Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure X Vacuum Hydrostatic D Other (Spec) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: Tank #89 Tank 987 MASTER Tank #87 SLAVE Tank #91 is Tank Exempt From Testing ?' Yes X No Yes X No D Yes X No Yes X No Tank Capacity: IOK IOK IOK IOK Tank Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Tank Manufacturer: UNKNOWN UNKNOWN UNKNOWN UNKNOWN Product Stored: UNL89 UNL87 UNL87 UNL91 Wait time between applying pressure /vacuum/water and starting test: 30MIN 30MIN 30MIN 30MIN Test Start Time: 9:30 9:30 11:00 12:30 Initial Reading (R,): IOHG IOHG IOHG I0k,G Test End Time: 10 :30 10:30 12:00 1:30 Final Reading (RF): lOHG IOHG 10HG IOHG Test Duration: 60 MIN 60 MIN 60 MIN 60MIN Change in Reading (RrR,): 0 0 0 0 Pass/Fail Threshold or Criteria: 0.00 0.00 0.00 0.00 itX i; N 1 zN, - j., r _ ,:,Il cs:•;.'.k'' Was sensor removed for testing? X Yes D No D NA " X Yes D No DNA X Yes No D NA X Yes No NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes No NA X Yes No NA XYes No NA Comments — (include information on repairs made prior to testing and recommendedfollow -upforfailed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 5. SECONDARY PIPE TESTING KZ523* Page of) J C Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer Other (Specify) Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic Other (Sped) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5% Piping Material: Piping Run #89 Piping Run #871 xW Piping Run #87S Piping Run 491 FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer. SMITH SMITH SMITH SMITH Piping Diameter: 3" X' 3" 3" Length ofPiping Run: 75' 75' 10' 75' Product Stored: UNL89 UNL87M UNL87S UNL91 Method and location of piping-ran isolation: TEST BOOT TEST BOOT TEST BOOT TEST 900T Wait time between applying pressure /vacuum/water and starting test: 30 MIN 30 MIN 30 MIN 30 MIN Test Start Time: 9:45 9:45 11:30 9:45 Initial Reading (Rj): 6.0 6.0 5.5 6.2 Test End Time: 10:45 10:45 12:30 10:45 Final Reading (RF): 6.0 6.0 5:5 6.2 Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN Change in Reading (RF -R4): 0 0 0 0 Pass/Fail Threshold or Criteria: 0 PSI 0 PSI 0 PSI 0 PSI T; Opp lip R. Comments — (include information on repairs made prior to testing, and recommendedfollow -yforfailed tests) SWRCB, January 2002 6. PIPING SUMP TESTING Page #_ of Test Method Developed By: p Sump Manufacturer X Industry Standard Professional Engineer D Other (Specto) Test Method Used: D Pressure, 0 Vacuum X Hydrostatic 0 Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: Sump Diameter. Sump 989 Sump #87M Sump #87S Sump #91 36" 36" 36" 36" Sump Depth: 72" 72" 72" 72" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of Highest Piping Penetration: 25" 25" 25" 25" Height from Tank Top to Lowest Electrical Penetration: 24" 24" 24" 24" Condition ofsump prior to testing: GOOD GOOD GOOD GOOD Portion of Sump Tested' 2T' 17 27" 2T' Does turbine shut down when sump Sens, or detects liquid (both product and water)?' 0 Yes DNo XNA 0 Yes DNo XNA D Yes D No XNA Yes No XNA Turbine shutdown response time Is system programmed for fail safe shutdown ?' 0 Yes DNo X NA D Yes No XNA D Yes 0 No XNA 0 Yes DNo XNA Was fail-safe verified to be o rational ?' 0 yes DNo XNA Yes DNo XNA 11 Yes DNo XNA 0 Yes DNo XNA Wait time between applying pressure/vacuum/water and starting test: 30 MIN 30 MIN 30 MIN 30 MIN Test Start Time: 1:24 1:56 1.09', 1:24. 1:07 1:24 2:23 2:40 Initial Reading (Rj): 2.753 8.082 3.784 3.784 3.875 3.875 4.615. 4.615 Test End Time: 1:40 2:11 1:22 1:40.. 1:22 1:40 2:39 2:55 Final Reading (RF): 2.753 8.802 3.784 3.784 3.875 3.875 4.615 4.615 Test Duration: 15MIN I5MIN 15M1N 15MIN 15MIN 15MIN 15M1N 15MIN Change in Reading (RF -Ri): OOQ OQO 000 OQO 000 000 000 -.000 Pass/FailThreshold or Criteria 002 -.002 002 002 002 002 002 -.002 r ,t,/l$i. t: 1 fL is Was sensor removed for testing? X Yes 0 No D NA X Yes DNo ONA X Yes DNo D NA X Yes 0No DNA Was sensor properly replaced and verified functional after testing? X Yes 0 No DNA X Yes DNo DNA X Yes DNo DNA X Yes 0No DNA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Ifthe entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to gay ofthe questions indicated with an asterisk (*) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) . U o SWRCB,1January 2002 Page of 7_ ITN ER- i1ICPFNCF.R rnNTAINMF.NT amn TESTING. Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer D Other (Specify) Test Method Used: D Pressure Vacuum X Hydrostatic Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: UDC #112 UDC #3/4 UDC #5/6 UDC #7/8 ufacturer: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS rial: 77D UNKNOWN UNKNOWN UNKNOWN UNKNOWN he 10" 10" 10" 10" Height from UDC Bottom to Top ofHighest Piping Penetration: 0 0 0 0 Height from UDC Bottom to Lowest Electrical Penetration: 0 0 0 0 Condition of UDC prior to testing: GOOD GOOD GOOD GOOD Portion ofUDC Tested 7" T' 7" T' Does turbine shut down when UDC sensor detects liquid (both product and water )?` Yes No X NA Yes DNo X NA D Yes No XNA Yes No X NA Turbine shutdown response time Is system programmed for fail- safe shutdown? D Yes 11 No X NA Yes No X NA D Yes No XNA Yes No X NA Was fail -safe verified to be operational?* Yes No X NA Yes D No X NA 11 Yes No X NA Yes No X NA Wait time between applying pressure/vacuum/water and starting test 30MIN 30MIN 30MIN 30MIN Test Start . Time: 3:35 3:52. 3:35 3:52 3:35 3:52 3:35 3:52 Initial Reading 4.216 4.216 2.641 2:642 2.858 2.859 3.590 3.591 Test End Time: 3:50 4:07.. 3:50 4:07. 3:50 4:07 3:50 4:07 Final Reading (RF): 4.217 4.216 2.642 2.642 2.858 2.859 3.391 3.591 Test Duration: 15MIN 15MIN ISMIN 15MIN 15MIN 15MIN 15MIN 15MIN Chan a in Readin RF -Rj): 001 -.000 001 000 000 000 001 000 Pass/Fail Threshold or Criteria: 002 -.002 002 1 .002 002 002 002 002 7r lIt T' . .;,`i .fi ., .•i.. t i 7 ., , ,ir 01131* 114 AN No DNA i• ; -:;;i i::i• X Yes No NAWassensorremovedfortesting? X Yes D No DNA X Yes No NA X Yes Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes D No D NA X Yes No NA X Yes No NA Comments - (include information on repairs madeprior to testing, and recommendedfollow -upfor ailed tests) Ifthe entire depth ofthe UDC is not tested, specify how much was tested. If the_ answer to My ofthe questions indicated with an asterisk (") is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG460) SWRCB, January 2002 8. FH L RISER CONTAINMENT SUMP TESTING e 4-u o U Page __ of *r7 T Facility is Not Equipped With Fill Riser Containment Sums 0 Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: D Sump Manufacturer X Industry Standard 0 Professional Engineer 0 Other (Spec) Test Method Used: D Pressure D Vacuum X Hydrostatic 0 Other (Spec) Test Equipment. Used: INCON TS -STS Fill Sump #89 Fill Sum #87M Sump Diameter. 42" 42" Equipment Resolution: Fill Sump #87S Fill Sump #91 42" 42" Sump Depth: 72" 72" 72" 72" Height from Tank Top to Top of Hi hest Piping Penetration: 0 0 0 0 Height from Tank Top to Lowest Electrical Penetration: 0 0 0 0 Condition of sump prior to testing:, GOOD GOOD GOOD, GOOD Portion: of Sump Tested 12" 12" 12" 12" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying pressure /vacuum/water and starting test: 30MIN 30MIN 30MIN 30MIN Test Start Time: 12:10 1229 10:43 11:13 10:43 11:13 12:29 1:07 Initial Reading 3.345 3.345 3.788 3.792 7.507 3.792 3.131 3.129 Test.End Time: 1225 12:44 10:58. 11 :28 10:58 11:28 12:44 1:22 Final Reading (RF ): 3.345 3.345 3.790 3.792 7.507 3.792 3.130 3.129 Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Chan a in Reading F-R,): 000 =.000 002 000 000 000 000 Pass/Fail Threshold or Criteria:. 002 -.002 002 002 002. 002 0;02 002 M Iola ill, Oo Is there a sensor in the sump? X Yes 0 No X Yes D No X Yes D No X Yes D No Does the sensor alarm when either product or water is detected? D Yes 0 No XNA D Yes 0 No X NA 0 Yes D No X NA 0 Yes D No X NA Was sensor removed for testing? X Yes D No 0 NA XYes 0 No DNA X Yes 0 No D NA X Yes D No 0 NA Wassensor properly replaced verified functional after testing? X Yes 0 No DNA. X.Yes ONO DNA X Yes D No DNA X Yes D No DNA Comments —(include information on repairs made prior to testing and recommendedfollow -upforfailed testy) SWRCB, January 2002 9. SPILIJOVERFILL CONTAINMENT BOXES Page a of ' Facility,is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: 0 Spill Bucket Manufacturer X.Industry Standard Professional Engineer C Other (Spec) Test Method Used: p Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: Spill Box #VPR 89 Spill Box #VPR 87M Spill Box #VPR 87S Spill Box #VPR 91TWaftiameter: 12" 12" 12" 12" epth: 14" 14" 14" 14" between applying pressure/vacuum /water and starting test: 30MIN 30MIN 30MIN 30MIN Test Start Time: 10:02 10:20 10:02 10:20 10:02 10:20 10:20 10:43 Initial Reading (111): 3.588 3.587 5.159 5.158 7.449 7.507 7.212 4.810 Test End Time: 10:17 10:36 10:17 10:36 10:17 10:36 10:36 10:58 Final Reading (RF): 3.588 3.587 5.159. 5.158 7.450 7.507 7.213 4.810 Test Duration: 15MYN 15NUN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RF -Ri): 000 -.000 000 000 001 000 00I 000 aGsDs/Fail Threshold or Criteria: 00200, 0 2 00 J2 0,0en2 0' i0'.. 2 002 002 002P1 / 1 2Uu tt-f.. . . PFltr• WN t t.l ' # i•,. •. n t A' ',. a y. Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) QPw :BUCKETS aONNYS ARCO 3 UNION .AVE RAKERSFIELD CA JONNYS ARCO 3333 UNION AVE 1,.36 AM BAKERSFIELD CA 71 IMP LEAK TEST REPORT 06/09/2011 10:17 RM 89UPR SUMP L AK TEST REPORT 7 GTARTED 10:20 AM 89UPR STARTED 05/09%20INLEVEL3.587$_,.tr +` " TEST STARTED 10:.201MSTARTED06-'09 END TIME END DATE i0:3 q 06i090II1NN1 ENDTEST BEGIN LEVEL 3io.1 IN LEVEL LEAK THRESHOLD 38.001 IN END TIME END DATE. 06/09i20 TEST RESULT PASSED END LEVEL 3.5$81 LEAK THRESHOLD 0.00PA 87MUPR TEST RESULT TEST STARTED 10:2g p q TEST STARTED 06r1109f20IIiMM1S7MUPRGIEL5105 TEST STARTED 1002 1A1M1 TEST 0S 9y IN END TIME 06/ 1111 END DATE .158 TN ESIN LEVEL THRESHOLD 9.7 END TIME 06/09/201M EST END DATE END LEVEL 5,1 N6 sTHRSHOLDLEAKPASSED TEST RESULT 87SUPR TEST STARTED 10:20 AM 87SUPR TEST BEGINLEVE STARTED 06./09/ 07 1 4 iN TEST STARTED 10:0? Ah 06A 01 END TIME 10:3§ 2 RtqENDDATE06/091 01,1. TEST STARTED 7.449 N BEGIN LEVEL 10.11 fiM END LEVEL 7.50 rIN LEAK THRESHOLD 0,002 IN END TIME 11 END DATE 07 0 IN TFPT aF I.ILT PASSED END LEVEL 4 2 LEAK THRESHOLD 0 •SS 91t)PR TEST RESULT TF?T 'STARTEb 26 q 9i2e11TESTSTARTED 06i1 BEGITIME EL 7101W.TANM LEI DATE 06i09/2011 7.2133 IFIENDLEVEL LEAK THRESHOLD 0. 5TESTRESULT 91FILS TEST STARTED 12:29 P TEST STARTED 009/201 BEGIN LEVEL 3113,10 ND TIME i1ENDDATE06/09/33 END LEVEL PSSLEAKTHRESHOLD0• SSTESTRESULT JONNYS ARCO 3333 UNION AVE BAKERSFIELD CA 06/09/2011 1:22 PM LIMP LEAK. TEST REPORT 89STP TEST STARTED 1:07 PM TEST STARTED 06/09/2011 BEGIN LEVEL 2.71:2257 Ph END TIME END DATE 06/079 0 END LEVELLEAKTHRESHOLD 0.002 TEST RESULT 87MSTP TEST STARTED i:07 PM TEST STARTED 06/09 BEGIN LEVEL 3.784ENDTIME 1ENDDATE END LEVEL 96/09/20 IN3.7845 INLEAKTHRESHOLD0.002 TEST RESULT PASSED 87SSTP- TEST STARTED 1:07 PM TEST STARTED 06/09/2011 BEGIN LEVEL 3.0752 IN MiENDTIME END DATE 030097520 END LEVEL yyOAKTHRESHOLD0.-002PASEOTESTRESULT 91FILS TEST STARTED 1:07 PM TEST STARTED 06/09/201, BEGIN LEVEL END TIME 3.1295 MPI. ,jqENDDATE0 END LEVEL .2 I LEAK THRESHOLD 30100 IN TEST RESULT PASSED ., JONNYS ARM 3333.UNION AVE BAKER•SFIzLD: CA 06/09/2011 12:25 PM SUMP LEAK TEST REPORT 39FILS TEST STARTED 12:10. PM TEST STARTED 06/09/2011' BEGIN LEVEL 3.3459 IN END TIME 12 :25 PM END DATE 06/09/20 END LEVEL 3.3459 INNLEAKTHRESHOLD0.002 TEST RESULT fJONNYS ARCO 3333 UNION AVE BAKERSFIELD CA 06/09/2011 12:45 PM SUMP LEAK TEST REPORT 89FILS TEST STARTED 12:29 PM TEST STARTED 06/09/201111 BEGIN LEVEL 3.3459 IN END TIME 12:44 Ph END DATE 06/09/201 END LEVEL 3.3459 IN LEAK THRESHOLD 0.002 IN t TEST RESULT PASSED 87MFILS TEST STARTED 11:13 AI TEST STARTED 06/09/201 BEGIN LEVEL 3.7925 IN END TIME 11:28 AM END ,DATE . 06/09/201111 END fiVEL 3.7928 IN LEAK THRESHOLD 0.00 TESTTEST RESULT PASSED 87SFILS TEST STARTED 11 :13 AM TEST STARTED 06/09/20 }11 BEGIN LEVEL 4.814 N END TIME 11:28 AM END DATE 06/09/2011 END LEVEL 4.8113 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED S7MFILS, TEST STARTED 10:43 AM TEST STARTED 03$ INBEGINLEVEL END LEVEL OLD $%J-SED0 • PLEAK END TIME pM 09A01.1 END LEVEL 3.79gg IIN LEAK THRESHOLD 8.00G IN TEST RESULT I 7SFILS TEST STARTED TEST STARTED 1b :'' 06/09/ 0 BEGIN LEVEL 7irENDTIME END DATE 06/ b7. END LEVEL OLD $%J-SED0 • PLEAK TEST RESLT PASSED 91VPR TEST STARTED TEST STARTED 1043 AM 04 g160IN BEGIN LEVEL END TIME 100:95 110ENDDATE END LEVEL. 0/ 09 4 8 r^" THRESHOLD TEST.- RESULT i, PASSED JONAyS ARCO 3333 UNION AVEBAKERSFIELDCA 06/09/2011 2:39 PM SI 1Mr' ;EAK TEST REPORT g9STP JONNYS ARCQ 3333 UNION HUE ST STARTED 2:23 PP1 BAKERSFIELD CA TEST STARTED 06/09/20} 5.0821 06/09/2011 2,11 Phi' JONNVS ARGO LEVEL 3333 UNION AVEENDTIME9q 06/09/2011f1 SUMP LEAK TEST REPORT BAKERSFIELD CA END DAE END "L THRESHOLD $60 IN 89STR 06/09/2011 1.40 PM TEST RESULT PASSED 1 ;S pTESTSTARTEDt 09A011 cis•• _ERK TEST REPORT 87MSTP 06TESTSTARTED / BEGIN LEVEL 8.0811 Ph1 ggSTP EST STARTED 2:23 PMM END TIME 061ENDDATE0820I8• 0 TEST cTRP,TED 1:24 PM TEST.STARTED 06/Qr9/ 01TESTSTARTED TNT EVEL 06/09/2011 0. 39 I P ENp LEVEL IHLERKTHRESHOLD0• PASSED BFr_,TKI LEVEL 2. r5 I END Tr{E 1.4gg END TEST RESULT END DATE 06/09/20 ND SATE r n EL 06/09/011 0.0000 IPA END 1FUEL 2.753?g NTHRESHOLD0.004 hJ EPI' THRESHOLD 0. TEST RESULT P SSU 87MSTP 56 PPi; TE' T RESULT PASSED TEST STARTED 1- TEST STARTED 06/09/0} 87MSTP 87SSTP BEGIN LEVEL 0.00011 MTIME TEST STARTED 2:23 PM END 06/09/2015ENDDATE0,00 Q ST STARTED 1:211 PMV TEST STARTED 06/09/ 2011 TFc STARTEDST _ ARTED 06/09/2011 THRESHOLD 0.0 1 BEGIN LEVEL 3.784 NM1:4BEGINLEVEL END TIME 0.0000 IN 2:39 PM LERK PASSEDTESTRESULT EN^ TIME CND.naTF 06/09/2011. END DATE 06/09/2011 END LEVEL 3.784 ND LEVEL THRESHOLD 0.0000 IN 0.002 IN 6755TP LEAK THRESHOLD 0.002SBTESTRESULTPAEAK, EST RESULT PASSED TEST STARTED 1:56 PM 0f,/09/201NTESTSTARTED LEVEL 0.01 PM 87S5TP 91STP BEGIN END TIME 2'111 END DATE 0 900 TEST STARTED 1:24 PM EST STARTED TEST STARTED 2:23 PM 06/09/'L011 END LEVEL 0. PA25S } THRESHOLD ED TEST STARTED 66/89/ 0 D. ITIMEUEL 3.8 3EGIN LEVEL ND TIME 4.6155 IN 2:39 PM LEAK TEST RESULT Pppqq END DATE 06/09011 ND DATE ND LEVEL 06/09/2011 4.6153 IN i END-LEVEL 3.87.8g LENK.THRESHOLD 0.092 YIN EAK THRESHOLD 0.082 INPASSED TEST RESULT PASSED TEST RESULT 91FILS TEST STARTED 1:21 P TEST STARTED Or-/09/7011 BEGIN LEVEL 3. 140 °MEND:_TIME g11END•.DATE 030925 INENDLEVEL LEAK THRESHOLD 0. TEEM RESULT co3 JONNYS ARCO JFJNN4`S ARCO _. -- 3333 UNON PAKERSFIELD AVE 3333 UNION AVE' J ARCO BAKERSFIELD,CA 33333 NYS UNION AVE 06/091-11011 4:07 PM BAKERSFIELD CA 06/09/2011 3 :- 5 PM LEAK TEST REPORT 06/09/2011 2:55 PM SUMS !_E SUMP LEAK TEST REPORT SUMP LEAK TEST REPORTDISP1-2 DISP1-2 8957P TEST STARTED 3 :52 PM TFST STARTED 06/09/ TEST STARTED 3:35 Pt9 r_ 8 TEST STARTED 06/09/2011 TEST STARTED 2 :40 PMEUEL4,215 BEGIN LEVEL 4.2168 IN I TEST STARTED 06/09/2011END ^TIME 4:07 PM END TIME 3 :50 PM BEGIN LEVEL 8.0825 IINEke^ 'TF 06/09/2011 END DATE 06109f20 11 END TIME 2 :55 PM LEW THRESHOLD 4.2169 IN END LEVEL 4.2171 i N END END °EVE. 06,09/20 § T TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST HRSEESTOLD 0.00A 1 DISPY -4 DISP3 -4 7MSTPTESTSTARTED3;52 PM TEST STARTED 3 :35 PMTESTSTARTED06/09/2011 TEST STARTED 06/09/ 8 i TEST STARTED 2:40 PMBEGINLEVEL2,6424 IN 8EGIN.LEVEL 2.641 I TEST STARTED 06/09/ END TIME 4 :0? PM END TIME 3:50 PMiTE BEGIN LEVEL 0.000 END LEVEL 06''09/2011 END DATE 06/09/2011 END TIME IN 2:5 P1 2.6425 IN END LEVEL 2.642,3 N END DATE. 06/09 01- LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 N END LEVEL 0.0000 INTESTRESULTPASSEDTESTRESULTPASSEDLEAKTHRESHOLD0.002 IN TEST RESULT PASSED DISPS -6 DISP5-6 87SSTP TEST STARTED 352 PM Q TEST STARTED 335 PMTESTSTARTED06/09/2011 TEST STARTED 06/09/2011 TEST STARTED _ 2:40 PM BEGIN LEVEL 2,8590 IN BEGIN LEVEL 2.85$2 IIN TEST STARTED 06/09/2011 END TIME 4:07 PM END TIME 3:.50 PM BEGIN ILEVEL 0.020 PMENDDATEENDDATE06/09/2006/09/20// 1111 END DATE 06/0911ENDLEVEL2.8590 IN END LEVEL 2.8589 8 SIN END LEVEL 0.000 IN TEST RESULTOLD O. PASSEO TEST RESULT 6. PASSED LEAK THRESHOLD 0.00 IINN TEST RESULT WS DISP7 -8 DISP7 -8 91STP TEST STARTED 3;52 TEST STARTED 3:35 PM _ TEST STARTED 06/09/2011 TEST STARTED 06/0901111 TEST STARTED 2 :40 PM BEGIN LEVEL 3.5915 IN BEGIN LEVEL 3.590$— TEST STARTED 06/09/2011 END TIME 4:07 PM END TI 3:5 P q BEGIN LEVEL 4.6153 IN END DATE 06/09/2011 END DA 06/09/2011 END.TIME 2:5. Pq END LEVEL 3.5916 IN 3.5913 IN END DATE 06/09/2011 LEA '7 SHOLD 0.002 IN END LEVEL 4.6152 jNLEAKTHRESHOLD0.002 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 NTESTRESULTPASSEDTESTRESULTPASSED SB989 TESTING FAILURE REPORT THE FOLLOWING COMPONENTS WERE REPLACED /REPAIRED TO COMPLETE TESTING. REPAIRS: LABOR: PARTS INSTALLED: NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR CONVIENENCE. .