HomeMy WebLinkAbout3460 SILLECT AVENUESWRCB January 2002 Page of
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing of USTsecondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested The completedform, written testprocedures, and
printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Technician Conducting Test: JAMES J RICH
Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester
License Type: C6 iD40 A HAZ License Number: 809850
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON TS -STS 6/25/2014
3. SUMMARY OF TEST RESULTS
Component
Facility Name: ORANGE BELT STAGES I Date ofTesting: 6/25/12
Facility Address: 3640 SILLECT AVENUE, BAKERSFIELD
Facility Contact: Phone:
Date Local Agency Was Notified of Testing:
Name ofLocal Agency Inspector (ifpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Technician Conducting Test: JAMES J RICH
Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester
License Type: C6 iD40 A HAZ License Number: 809850
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON TS -STS 6/25/2014
3. SUMMARY OF TEST RESULTS
Component UP111A NI
0000; nninnn
SECONDARY nuo noon
nnn n; aoAO
nno
nnn nnmo
ninnnn r.nnntn
mom
If hydrostatic testing was performed, describe what was done with the water after completion oftests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts stated in this document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 6/25/12
7 /
SWRCB, January 2002
4. TANK ANNULAR TESTING
06x54
J
Page 1Yof I
Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer
Other (Sped)
Test Method Used: Pressure X Vacuum Hydrostatic
Other (Sped)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution:
Tank # DIESEL
Is Tank Exempt From Testing ?` X Yes No
Tank # Tank # Tank #
Yes No Yes No Yes No
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF -Rj):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? yes No NA rOYes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor failed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)1
SWRCB, January 2002
5. SECONDARY PIPE TESTING
4b95q //
Page 3 of I
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: X Pressure 0 Vacuum Hydrostatic
Other (Sped)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run # DSL
Piping Material: FIBERGLASS
Piping Run # Piping Run # Piping Run #
Piping Manufacturer: AO SMITH
Piping Diameter. 2"
Length ofPiping Run: 20'
Product Stored: DIESEL
Method and location of
i in -run isolation: TEST BOOT rN STP
Wait time between applying
pressure/vacuum/water and
starting test:
30 MIN
Test Start Time: 10:00
Initial Reading (Rz): 5
Test End Time: 11:00
Final Reading (RF): 5
Test Duration: 60 MIN
Change in Reading (RF -R,): 0
Pass/Fail Threshold or
Criteria: 0
Test Result: X Pass 0 Fail Pass Fall. 0 Pass 0 Fail Q Pass 0 Fail
COMMentS — (include information on repairs made prior to testing, andrecommendedfollow -upforfailed tests)
SWRCB, January 2002
6_ PIPING SITMP TF.9T1NG
4b0v5q
Page q ^ / of L
Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure D Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Sump # DSL Sump # Sump # Sump 4
Sump Diameter. 36"
Sump Depth: 36"
Sump Material: FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration: 20"
Height from Tank Top to Lowest
Electrical Penetration: 36"
Condition ofsump prior to testing: CLEAN
Portion of Sump Tested' 50%
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?*
X Yes 0 No NA Yes No D NA Yes D No NA Yes No NA
Turbine shutdown response time 2SEC
Is system programmed for fail -safe
shutdown? X Yes D No DNA Yes No NA 0 Yes D No NA D Yes 0 No DNA
Was fail -safe verified to be
operational?*
X Yes No NA D Yes No NA D Yes D No NA 0 Yes No NA
Wait time between applying
pressure/vacuum /water and starting
test:
30 MIN
Test Start Time: 10:47 11:04
Initial Reading (Rj): 2.491 2.491
Test End Time: 11:02 11:19
Final Reading (RF): 2.491 2.492
Test Duration: 15MIN 15MIN
Change in Reading (RF -RI): 000 001
Pass/FaiI Threshold or Criteria: 002 002
Test Result: X Pass D Fail l Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? X Yes No D NA D Yes D No D NA D Yes D No D NA D Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes No NA C1 Yes No 0 NA D Yes =No(] D Yes D No NA
Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January Page2002 of lg
7. UNDER-DISPENSER CONTAINMENT C TESTING
Test Method Developed By: UDC Manufacturer X Industry Standard D Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Q Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC # DSL
UDC Manufacturer: UNKNOWN
UDC # UDC # UDC #
UDC Material: FIBERGLASS
UDC De the 36"
Height from UDC Bottom to Top
of Highest Pi2ing Penetration:
20"
Height from UDC Bottom to
Lowest Electrical Penetration:
30"
Condition of UDC prior to
testing:
GOOD
Portion ofUDC Tested 90%
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Yes D No X NA Yes No NA 0 Yes No DNA Yes 0 No D NA
Turbine shutdown response time N/A
Is system programmed for fail-
safe shutdown ?* D Yes No XNA D Yes No DNA D Yes No NA Yes No DNA
Was fail -safe verified to be
operational?'
Yes No XNA D Yes DNo DNA Yes No NA Yes No D NA
Wait time between applying
pressure /vacuum/water and
starting test
30MIN
Test Start Time: 11:33 12 :08
Initial Reading (R1): 2.606 2.600
Test End Time: 11:48 12:23
Final Reading (Rr): 2.604 2.599
Test Duration: 15MIN 15MIN
Change in Reading RF-Ri : 002 001
PassNail Threshold or Criteria: 002 002
Test Result: X Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? X Yes 0 No NJAYesCNo NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes No D N Yes D No DNA D Yes D No NA Yes D No D NA
Comments — (include information on repairs madeprior to testing, andrecommendedfollow -upforfailedtests)
1 Ifthe entire depth ofthe UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an
asterisk (*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January e2002Pa ofPage
8. FELL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps D
Fill Riser Containment Sumps are Present, but were Not Tested
Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Fill Sum # Fill Sump # Fill Sump # Fill Sump #
Sump Diameter:
Sump, Depth:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressurelvacuum/water and
starting test:
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading- (RF-R,):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail D Pass Fail
Is there a sensor in the sump? Yes No Yes No Yes No Yes No
Does the sensor alarm when
either product or water is
detected?
Yes D No NA D Yes No DNA Yes No NA Yes No NA
Was sensor removed for testing? Yes No NA Yes No DNA Yes No NA D Yes D No NA
Was sensor properly replaced and
verified functional after testing? Yes No D NA Yes []No NA Yes DNo NA Yes No DNA
Comments — (include information on repairs made prior to testing and recommendedfollow -upforfailed tests)
NO FILL SUMPS
SWRCB, January 2002
9. SPILL/OVERFILL CONTAINMENT BOXES
Page 7 of
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Spill Box #
Bucket Diameter.
Spill Box # Spill Box # Spill Box #
Bucket Depth:
Wait time between applying
pressure/vacuum /water and
starting test:
NOT TESTED
Test Start Time:
Initial Reading (R,):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF -R4):
Pass/Fail Threshold or
Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor ailed tests)
TESTED WITH MONITOR CERTIFICATION
q6`"4
ANr,E
3 SELT STAG S540SILLECTAO
1WERSFIELD CA ORANGE BELT STAGES ORANGE BELT STAGES1- 800 - 984`6266 7640 SILLECT AVE 3649 SILLECT AVE
06/25x2012 11: @? AM 1-800-984-6266
CA !3AKERSFIFLD CA
1- 800 -984 -6266 1- 800 - 984 -6266
SUMP LEAK TEST REPORT 06/25/2012 12:04 PM 06/25/2012 11:48 AM
DSL -1TP SUMP LEAK TEST REPORT SUMP
Z f
7-ST ORT
TEST STARTED 10:47 AM AIL -BKT
TEST STAR. TECG 06/25/2012
BEGIN LEVEL 2.4915 IN TEST STARTED 11:49 AM TEST,.STARTED .11:.33 AM .
END TIME 11:02 AM TEST 'STARTED 06/25/2012 TEST SthKYED '6i25f 612ENDDATE06/25/2012 BEGIN LEVEL 2.2986 IN BEGIN LEVEL 2.2983 INENDLEVEL2.4914 IN END TIME 12:04 PM END TIME 11:48 AMLEAKTHRESHOLD0.002 IN END DATE 06/25/2012 END'DATE 06/25/2012TESTRESULTPASSEDENDLEVEL2.29:36 IN END LEVEL 2.2987 IN
LEAK. THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED TEST RESULT PASSED
DSL -UDC DSL -UGC
TES STARTED 11 :49 TEST STARTED 11 :33 AM
TEST RTED 06/7 2012 TEST STARTED 06/25/2012
BEGIN LE '.6037 IN BEGIN LEVEL 2.6062 IN
ORANGE BELT STAGE:? END TIME 11:04 PM END TIME 1I:48 AM
64@ SILLECT AVE
END DA /25/2012 END DATE 06/25/2012
BAKERSFIELD GA END UEL 12 IN END LEVEL 2.6046 IN
1- 30t - °P4 -6266 LEA THRESHOLD @. I LEAK THRESHOLD 0.002 IN
TEST RESULT FAIL TEST RESULT PASSED
06/25/2012 11 :19 AM
SUMP LEAK TEST REPORT
DSL -STP
TEST STARTED 11:04 AM
TEST STARTED 06/25/2012
BEGIN LEVEL 2:4916 IN -
END TIME 11:19 AM
END DATE 96/25/2012
END LEVEL 2.4920 IN
LEAK THRESHOLD 0.002 IN ORANGE BELT STAGESTESTRESULTPASSED3640SILLECTAVE
BAKERSFIELD CA
1- 800 - 984 -6266
06/25/2012 12:23 PM
SUMP LEAK TEST REPORT
FIL -BKT
ST STARTED 12:0
TES ,TARTED 06/ 012
BEGIN EL UME ERP.
END TIME^ 12:09 PM
END DAT 06/25/2012
END L L 4E ERR
LF THRESHOLD 0. IN
ST RESULT ERROR
DSL -UDC
TEST STARTED
TEST STARTED
BEGIN LEVEL
END TIME
END DATE
END LEVEL
LEAK THRESHOL
TEST RESULT
12:08 PM
06/25/20!2
2.6009 IN
12:23 PM
06/25/2012
2.5991 IN
D 0.002 IN
PASSED
SB989 TESTING FAILURE REPORT
SITE NAME: ORANGE BELT STAGES DATE: 6/25/12
ADDRESS: 3640 SILLECT AVENUE TECHNICIAN: JAMES RICH
CITY: BAKERSFIELD SIGNATURE:
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: NONE
LABOR: NONE
PARTS INSTALLED: NONE
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.